CN212485981U CN202021345449.9U CN202021345449U CN212485981U CN 212485981 U CN212485981 U CN 212485981U CN 202021345449 U CN202021345449 U CN 202021345449U CN 212485981 U CN212485981 U CN 212485981U
Authority
CN
China
Prior art keywords
wall
elastic block
cable
base
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021345449.9U
Other languages
Chinese (zh)
Inventor
李颖龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Fangxin Construction Engineering Co ltd
Original Assignee
Guangxi Fangxin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Fangxin Construction Engineering Co ltd filed Critical Guangxi Fangxin Construction Engineering Co ltd
Priority to CN202021345449.9U priority Critical patent/CN212485981U/en
Application granted granted Critical
Publication of CN212485981U publication Critical patent/CN212485981U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

The utility model discloses an electric cable strutting arrangement is faced in construction belongs to construction technical field, the on-line screen storage device comprises a base, first recess has been seted up in the middle of the base bottom outer wall, and first recess both sides inner wall has seted up the spout, and first recess top inner wall installs the hydraulic pressure post through the bolt, hydraulic pressure post bottom end fixed mounting has the connecting plate, and the connecting plate is at the inside slip of spout, two spring posts are installed through the bolt in the connecting plate bottom, and there is anti-skidding truckle spring post bottom through support fixed mounting. The utility model discloses in through hydraulic pressure post, connecting plate, spring post, antiskid truckle cooperation work for the device is convenient for remove and the shock attenuation is effectual, and installs down elastic block and fixed plate bottom on the backup pad top and install the elastic block, makes the cable be located elastic block and elastic block cross joint department down, and the installation of ball is convenient for the cable and removes inside the device, and the device of also being convenient for removes on the cable surface, has avoided damaging its insulating surface when pulling the cable.

