CN212529667U - Air entrainment piece handling device for building engineering construction - Google Patents

Air entrainment piece handling device for building engineering construction Download PDF

Info

Publication number
CN212529667U
CN212529667U CN202021403767.6U CN202021403767U CN212529667U CN 212529667 U CN212529667 U CN 212529667U CN 202021403767 U CN202021403767 U CN 202021403767U CN 212529667 U CN212529667 U CN 212529667U
Authority
CN
China
Prior art keywords
carriage
air
plate
fixedly connected
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021403767.6U
Other languages
Chinese (zh)
Inventor
张梦磊
赵小章
郭伟彦
吴伟员
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Application granted granted Critical
Publication of CN212529667U publication Critical patent/CN212529667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B1/00Hand carts having only one axis carrying one or more transport wheels; Equipment therefor
    • B62B1/008Hand carts having only one axis carrying one or more transport wheels; Equipment therefor having a prop or stand for maintaining position
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B1/00Hand carts having only one axis carrying one or more transport wheels; Equipment therefor
    • B62B1/10Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels
    • B62B1/14Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels involving means for grappling or securing in place objects to be carried; Loading or unloading equipment
    • B62B1/145Unloading equipment for pushing the load from the carrier platform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B5/00Accessories or details specially adapted for hand carts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62BHAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
    • B62B2202/00Indexing codes relating to type or characteristics of transported articles
    • B62B2202/62Tiles, bricks, paving slabs or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering construction is with piece handling device that adds air, it includes transport mechanism, heightening mechanism, closing mechanism and shedding mechanism, the equal swing joint in both sides of transport mechanism has heightening mechanism, one side swing joint of transport mechanism has closing mechanism, one side swing joint that closing mechanism was kept away from to transport mechanism has shedding mechanism. According to the air-entraining block carrying device for building engineering construction, the door plate is opened to enable the carriage to incline so that the air-entraining block in the carriage slides off, and the air-entraining block is dismounted, so that the manpower is saved; the limiting rod and the roller limit the inclination angle of the carriage, so that the problems that the carriage is too large in inclination angle and the air-entraining block is directly dropped and damaged are avoided, and the purpose of protecting the air-entraining block is achieved; the heightening mechanism increases the amount of the air-adding blocks transported each time, improves the carrying efficiency, opens the heightening mechanism, reduces the height of the carrying device and is convenient for loading; when the air entrainment piece card was in the carriage, used discharge mechanism to release the air entrainment piece, improved the practicality.

Description

Air entrainment piece handling device for building engineering construction
Technical Field
The utility model belongs to the technical field of the construction auxiliary assembly, especially, relate to a building engineering is air entrainment piece handling device for construction.
Background
The air-entraining block produced by the air-entraining block equipment has the advantages of light volume weight, high heat preservation efficiency, good sound absorption, processability and the like, can be made into products such as wall building blocks, heat preservation blocks, laminated boards, floor boards, wall boards, heat preservation pipes and the like, is widely used for heat preservation of bearing or non-bearing structures and pipelines in industrial and civil buildings in China, and becomes an important component of the novel building material. The aerated block equipment can be produced by adopting different processes according to the types and the qualities of raw materials, the process characteristics of main equipment and the like.
The air-entraining blocks are moved from one area to another area in production enterprises and building construction enterprises, the existing air-entraining block conveying device is generally a common trolley, and the air-entraining blocks are placed in the trolley for carrying out long-distance conveying, but the existing air-entraining block conveying device has the following defects: the existing aerated block carrying device does not have the unloading function, and after the aerated blocks are loaded into the carrying device and transported to a designated position, the aerated blocks are unloaded one by one, which wastes physical power.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a building engineering is aerated piece handling device for construction to solve technical problem.
The utility model provides an above-mentioned technical problem's technical scheme as follows: the utility model provides a building engineering is aerated block handling device for construction, it includes: the device comprises a conveying mechanism, a sealing mechanism and a discharging mechanism; the transportation mechanism comprises a carriage, wheels, a carriage handle, supporting legs, a limiting rod and rollers, wherein the wheels are rotatably connected to the bottom of the carriage, the carriage handle is fixedly connected to one side of the carriage, the supporting legs are fixedly connected to one side of the bottom of the carriage, which is close to the carriage handle, the limiting rod is fixedly connected to one side of the bottom of the carriage, which is far away from the supporting legs, and the rollers are rotatably connected to the end parts of the limiting rod; a groove is formed in one side, close to the carriage handle, of the inner wall of the carriage, and a through hole is formed in the groove; the lower side of the door plate of the sealing mechanism is connected to one side of the carriage, which is far away from the carriage handle, through a hinge; the discharging mechanism comprises a push plate, a supporting rod and a pedal plate, wherein the supporting rod is fixedly connected to one side of the push plate, and the pedal plate is fixedly connected to the end part of the supporting rod; the size of the push plate is matched with the groove on one side, close to the carriage handle, of the carriage, the push plate can be arranged in the groove, the supporting rod penetrates through a through hole formed in the groove, and the pedal plate is located on the outer side of the carriage.
The utility model discloses an air entrainment piece handling device for building engineering construction as above, further, still include heightening mechanism, heightening mechanism includes baffle, pivot and buckle, one side fixedly connected with pivot at baffle top, the buckle rotatable connection is in the pivot; the sealing mechanism further comprises a fixed shaft and a limiting plate, the top of one side of the door plate is fixedly connected with the fixed shaft, and the end part of the fixed shaft is fixedly connected with the limiting plate.
The utility model discloses as above air entrainment piece handling device for the building engineering construction, further, set up the through-hole that two levels set up and are parallel to each other on the recess, shedding mechanism's bracing piece quantity is two, inserts respectively the through-hole.
The utility model discloses as above air entrainment piece handling device for the building engineering construction, further, the wheel is greater than the interval of wheel and gag lever post with the interval of supporting legs.
The utility model discloses as above air entrainment piece handling device for the building engineering construction, further, the length of supporting legs is greater than the length of stop lever.
The utility model has the advantages that:
1. this air entrainment piece handling device for building engineering construction makes door plant and carriage swing joint through setting up the door plant, opens the door plant, makes the carriage slope through raising the carriage handle, and the air entrainment piece landing in the carriage then draws the carriage backward and takes out the door plant from the bottom of air entrainment piece slowly to reach the purpose of unloading, simple and convenient swift has practiced thrift the manpower.
2. This air entrainment piece handling device for building engineering construction through setting up gag lever post and gyro wheel, and the gyro wheel lands the angle of inclination in restriction carriage on the gag lever post, avoids the carriage handle to lift too high and leads to the carriage angle of inclination too big, and the air entrainment piece in the carriage directly falls to damage the air entrainment piece, reaches the purpose of protection air entrainment piece, has avoided the air entrainment piece to press on the door plant simultaneously, the inconvenient problem of taking handling device out.
3. This air entrainment piece handling device for building engineering construction, through setting up heightening mechanism, increase the volume of transporting the air entrainment piece at every turn, thereby improve the efficiency of transport, and heightening mechanism and transport mechanism swing joint, during the loading, can open heightening mechanism, reduce handling device's height, make things convenient for the loading, through setting up discharge mechanism, when the air entrainment piece card is unable landing in the carriage, can use the foot to promote the running-board, the push pedal is from roll-off in the recess, exert thrust to the air entrainment piece, thereby make the air entrainment piece landing, the efficiency of unloading has been improved.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
FIG. 1 is a schematic view showing a transportation state of an air entrainment block carrying device for construction of a construction project according to an embodiment;
FIG. 2 is a schematic view showing an unloading state of the aerated block carrying device for constructional engineering construction according to an embodiment;
fig. 3 is a schematic view of a transportation mechanism according to an embodiment of the present invention;
fig. 4 is a schematic view of a heightening mechanism according to an embodiment of the present invention;
fig. 5 is a schematic view of a closing mechanism according to an embodiment of the present invention;
fig. 6 is a schematic view of a discharging mechanism according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the device comprises a transportation mechanism, 101, a carriage, 102, wheels, 103, carriage handles, 104, supporting legs, 105, limiting rods, 106, rollers, 107, grooves, 108, through holes, 109, hinges, 2, a heightening mechanism, 201, a baffle, 202, a rotating shaft, 203, a buckle plate, 3, a closing mechanism, 301, a door plate, 302, a fixed shaft, 303, a limiting plate, 4, a discharging mechanism, 401, a push plate, 402, supporting rods, 403 and a pedal.
Detailed Description
Hereinafter, an embodiment of the present invention of an air entrainment piece carrying device for construction work will be described with reference to the drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1 to 6 show an air-entraining block carrying device for construction engineering, which is implemented by the present invention, and comprises a transporting mechanism 1, an heightening mechanism 2, a sealing mechanism 3 and a discharging mechanism 4, wherein both sides of the transporting mechanism 1 are movably connected with the heightening mechanism 2, so as to increase the amount of air-entraining block transported each time, thereby improving the carrying efficiency, one side of the transporting mechanism 1 is movably connected with the sealing mechanism 3, and one side of the transporting mechanism 1, which is far away from the sealing mechanism 3, is movably connected with the discharging mechanism 4;
the transportation mechanism 1 comprises a carriage 101, wheels 102, a carriage handle 103, supporting feet 104, a limiting rod 105, rollers 106, a groove 107 and a through hole 108, the wheels 102 are rotatably connected to the bottom of the carriage 101, the carriage handle 103 is fixedly connected to one side of the carriage 101, the supporting feet 104 are fixedly connected to one side, close to the carriage handle 103, of the bottom of the carriage 101, and when the vehicle is loaded, the wheels 102 and the supporting feet 104 are simultaneously grounded, so that the sliding of the carrying device is avoided, and the purpose of fixing the carrying device is achieved; the side, far away from the supporting legs 104, of the bottom of the carriage 101 is fixedly connected with a limiting rod 105, one end, far away from the carriage 101, of the limiting rod 105 is rotatably connected with a roller 106, when unloading is carried out, the roller 106 on the limiting rod 105 is grounded, so that the carriage 101 is inclined, an air-entraining block in the carriage 101 slides down, then the carriage 101 is pulled backwards, the wheels 102 and the roller 106 rotate simultaneously, the door plate 301 is slowly pulled out from the bottom of the air-entraining block, and therefore the unloading purpose is achieved, the purpose that the limiting rod 105 and the roller 106 are grounded is to limit the inclination angle of the carriage 101, the problem that the carriage handle 103 is lifted too high to cause the overlarge inclination angle of the carriage 101, the air-entraining block in the carriage 101 is directly dropped to damage the air-entraining block, the purpose of protecting the air-entraining block is achieved, and meanwhile, the problem that the air-entraining block is pressed; a groove 107 is formed in one side, close to the carriage handle 103, of the carriage 101, and a through hole 108 is formed in the groove 107;
the heightening mechanism 2 comprises a baffle 201, a rotating shaft 202 and a pinch plate 203, wherein the rotating shaft 202 is fixedly connected to one side of the top of the baffle 201, and the baffle 201 is rotatably connected with the pinch plate 203 through the rotating shaft 202 arranged on one side of the baffle 201;
the closing mechanism 3 comprises a door plate 301, a fixed shaft 302 and a limit plate 303, the fixed shaft 302 is fixedly connected to the top of one side of the door plate 301, the limit plate 303 is fixedly connected to one end, away from the door plate 301, of the fixed shaft 302, and the pinch plate 203 is prevented from sliding out of the fixed shaft 302;
the discharging mechanism 4 comprises a push plate 401, a support rod 402 and a pedal plate 403, wherein the support rod 402 is fixedly connected to one side of the push plate 401, and the pedal plate 403 is fixedly connected to one end, far away from the push plate 401, of the support rod 402.
The carriage 101 is movably connected with the baffle 201 through hinges 109 arranged on two sides of the carriage, so that the capacity of the carriage 101 is increased, the carrying efficiency is improved, the carriage 101 is movably connected with the door plate 301 through the hinges 109, the size of the groove 107 is matched with the external contour of the push plate 401, and the push plate is placed in the groove when being retracted, so that the internal space of the carriage is not influenced; the supporting rod 402 penetrates through the through hole 108 in the groove 107, the baffle plate 201 is connected with the buckle plate 203 connected to the rotating shaft 202 in a rotating mode and is clamped with the fixing shaft 302 arranged on the door panel 301 in a clamping mode, the purpose of fixing the heightening mechanism 2 and the sealing mechanism 3 is achieved, the distance between the wheel 102 and the supporting leg 104 is larger than the distance between the wheel 102 and the limiting rod 105, the weight of one side of the supporting leg 104 is larger than the weight of one side of the limiting rod 105 through the lever principle, it is guaranteed that one side of the supporting leg 104 lands under the condition that no person supports the supporting leg, the length of the supporting leg 104 is larger than the length of the limiting rod 105, the problem that the limiting rod 105 lands when the carriage handle 103 is lifted to push the carrying device is avoided, the length of the supporting rod 402 is larger than the thickness of the carriage.
When the aerated block carrying device for building engineering construction is used, the heightening mechanism 2 and the sealing mechanism 3 are opened, the aerated block is arranged in the carriage 101, then the heightening mechanism 2 and the sealing mechanism 3 are closed, the buckle plate 203 is clamped with the fixed shaft 302, the heightening mechanism 2 and the sealing mechanism 3 are fixed, then the carrying device is pushed to a specified place through the carriage handle 103, the heightening mechanism 2 and the sealing mechanism 3 are opened again, the carriage handle 103 is lifted, the roller 106 on the limiting rod 105 is landed, the carriage 101 is inclined, the aerated block in the carriage 101 slides off, then the carriage 101 is pulled backwards, the wheels 102 and the roller 106 rotate simultaneously, the door plate 301 is slowly drawn out from the bottom of the aerated block, the purpose of unloading is achieved, if the aerated block cannot slide off in the carriage 101, the foot pedal plate 403 can be pushed by feet, the push plate 401 slides out from the groove 107, thrust is applied to the aerated block, thereby causing the aerated mass to slide off.
To sum up, when the air-entrapping block transporting device for building engineering construction is used, the door plate 301 is movably connected with the carriage 101 by arranging the door plate 301, the door plate 301 is opened, the carriage 101 is inclined by lifting the carriage handle 103, the air-entrapping block in the carriage 101 slides down, then the carriage 101 is pulled backwards, and the door plate 301 is slowly drawn out from the bottom of the air-entrapping block, so that the purpose of unloading is achieved, simplicity and rapidness are realized, and manpower is saved; by arranging the limiting rod 105 and the roller 106, the roller 106 on the limiting rod 105 lands to limit the inclination angle of the carriage 101, so that the situation that the carriage handle 103 is lifted too high to cause too large inclination angle of the carriage 101 and the air-entraining block in the carriage 101 directly falls down to damage the air-entraining block is avoided, the purpose of protecting the air-entraining block is achieved, and meanwhile, the problem that the air-entraining block is pressed on the door plate 301 to be inconvenient to draw out the carrying device is avoided; the heightening mechanism 2 is arranged to increase the amount of the air-adding blocks transported each time, so that the transporting efficiency is improved, and the heightening mechanism 2 is movably connected with the transporting mechanism 1, so that the heightening mechanism 2 can be opened during loading, the height of the transporting device is reduced, and loading is facilitated; through setting up discharge mechanism 4, when the piece card of aerifing can't the landing in carriage 101, can use the foot to promote running-board 403, push pedal 401 slips out in the recess 107, applys thrust to the piece of aerifing to make the piece landing of aerifing, improved the practicality.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (5)

1. The utility model provides a building engineering construction is with aerated block handling device which characterized in that includes: the device comprises a conveying mechanism (1), a sealing mechanism (3) and a discharging mechanism (4); the transportation mechanism (1) comprises a carriage (101), wheels (102), a carriage handle (103), supporting legs (104), a limiting rod (105) and rollers (106), wherein the wheels (102) are rotatably connected to the bottom of the carriage (101), the carriage handle (103) is fixedly connected to one side of the carriage (101), the supporting legs (104) are fixedly connected to one side, close to the carriage handle (103), of the bottom of the carriage (101), the limiting rod (105) is fixedly connected to one side, far away from the supporting legs (104), of the bottom of the carriage (101), and the rollers (106) are rotatably connected to the end portion of the limiting rod (105); a groove (107) is formed in one side, close to the carriage handle (103), of the inner wall of the carriage (101), and a through hole (108) is formed in the groove (107); the closing mechanism (3) comprises a door panel (301), and the lower side of the door panel (301) of the closing mechanism (3) is connected to one side, away from the compartment handle (103), of the compartment (101) through a hinge (109); the discharging mechanism (4) comprises a push plate (401), a supporting rod (402) and a pedal plate (403), wherein the supporting rod (402) is fixedly connected to one side of the push plate (401), and the pedal plate (403) is fixedly connected to the end part of the supporting rod (402); the size of the push plate (401) is matched with a groove (107) on one side of the carriage (101) close to the carriage handle (103) and can be placed in the groove, the supporting rod (402) penetrates through a through hole (108) formed in the groove (107), and the pedal plate (403) is located on the outer side of the carriage (101).
2. The aerated block carrying device for the construction of the constructional engineering according to claim 1, further comprising a heightening mechanism (2), wherein the heightening mechanism (2) comprises a baffle plate (201), a rotating shaft (202) and a buckle plate (203), the rotating shaft (202) is fixedly connected to one side of the top of the baffle plate (201), and the buckle plate (203) is rotatably connected to the rotating shaft (202); the sealing mechanism (3) further comprises a fixing shaft (302) and a limiting plate (303), the fixing shaft (302) is fixedly connected to the top of one side of the door plate (301), and the limiting plate (303) is fixedly connected to the end portion of the fixing shaft (302).
3. The air-entraining lump conveying device for building engineering construction according to claim 1 or 2, wherein two through holes (108) are provided in the groove (107) and are horizontally arranged and parallel to each other, and the number of the support rods (402) of the discharging mechanism (4) is two, and the two support rods are respectively inserted into the through holes (108).
4. The aerated block carrying device for building engineering construction according to claim 3, wherein the distance between the wheel (102) and the supporting foot (104) is larger than the distance between the wheel (102) and the limiting rod (105).
5. The air entrainment piece carrying device for construction of building engineering according to claim 4, characterized in that the length of the support foot (104) is greater than the length of the stopper rod (105).
CN202021403767.6U 2019-12-30 2020-07-16 Air entrainment piece handling device for building engineering construction Expired - Fee Related CN212529667U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201911393524.0A CN111055893A (en) 2019-12-30 2019-12-30 Air entrainment piece handling device for building engineering construction
CN2019113935240 2019-12-30

Publications (1)

Publication Number Publication Date
CN212529667U true CN212529667U (en) 2021-02-12

Family

ID=70304584

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201911393524.0A Pending CN111055893A (en) 2019-12-30 2019-12-30 Air entrainment piece handling device for building engineering construction
CN202021403767.6U Expired - Fee Related CN212529667U (en) 2019-12-30 2020-07-16 Air entrainment piece handling device for building engineering construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201911393524.0A Pending CN111055893A (en) 2019-12-30 2019-12-30 Air entrainment piece handling device for building engineering construction

Country Status (1)

Country Link
CN (2) CN111055893A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661118B (en) * 2020-06-23 2021-05-25 广州形银科技有限公司 Environmental protection handcart for building engineering

Also Published As

Publication number Publication date
CN111055893A (en) 2020-04-24

Similar Documents

Publication Publication Date Title
CN212529667U (en) Air entrainment piece handling device for building engineering construction
CN206797214U (en) A kind of safe rear-dump wagon railway carriage or compartment
CN105236055A (en) Vertical box device of vertical trash compression transfer station
CN212313571U (en) Building site transport rotary block flatbed
CN214360071U (en) Pipeline bracket convenient for pipeline carrying
CN214996137U (en) Construction is with platform of unloading
CN210941803U (en) Aerated brick conveyor who facilitates use
CN210311902U (en) Garbage can
CN210086781U (en) Building construction discharge apparatus
CN210364958U (en) Bentonite storage and transportation device
CN210941864U (en) Air entrainment piece handling device for building engineering construction
CN211686378U (en) A automatic access arrangement for material transportation
CN113460835A (en) Automatic plate turnover device without material receiving platform for construction elevator and use method
CN217477326U (en) Air entrainment piece handling device for building engineering construction
CN220785852U (en) Conveying device
CN111559415A (en) Movable locking anti-dumping hand-push type plate conveying vehicle
CN216003601U (en) Transport transfer device of switch board
CN210012540U (en) Lifting device for constructional engineering
CN211765664U (en) Environment-friendly book and periodical carrying device for propaganda
CN218172974U (en) Bracket for logistics transportation
CN218950042U (en) Building construction hopper that loading and unloading are efficient
CN219771469U (en) Vertical elevator for building construction
CN212125238U (en) Novel urban construction is with fortune material device
CN221138173U (en) Aerated block carrier
CN221340623U (en) Building site building materials transport means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212