CN212521199U - Engineering cost's management device - Google Patents

Engineering cost's management device Download PDF

Info

Publication number
CN212521199U
CN212521199U CN202020702534.XU CN202020702534U CN212521199U CN 212521199 U CN212521199 U CN 212521199U CN 202020702534 U CN202020702534 U CN 202020702534U CN 212521199 U CN212521199 U CN 212521199U
Authority
CN
China
Prior art keywords
storage box
sliding
case
slider
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020702534.XU
Other languages
Chinese (zh)
Inventor
秦成成
张力郅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020702534.XU priority Critical patent/CN212521199U/en
Application granted granted Critical
Publication of CN212521199U publication Critical patent/CN212521199U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a management device of engineering cost, including hollow device shell, a plurality of mounting panels have been welded in the device shell, mounting panel sliding connection has the case, the cross-section of case has been for opening ascending character cut in bas-relief and the inside installation cavity of having seted up, lateral wall sliding connection has the clamp plate in the case, a plurality of second springs of fixed surface are connected with under the clamp plate, the common fixedly connected with rubber briquetting of one end of clamp plate is kept away from to the second spring, a plurality of second sliding chutes have been seted up to the lateral wall in the case, second sliding chute sliding connection has the second slider, second slider one side and clamp plate welding. The utility model discloses can the categorised management engineering cost data, need not browse all data when looking for the data, improve work efficiency greatly, can loosen automatically and press from both sides tight data simultaneously when taking out and pushing out the case, simplify operating procedure greatly.

