CN212506730U - A prefabricated sandwich thermal insulation wall - Google Patents

A prefabricated sandwich thermal insulation wall Download PDF

Info

Publication number
CN212506730U
CN212506730U CN202020974969.XU CN202020974969U CN212506730U CN 212506730 U CN212506730 U CN 212506730U CN 202020974969 U CN202020974969 U CN 202020974969U CN 212506730 U CN212506730 U CN 212506730U
Authority
CN
China
Prior art keywords
wall body
wall
thermal insulation
prefabricated sandwich
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020974969.XU
Other languages
Chinese (zh)
Inventor
殷敬峰
谭金娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongying Engineering Group Co ltd
Original Assignee
Guangdong University Of Business And Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University Of Business And Technology filed Critical Guangdong University Of Business And Technology
Priority to CN202020974969.XU priority Critical patent/CN212506730U/en
Application granted granted Critical
Publication of CN212506730U publication Critical patent/CN212506730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

本实用新型涉及建筑用品技术领域,且公开了一种建筑预制夹心保温墙,包括外墙体、内墙体和保温板,所述外墙体和所述内墙体前后对称分布,所述保温板位于所述外墙体和所述内墙体之间,且所述保温板的前表面与所述外墙体的后表面相贴合,所述保温板的后表面与所述内墙体的前表面相贴合;在进行组合安装的时候,可以将一个墙体上的连接柱插入到另一个墙体固定柱上的连接槽中,从而可以实现两个墙体之间的快速组合安装,相较于现有的组合安装方式,该方式相较于现有的组合安装方式,更加的方便快捷有利于建筑的快速施工,并且连接柱与固定柱均与外墙体和内墙体一体成型,从而可以避免外墙体、内墙体和保温板之间发生相互脱离的情况。

Figure 202020974969

The utility model relates to the technical field of building supplies, and discloses a prefabricated sandwich thermal insulation wall for buildings, which comprises an outer wall, an inner wall and a thermal insulation board. The board is located between the outer wall and the inner wall, and the front surface of the insulation board is attached to the rear surface of the outer wall, and the rear surface of the insulation board is in contact with the inner wall. The front surface of the two walls fits together; during combined installation, the connecting column on one wall can be inserted into the connecting groove on the fixing column on the other wall, so that the rapid combined installation between the two walls can be realized. , Compared with the existing combined installation method, this method is more convenient and quicker than the existing combined installation method, which is conducive to the rapid construction of the building, and the connecting column and the fixed column are integrated with the outer wall and the inner wall. forming, so that the mutual separation of the outer wall, the inner wall and the thermal insulation board can be avoided.

