CN212506908U - Isolation wallboard for building intelligent installation engineering - Google Patents

Isolation wallboard for building intelligent installation engineering Download PDF

Info

Publication number
CN212506908U
CN212506908U CN202020770288.1U CN202020770288U CN212506908U CN 212506908 U CN212506908 U CN 212506908U CN 202020770288 U CN202020770288 U CN 202020770288U CN 212506908 U CN212506908 U CN 212506908U
Authority
CN
China
Prior art keywords
wall board
board
wall
wallboard
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020770288.1U
Other languages
Chinese (zh)
Inventor
程金晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Guanghao Electronic Technology Engineering Co ltd
Original Assignee
Hubei Guanghao Electronic Technology Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Guanghao Electronic Technology Engineering Co ltd filed Critical Hubei Guanghao Electronic Technology Engineering Co ltd
Priority to CN202020770288.1U priority Critical patent/CN212506908U/en
Application granted granted Critical
Publication of CN212506908U publication Critical patent/CN212506908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a building intelligent partition wall board for installation engineering, which comprises a first wall board and a second wall board, wherein one side of the first wall board and one side of the second wall board are respectively penetrated with a butt joint port, a water outlet pipe and a water inlet pipe, one end of the water outlet pipe and one end of the water inlet pipe are fixedly connected with a circulating pipe, the inner sides of the tops of the first wall board and the second wall board are movably connected with a top frame, the inner part of the top frame is fixedly connected with a nut sleeve, one end of the nut sleeve is connected with a screw post, the outer side of the screw post is fixedly connected with an adjusting screw, the bottom end of the screw post is movably connected with a baffle plate, the front sides of the first wall board and the second wall board are respectively provided with an adjusting port and an adjusting groove, through the arranged gear, a connecting plate and a rack, the problem that a constructor can not misunderstand the problem that the, the wall board is more firmly installed, and the indoor temperature can be adjusted according to the climate problem.

Description

Isolation wallboard for building intelligent installation engineering
Technical Field
The utility model relates to a building technical field especially relates to a building intelligent partition wall board for installation engineering.
Background
The wallboard is a building material, and is a house structure of a bearing system consisting of a wall and a floor slab, wherein a bearing wall of the wallboard structure can be made of bricks, building blocks and prefabricated or cast-in-place concrete, and can be divided into a mixed structure, an assembled large-plate structure and a cast-in-place wallboard structure according to different used materials and construction methods.
The existing isolation wallboard is not tight in connection between wallboard and the wallboard when installed, the existing gap is large, the wallboard cannot be installed due to the overlarge width, and after the wallboard is installed, a certain space can be reserved between the top of a house and the top of the wallboard to lead to the infirm installation of the wallboard, and when the wallboard is used in winter and summer, the problem that the indoor temperature is slow in heating and cooling is needed due to the climate.
Therefore, it is necessary to provide a partition wall panel for building intelligent installation engineering to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building intelligent installation is partition wall board for engineering has solved, be connected inseparable and insecure and use the wallboard winter and summer between wallboard and the wallboard when the installation, because of the reason of weather, relatively slow problem when needs heat up and cool down indoor temperature.
In order to solve the technical problems, the utility model provides a partition board for building intelligent installation engineering, which comprises a first wall board and a second wall board, wherein one side of the first wall board and one side of the second wall board respectively penetrate through a butt joint port, a water outlet pipe and a water inlet pipe, one end of the water outlet pipe and one end of the water inlet pipe are fixedly connected with a circulating pipe, the inner sides of the tops of the first wall board and the second wall board are movably connected with a top frame, the inner part of the top frame is fixedly connected with a nut sleeve, one end of the nut sleeve is connected with a screw column in a threaded manner, the outer side of the screw column is fixedly connected with an adjusting screw, the bottom end of the screw column is movably connected with a partition board, the front sides of the first wall board and the second wall board are respectively provided with an adjusting port and an adjusting groove, the first wall board and the second wall board are movably, the bottom fixedly connected with rack of connecting plate, the inner wall of first wallboard and second wallboard is equallyd divide respectively fixedly connected with bearing plate and acoustic celotex board.
Preferably, the rack is provided with a plurality ofly, and is a plurality of the rack is the equidistance respectively and arranges, rack and connecting plate formula structure as an organic whole, the rack is connected with the gear interlock.
Preferably, the first wallboard and the second wallboard are the same in height, the outer surfaces of the first wallboard and the second wallboard are smooth, and the first wallboard and the second wallboard are movably connected with the top frame.
Preferably, the outer width of the connecting plate is matched with the inner width of the butt joint port, and the butt joint port is movably connected with the connecting plate.
Preferably, the top frame is formed by combining a nut sleeve in the top frame, a screw post at one end of the nut sleeve and an adjusting screw outside the screw post, and the nut sleeve is fixedly connected with the top frame.
Preferably, the second wallboard comprises a bearing plate on the inner wall of the second wallboard, a sound insulation plate, a circulating pipe inside the second wallboard and a top frame connected with the second wallboard, and the second wallboard is fixedly connected with the bearing plate and the sound insulation plate respectively.
Compared with the prior art, the utility model provides a pair of building intelligent partition wall board for installation engineering has following beneficial effect:
the utility model provides a building intelligent partition wall board for installation engineering, gear through setting up, connecting plate and rack, when installing partition wall board, constructor fixes first wallboard on the wall body, then dock to the connecting plate to the butt joint on the second wallboard, the rack on the connecting plate will be lived in the interlock to the gear, at this moment the staff is through adjusting mouthful use tool rotating gear, when the gear is rotatory, the connecting plate will stimulate the second wallboard through the rack and be close to first wallboard, make first wallboard and second wallboard closely merge, so that make be connected more accurate between wallboard and the wallboard, it can not be inaccurate because wallboard and wallboard are connected after the customization process to have solved the wallboard, lead to constructor misunderstanding because of the problem of size problem on the installation.
The utility model provides a building intelligent partition wall board for installation engineering, through adopting the roof-rack, after the wallboard is installed, if there is gap and great space at the top in house and the top of wallboard, constructor, through the adjustment tank, dock the mounting tool on the adjusting screw, then constructor rotates adjusting screw, the rotation also can be followed to the screw post, and the screw post will break away from the nut cover, at this moment the roof-rack will upwards rise, and the top is at the roof in house, so that make the wallboard installation more firm, and can also play the effect of supporting the house.
The utility model provides a building intelligent installation is partition plate for engineering, through the circulating pipe, after wallboard installation net, the staff advances water piping connection to domestic water heater with the outlet pipe on, in winter, because people all need heat water when bathing, at this moment, after water heating through the water heater, open the outlet valve, water will enter into the circulating pipe through the inlet tube, and the circulating pipe will come out the heat diffusion, and transmit on partition plate, thereby heat indoor, in summer, add the circulating pipe to cold water through the water heater, make the cold water in the circulating pipe cool down to partition plate, thereby prevent because of outdoor high temperature, lead to partition plate's temperature rising, make indoor temperature also rise, so that partition plate can adjust indoor temperature according to the problem of weather.
Drawings
Fig. 1 is a schematic view of the overall structure of a partition wall panel for building intelligent installation engineering provided by the present invention;
FIG. 2 is an exploded view of the overall structure of the present invention;
FIG. 3 is a sectional view of the overall structure of the present invention;
fig. 4 is a cross-sectional view of the first wall panel of the present invention.
Reference numbers in the figures: 1. a first wall panel; 101. a gear; 102. a partition plate; 103. a circulation pipe; 104. a bearing plate; 105. a sound insulating board; 2. a second wall panel; 3. an adjustment port; 4. a butt joint port; 5. a water outlet pipe; 6. a water inlet pipe; 7. a top frame; 701. a nut sleeve; 702. a screw post; 703. adjusting screws; 8. an adjustment groove; 9. a connecting plate; 10. a rack.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the technical scheme in the utility model, all other embodiments that ordinary skilled person in the art obtained under the prerequisite of not making the creative work all belong to the scope of the utility model protection.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Please refer to fig. 1, fig. 2, fig. 3 and fig. 4 in combination, wherein fig. 1 is a schematic view of an overall structure of a partition wall board for building intelligent installation engineering according to the present invention; FIG. 2 is an exploded view of the overall structure of the present invention; FIG. 3 is a sectional view of the overall structure of the present invention; fig. 4 is a cross-sectional view of the first wall panel of the present invention. A partition wall board for building intelligent installation engineering comprises a first wall board 1 and a second wall board 2, wherein one side of the first wall board 1 and one side of the second wall board 2 are respectively penetrated with a butt joint port 4, a water outlet pipe 5 and a water inlet pipe 6, one end of the water outlet pipe 5 and one end of the water inlet pipe 6 are fixedly connected with a circulating pipe 103, the inner sides of the tops of the first wall board 1 and the second wall board 2 are movably connected with a top frame 7, the inside of the top frame 7 is fixedly connected with a nut sleeve 701, one end of the nut sleeve 701 is connected with a screw column 702 in a threaded manner, the outer side of the screw column 702 is fixedly connected with an adjusting screw 703, the bottom end of the screw column 702 is movably connected with a partition board 102, the front sides of the first wall board 1 and the second wall board 2 are respectively provided with an adjusting port 3 and an adjusting groove 8, the first wall board 1 and the second wall board 2 are movably connected with a gear 101, the inner walls of the first wall plate 1 and the second wall plate 2 are fixedly connected with a bearing plate 104 and a sound insulation plate 105 respectively.
Further, rack 10 is provided with a plurality ofly, and a plurality of racks 10 are the equidistance respectively and arrange, and rack 10 and connecting plate 9 formula structure as an organic whole, and rack 10 is connected with gear 101 interlock, uses the instrument through regulation mouth 3 and rotates gear 101, and when gear 101 was rotatory, connecting plate 9 will stimulate second wallboard 2 through rack 10 and be close to first wallboard 1, makes first wallboard 1 and second wallboard 2 closely merge.
Further, first wallboard 1 is the same with 2 high of second wallboard, and the surface of first wallboard 1 and second wallboard 2 is smooth, first wallboard 1 and second wallboard 2 and roof-rack 7 swing joint, and the surface of first wallboard 1 and second wallboard 2 is smooth, can prevent constructor fish tail when the installation.
Further, the outer width of connecting plate 9 and the interior width looks adaptation of interface 4, interface 4 and connecting plate 9 swing joint are convenient for the constructor to be got up first wallboard 1 and second wallboard 2 combination.
Further, the top frame 7 is formed by combining a nut sleeve 701 inside the top frame 7, a screw column 702 at one end of the nut sleeve 701 and an adjusting screw 703 outside the screw column 702, the nut sleeve 701 is fixedly connected with the top frame 7, and then, if a gap and a large space exist between the top of the house and the top of the wallboard, a constructor butt joints an installation tool onto the adjusting screw 703 through an adjusting groove 8, and then the constructor rotates the adjusting screw 703, the screw column 702 can also rotate, the screw column 702 can be separated from the nut sleeve 701, at this time, the top frame 7 can be lifted upwards and is propped against the roof of the house, so that the wallboard is fixed more firmly.
Further, the second wall panel 2 comprises a bearing plate 104 on the inner wall of the second wall panel 2, a sound insulation plate 105, a circulation pipe 103 inside the second wall panel 2, and a top frame 7 connected to the second wall panel 2, wherein the second wall panel 2 is fixedly connected to the bearing plate 104 and the sound insulation plate 105, respectively, and sound transmission can be better insulated by the sound insulation plate 105.
The utility model provides a pair of building intelligent for installation engineering division wallboard's theory of operation as follows: firstly, the installation fixing and the safety protection of the utility model are checked, when the partition wall board is installed, a constructor fixes a first wall board 1 on a wall body, then butt joints a butt joint port 4 on a second wall board 2 to a connecting board 9, a gear 101 can be meshed with a rack 10 on the connecting board 9, at the moment, the constructor uses a tool to rotate the gear 101 through an adjusting port 3, when the gear 101 rotates, the connecting board 9 can pull the second wall board 2 to approach the first wall board 1 through the rack 10, so that the first wall board 1 and the second wall board 2 are combined closely, after the wall boards are installed, if a gap and a larger space exist between the top of a house and the top of the wall boards, the constructor butt joints an installing tool to an adjusting screw through an adjusting groove 8, then the constructor rotates the adjusting screw 703, a screw column 702 can also follow the rotation, and the screw column 702 can be separated from a nut sleeve 701, at this moment roof-rack 7 will upwards rise, and the top is at the roof in house, after wallboard installation net, the staff is connected outlet pipe 5 and inlet tube 6 to domestic water heater on, in winter, because people all need heat water when bathing, at this moment, after water heating through the water heater, open the outlet valve, water will enter into in the circulating pipe 103 through inlet tube 6, and circulating pipe 103 will come out the heat diffusion, and transmit on the partition wall board, thereby heat indoor, in summer, add circulating pipe 103 to cold water through the water heater, make the cold water in the circulating pipe 103 cool down to partition wall board, thereby prevent because of outdoor high temperature, lead to partition wall board's temperature to rise, make indoor temperature also rise, just so accomplish right the utility model discloses a use, the utility model discloses simple structure, convenience safe in utilization.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building intelligent installation is insulated wall panel for engineering, includes first wallboard (1) and second wallboard (2), its characterized in that: one side of each of the first wall plate (1) and the second wall plate (2) is provided with a butt joint port (4), a water outlet pipe (5) and a water inlet pipe (6) in a penetrating mode, one end of each of the water outlet pipe (5) and the water inlet pipe (6) is fixedly connected with a circulating pipe (103), the inner sides of the tops of the first wall plate (1) and the second wall plate (2) are movably connected with a top frame (7), the inside of the top frame (7) is fixedly connected with a nut sleeve (701), one end of the nut sleeve (701) is connected with a screw column (702) in a threaded mode, the outer side of the screw column (702) is fixedly connected with an adjusting screw (703), the bottom end of the screw column (702) is movably connected with a partition plate (102), the front sides of the first wall plate (1) and the second wall plate (2) are provided with an adjusting port (3) and an adjusting groove (8), and the first wall plate (1) and the second wall plate, the opposite side fixedly connected with connecting plate (9) of first wallboard (1), the bottom fixedly connected with rack (10) of connecting plate (9), difference fixedly connected with bearing plate (104) and acoustic celotex board (105) are equallyd divide to the inner wall of first wallboard (1) and second wallboard (2).
2. The partition wall board for the intelligent installation engineering of buildings according to claim 1, characterized in that a plurality of racks (10) are provided, the racks (10) are respectively arranged at equal intervals, the racks (10) and the connecting plate (9) are of an integrated structure, and the racks (10) are engaged with the gear (101).
3. The partition wall board for the intelligent building installation project according to claim 1, wherein the first wall board (1) and the second wall board (2) are the same in height, the outer surfaces of the first wall board (1) and the second wall board (2) are smooth, and the first wall board (1) and the second wall board (2) are movably connected with the top frame (7).
4. The partition wall board for the intelligent building installation project according to claim 1, wherein the outer width of the connecting board (9) is matched with the inner width of the butt joint port (4), and the butt joint port (4) is movably connected with the connecting board (9).
5. The partition wall board for the intelligent building installation project according to claim 1, wherein the top frame (7) is formed by combining a nut sleeve (701) in the top frame (7), a screw column (702) at one end of the nut sleeve (701) and an adjusting screw (703) outside the screw column (702), and the nut sleeve (701) is fixedly connected with the top frame (7).
6. The partition wall board for the intelligent building installation project according to claim 1, wherein the second wall board (2) comprises a bearing board (104) on the inner wall of the second wall board (2), a sound insulation board (105), a circulation pipe (103) inside the second wall board (2), and a top frame (7) connected with the second wall board (2), and the second wall board (2) is fixedly connected with the bearing board (104) and the sound insulation board (105) respectively.
CN202020770288.1U 2020-05-11 2020-05-11 Isolation wallboard for building intelligent installation engineering Active CN212506908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020770288.1U CN212506908U (en) 2020-05-11 2020-05-11 Isolation wallboard for building intelligent installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020770288.1U CN212506908U (en) 2020-05-11 2020-05-11 Isolation wallboard for building intelligent installation engineering