Description

Engineering cost's management device
Technical Field
The utility model relates to an engineering cost technical field especially relates to an engineering cost's management device.
Background
Civil engineering is a general term for scientific technology for building various land engineering facilities. It refers to both the materials, equipment used and the technical activities carried out such as surveying, designing, construction, maintenance, repair, etc., as well as the objects of engineering construction. The civil engineering needs to estimate the cost, a large amount of data needs to be stored and managed during estimation, and a management device is needed to collect and arrange the data uniformly.
Among the prior art, current management device only plays a storage effect to the engineering cost data, and unable categorised the depositing needs to turn over in batches when looking for the data, leads to work efficiency low, and current management device needs the manual work to open the clip simultaneously and presss from both sides the data, and operation process is more loaded down with trivial details.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a management device for construction cost.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a management device for engineering construction cost comprises a hollow device shell, wherein a plurality of mounting plates are welded in the device shell, the mounting plates are connected with a storage box in a sliding manner, the cross section of the storage box is in a shape of a Chinese character 'ao' with an upward opening and is internally provided with a mounting cavity, the inner side wall of the storage box is connected with a pressing plate in a sliding manner, the lower surface of the pressing plate is fixedly connected with a plurality of second springs, one ends of the second springs, far away from the pressing plate, are jointly and fixedly connected with rubber pressing blocks, the inner side wall of the storage box is provided with a plurality of second sliding grooves, the second sliding grooves are connected with second sliding blocks in a sliding manner, one sides of the second sliding blocks are welded with the pressing plate, the other sides of the second sliding blocks penetrate through the storage box and extend into a safety cavity of the storage box, the side wall of the device shell is rotatably connected with a box door through a hinge.
Preferably, the storage box lateral wall runs through sliding connection and has a first rack, the welding of the one end that first rack is located the storage box outside has the fixed plate, the first spring of fixedly connected with between fixed plate and the storage box, first rack is located one section meshing in the installation cavity of storage box has the gear, gear engagement has a plurality of second racks, roof runs through sliding connection in second rack and the storage box, the gear is kept away from to the second rack one side with correspond the welding of second slider.
Preferably, a plurality of first sliding grooves are formed in the mounting plate, a plurality of first sliding blocks are welded to the lower surface of the storage box, and the storage box is connected with the mounting plate in a sliding mode through the matching of the first sliding blocks and the first sliding grooves.
Preferably, the first sliding block is a sliding block with a T-shaped cross section, the first sliding groove and the T-shaped sliding groove are at least symmetrically provided with three groups.
Preferably, the gear interference fit has the axis of rotation, the axis of rotation both ends all are connected with the box inner wall through the bearing rotation, the second rack is provided with two sets with the second slider symmetry at least.
Preferably, a plurality of through holes are formed in the top wall and the side wall of the device shell, the non-slip mat is bonded to the lower surface of the device shell, and the label is bonded to the side wall, close to one side of the box door, of the storage box.
The utility model discloses contrast prior art, its advantage lies in:
1. the management device is internally provided with a plurality of storage boxes, labels are pasted on the side faces of the storage boxes, engineering cost data can be stored in a classified mode according to different types of data, the storage boxes corresponding to the labels are only required to be drawn out to take when the data are searched, all the data do not need to be browsed, and the working efficiency is greatly improved;
2. arrange the engineering cost data in corresponding case, when pushing the case in the management device, through the meshing between first rack, gear, the second rack, drive the clamp plate and compress tightly the data, do not need the manual work to open the clip and press from both sides the data tightly, simplified the operating procedure when depositing the data greatly.
Drawings
Fig. 1 is a schematic structural diagram of a management device for construction cost according to the present invention.
Fig. 2 is an enlarged view of a management device a of construction cost according to the present invention.
Fig. 3 is a partial sectional view of a management device B for construction cost according to the present invention.
In the figure: the device comprises a device shell 1, a mounting plate 2, a first sliding groove 21, a first sliding block 22, a storage box 3, a second sliding groove 31, a pressing plate 4, a second spring 41, a rubber pressing block 5, a first rack 6, a fixing plate 61, a first spring 62, a gear 7, a rotating shaft 71, a second rack 8, a second sliding block 81, a box door 101, a through hole 102 and a non-slip mat 103.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a management device for engineering cost comprises a hollow device shell 1, a plurality of mounting plates 2 are welded in the device shell 1, the mounting plates 2 are connected with a storage box 3 in a sliding manner, the cross section of the storage box 3 is in a concave shape with an upward opening and is internally provided with a mounting cavity, the inner side wall of the storage box 3 is connected with a pressing plate 4 in a sliding manner, the lower surface of the pressing plate 4 is fixedly connected with a plurality of second springs 41, one ends of the second springs 41 far away from the pressing plate 4 are fixedly connected with a rubber pressing block 5 together, the inner side wall of the storage box 3 is provided with a plurality of second sliding grooves 31, the second sliding grooves 31 are connected with a second sliding block 81 in a sliding manner, one side of the second sliding block 81 is welded with the pressing plate 4, the other side of the second sliding block 81 penetrates through the storage box 3 and extends into a safety cavity of, a door 101 is rotatably connected to the side wall of the apparatus casing 1 through a hinge.
The lateral wall of the storage box 3 is connected with a first rack 6 in a penetrating and sliding mode, one end, located outside the storage box 3, of the first rack 6 is welded with a fixing plate 61, a first spring 62 is fixedly connected between the fixing plate 61 and the storage box 3, one section, located in an installation cavity of the storage box 3, of the first rack 6 is meshed with a gear 7, the gear 7 is meshed with a plurality of second racks 8, the top wall of the second racks 8 and the storage box 3 are connected in a penetrating and sliding mode, and one side, away from the gear 7, of each second rack 8 is welded with a corresponding second sliding block 81.
A plurality of first sliding chutes 21 are formed in the mounting plate 2, a plurality of first sliding blocks 22 are welded on the lower surface of the storage box 3, and the storage box 3 is connected with the mounting plate 2 in a sliding mode through the matching of the first sliding blocks 22 and the first sliding chutes 21.
First slider 22 is the slider of T shape for the cross-section, first sliding tray 21 and T shape sliding tray, and first slider 22 is provided with three groups with first sliding tray 21 symmetry at least, and the symmetry sets up three first sliders 22 of group and guarantees the case 3 steadily taking out with pushing the in-process with third sliding tray 21, and the cooperation of the first slider 22 of T shape and first sliding tray 21 is more firm, prevents that case 3 from droing from mounting panel 2.
The gear 7 is in interference fit with the rotating shaft 71, two ends of the rotating shaft 71 are rotatably connected with the inner side wall of the storage box 3 through bearings, the second racks 8 and the second sliding blocks 81 are at least symmetrically provided with two groups, and the two groups of second racks 8 and the second sliding blocks 81 are symmetrically arranged about the gear 7, so that the stable up-and-down motion of the pressing plate 4 is ensured.
The top wall and the side wall of the device shell 1 are both provided with a plurality of through holes 102, the lower surface of the device shell 1 is bonded with a non-slip mat 103, and the side wall of the storage box 3 close to one side of the box door 101 is bonded with a label. The through holes 102 ensure ventilation in the device and prevent the data from being affected with moisture; the anti-slip pad 103 prevents the management device from slipping under external force, so that the stability of the device is improved; the label is convenient for the classification storage management of engineering materials.
When the device of the utility model is used and engineering cost data needs to be stored or taken, the box door 101 is opened, the corresponding storage box 3 is found according to the classification on the label, the storage box 3 is pulled out, under the action of the elastic force of the first spring 62, the first rack 6 moves towards the direction far away from the storage box 3 to drive the gear 7 meshed with the first rack to rotate, the gear 7 drives the second rack 8 meshed with the second rack to move upwards, the second rack 7 drives the pressing plate 4 to move upwards through the second sliding block 81, the pressed data is released, after the data is taken out or stored, the storage box 3 is pushed into the management device and pushed into the management device, the first rack 6 moves towards the direction close to the storage box 3, the gear 7 is driven to rotate, the gear 7 rotates to enable the second rack 8 to move downwards, the second sliding block 81 drives the pressing plate 4 to move downwards, so that the stored data are pressed tightly, and then the door 101 is closed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a management device of engineering cost, includes hollow device shell (1), its characterized in that, a plurality of mounting panels (2) have been welded in device shell (1), mounting panel (2) sliding connection has case (3), the installation cavity has been seted up for opening ascending character cut in bas-relief and inside in the cross-section of case (3), case (3) inside wall sliding connection has clamp plate (4), a plurality of second springs (41) of clamp plate (4) lower fixed surface, the common fixedly connected with rubber briquetting (5) of one end of clamp plate (4) are kept away from in second spring (41), a plurality of second sliding tray (31) have been seted up to case (3) inside wall, second sliding tray (31) sliding connection has second slider (81), second slider (81) one side and clamp plate (4) welding, second slider (81) opposite side runs through case (3) and extends to the safety of case (3) In the cavity, be provided with automatic closing device in the installation cavity of case (3), case (3) and device shell (1) lateral wall run through sliding connection, device shell (1) lateral wall rotates through the hinge and is connected with chamber door (101).
2. A construction cost management device according to claim 1, wherein a first rack (6) is slidably connected to the side wall of the storage box (3), a fixing plate (61) is welded to one end of the first rack (6) located outside the storage box (3), a first spring (62) is fixedly connected between the fixing plate (61) and the storage box (3), a gear (7) is engaged with one section of the first rack (6) located in the installation cavity of the storage box (3), a plurality of second racks (8) are engaged with the gear (7), the second racks (8) are slidably connected to the inner top wall of the storage box (3) in a penetrating manner, and one side of the second racks (8) away from the gear (7) is welded to the corresponding second sliding block (81).
3. A construction cost management device according to claim 1, wherein a plurality of first sliding grooves (21) are formed on the mounting plate (2), a plurality of first sliding blocks (22) are welded on the lower surface of the storage box (3), and the storage box (3) is slidably connected with the mounting plate (2) through the matching of the first sliding blocks (22) and the first sliding grooves (21).
4. A construction cost management device according to claim 3, wherein the first slider (22) is a slider with a T-shaped cross section, the first sliding groove (21) and the T-shaped sliding groove are arranged, and at least three groups of the first slider (22) and the first sliding groove (21) are symmetrically arranged.
5. A construction cost management device according to claim 2, wherein the gear (7) is fitted with a rotation shaft (71) in an interference fit manner, both ends of the rotation shaft (71) are rotatably connected with the inner side wall of the storage box (3) through bearings, and at least two sets of the second racks (8) and the second sliding blocks (81) are symmetrically arranged.
6. A construction cost management device according to claim 1, wherein the top wall and the side wall of the device casing (1) are provided with a plurality of through holes (102), the lower surface of the device casing (1) is adhered with a non-slip mat (103), and the side wall of the storage box (3) close to the box door (101) is adhered with a label.
CN202020702534.XU 2020-04-30 2020-04-30 Engineering cost's management device Active CN212521199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020702534.XU CN212521199U (en) 2020-04-30 2020-04-30 Engineering cost's management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020702534.XU CN212521199U (en) 2020-04-30 2020-04-30 Engineering cost's management device

Publications (1)

Publication Number Publication Date
CN212521199U true CN212521199U (en) 2021-02-12

Family

ID=74540187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020702534.XU Active CN212521199U (en) 2020-04-30 2020-04-30 Engineering cost's management device

Country Status (1)

Country Link
CN (1) CN212521199U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114055986A (en) * 2021-11-22 2022-02-18 滨州学院 Portable account book storage device for financial management teaching
CN114261629A (en) * 2022-02-08 2022-04-01 深圳市顺新安电子有限公司 IC chip processing is accomodate and is used case

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114055986A (en) * 2021-11-22 2022-02-18 滨州学院 Portable account book storage device for financial management teaching
CN114261629A (en) * 2022-02-08 2022-04-01 深圳市顺新安电子有限公司 IC chip processing is accomodate and is used case

Similar Documents

Publication Publication Date Title
CN212521199U (en) Engineering cost's management device
CN212530192U (en) Clothes packing device
CN210120989U (en) Human resource information storage cabinet
CN207860779U (en) A kind of industrial chemicals storing unit
CN112864516B (en) Energy storage plug box applied to energy storage system
CN208638817U (en) A kind of water conservancy and hydropower construction management device
CN208578245U (en) A kind of steel building plate
CN212765390U (en) Accounting document management device
CN211684241U (en) Accounting bill processing apparatus
CN206466543U (en) garbage packer
CN213550562U (en) Data collection device for engineering consultation management
CN214023170U (en) Metal parts processing clout recovery unit
CN214258552U (en) Drawer laminated combined cultural relic storage cabinet frame
CN111622186A (en) Auxiliary supporting structure of gate hoist
CN206883542U (en) Rotating shaft of sunshading board assembly tooling
CN214127638U (en) Architectural design drawing stores storage device
CN213382054U (en) Peeling device for processing bamboo-wood fiberboard
CN209829817U (en) A general machine of recoverable using of oil gas for cell-phone production
CN210548262U (en) Industrial automation is with panel drilling equipment
CN217617837U (en) Drilling device for processing metallurgical non-standard parts
CN208028394U (en) A kind of novel automatic electrical cabinet
CN220955244U (en) Door structure convenient to door equipment
CN213677780U (en) Project tracking management device
CN216370275U (en) Punching device for production and processing of guide rail pressing plate
CN213308327U (en) Building engineering management information processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant