CN212534756U - Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly - Google Patents

Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly Download PDF

Info

Publication number
CN212534756U
CN212534756U CN202020809362.6U CN202020809362U CN212534756U CN 212534756 U CN212534756 U CN 212534756U CN 202020809362 U CN202020809362 U CN 202020809362U CN 212534756 U CN212534756 U CN 212534756U
Authority
CN
China
Prior art keywords
aluminum plate
hyperboloid
hyperboloid aluminum
plate
curved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020809362.6U
Other languages
Chinese (zh)
Inventor
容文平
林永琪
彭伟龙
金武忠
陈喆
周艳华
邓勇奎
邓光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Literary Decoration Design Engineering Co ltd
Original Assignee
Shenzhen Literary Decoration Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Literary Decoration Design Engineering Co ltd filed Critical Shenzhen Literary Decoration Design Engineering Co ltd
Priority to CN202020809362.6U priority Critical patent/CN212534756U/en
Application granted granted Critical
Publication of CN212534756U publication Critical patent/CN212534756U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly, wherein, combination formula furred ceiling pendant includes main jib, mounting panel, first, secondary jib, first, second connecting piece. The mounting panel is located the one end that the roof was kept away from to main jib. The mounting plate is provided with a first transverse strip-shaped hole and a second transverse strip-shaped hole. The first-time suspender can move along the transverse direction and is arranged at different positions of the first transverse strip-shaped hole. The second suspender can move along the transverse direction and is arranged at different positions of the second transverse strip-shaped hole. The first connecting piece can vertically move and is arranged at different positions of the first suspender. One end of the first connecting piece, which is far away from the mounting plate, is used for connecting the first double-curved-surface aluminum plate. The second connecting piece can vertically move and is arranged at different positions of the second suspender. One end of the second connecting piece, which is far away from the mounting plate, is used for connecting a second double-curved-surface aluminum plate. When the ceiling hyperboloid aluminum plate is used, the position of the hyperboloid aluminum plate can be adjusted in multiple directions.

Description

Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly
Technical Field
The utility model relates to an architectural decoration technical field, in particular to hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly.
Background
The double-curved-surface aluminum plate is beneficial to sound absorption, and in addition, the double-curved-surface aluminum plate is well arranged, so that the space can not generate an echo effect more easily, and the double-curved-surface aluminum plate can be applied to places such as large meeting places, meeting rooms, multimedia rooms or movie theaters. But it is more difficult at present to install hyperboloid aluminum plate at the roof of all kinds of places furred ceiling because traditional hyperboloid aluminum plate's furred ceiling method either hardly realizes hyperboloid aluminum plate's position adjustment, or can only carry out position adjustment to hyperboloid aluminum plate's single direction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hyperboloid aluminum plate combination formula furred ceiling pendant, when aiming at furred ceiling hyperboloid aluminum plate, can multi-direction adjustment hyperboloid aluminum plate's position.
In order to achieve the above object, the utility model provides a hyperboloid aluminum plate combination formula furred ceiling pendant for connect roof and two hyperboloid aluminum plates, two hyperboloid aluminum plates are first hyperboloid aluminum plate and second hyperboloid aluminum plate respectively, hyperboloid aluminum plate combination formula furred ceiling pendant includes:
a main boom having one end for connection with the top wall;
the mounting plate is arranged at one end, far away from the top wall, of the main hanging rod, and is provided with a first transverse strip-shaped hole and a second transverse strip-shaped hole;
the first secondary suspender penetrates through the first transverse strip-shaped hole, can move transversely and is arranged at different positions of the first transverse strip-shaped hole;
the second secondary suspension rod penetrates through the second transverse strip-shaped hole, can move transversely and is arranged at different positions of the second transverse strip-shaped hole;
the first connecting piece is arranged on the first primary suspender, can move vertically and is arranged at different positions of the first primary suspender, and one end of the first connecting piece, which is far away from the mounting plate, is used for connecting the first double-curved-surface aluminum plate; and
the second connecting piece, the second connecting piece is located on the jib for the second time, just the second connecting piece can be followed vertical removal and locate the different positions of jib for the second time, the second connecting piece is kept away from the one end of mounting panel is used for connecting the second double curved surface aluminum plate.
In one embodiment, the main boom is a full-thread screw, the hyperboloid aluminum plate combined ceiling hanger further comprises an expansion bolt, and the main boom is connected with the top wall through the expansion bolt.
In one embodiment, the mounting plate is welded to the main boom.
In an embodiment, first vertical bar hole and second vertical bar hole have still been seted up to the mounting panel, first vertical bar hole with first horizontal bar hole is crossing perpendicularly, longitudinal movement can also be followed to the jib for the first time and locate the different positions in first vertical bar hole, the second vertical bar hole with the second horizontal bar hole is crossing perpendicularly, the jib can also be followed longitudinal movement and located the different positions in second vertical bar hole for the second time.
In one embodiment, the first longitudinal bar-shaped holes are multiple, and the multiple first longitudinal bar-shaped holes are arranged at intervals along the transverse direction; and/or
The second longitudinal strip-shaped holes are arranged in a plurality of transverse intervals.
In an embodiment, the lengths of the first secondary hanger rod and the second secondary hanger rod are different, so that the adjacent sides of the first double-curved aluminum plate and the second double-curved aluminum plate can be arranged at intervals in the vertical direction.
In an embodiment, the first secondary suspension rod is a full-thread screw rod, the hyperboloid aluminum plate combined ceiling hanger further comprises two first fixing nuts, and the two first fixing nuts are both arranged on the first secondary suspension rod in a penetrating manner and respectively abutted against two surfaces of the mounting plate;
the jib is full thread screw rod for the second time, hyperboloid aluminum plate combination formula furred ceiling pendant still includes two second fixation nut, two second fixation nut all wears to locate on the jib of second time, and respectively with two surfaces of mounting panel are contradicted.
In an embodiment, the hyperboloid aluminum plate combined ceiling hanger further comprises a first adjusting nut, the first adjusting nut is arranged on the first secondary suspension rod, the first connecting piece is a first connecting corner connector, a transverse plate of the first connecting corner connector penetrates through the first secondary suspension rod and abuts against the surface, close to the mounting plate, of the first adjusting nut, and a vertical plate of the first connecting corner connector is used for being connected with the first hyperboloid aluminum plate;
hyperboloid aluminum plate combination formula furred ceiling pendant still includes second adjusting nut, second adjusting nut locates on the jib of second time, the second connecting piece is the second and connects the angle sign indicating number, the diaphragm that the angle sign indicating number was connected to the second is worn to locate on the jib of second time, and with second adjusting nut is close to the surface of mounting panel is contradicted, the riser that the angle sign indicating number was connected to the second is used for connecting second hyperboloid aluminum plate.