Publications (1)

Publication Number Publication Date
CN212506908U true CN212506908U (en) 2021-02-09

Family

ID=74446108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020770288.1U Active CN212506908U (en) 2020-05-11 2020-05-11 Isolation wallboard for building intelligent installation engineering

Country Status (1)

Country Link
CN (1) CN212506908U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026982A (en) * 2021-03-05 2021-06-25 重庆中昆新材料科技有限公司 Energy-saving assembled all-aluminum building wall
CN113107113A (en) * 2021-05-12 2021-07-13 贾仁兵 Assembled building partition plate convenient to assemble and disassemble

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026982A (en) * 2021-03-05 2021-06-25 重庆中昆新材料科技有限公司 Energy-saving assembled all-aluminum building wall
CN113107113A (en) * 2021-05-12 2021-07-13 贾仁兵 Assembled building partition plate convenient to assemble and disassemble

Similar Documents

Publication Publication Date Title
US4296798A (en) Integrated house
CN212506908U (en) Isolation wallboard for building intelligent installation engineering
AU2009232081B2 (en) Novel sustainable building model
US20110099918A1 (en) Complete prefabricated mechanical & utility system
RU2014134178A (en) METHOD AND SYSTEM FOR BUILDING A BUILDING
CN108824648A (en) Space module house
CN106480977A (en) Passive type house
JP2012026105A (en) Building
WO2016156778A1 (en) Modular building
CN107524252B (en) The moisture-proof heat preserving exterior wall in lightgage steel joist house and its construction method
KR101388178B1 (en) Sunlight protect of light and heat for double-glazed to device access
CN204645359U (en) A kind of without seam Prefabricated integral polyurethane floor
GB1022285A (en) Buildings
CN207538313U (en) Mobile house wallboard and mobile house
CN208870194U (en) Space module house
CN220747216U (en) Assembled building convenient to temperature regulation
CN220790133U (en) Building movement joint device
CN219280980U (en) Waterproof anticorrosive heat preservation sound insulation wall structure of modularization
CN213572451U (en) Assembled acoustic celotex board mounting member easy to assemble
CN215563522U (en) Energy-saving assembled building wall
CN215260026U (en) Sunshine room with electric heating floor heating
CN220469149U (en) Light steel house of joining in marriage formula with insulating layer
CN220538966U (en) Assembled wall with stable fixed knot constructs
CN218972754U (en) Integral toilet
CN216949675U (en) Outdoor far infrared spectrum energy room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant