CN212502486U - Building engineering is carried with novel material device - Google Patents

Building engineering is carried with novel material device Download PDF

Info

Publication number
CN212502486U
CN212502486U CN202021078324.4U CN202021078324U CN212502486U CN 212502486 U CN212502486 U CN 212502486U CN 202021078324 U CN202021078324 U CN 202021078324U CN 212502486 U CN212502486 U CN 212502486U
Authority
CN
China
Prior art keywords
fixedly connected
building engineering
bottom plate
novel material
conveying device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021078324.4U
Other languages
Chinese (zh)
Inventor
李向东
高静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Polytechnic
Original Assignee
Binzhou Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Polytechnic filed Critical Binzhou Polytechnic
Priority to CN202021078324.4U priority Critical patent/CN212502486U/en
Application granted granted Critical
Publication of CN212502486U publication Critical patent/CN212502486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Screw Conveyors (AREA)

Abstract

The utility model discloses a novel material conveying device for building engineering relates to building engineering technical field, and it includes the bottom plate, fixedly connected with backup pad on the position on the left side of bottom plate upper surface, the backup pad is articulated mutually with the connecting block through round pin axle one, connecting block fixed connection is in the bottom of carriage, fixedly connected with articulates seat one on the position on the right side of bottom plate upper surface, it is articulated mutually with electric putter's fixed end through round pin axle two to articulate seat one. This novel material conveying device for building engineering drives fixed plate and motor and removes left through the extension of electric putter two, makes gear wheel two break away from with pinion one then, makes pinion two mesh with gear wheel one mutually, and then slows down the slew velocity of pivot and screw conveyer wheel temporarily at two transmission gear wheels of pinion, can slow down the conveying speed of screw conveyer wheel to the material then according to the use needs to satisfy workman's user demand.

Description

Building engineering is carried with novel material device
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering uses novel material conveyor.
Background
The building engineering, a part of the construction engineering, refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the building constructions, and the materials such as sand, cement and the like need to be conveyed by using a conveying device in the building construction process, so as to reduce the labor amount of workers and improve the efficiency of building construction.
The existing conveying device cannot slow down the conveying speed of the conveying device to materials as required in the using process, and meanwhile, the blanking speed of the conveying device cannot be controlled according to the using requirements of the materials, so that inconvenience is brought to the use of workers, and the using requirements of users cannot be met.
Therefore, the defects of the existing conveying device are improved correspondingly.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a novel material conveyor for building engineering has solved current conveyor and can not slow down conveyor to the transport speed of material as required in the use, can not be according to the user demand of material, control conveyor's unloading speed's problem simultaneously.
(II) technical scheme
In order to achieve the above purpose, the utility model adopts the technical proposal that: a novel material conveying device for building engineering comprises a bottom plate, wherein a supporting plate is fixedly connected to the left position of the upper surface of the bottom plate, the supporting plate is hinged to a connecting block through a first pin shaft, the connecting block is fixedly connected to the bottom of a conveying box, a first hinged seat is fixedly connected to the right position of the upper surface of the bottom plate, the first hinged seat is hinged to the fixed end of a first electric push rod through a second pin shaft, the telescopic end of the first electric push rod is hinged to a second hinged seat through a third pin shaft, the second hinged seat is fixedly connected to the bottom of the conveying box, a first bearing is clamped to the left side wall and the right side wall of the conveying box, the same rotating shaft is sleeved in the first bearings, a spiral conveying wheel is fixedly connected to the rotating shaft, a first gear wheel and a first pinion are fixedly connected to the left end of the rotating shaft from left to right in sequence, the first gear wheel and the first pinion are, the second pinion and the second gearwheel are both sleeved on an output shaft of a motor, the motor is fixedly connected to the right side surface of a fixed plate, a second electric push rod is fixedly connected to the position on the upper side of the right side surface of the fixed plate, the fixed end of the second electric push rod is fixedly connected to the left side surface of a conveying box, a discharging pipe is fixedly connected to the position on the right side of the lower side wall of the conveying box, the other end of the discharging pipe penetrates through the left side wall of a discharging pipe and is communicated with the discharging pipe, a movable block is connected in the discharging pipe in a sliding manner, an L-shaped sliding rod is fixedly connected to the top end of the movable block, the other end of the L-shaped sliding rod penetrates through a sliding sleeve clamped on the upper side wall of the discharging pipe and is fixedly connected with a nut, the nut is in threaded connection with a screw rod, the connecting plate is fixedly connected to the right side face of the conveying box.
Preferably, the four corners of the bottom plate are fixedly connected with pulleys.
Preferably, the bottom end of the screw is fixedly connected with a rotating disc.
Preferably, a feed hopper is arranged on the left side of the side wall of the conveying box.
Preferably, the front surface of the bottom plate is fixedly provided with a control box, and the output end of the control box is electrically connected with the first electric push rod, the second electric push rod and the access end of the motor respectively.
(III) advantageous effects
The beneficial effects of the utility model reside in that:
1. this novel material conveying device for building engineering drives fixed plate and motor and removes left through the extension of electric putter two, makes gear wheel two break away from with pinion one then, makes pinion two mesh with gear wheel one mutually, and then slows down the slew velocity of pivot and screw conveyer wheel temporarily at two transmission gear wheels of pinion, can slow down the conveying speed of screw conveyer wheel to the material then according to the use needs to satisfy workman's user demand.
2. This novel material conveying device for building engineering drives the rotation of screw rod through forward rotation rotary disk, and the screw rod makes nut, L type slide bar and movable block downstream rotating the in-process, and the movable block is at the in-process shutoff discharging pipe gradually that moves downstream to reduce the speed that the material in the discharging pipe got into the unloading pipe, and then reduce the unloading speed of unloading pipe, easy operation, thereby it is convenient to bring for workman's work.
3. This novel material conveyor for building engineering through electric putter one's extension to through backup pad, round pin axle one, connecting block, articulated seat one, round pin axle two, articulated seat two and the cooperation of round pin axle three, make the delivery box slope right, can adjust the height of material transportation then according to the needs of construction, so that the workman uses the device, improves workman's work efficiency.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
fig. 2 is a schematic view of the front view structure of the present invention.
In the figure: the device comprises a base plate 1, a support plate 2, a connecting block 3, a first hinged seat 4, a first electric push rod 5, a conveying box 6, a rotating shaft 7, a spiral conveying wheel 8, a first pinion 9, a first gearwheel 10, a second gearwheel 11, a second pinion 12, a motor 13, a fixing plate 14, a second electric push rod 15, a discharge pipe 16, a discharge pipe 17, a movable block 18, a sliding sleeve 19, a 20L-shaped sliding rod, a screw rod 21, a nut 22, a connecting plate 23, a rotating disc 24, a pulley 25, a feeding hopper 26, a control box 27 and a second hinged seat 28.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-2, the utility model provides a technical solution: a novel material conveying device for building engineering comprises a bottom plate 1, a supporting plate 2 is fixedly connected to the position, on the left side, of the upper surface of the bottom plate 1, the supporting plate 2 is hinged to a connecting block 3 through a first pin shaft, the supporting plate 2, the first pin shaft and the connecting block 3 are matched, on the one hand, the supporting plate plays a role in supporting and fixing the conveying box 6, on the other hand, the connecting block 3 can adapt to the inclination of the conveying box 6, the connecting block 3 is fixedly connected to the bottom of the conveying box 6, a first hinged seat 4 is fixedly connected to the position, on the right side, of the upper surface of the bottom plate 1, the first hinged seat 4 is hinged to the fixed end of a first electric push rod 5 through a second pin shaft, the telescopic end of the first electric push rod 5 is hinged to a second hinged seat 28 through a third pin shaft, the second hinged seat 28 is fixedly connected to the bottom of the conveying box, The second pin shaft, the second hinged seat 28 and the third pin shaft are matched to enable the conveying box 6 to incline rightwards, so that the conveying height of materials can be adjusted according to construction requirements, a worker can conveniently use the device, the working efficiency of the worker is improved, the first bearings are clamped on the left side wall and the right side wall of the conveying box 6, the same rotating shaft 7 is sleeved in the first bearings, the rotating shaft 7 is fixedly connected with a spiral conveying wheel 8, the left end of the rotating shaft 7 is sequentially and fixedly connected with a first big gear 10 and a first small gear 9 from left to right, the first big gear 10 and the first small gear 9 are respectively matched with a second small gear 12 and a second big gear 11, when the discharging pipe 16 is not plugged by the movable block 18, the second big gear 11 is meshed with the first small gear 9, the rotating speed of the rotating shaft 7 and the spiral conveying wheel 8 can be increased, the conveying speed of the materials by the spiral conveying wheel 8 is guaranteed, and the second small gear 12 and the second big, motor 13 fixed connection is at the right flank of fixed plate 14, fixedly connected with electric putter two 15 on the inclined to one side position of fixed plate 14 right flank, and the stiff end fixed connection of electric putter two 15 lies in the left surface of delivery box 6, and its effect lies in: the fixed plate 14 and the motor 13 are driven to move leftwards by the extension of the electric push rod II 15, then the gear wheel II 11 is separated from the gear wheel I9, the gear wheel II 12 is meshed with the gear wheel I10, further, the rotating speed of the rotating shaft 7 and the spiral conveying wheel 8 is reduced when the gear wheel II 12 drives the gear wheel I10, further, the conveying speed of the spiral conveying wheel 8 to materials can be reduced according to the use requirement so as to meet the use requirement of workers, a discharging pipe 16 is fixedly connected to the position of the lower side wall of the conveying box 6 on the right side, the other end of the discharging pipe 16 penetrates through the left side wall of the discharging pipe 17 and is communicated with the discharging pipe 17, a movable block 18 is connected in the discharging pipe 17 in a sliding mode, an L-shaped slide rod 20 is fixedly connected to the top end of the movable block 18, the other end of the L-shaped slide rod 20 penetrates through, the function is as follows: make nut 22 through screw rod 21 at the forward rotation in-process, L type slide bar 20 and movable block 18 move down, movable block 18 is at the in-process shutoff discharging pipe 16 gradually that moves down, in order to reduce the speed that the material in the discharging pipe 16 got into unloading pipe 17, and then reduce the unloading speed of unloading pipe 17, therefore easy operation, thereby it is convenient to bring for workman's work, the bottom optical axis department of screw rod 21 has cup jointed bearing two, and bearing two joint is on connecting plate 23, the joint has unloading pipe 17 in connecting plate 23, connecting plate 23 fixed connection is at the right flank of carrying case 6, play the fixed effect of support to unloading pipe 17 and bearing two through connecting plate 23.
Equal fixedly connected with pulley 25 in bottom four corners department of bottom plate 1 through setting up pulley 25 for the device is convenient for remove, and the bottom fixedly connected with rotary disk 24 of screw rod 21 is provided with feeder hopper 26 on the position of the lateral wall on the left side on transport case 6, and the positive fixed mounting of bottom plate 1 has control box 27, and control box 27's output is connected with electric putter one 5, electric putter two 15 and motor 13's incoming end electricity respectively.
The utility model discloses an operating procedure does:
s1, when the blanking device is needed to be used, firstly, the blanking speed of the blanking pipe 17 is adjusted according to the use requirement, a worker rotates the rotating disc 24 to drive the screw rod 21 to rotate, the screw rod 21 enables the nut 22, the L-shaped sliding rod 20 and the movable block 18 to move downwards in the forward rotation process, and the movable block 18 gradually blocks the discharging pipe 16 in the downward movement process so as to reduce the speed of the material in the discharging pipe 16 entering the blanking pipe 17 and further reduce the blanking speed of the blanking pipe 17;
s2, controlling the extension of the second electric push rod 15 through the control box 27, driving the fixing plate 14 and the motor 13 to move leftwards by the extension of the second electric push rod 15, separating the second gearwheel 11 from the first gearwheel 9, meshing the second gearwheel 12 with the first gearwheel 10, slowing down the conveying speed of the spiral conveying wheel 8 to materials according to use requirements, adjusting the inclination angle of the conveying box 6 according to the height of material transportation, controlling the extension of the first electric push rod 5 through the control box 27, extending the first electric push rod 5, and matching the support plate 2, the first pin shaft, the connecting block 3, the first hinge seat 4, the second pin shaft, the second hinge seat 28 and the third pin shaft to enable the conveying box 6 to incline rightwards, and then adjusting the height of material transportation according to construction requirements;
s3, finally, controlling the box motor 13 to work by the control box 27, driving the second pinion 12 and the second gearwheel 11 to rotate by the rotation of the motor 13, driving the first gearwheel 10 by the engagement of the second pinion 12, and then enabling the rotating shaft 7 and the spiral conveying wheel 8 to rotate, and pouring the materials into the conveying box 6 by workers through the feed hopper 26 and conveying the materials through the spiral conveying wheel 8.
The above-mentioned embodiments further describe the objects, technical solutions and advantages of the present invention in detail, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (5)

1. The utility model provides a novel material conveyor for building engineering, includes bottom plate (1), its characterized in that: fixedly connected with backup pad (2) on the position of bottom plate (1) upper surface on the left side, backup pad (2) are articulated mutually with connecting block (3) through round pin axle one, connecting block (3) fixed connection is in the bottom of transport case (6), fixedly connected with articulates seat one (4) on the position of bottom plate (1) upper surface on the right side, it is articulated mutually with the fixed end of electric putter one (5) through round pin axle two (4), the flexible end of electric putter one (5) is articulated mutually with articulated seat two (28) through round pin axle three, articulated seat two (28) fixed connection is in the bottom of transport case (6), the equal joint of left side wall and the right side wall of transport case (6) has bearing one, and has cup jointed same pivot (7) in two bearing one, fixedly connected with screw conveyer wheel (8) on pivot (7), the left end of pivot (7) turns right fixedly connected with gear wheel one (10) and pinion one (one) in proper order from a left side, (7) 9) The utility model discloses a conveying device for the automobile engine, the first gear wheel (10) and the first pinion (9) respectively with two (12) and two (11) gear wheels looks adaptation, two (12) gear wheels and two (11) gear wheels all cup joint on the output shaft of motor (13), motor (13) fixed connection is in the right flank of fixed plate (14), fixedly connected with electric putter two (15) on the position on the inclined to one side of fixed plate (14) right flank, the stiff end fixed connection of electric putter two (15) is in the left flank of conveying case (6), fixedly connected with discharging pipe (16) on the position on the inclined to one side of conveying case (6) lower side wall, the other end of discharging pipe (16) passes the left side wall of unloading pipe (17) and is linked together with unloading pipe (17), sliding connection has movable block (18) in unloading pipe (17), the top fixedly connected with L type slide bar (20) of movable block (18), the other end of L type slide bar (20) passes sliding sleeve (19) of lateral wall joint and nut (22) fixed connection on unloading pipe (17), nut (22) and screw rod (21) threaded connection, the bottom optical axis department of screw rod (21) has cup jointed bearing two, and two joints of bearing are on connecting plate (23), the joint has unloading pipe (17) in connecting plate (23), connecting plate (23) fixed connection is at the right flank of transport case (6).
2. The novel material conveying device for the building engineering as claimed in claim 1, characterized in that: the bottom four corners of the bottom plate (1) are fixedly connected with pulleys (25).
3. The novel material conveying device for the building engineering as claimed in claim 1, characterized in that: the bottom end of the screw rod (21) is fixedly connected with a rotating disc (24).
4. The novel material conveying device for the building engineering as claimed in claim 1, characterized in that: and a feed hopper (26) is arranged at the left position of the upper side wall of the conveying box (6).
5. The novel material conveying device for the building engineering as claimed in claim 1, characterized in that: the front face of the bottom plate (1) is fixedly provided with a control box (27), and the output end of the control box (27) is electrically connected with the access ends of the electric push rod I (5), the electric push rod II (15) and the motor (13) respectively.
CN202021078324.4U 2020-06-12 2020-06-12 Building engineering is carried with novel material device Expired - Fee Related CN212502486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021078324.4U CN212502486U (en) 2020-06-12 2020-06-12 Building engineering is carried with novel material device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021078324.4U CN212502486U (en) 2020-06-12 2020-06-12 Building engineering is carried with novel material device

Publications (1)

Publication Number Publication Date
CN212502486U true CN212502486U (en) 2021-02-09

Family

ID=74395977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021078324.4U Expired - Fee Related CN212502486U (en) 2020-06-12 2020-06-12 Building engineering is carried with novel material device

Country Status (1)

Country Link
CN (1) CN212502486U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113291720A (en) * 2021-05-13 2021-08-24 厦门顶峰螺旋科技有限公司 Assembled efficient screw conveying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113291720A (en) * 2021-05-13 2021-08-24 厦门顶峰螺旋科技有限公司 Assembled efficient screw conveying device
CN113291720B (en) * 2021-05-13 2022-05-20 厦门顶峰螺旋科技有限公司 Assembled efficient screw conveying device

Similar Documents

Publication Publication Date Title
CN212502486U (en) Building engineering is carried with novel material device
CN201253785Y (en) Slender shaft pipe fitting high speed supporting roller conveying device
CN108759452B (en) Grain drying-machine conveying equipment
CN214869312U (en) Grinding device for deburring of metal products
CN210887801U (en) Light roof boarding apparatus for producing
CN210616944U (en) Aggregate conveyor of concrete mixing plant
JP2645398B2 (en) Work feeder for centerless grinding machine
CN212596004U (en) Material grinder is used in production of medicine intermediate
CN200946043Y (en) Helical delivering machine
CN110614577B (en) Convenient repair equipment of ageing ceramic tile
CN208683819U (en) A kind of brick-making raw material box-type feeder
CN207861187U (en) A kind of embedded scraper transporter
CN221293720U (en) Material conveyer for building engineering
CN219340956U (en) Anti-blocking pneumatic conveying device
CN210906011U (en) Premix production line equipment
CN215212149U (en) Construction device for modified asphalt waterproof coating
CN217755376U (en) Automatic feeding device for asphalt concrete production
CN215286676U (en) Raw material conveying device for producing aluminum silicate heat-insulating material
CN220097497U (en) Dry powder mortar loading attachment
CN214570447U (en) Lifting device for bulk material processing
CN218859467U (en) Cement feed mechanism
CN211768273U (en) Sealed conveyer belt with prevent material function of droing
CN212173869U (en) Powder conveying device for asphalt mixing plant
CN214030902U (en) Hydraulic control device of long stock ground material taking machine
CN220844101U (en) Bucket elevator for feeding aluminum ash

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209

CF01 Termination of patent right due to non-payment of annual fee