In one embodiment, the hyperboloid aluminum plate combined ceiling hanging piece further comprises a first mounting corner brace, a vertical plate of the first connecting corner brace is connected with a vertical plate of the first mounting corner brace, and a transverse plate of the first mounting corner brace is used for connecting the first hyperboloid aluminum plate;
hyperboloid aluminum plate combination formula furred ceiling pendant still includes second installation angle sign indicating number, the riser of second connection angle sign indicating number with the riser of second installation angle sign indicating number is connected, the diaphragm of second installation angle sign indicating number is used for connecting second hyperboloid aluminum plate.
The utility model also provides a hyperboloid aluminum plate subassembly, include:
the hyperboloid aluminum plate combined ceiling hanging piece is arranged on the ceiling;
the first double-curved-surface aluminum plate structure comprises a first double-curved-surface aluminum plate and a first mounting corner brace, a transverse plate of the first mounting corner brace is connected with one side, close to the top wall, of the first double-curved-surface aluminum plate, and a vertical plate of the first mounting corner brace is used for being connected with the first connecting piece; and
the second dual-curved surface aluminum plate structure, the second dual-curved surface aluminum plate structure includes second dual-curved surface aluminum plate and second installation angle sign indicating number, the diaphragm of second installation angle sign indicating number with second dual-curved surface aluminum plate is close to one side of roof is connected, the riser of second installation angle sign indicating number be used for with the second connecting piece is connected.
The first double-curved-surface aluminum plate and the second double-curved-surface aluminum plate are installed by adopting the double-curved-surface aluminum plate combined ceiling hanging piece, the positions of the first double-curved-surface aluminum plate and the second double-curved-surface aluminum plate can be adjusted in the transverse direction, and meanwhile, the positions of the first double-curved-surface aluminum plate and the second double-curved-surface aluminum plate can be adjusted in the vertical direction, so that the first double-curved-surface aluminum plate and the second double-curved-surface aluminum plate can.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
Fig. 1 is a schematic structural view of a hyperboloid aluminum plate combined ceiling hanger according to an embodiment of the present invention, connecting a top wall with two hyperboloid aluminum plates;
FIG. 2 is an enlarged view of a portion of FIG. 1;
FIG. 3 is a perspective view of the main boom and the mounting plate of FIG. 1;
fig. 4 is a schematic top view of a mounting plate of a hyperboloid aluminum plate combined ceiling suspension member according to an embodiment of the present invention.
The reference numbers illustrate:
Figure BDA0002492643360000041
the objects, features and advantages of the present invention will be further described with reference to the accompanying drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that if directional indications (such as up, down, left, right, front, and back … …) are involved in the embodiment of the present invention, the directional indications are only used to explain the relative position relationship between the components, the motion situation, etc. in a specific posture, and if the specific posture is changed, the directional indications are changed accordingly.
In addition, if there is a description relating to "first", "second", etc. in the embodiments of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, if appearing throughout the text, "and/or" is meant to include three juxtaposed aspects, taking "A and/or B" as an example, including either the A aspect, or the B aspect, or both A and B satisfied aspects. In addition, the technical solutions in the embodiments may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should not be considered to exist, and is not within the protection scope of the present invention.
The utility model provides a hyperboloid aluminum plate combination formula furred ceiling pendant.
In the embodiment of the present invention, as shown in fig. 1 to 3, the double-curved aluminum plate combined ceiling suspension 10 is used to connect the top wall 20 and two double-curved aluminum plates, which are a first double-curved aluminum plate 30a and a second double-curved aluminum plate 30b, respectively.
In the present embodiment, the double-curved aluminum plate sectional ceiling hanger 10 includes a main hanger bar 100, a mounting plate 200, a first sub hanger bar 300, a second sub hanger bar 400, a first connector 500, and a second connector 600.
One end of the main boom 100 is adapted to be connected to the top wall 20.
A mounting plate 200 is provided at an end of the main boom 100 remote from the top wall 20. The mounting plate 200 is formed with a first transverse hole 210 and a second transverse hole 220.
The first sub-hanger bar 300 is disposed through the first transverse bar-shaped hole 210, and the first sub-hanger bar 300 can move along the transverse direction and is disposed at different positions of the first transverse bar-shaped hole 210.
The second secondary suspension rod 400 is arranged on the second transverse strip-shaped hole 220 in a penetrating manner, and the second secondary suspension rod 400 can move along the transverse direction and is arranged at different positions of the second transverse strip-shaped hole 220.
The first connector 500 is disposed on the first sub-boom 300, and the first connector 500 can move vertically and be disposed at different positions of the first sub-boom 300. The end of the first connecting member 500 remote from the mounting plate 200 is used to connect the first double-curved aluminum plate 30 a.
The second link 600 is disposed on the second sub-boom 400, and the second link 600 can move vertically and be disposed at different positions of the second sub-boom 400. The end of the second connector 600 remote from the mounting plate 200 is used to connect to the second doubly curved aluminum plate 30 b.
When the above-mentioned hyperboloid aluminum plate combination formula furred ceiling pendant 10 is to hyperboloid aluminum plate furred ceiling, because jib 300 can be along lateral shifting and locate the different positions of first horizontal bar hole 210 for the first time to can adjust the position of first hyperboloid aluminum plate 30a in horizontal, and the different positions of jib are located along vertical shifting to first connecting piece, thereby can adjust the position of first hyperboloid aluminum plate 30a in vertical. Similarly, the second secondary hanger bar 400 can move in the transverse direction and be disposed at different positions of the second transverse bar-shaped hole 220, so that the position of the second doubly-curved aluminum plate 30b in the transverse direction can be adjusted, and the second connecting member 600 can move in the vertical direction and be disposed at different positions of the second secondary hanger bar 400, so that the position of the second doubly-curved aluminum plate 30b in the vertical direction can be adjusted.
Because the first and second double- curved aluminum plates 30a and 30b are adjustable in the transverse position, when the first and second double- curved aluminum plates 30a and 30b are installed, interference between the first and second double- curved aluminum plates 30a and 30b in the transverse direction can be effectively avoided. When it is required that the first and second double- curved aluminum plates 30a and 30b are butted in the lateral direction or spaced apart in the vertical direction, the distance between the first and second double- curved aluminum plates 30a and 30b in the lateral direction may be adjusted.
It should be noted that, during ceiling suspension, the hyperboloid aluminum plate combined ceiling suspension member 10 is usually multiple, and the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b are also multiple, and interference in the transverse direction may be interference of two hyperboloid aluminum plates of the same hyperboloid aluminum plate combined ceiling suspension member 10 in the transverse direction, or interference of two hyperboloid aluminum plates of different hyperboloid aluminum plate combined ceiling suspension members 10 in the transverse direction.
The first and second double- curved aluminum plates 30a and 30b are butted in the transverse direction, that is, the first and second double- curved aluminum plates 30a and 30b are approximately located on the same transverse plane, and the first and second double- curved aluminum plates 30a and 30b are not overlapped; the first and second double- curved aluminum plates 30a and 30b are vertically spaced, that is, the first and second double- curved aluminum plates 30a and 30b are located on different transverse planes, and the first and second double- curved aluminum plates 30a and 30b may or may not be overlapped; the distance between the first and second double- curved aluminum plates 30a and 30b in the transverse direction means the distance between the first double-curved aluminum plate 30a on the side close to the second double-curved aluminum plate 30b and the second double-curved aluminum plate 30b on the side close to the first double-curved aluminum plate 30a in the transverse direction.
Meanwhile, the first and second double- curved aluminum plates 30a and 30b are adjustable in vertical position, so that when the first and second double- curved aluminum plates 30a and 30b are installed, the first and second double- curved aluminum plates 30a and 30b are effectively prevented from vertically interfering. When the first and second double- curved aluminum plates 30a and 30b are required to be spaced apart in the vertical direction, the distance between the first and second double- curved aluminum plates 30a and 30b in the vertical direction may be adjusted. The vertical distance between the first doubly-curved aluminum plate 30a and the second doubly-curved aluminum plate 30b means the vertical distance between the first doubly-curved aluminum plate 30a and the second doubly-curved aluminum plate 30b on the side close to the first doubly-curved aluminum plate 30 a.
When the hyperboloid aluminum plate combined ceiling hanger 10 is used for installing the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b, the positions of the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b can be adjusted in the transverse direction, and meanwhile, the positions of the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b can be adjusted in the vertical direction, so that the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b can be installed conveniently.
In this embodiment, the first sub boom 300 is different in length from the second sub boom 400. Thus, the first double-curved aluminum plate 30a and the second double-curved aluminum plate 30 can be spaced apart vertically. It is understood that in other embodiments, the first secondary hanger bar 300 and the second secondary hanger bar 400 may have the same length.
Specifically, in the present embodiment, the first and second double- curved aluminum plates 30a and 30a are vertically spaced apart, and the first and second double- curved aluminum plates 30a and 30a are overlapped. It is understood that in other embodiments, the first and second double-curved aluminum plates 30a and 30 may be vertically spaced apart, and the first and second double-curved aluminum plates 30a and 30 may not overlap.
In this embodiment, the main boom 100 is a full-flight screw. The double-curved aluminum plate modular ceiling hanger 10 further includes expansion bolts 700, and the main boom 100 is connected to the top wall 20 by the expansion bolts 700. At this time, the top wall 20 is generally a concrete structure. In this manner, it is greatly facilitated to secure the main boom 100 to the top wall 20. It is understood that in other embodiments, when the top wall 20 is a steel structure, the main boom 100 may be welded to the top wall 20, and the expansion bolts 700 may be omitted.
In this embodiment, the mounting plate 200 is welded to the main boom 100. In this case, the mounting plate 200 is generally of steel construction. Thus, it is very convenient to fix the mounting plate 200 and the main boom 100. It is understood that in other embodiments, the mounting plate 200 may be threaded with the main boom 100.
In this embodiment, the first sub hanger bar 300 is a full thread screw. The hyperboloid aluminum plate combination formula furred ceiling pendant 10 still includes two first fixation nuts 810, and two first fixation nuts 810 are all worn to locate on jib 300 for the first time to contradict with two surfaces of mounting panel 200 respectively. In this manner, it is very convenient to fix the first sub-hanger bar 300 to the mounting plate 200 at different positions of the first transverse bar-shaped hole 210. It is understood that in other embodiments, other retaining members may be used to secure the primary hanger bar 300 to the mounting plate 200 at different locations within the first transverse strip aperture 210.
In this embodiment, the second sub hanger bar 400 is a full flight screw. The hyperboloid aluminum plate combined type ceiling suspension member 10 further comprises two second fixing nuts 820, and the two second fixing nuts 820 are all arranged on the second secondary suspension rod 400 in a penetrating manner and respectively abut against two surfaces of the mounting plate 200. In this manner, it is very convenient to secure the secondary hanger bar 400 to the mounting plate 200 at different locations of the second transverse bar aperture 220. It will be appreciated that in other embodiments, other retaining members may be used to secure the secondary hanger bar 400 to the mounting plate 200 at different locations within the second transverse strip aperture 220.
In this embodiment, the double-curved aluminum plate combined ceiling suspension member 10 further includes a first adjusting nut 830, and the first adjusting nut 830 is disposed on the first secondary hanger rod 300. The first connecting member 500 is a first connecting angle connector, and the transverse plate 510 of the first connecting angle connector is inserted into the first suspension rod 300 and abuts against the surface of the first adjusting nut 830 close to the mounting plate 200. The risers 520 of the first connecting corner bracket are used for connecting the first hyperbolic aluminum plate 30 a. In this manner, it is very convenient to locate the first connector 500 at a different position of the first sub boom 300. It is understood that in other embodiments, the first adjustment nut 830 may be omitted when the first connector 500 is directly threaded with the first sub-boom 300.
In this embodiment, a first mounting corner bracket 910 is fixed to a side of the first double-curved aluminum plate 30a close to the top wall 20, and the transverse plate 912 of the first mounting corner bracket 910 is fixedly connected to a side of the first double-curved aluminum plate 30a close to the top wall 20. When the first aluminum hyperboloid plate 30a is connected to the first connecting member 500, the riser 520 of the first connecting corner bracket is connected to the first aluminum hyperboloid plate 30 a. The first mounting bracket 910 and the first double-curved aluminum plate 30a are fixed to the first double-curved aluminum plate 30a before the first double-curved aluminum plate 30a leaves the factory.
Specifically, in the present embodiment, the first corner key 910 is integrally formed with the first aluminum hyperboloid plate 30 a. The vertical plate 520 of the first connecting corner brace and the vertical plate 914 of the first mounting corner brace 910 are connected with a nut through a screw.
In other embodiments, the hyperboloid aluminum sheet modular ceiling hanger 10 may include a first mounting corner brace 910 when the first hyperboloid aluminum sheet 30a is not pre-secured with the first mounting corner brace 910. The vertical plate 520 of the first connecting corner brace is connected with the vertical plate 914 of the first mounting corner brace 910, and the horizontal plate 912 of the first mounting corner brace 910 is used for connecting the first double-curved aluminum plate 30 a.
In this embodiment, the hyperboloid aluminum plate combined ceiling suspension member 10 further comprises a second adjusting nut 840, and the second adjusting nut 840 is disposed on the second secondary hanger rod 400. The second connecting member 600 is a second connecting angle bracket, and the transverse plate 610 of the second connecting angle bracket is inserted into the second secondary suspension rod 400 and abutted against the surface of the second adjusting nut 840 close to the mounting plate 200. The riser 620 of the second connection corner brace is used for connecting the second doubly curved aluminum plate 30 b. In this manner, it is very convenient to locate the second link 600 at a different position on the second sub boom 400. It is understood that in other embodiments, the second adjustment nut 840 may be omitted when the second connector 600 is directly threaded with the second secondary boom 400.
In this embodiment, a second mounting corner brace 920 is fixed to a side of the second doubly-curved aluminum plate 30b close to the ceiling 20, and a horizontal plate 922 of the second mounting corner brace 920 is fixedly connected to a side of the second doubly-curved aluminum plate 30b close to the ceiling 20. When the second double-curved aluminum plate 30b is connected to the second connector 600, the vertical plate 620 of the second connecting corner brace is connected to the vertical plate 924 of the second mounting corner brace 920 fixed to the second double-curved aluminum plate 30 b. The second installation corner brace 920 and the second double-curved aluminum plate 30b are fixed on the second double-curved aluminum plate 30b before the second double-curved aluminum plate 30b leaves the factory.
Specifically, in this embodiment, the second corner brace 920 is integrally formed with the second doubly curved aluminum plate 30 b. The vertical plate 620 of the second connecting angle bracket is connected with the vertical plate 924 of the second mounting angle bracket 920 through screws and nuts.
In other embodiments, the bi-curved aluminum sheet modular ceiling pendant 10 may include a second mounting corner brace 920 when the second bi-curved aluminum sheet 30b is not pre-secured with the second mounting corner brace 920. The riser 620 of second connection angle sign indicating number is connected with the riser 924 of second installation angle sign indicating number 920, and the diaphragm 922 of second installation angle sign indicating number 920 is used for connecting second hyperboloid aluminum plate 30 b.
In this embodiment, as shown in fig. 3 and 4, the mounting plate 200 further has a first longitudinal hole 230 and a second longitudinal hole 240. The first longitudinal bar-shaped hole 230 is vertically intersected with the first transverse bar-shaped hole 210, and the first secondary hanger bar 300 can also move longitudinally and be arranged at different positions of the first longitudinal bar-shaped hole 230. The second longitudinal bar-shaped hole 240 is vertically intersected with the second transverse bar-shaped hole 220, and the second secondary hanger bar 400 can also move longitudinally and be arranged at different positions of the second longitudinal bar-shaped hole 240.
When the above-mentioned hyperboloid aluminum plate combined ceiling hanger 10 is used for the hyperboloid aluminum plate ceiling, the first suspender 300 can move in the longitudinal direction and be disposed at different positions of the first longitudinal strip-shaped hole 230, so that the position of the first hyperboloid aluminum plate 30a in the longitudinal direction can be adjusted. Similarly, the second secondary hanger bar 400 can be moved in the longitudinal direction and disposed at different positions of the second longitudinal strip-shaped hole 240, so that the position of the second doubly-curved aluminum plate 30b in the longitudinal direction can be adjusted. In this way, when the hyperboloid aluminum plates are installed, the edges of the first hyperboloid aluminum plate 30a and the second hyperboloid aluminum plate 30b are approximately flush, and interference between two adjacent hyperboloid aluminum plates on different hyperboloid aluminum plate combined type ceiling hangers 10 in the longitudinal direction can be avoided.
In this embodiment, the first longitudinal stripe holes 230 are multiple, and the multiple first longitudinal stripe holes 230 are arranged at intervals along the transverse direction. The second longitudinal bar-shaped holes 240 are multiple, and the second longitudinal bar-shaped holes 240 are arranged at intervals along the transverse direction. Therefore, the longitudinal position of the hyperboloid aluminum plate can be adjusted conveniently after the transverse position of the hyperboloid aluminum plate is adjusted and determined.
In the present embodiment, the first doubly-curved aluminum plate 30a and the first mounting bracket 910 are elements of a first doubly-curved aluminum plate structure, and the second doubly-curved aluminum plate 30b and the second mounting bracket 920 are elements of a second doubly-curved aluminum plate structure. The hyperboloid aluminum plate combined ceiling hanger 10, the first hyperboloid aluminum plate structure element and the first hyperboloid aluminum plate structure element are hyperboloid aluminum plate assembly elements.
The utility model also provides a ceiling method of hyperboloid aluminum plate, including following step:
step S10a, providing the above-mentioned hyperboloid aluminum plate combined ceiling hanger, the first hyperboloid aluminum plate and the second hyperboloid aluminum plate.
In step S10b, an end of the main boom remote from the mounting plate is fixed to the ceiling wall.
Step S10c, the first hanger bar is fixed to the first transverse bar-shaped hole.
Step S10d, the first link is fixed to the first boom.
Step S10e, fixing the first aluminum hyperboloid plate to the first connecting member.
Step S10f, fixing the second secondary hanger bar to the second transverse bar-shaped hole according to the transverse preset distance between the first and second double-curved aluminum plates in the transverse direction.
In this embodiment, when the first and second double- curved aluminum plates 30a and 30b are butted, that is, the first and second double- curved aluminum plates 30a and 30b are substantially located on the same transverse plane, and the first and second double- curved aluminum plates 30a and 30b are not overlapped, the transverse preset distance is set to be zero, that is, the first and second double- curved aluminum plates 30a and 30b are butted in the transverse direction. It is understood that in other embodiments, when it is required to place other elements between the first doubly curved aluminum plate 30a and the second doubly curved aluminum plate 30b, the transverse preset distance is not zero, and the size of the transverse preset distance can be set according to actual needs.
In this embodiment, when the first and second double- curved aluminum plates 30a and 30b are vertically spaced apart and the first and second double- curved aluminum plates 30a and 30b are overlapped, the predetermined transverse distance is set to be 0.5-5 cm. So, have fine furred ceiling effect.
Step S10g, fixing the second connecting member to the second secondary hanger rod according to the vertical preset distance between the first and second double-curved aluminum plates in the vertical direction.
In this embodiment, the vertical preset spacing is set to be 0.5-5 cm. So, have fine furred ceiling effect.
The above is only the optional embodiment of the present invention, and not the scope of the present invention is limited thereby, all the equivalent structure changes made by the contents of the specification and the drawings are utilized under the inventive concept of the present invention, or the direct/indirect application in other related technical fields is included in the patent protection scope of the present invention.