Figure 202020974969

Description

Building prefabricated sandwich heat preservation wall
Technical Field
The utility model relates to a building articles for use technical field specifically is a building prefabricated sandwich heat preservation wall.
Background
Along with the rapid development of the building industry in China and the improvement of the consciousness of environmental protection and energy conservation, the modernization of the building industry is developed rapidly, the modernization of the building industry is a necessary way for improving the overall level of the building industry in China, the precast concrete is an important basis for realizing the building industrialization, is an important guarantee for realizing high efficiency, high quality, low resource consumption and low environmental impact of building construction, and is a necessary choice for sustainable development, meanwhile, the building energy conservation technology is developed vigorously in China, the building energy conservation standard is enforced to be implemented everywhere, the energy-saving house is absolutely necessary to be developed vigorously, the enclosure structure is one of the main ways of building energy loss, so the great development of the improvement of the thermal performance of the enclosure structure is particularly important, and the prefabricated sandwich heat-insulating wall panel is one of effective measures for reducing the building energy consumption, prolonging the service life of the building and ensuring the building safety.
The in-process that current prefabricated sandwich heat preservation wall was used, generally through the pre-buried connecting piece in the wall body realize the intercombination installation between two wall bodies, the installation is accomplished the back, in order to make more firm of connecting between two wall bodies, generally can punch at the junction to put into the montant in the air, and make the montant pass the connecting piece between two wall bodies, then with the concrete shutoff for the hole again, comparatively waste time and energy like this, be unfavorable for the quick construction of building.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building prefabricated sandwich heat preservation wall has solved in order to make between two walls body connect more firm, generally can punch in the junction to put into the montant aloft, and make the montant pass the connecting piece between two walls bodies, then with the concrete shutoff for the hole again, comparatively waste time and energy like this, be unfavorable for the problem of the quick construction of building.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prefabricated sandwich heat preservation wall of building, includes outer wall body, interior wall body and heated board, outer wall body with interior wall body front and back symmetric distribution, the heated board is located outer wall body with between the interior wall body, just the front surface of heated board with the rear surface of outer wall body laminates mutually, the rear surface of heated board with the front surface of interior wall body laminates mutually, outer wall body with same one side of interior wall body is fixed with the spliced pole, just outer wall body with the same opposite side of interior wall body is fixed with the fixed column, the fixed column is kept away from outer wall body with the spread groove has been seted up to one side of interior wall body, the both ends opening of spread groove is located respectively the upper surface and the lower surface of fixed column.
Preferably, the connecting column and the connecting groove are both T-shaped structures, and the connecting column is matched with the connecting groove.
Preferably, the inside wall of spread groove is fixed with the rubber gasket, the rubber gasket is HNBR hydrogenated nitrile rubber material.
Preferably, the connecting columns and the fixing columns are integrally formed with the outer wall body and the inner wall body.
Preferably, the upper surface and the lower surface of the connecting column are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body, and the upper surface and the lower surface of the fixing column are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body.
Preferably, a plurality of inserting columns are uniformly fixed on the upper surface of the outer wall body and the upper surface of the inner wall body from left to right, a plurality of inserting holes are uniformly formed in the lower surface of the outer wall body and the lower surface of the inner wall body from left to right, the inserting columns correspond to the inserting holes in a one-to-one mode, and the inserting columns are matched with the inserting holes in a plurality of modes.
(III) advantageous effects
The utility model provides a building prefabricated sandwich heat preservation wall possesses following beneficial effect:
(1) the utility model discloses when carrying out composite mounting, can insert the spread groove on another wall body fixed column with the spliced pole on the wall body to can realize the quick aggregate erection between two wall bodies, compare in current aggregate erection mode, this mode is compared in current aggregate erection mode, and convenient and fast more is favorable to the quick construction of building.
(2) The utility model provides a spliced pole and fixed column all with outer wall body and interior wall body integrated into one piece to can avoid taking place the condition that breaks away from each other between outer wall body, interior wall body and the heated board.
(3) The utility model discloses a plurality of spliced poles and connecting hole on outer wall body and the interior wall body can make progress built-up mounting thermal insulation wall body, convenient and fast more.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic bottom view of the present invention;
fig. 3 is an enlarged schematic structural diagram of a in fig. 1 of the present invention.
In the figure: 1. inserting a column; 2. an inner wall; 3. a thermal insulation board; 4. an outer wall body; 5. connecting columns; 6. fixing a column; 7. connecting grooves; 8. a jack; 9. a rubber gasket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, the utility model provides a technical solution: a building prefabricated sandwich heat-insulating wall comprises an outer wall body 4, an inner wall body 2 and a heat-insulating plate 3, wherein the outer wall body 4 and the inner wall body 2 are symmetrically distributed in the front-back direction, the heat-insulating plate 3 is positioned between the outer wall body 4 and the inner wall body 2, the front surface of the heat-insulating plate 3 is attached to the rear surface of the outer wall body 4, the rear surface of the heat-insulating plate 3 is attached to the front surface of the inner wall body 2, connecting columns 5 are fixed on the same side of the outer wall body 4 and the inner wall body 2, fixed columns 6 are fixed on the same other side of the outer wall body 4 and the inner wall body 2, one sides of the fixed columns 6 far away from the outer wall body 4 and the inner wall body 2 are provided with connecting grooves 7, openings at two ends of the connecting grooves 7 are respectively positioned on the upper surface and the lower surface of the fixed columns 6, when the combined installation is carried out, the connecting, compared with the existing combined installation mode, the mode is more convenient and faster, and is beneficial to the rapid construction of buildings.
Furthermore, the connecting column 5 and the connecting groove 7 are both of a T-shaped structure, and the connecting column 5 is matched with the connecting groove 7, so that the situation that the two walls are separated easily after the two walls are assembled and installed together is avoided.
Further, the inside wall of spread groove 7 is fixed with rubber gasket 9, and rubber gasket 9 is HNBR hydrogenated nitrile rubber material, can make the leakproofness of the good whole wall body of aggregate erection better, avoids external moisture to permeate into indoorly from between two wall bodies easily to rubber gasket 9 can be long-time use.
Further, spliced pole 5 and fixed column 6 all with outer wall body 4 and interior wall body 2 integrated into one piece, can avoid taking place the condition that breaks away from each other between outer wall body 4, interior wall body 2 and the heated board 3, make whole wall body more firm.
Furthermore, the upper surface and the lower surface of the connecting column 5 are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body 4, and the upper surface and the lower surface of the fixing column 6 are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body 4, so that the upper surface and the lower surface of two well-assembled wall bodies are both positioned on the same horizontal plane, and the condition that holes appear on the assembled wall is avoided.
Further, the upper surface of outer wall body 4 and the upper surface of interior wall body 2 are evenly fixed with a plurality of posts 1 of inserting from left to right, and a plurality of jacks 8 have evenly been seted up from left to right to the lower surface of outer wall body 4 and the lower surface of interior wall body 2, a plurality of posts 1 and a plurality of jacks 8 one-to-one inserted, and a plurality of posts 1 of inserting respectively with a plurality of jacks 8 looks adaptations, in the in-process of using, can place a wall body on another wall body, a plurality of posts 1 of inserting on a wall body this moment can insert respectively in a plurality of jacks 8 on another wall body, thereby can make things convenient for the quick composite erection wall body that makes progress.
To sum up, the utility model discloses a work flow: when the combined installation is carried out, the connecting column 5 on one wall body can be inserted into the connecting groove 7 on the other wall body fixing column 6, thereby realizing the rapid combined installation between the two walls, compared with the prior combined installation mode, compared with the existing combined installation mode, the mode is more convenient and faster, is beneficial to the rapid construction of buildings, and the connecting columns 5 and the fixing columns 6 are integrally formed with the outer wall body 4 and the inner wall body 2, so that the situation that the outer wall body 4, the inner wall body 2 and the heat-insulating board 3 are separated from each other can be avoided, the whole wall body is more stable, simultaneously in the in-process of using, can place a wall body on another wall body, a plurality of posts 1 of inserting on a wall body can insert respectively in a plurality of jacks 8 on another wall body this moment to can make things convenient for quick upwards aggregate erection wall body.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a prefabricated sandwich heat preservation wall of building, includes outer wall body (4), interior wall body (2) and heated board (3), its characterized in that: the heat insulation board comprises an outer wall body (4) and an inner wall body (2), wherein the outer wall body (4) and the inner wall body (2) are symmetrically distributed in the front-back direction, the heat insulation board (3) is located between the outer wall body (4) and the inner wall body (2), the front surface of the heat insulation board (3) is attached to the rear surface of the outer wall body (4), the rear surface of the heat insulation board (3) is attached to the front surface of the inner wall body (2), a connecting column (5) is fixed to the same side of the outer wall body (4) and the inner wall body (2), a fixing column (6) is fixed to the same other side of the outer wall body (4) and the inner wall body (2), a connecting groove (7) is formed in one side, far away from the outer wall body (4) and the inner wall body (2), and openings at two ends of the connecting groove (7) are located in.
2. The building prefabricated sandwich thermal insulation wall as claimed in claim 1, wherein: the connecting column (5) and the connecting groove (7) are both T-shaped structures, and the connecting column (5) and the connecting groove (7) are matched.
3. The building prefabricated sandwich thermal insulation wall as claimed in claim 1, wherein: the inside wall of spread groove (7) is fixed with rubber gasket (9), rubber gasket (9) are HNBR hydrogenation nitrile rubber material.
4. The building prefabricated sandwich thermal insulation wall as claimed in claim 1, wherein: the connecting columns (5) and the fixing columns (6) are integrally formed with the outer wall body (4) and the inner wall body (2).
5. The building prefabricated sandwich thermal insulation wall as claimed in claim 1, wherein: the upper surface and the lower surface of the connecting column (5) are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body (4), and the upper surface and the lower surface of the fixing column (6) are respectively positioned on the same plane with the upper surface and the lower surface of the outer wall body (4).
6. The building prefabricated sandwich thermal insulation wall as claimed in claim 1, wherein: the upper surface of outer wall body (4) with the upper surface of interior wall body (2) from left to right evenly is fixed with a plurality of posts (1) of inserting, just the lower surface of outer wall body (4) with a plurality of jacks (8) have from left to right evenly been seted up to the lower surface of interior wall body (2), and is a plurality of post (1) and a plurality of jack (8) one-to-one, and a plurality of it is respectively with a plurality of to insert post (1) jack (8) looks adaptation.
CN202020974969.XU 2020-06-02 2020-06-02 A prefabricated sandwich thermal insulation wall Active CN212506730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020974969.XU CN212506730U (en) 2020-06-02 2020-06-02 A prefabricated sandwich thermal insulation wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020974969.XU CN212506730U (en) 2020-06-02 2020-06-02 A prefabricated sandwich thermal insulation wall

Publications (1)

Publication Number Publication Date
CN212506730U true CN212506730U (en) 2021-02-09

Family

ID=74381636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020974969.XU Active CN212506730U (en) 2020-06-02 2020-06-02 A prefabricated sandwich thermal insulation wall

Country Status (1)

Country Link
CN (1) CN212506730U (en)

Similar Documents

Publication Publication Date Title
CN212506730U (en) A prefabricated sandwich thermal insulation wall
CN209798994U (en) prefabricated house
CN112376747A (en) Building decoration is with assembled partition wall that inside can lay circuit
CN201391052Y (en) Integrated building components for power generation and thermal insulation
CN209855037U (en) Novel assembled aluminum alloy wall structure
Yu et al. The research on a new type of BIPV modules constructed by thin-film photovoltaic panel (or module)/PU/color organic-coated steel plate
CN206941921U (en) A kind of floor plates with radiating sound insulation function
CN202731092U (en) Environment-friendly insulation plate of asbestos cement board and foam
CN207968383U (en) A kind of photovoltaic battery panel assembly system
CN204401909U (en) A kind of energy-conservation top floor
CN206090838U (en) Assembled steel construction house with solar energy structure
CN207597709U (en) A kind of modular unit combination prefabricated panel
CN205134636U (en) Novel fire prevention heat insulation structure
CN206591709U (en) A kind of preformed self thermal insulation pre-stress concrete box ventilation roofing plate
CN211691057U (en) Assembled steel construction outer wall
CN219158547U (en) Multilayer assembled energy-saving building
CN211597225U (en) Assembled light steel wallboard
CN205617838U (en) Hollow load -bearing wall panel prefabricated building of environmental protection and energy saving
CN212249004U (en) A kind of building energy-saving thermal insulation decorative board
CN219732399U (en) Prefabricated environment-friendly energy-saving wall body of building
CN211949061U (en) Enclosure system for assembly type steel structure
CN223088695U (en) House building assembly wall
CN219840278U (en) Color steel tile roof with exhaust structure
CN212773132U (en) Prefabricated wallboard keeps warm with window form
CN205531471U (en) Lightly constructed and simply equipped building of assembling fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240919

Address after: Room 202, Building B, No. 2 Qiande Road, Jiangning District, Nanjing City, Jiangsu Province (Jiangning High tech Park)

Patentee after: Zhongying Construction Development Group Co.,Ltd.

Country or region after: China

Address before: 526000 in Beiling Qixing tourist resort, Duanzhou District, Zhaoqing City, Guangdong Province

Patentee before: Guangdong University of business and technology

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241028

Address after: No. 123, Township Government Yard, Xilingsi Town, Sui County, Shangqiu City, Henan Province, China 476942

Patentee after: Zhongying Engineering Group Co.,Ltd.

Country or region after: China

Address before: Room 202, Building B, No. 2 Qiande Road, Jiangning District, Nanjing City, Jiangsu Province (Jiangning High tech Park)

Patentee before: Zhongying Construction Development Group Co.,Ltd.

Country or region before: China