CN212533924U - Flood prevention protection device for hydraulic engineering - Google Patents
Flood prevention protection device for hydraulic engineering Download PDFInfo
- Publication number
- CN212533924U CN212533924U CN202020951771.XU CN202020951771U CN212533924U CN 212533924 U CN212533924 U CN 212533924U CN 202020951771 U CN202020951771 U CN 202020951771U CN 212533924 U CN212533924 U CN 212533924U
- Authority
- CN
- China
- Prior art keywords
- flood prevention
- bearing base
- protection device
- buffering
- buffer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a hydraulic engineering is with flood prevention protection device, including the bearing base, the fixed flood prevention case of having placed of roof of bearing base, flood prevention incasement is equipped with fills the chamber, flood prevention case's left side outer wall fixed welding has the cassette, the middle part of cassette is equipped with the draw-in groove, there is the mount through screw fixed mounting in the draw-in groove, the other end and the bearing base laminating of mount and seted up the screw thread mouth. The utility model discloses a screw is connected mount and flood prevention case, then insert two picture pegs and realize fixing to the bearing base ground, down rotatory threaded rod again, the lower extreme extrusion inserted bar of threaded rod moves toward the outside, fixed between mount and the bearing base has been realized promptly, the power of combining together of grabbing to ground has greatly been promoted again, buffer gear can play the effect that the buffering released power to the impact of rivers and debris simultaneously, prevent effectively that rivers and debris direct impact flood prevention case, the life of flood prevention case has been prolonged greatly.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field especially relates to a hydraulic engineering is with flood prevention protection device.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production.
The traditional method usually adopts sand bags to pile up into a flood prevention wall to block flood, but a gap exists between the sand bags, and the flood prevention effect is poor, so that the flood prevention protection device for the hydraulic engineering is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem in the background art, and providing a flood prevention protection device for hydraulic engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a flood prevention protection device for hydraulic engineering, includes the bearing base, the fixed flood prevention case of having placed of roof of bearing base, flood prevention incasement is equipped with fills the chamber, flood prevention case's left side outer wall fixed welding has the cassette, the middle part of cassette is equipped with the draw-in groove, there is the mount through screw fixed mounting in the draw-in groove, the other end and the bearing base laminating of mount and seted up the screw thread mouth, every equal threaded connection has the threaded rod in the screw thread mouth, fixedly connected with picture peg on the diapire of bearing base, be equipped with a plurality of openings on the outer wall of picture peg, every all insert in the opening and be equipped with the inserted bar, flood prevention case's right side outer wall fixed welding has the buffering base, be equipped with buffer gear in the buffering base.
Preferably, a cavity is arranged in the insert plate, and a gap is arranged between one ends of the two insert rods positioned on the same horizontal line and positioned in the cavity.
Preferably, the threaded rod, the bottom end of the insertion plate and one end of each insertion rod positioned outside the insertion plate are provided with conical tips.
Preferably, buffer gear is including locating in the buffer base and a plurality of flexible grooves of evenly distributed, flexible inslot interpolation is equipped with the buffer beam, the buffer beam is kept away from the one end of buffer base and is fixed with the buffer board jointly.
Preferably, the buffer rod is located the baffle of the one end fixedly connected with sliding connection between the flexible inslot inside wall of flexible inslot, two parallel arrangement's of fixedly connected with buffer spring between the inside wall of baffle and flexible groove, the right side roof of flexible groove is equipped with perpendicular inside turn-ups, interval between the turn-ups is less than the length of baffle.
Preferably, the right side of the bearing base is provided with an integrally formed barb body, and the right side wall of the flood prevention box is provided with a limit groove matched with the barb body in size and position.
Compared with the prior art, this flood prevention protection device for hydraulic engineering's advantage lies in:
1. the fixing frame is connected with the flood prevention box through the screws, then the two inserting plates are inserted into the ground to fix the bearing base, the threaded rod is rotated downwards, the lower end of the threaded rod extrudes the inserting plates to move towards the outer side, fixing between the fixing frame and the bearing base is achieved, and grabbing force to the ground is greatly improved;
2. the buffering mechanism can play a role in buffering and releasing force for impact of water flow and sundries, effectively prevents the water flow and the sundries from directly impacting the flood prevention box, and greatly prolongs the service life of the flood prevention box;
3. the inverted hook body is matched with the limiting groove, so that the stability of the flood prevention box in use is ensured;
to sum up, the utility model discloses a screw is connected mount and flood prevention case, then insert two picture pegs ground and realize fixing in the face of the bearing base, down rotatory threaded rod again, the lower extreme extrusion inserted bar of threaded rod moves toward the outside, has realized fixing between mount and the bearing base promptly, has greatly promoted the power of combining together of grabbing to ground again, buffer gear can play the effect that the buffering released power to the impact of rivers and debris simultaneously, prevents effectively that rivers and debris direct impact flood prevention case, has prolonged flood prevention case's life greatly.
Drawings
Fig. 1 is a front view of a flood prevention protection device for hydraulic engineering provided by the utility model;
FIG. 2 is an enlarged view of A in FIG. 1;
fig. 3 is an enlarged view of B in fig. 1.
In the figure: the flood prevention box comprises a bearing base 1, a flood prevention box 2, a filling cavity 3, a fixing frame 4, a clamping seat 5, a threaded rod 6, an inserting plate 7, an inserting rod 8, a buffering base 9, a buffering rod 10, a buffering plate 11, a buffering spring 12, a partition plate 13 and a flanging 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a flood prevention protection device for hydraulic engineering comprises a bearing base 1, a flood prevention box 2 is fixedly arranged on the top wall of the bearing base 1, a filling cavity 3 is arranged in the flood prevention box 2, a clamping seat 5 is fixedly welded on the outer wall of the left side of the flood prevention box 2, a clamping groove is arranged in the middle of the clamping seat 5, a fixing frame 4 is fixedly arranged in the clamping groove through screws, the other end of the fixing frame 4 is attached to the bearing base 1 and is provided with threaded openings, each threaded opening is connected with a threaded rod 6 in a threaded manner, an inserting plate 7 is fixedly connected to the bottom wall of the bearing base 1, a plurality of openings are arranged on the outer wall of the inserting plate 7, an inserting rod 8 is inserted in each opening, a cavity is arranged in the inserting plate 7, a gap is arranged between one ends, located in the cavity, of two inserting rods 8 located on the same horizontal line, the threaded rods 6, the bottom end, the fixing frame 4 is connected with the flood prevention box 2 through screws, then the two inserting plates 7 are inserted into the ground to fix the bearing base 1, then the threaded rod 6 is rotated downwards, the lower end of the threaded rod 6 extrudes the inserting rod 8 to move towards the outer side, fixing between the fixing frame 4 and the bearing base 1 is achieved, and grabbing force to the ground is greatly improved.
The outer wall of the right side of the flood prevention box 2 is fixedly welded with a buffer base 9, a buffer mechanism is arranged in the buffer base 9 and comprises a plurality of telescopic grooves which are arranged in the buffer base 9 and are uniformly distributed, buffer rods 10 are inserted in the telescopic grooves, one ends of the buffer rods 10 far away from the buffer base 9 are jointly fixed with buffer plates 11, one ends of the buffer rods 10 in the telescopic grooves are fixedly connected with partition plates 13 which are slidably connected between the inner side walls of the telescopic grooves, two buffer springs 12 which are arranged in parallel are fixedly connected between the partition plates 13 and the inner side walls of the telescopic grooves, the top wall of the right side of the telescopic grooves is provided with vertical inward turned edges 14, the distance between the turned edges 14 is smaller than the length of the partition plates 13, water flow and sundries impact the buffer plates 11, at the moment, the buffer plates 11 drive the buffer rods 10 to extrude the partition plates 13 to move in the telescopic grooves, the buffer springs 12, effectively prevent rivers and debris direct impact flood prevention case 2, prolonged flood prevention case 2's life greatly, buffer spring 12 kick-backs and promotes buffer board 11 and reset after the buffering effect.
The right side of the bearing base 1 is provided with an integrally formed inverted hook body, the right side wall of the flood prevention box 2 is provided with a limit groove matched with the inverted hook body in size and position, and the inverted hook body and the limit groove are matched to ensure the stability of the flood prevention box 2 in use.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
Now, the operation principle of the present invention is explained as follows:
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.
Claims (6)
1. The flood prevention protection device for the hydraulic engineering comprises a bearing base (1) and is characterized in that a flood prevention box (2) is fixedly placed on the top wall of the bearing base (1), a filling cavity (3) is arranged in the flood prevention box (2), a clamping seat (5) is fixedly welded on the outer wall of the left side of the flood prevention box (2), a clamping groove is formed in the middle of the clamping seat (5), a fixing frame (4) is fixedly installed in the clamping groove through screws, the other end of the fixing frame (4) is attached to the bearing base (1) and provided with threaded holes, each threaded hole is internally and uniformly in threaded connection with a threaded rod (6), an inserting plate (7) is fixedly connected to the bottom wall of the bearing base (1), a plurality of openings are formed in the outer wall of the inserting plate (7), inserting rods (8) are inserted into the openings, a buffering base (9) is fixedly welded on the outer wall of the right side of the flood prevention box (2), a buffer mechanism is arranged in the buffer base (9).
2. The flood prevention protection device for the water conservancy project according to claim 1, wherein a cavity is formed in the insertion plate (7), and a gap is formed between one ends, located in the cavity, of the two insertion rods (8) located on the same horizontal line.
3. The flood prevention protection device for the water conservancy project according to claim 1, wherein the threaded rod (6), the bottom end of the inserting plate (7) and one end of each inserting rod (8) located outside the inserting plate (7) are provided with conical tips.
4. The flood prevention protection device for the hydraulic engineering according to claim 1, wherein the buffering mechanism comprises a plurality of telescopic grooves which are uniformly distributed in the buffering base (9), buffering rods (10) are inserted in the telescopic grooves, and buffering plates (11) are jointly fixed to one ends, far away from the buffering base (9), of the buffering rods (10).
5. The flood prevention protection device for the water conservancy project according to claim 4, wherein one end of the buffer rod (10) located in the telescopic groove is fixedly connected with a partition plate (13) in sliding connection between the inner side walls of the telescopic groove, two buffer springs (12) arranged in parallel are fixedly connected between the partition plate (13) and the inner side walls of the telescopic groove, a vertical inward flanging (14) is arranged on the top wall of the right side of the telescopic groove, and the distance between the flanging (14) is smaller than the length of the partition plate (13).
6. The flood prevention protection device for the water conservancy project according to claim 1, wherein an integrally formed barb body is arranged on the right side of the bearing base (1), and a limiting groove matched with the barb body in size and position is formed in the right side wall of the flood prevention box (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020951771.XU CN212533924U (en) | 2020-05-29 | 2020-05-29 | Flood prevention protection device for hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020951771.XU CN212533924U (en) | 2020-05-29 | 2020-05-29 | Flood prevention protection device for hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212533924U true CN212533924U (en) | 2021-02-12 |
Family
ID=74544977
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020951771.XU Expired - Fee Related CN212533924U (en) | 2020-05-29 | 2020-05-29 | Flood prevention protection device for hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212533924U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113155228A (en) * | 2021-03-30 | 2021-07-23 | 北京金房兴业测绘有限公司 | Underground water level monitoring system |
CN114108552A (en) * | 2021-11-11 | 2022-03-01 | 重庆江源工程勘察设计有限公司 | Road temporary flood prevention device for hydraulic engineering |
-
2020
- 2020-05-29 CN CN202020951771.XU patent/CN212533924U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113155228A (en) * | 2021-03-30 | 2021-07-23 | 北京金房兴业测绘有限公司 | Underground water level monitoring system |
CN114108552A (en) * | 2021-11-11 | 2022-03-01 | 重庆江源工程勘察设计有限公司 | Road temporary flood prevention device for hydraulic engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212533924U (en) | Flood prevention protection device for hydraulic engineering | |
CN109898666B (en) | Shock attenuation steel construction stand | |
CN214143731U (en) | Foundation pit supporting structure for civil engineering | |
CN211816389U (en) | Hydraulic engineering retaining wall | |
CN213390053U (en) | River course is floating rubbish fishing device for sewage treatment | |
CN215166468U (en) | Assembled building structure that water-proof effects is good | |
CN211646251U (en) | Novel hydraulic engineering flood prevention case | |
CN109487767B (en) | Water-blocking fence | |
CN214330224U (en) | A safety protection structure for water conservancy construction | |
CN213017102U (en) | Aluminum buckle plate with long service life | |
CN214939814U (en) | Flood prevention box for hydraulic engineering | |
CN213867624U (en) | Retaining wall for hydraulic engineering | |
CN214696290U (en) | Building curtain wall fixing structure | |
CN206204876U (en) | Novel water conservancy project flood-control water retaining device | |
CN211622157U (en) | Building curtain wall capable of being rapidly switched and assembled | |
CN217231538U (en) | Warning device is used in hydraulic engineering construction | |
CN220099788U (en) | Stable aluminum alloy flood control wall | |
CN217760104U (en) | Prestress tension frame | |
CN218438083U (en) | Novel scaffold | |
CN215107924U (en) | A security fence for hydraulic and hydroelectric engineering | |
CN210713353U (en) | Combined steel plate shear wall | |
CN213898423U (en) | Guardrail storage device for building convenient to equipment | |
CN212353994U (en) | Friction side bearing mounting seat structure of articulated vehicle frame | |
CN210976052U (en) | Anti-collision device of shockproof building structure | |
CN214532332U (en) | Adjustable water conservancy construction fence device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210212 |