Claims (10)

1. The utility model provides a hyperboloid aluminum plate combination formula furred ceiling pendant for connect roof and two hyperboloid aluminum plates, two hyperboloid aluminum plates are first hyperboloid aluminum plate and second hyperboloid aluminum plate respectively, its characterized in that, hyperboloid aluminum plate combination formula furred ceiling pendant includes:
a main boom having one end for connection with the top wall;
the mounting plate is arranged at one end, far away from the top wall, of the main hanging rod, and is provided with a first transverse strip-shaped hole and a second transverse strip-shaped hole;
the first secondary suspender penetrates through the first transverse strip-shaped hole, can move transversely and is arranged at different positions of the first transverse strip-shaped hole;
the second secondary suspension rod penetrates through the second transverse strip-shaped hole, can move transversely and is arranged at different positions of the second transverse strip-shaped hole;
the first connecting piece is arranged on the first primary suspender, can move vertically and is arranged at different positions of the first primary suspender, and one end of the first connecting piece, which is far away from the mounting plate, is used for connecting the first double-curved-surface aluminum plate; and
the second connecting piece, the second connecting piece is located on the jib for the second time, just the second connecting piece can be followed vertical removal and locate the different positions of jib for the second time, the second connecting piece is kept away from the one end of mounting panel is used for connecting the second double curved surface aluminum plate.
2. The hyperboloid aluminum plate modular ceiling hanger of claim 1, wherein the main hanger bar is a full-thread screw, the hyperboloid aluminum plate modular ceiling hanger further comprising an expansion bolt, the main hanger bar being connected to the top wall by the expansion bolt.
3. The hyperboloid aluminum plate modular ceiling hanger of claim 2, wherein the mounting plate is welded to the main hanger bar.
4. The hyperboloid aluminum plate combination formula furred ceiling pendant of claim 1, wherein the mounting panel still has seted up first longitudinal strip hole and second longitudinal strip hole, first longitudinal strip hole with first horizontal strip hole is crossing perpendicularly, the jib can also be followed longitudinal movement and locate the different positions in first longitudinal strip hole for the first time, second longitudinal strip hole with the second horizontal strip hole is crossing perpendicularly, the jib can also be followed longitudinal movement and locate the different positions in second longitudinal strip hole for the second time.
5. The hyperboloid aluminum plate combination formula furred ceiling pendant of claim 4, wherein, the first longitudinal bar hole is many, many the first longitudinal bar hole is along horizontal interval arrangement; and/or
The second longitudinal strip-shaped holes are arranged in a plurality of transverse intervals.
6. The hyperboloid aluminum plate combination ceiling hanger of claim 1, wherein the first secondary hanger bar is of a different length than the second secondary hanger bar so that adjacent sides of the first and second hyperboloid aluminum plates are vertically spaced apart.
7. The hyperboloid aluminum plate combined ceiling hanger of claim 1, wherein the first secondary hanger rod is a full-thread screw rod, and the hyperboloid aluminum plate combined ceiling hanger further comprises two first fixing nuts, and the two first fixing nuts are respectively arranged on the first secondary hanger rod and respectively abutted against two surfaces of the mounting plate;
the jib is full thread screw rod for the second time, hyperboloid aluminum plate combination formula furred ceiling pendant still includes two second fixation nut, two second fixation nut all wears to locate on the jib of second time, and respectively with two surfaces of mounting panel are contradicted.
8. The hyperboloid aluminum plate combined ceiling hanger of claim 7, further comprising a first adjusting nut, wherein the first adjusting nut is arranged on the first secondary hanger rod, the first connecting piece is a first connecting corner connector, a transverse plate of the first connecting corner connector penetrates through the first secondary hanger rod and is abutted against the surface, close to the mounting plate, of the first adjusting nut, and a vertical plate of the first connecting corner connector is used for connecting the first hyperboloid aluminum plate;
hyperboloid aluminum plate combination formula furred ceiling pendant still includes second adjusting nut, second adjusting nut locates on the jib of second time, the second connecting piece is the second and connects the angle sign indicating number, the diaphragm that the angle sign indicating number was connected to the second is worn to locate on the jib of second time, and with second adjusting nut is close to the surface of mounting panel is contradicted, the riser that the angle sign indicating number was connected to the second is used for connecting second hyperboloid aluminum plate.
9. The hyperboloid aluminum plate modular ceiling hanger of claim 8, further comprising a first mounting corner brace, wherein a riser of the first connecting corner brace is connected to a riser of the first mounting corner brace, and a cross plate of the first mounting corner brace is used for connecting the first hyperboloid aluminum plate;
hyperboloid aluminum plate combination formula furred ceiling pendant still includes second installation angle sign indicating number, the riser of second connection angle sign indicating number with the riser of second installation angle sign indicating number is connected, the diaphragm of second installation angle sign indicating number is used for connecting second hyperboloid aluminum plate.
10. A hyperboloid aluminum plate assembly, comprising:
the hyperboloid aluminum panel modular ceiling hanger of any one of claims 1-8;
the first double-curved-surface aluminum plate structure comprises a first double-curved-surface aluminum plate and a first mounting corner brace, a transverse plate of the first mounting corner brace is connected with one side, close to the top wall, of the first double-curved-surface aluminum plate, and a vertical plate of the first mounting corner brace is used for being connected with the first connecting piece; and
the second dual-curved surface aluminum plate structure, the second dual-curved surface aluminum plate structure includes second dual-curved surface aluminum plate and second installation angle sign indicating number, the diaphragm of second installation angle sign indicating number with second dual-curved surface aluminum plate is close to one side of roof is connected, the riser of second installation angle sign indicating number be used for with the second connecting piece is connected.
CN202020809362.6U 2020-05-14 2020-05-14 Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly Active CN212534756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020809362.6U CN212534756U (en) 2020-05-14 2020-05-14 Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020809362.6U CN212534756U (en) 2020-05-14 2020-05-14 Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly

Publications (1)

Publication Number Publication Date
CN212534756U true CN212534756U (en) 2021-02-12

Family

ID=74541353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020809362.6U Active CN212534756U (en) 2020-05-14 2020-05-14 Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly

Country Status (1)

Country Link
CN (1) CN212534756U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898110A (en) * 2021-10-22 2022-01-07 北京市建筑工程装饰集团有限公司 Hyperboloid arc-shaped GRG hanging device and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898110A (en) * 2021-10-22 2022-01-07 北京市建筑工程装饰集团有限公司 Hyperboloid arc-shaped GRG hanging device and construction method

Similar Documents

Publication Publication Date Title
CN111472491A (en) Hyperboloid aluminum plate combined type ceiling hanging piece, hyperboloid aluminum plate assembly and ceiling hanging method
US9631364B2 (en) Wall panel framing system
US7143562B2 (en) Suspension system and structure for securing border ceiling panels
US20020062617A1 (en) Building member connector allowing bi-directional relative movement
US9771718B1 (en) Strut with non-structural infill
US4189893A (en) Ceiling runner and panel assembly having sliding lockability
US11761205B2 (en) Ceiling system
US10928031B2 (en) Indirect light cove
CN212534756U (en) Hyperboloid aluminum plate combination formula furred ceiling pendant and hyperboloid aluminum plate subassembly
US9534383B1 (en) Ceiling panel system
US10563401B2 (en) Bridge clip
EP0238279A2 (en) Cladding
JP3163512B2 (en) Connection structure of ceiling bar
CN219080839U (en) Mounting assembly
CN219033888U (en) Assembled background wall integrated system
US11952775B2 (en) Connector bracket for non-rectangular grid
US20240018778A1 (en) Ceiling suspension bracket
CN212613512U (en) Wallboard fixing assembly
US20230167639A1 (en) Backing Connector
CN211341545U (en) Wallboard buckle assembly
JP2022157404A (en) Ceiling joist attachment member and suspended ceiling structure
JPS6133135Y2 (en)
JP2023050772A (en) Panel installation structure
JPH0633544A (en) Mounting structure for ceiling panel
JPH0416647A (en) Roof fitting construction for extension part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20231013

Granted publication date: 20210212

PP01 Preservation of patent right