Description

Electric cable strutting arrangement is faced in construction
Technical Field
The utility model relates to a construction technical field especially relates to a construction faces electric cable strutting arrangement.
Background
The building construction is a production movement which is carried out by people to build various building products in a certain space and time according to a specific design blueprint by utilizing various building materials and mechanical equipment; the method comprises the whole production process from construction preparation, earth breaking engineering to engineering completion acceptance inspection; building construction workers need to exert clever and intellectual abilities to creatively apply theories of materials, mechanics, structures, processes and the like to solve the technical problems which continuously appear in construction, and ensure the engineering quality and the construction safety.
The temporary electricity utilization refers to newly increased drought resistance, drainage and waterlogging electricity utilization of capital construction sites, farmland basic construction, rural aquaculture and abnormal annual scenes and other needs to be measured outside the household meters of an electric power department, the temporary electricity utilization plays a decisive role in the building construction process, and the completion of each process is closely related to the temporary electricity utilization; when present building construction site needs interim power consumption, mostly need constructor manual work to carry out laying of cable, need one kind to face electric cable strutting arrangement and reduce the potential safety hazard, but present building construction faces electric cable strutting arrangement and often damages the cable insulation surface when dragging, leads to the problem that cable life reduces.
Disclosure of Invention
The utility model aims at solving the shortcoming that exists among the prior art, and the electric cable strutting arrangement is faced in construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a temporary cable supporting device for building construction comprises a base, wherein a first groove is formed in the middle of the outer wall of the bottom end of the base, sliding grooves are formed in the inner walls of two sides of the first groove, a hydraulic column is installed on the inner wall of the top end of the first groove through a bolt, a connecting plate is fixedly installed at the bottom end of the hydraulic column and slides in the sliding grooves, two spring columns are installed at the bottom end of the connecting plate through bolts, anti-skid trundles are fixedly installed at the bottom ends of the spring columns through supports, side plates are installed on two sides of the outer wall of the top end of the base through bolts, a lifting groove is formed in the middle of the inner sides of the two side plates, a plurality of equidistant stop blocks are installed on two sides of the inner wall of the lifting groove through torsion springs in a rotating mode, a supporting plate is inserted between every two sets of four, and the middle of the limiting plate is rotatably provided with a regulating rod, the bottom end of the regulating rod is fixedly connected with a fixed plate, the middle of the outer wall of the bottom end of the fixed plate is fixedly provided with a plurality of equidistant upper elastic blocks, and two sides of the outer wall of the bottom end of the fixed plate are fixedly provided with dust removing brushes.
Preferably, the base is narrow trapezoidal down, and base bottom outer wall both sides have seted up the second recess, and there is the motor on the inside top of second recess through bolt fixed mounting, the motor lower extreme rotates through the shaft coupling and installs the threaded rod, and threaded rod circumference outer wall has the positioning claw through fixed cover welding.
Preferably, base top outer wall fixed mounting has the casing, and inside control box and the battery of having placed of casing, casing top fixed mounting has the warning light, and the casing outer wall subsides have high reflecting material.
Preferably, go up the elasticity piece and elasticity piece cross joint down, and go up the elasticity piece and all inlay with elasticity piece outer wall down and install the ball.
Preferably, a push handle is mounted on the outer wall of one of the side plates through a bolt.
Preferably, the fixing plate is a V-shaped structure with two sides protruding in the middle and downward, and the outer wall of the supporting plate is provided with water permeable holes at equal intervals.
Preferably, the outer walls of the top ends of the two side plates are fixedly and obliquely provided with a solar cell panel through a support.
The utility model has the advantages that:
1. the utility model provides a pair of electric cable strutting arrangement is faced in construction, through the hydraulic pressure post, the connecting plate, the spring post, antiskid truckle cooperation work, it is effectual to make the device be convenient for remove and the shock attenuation, and the backup pad top is installed down elastic block and fixed plate bottom and is installed the elastic block, make the cable be located elastic block and elastic block cross joint department down, the installation of ball is convenient for the cable and removes at last elastic block and elastic block down, the device of also being convenient for removes on the cable surface, damage its insulating surface when having avoided dragging the cable.
2. The utility model provides a pair of electric cable strutting arrangement is faced in construction rotates through the lift inslot wall and installs the dog of a plurality of equidistance for the height-adjustable of backup pad, and fixed plate top fixedly connected with adjusts the pole, can adapt to the cable of different diameters, increases the practicality of device, has the brush that removes dust through deciding board bottom outer wall both sides fixed mounting, removes dust to the cable surface, when the fixed position is confirmed to the device, and motor work makes the locating pawl downstream, fastens ground, ensures the stability of device.
3. The utility model provides a pair of electric cable strutting arrangement is faced in construction, turn into solar energy through solar cell panel and use the electric energy storage, energy-concerving and environment-protective, and two equal fixed inclinations in curb plate top install solar cell panel, ensure the stability of device.
Drawings
Fig. 1 is a schematic structural view of a temporary cable support device for building construction according to the present invention;
fig. 2 is a schematic view of a bottom view structure of a fixing plate of the temporary cable support device for building construction according to the present invention;
fig. 3 is a schematic side view of the positioning pawl of the temporary cable support device for building construction according to the present invention;
fig. 4 is the utility model discloses embodiment 2 provides a local schematic structure of electric cable strutting arrangement is faced in construction.
In the figure: the device comprises a side plate 1, a fixing plate 2, a stop block 3, a support plate 4, a lifting groove 5, a shell 7, a base 8, a motor 9, a positioning claw 10, an anti-skidding caster 11, a hydraulic column 12, a connecting plate 13, a spring column 14, a threaded rod 15, a lower elastic block 16, a limiting plate 17, an adjusting rod 18, an upper elastic block 19, a dust removing brush 20 and a solar cell panel 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-3, an electric cable supporting device for building construction, comprising a base 8, a first groove is arranged in the middle of the outer wall of the bottom end of the base 8, sliding grooves are arranged on the inner walls of the two sides of the first groove, a hydraulic column 12 is arranged on the inner wall of the top end of the first groove through a bolt, a connecting plate 13 is fixedly arranged at the bottom end of the hydraulic column 12, the connecting plate 13 slides in the sliding grooves, two spring columns 14 are arranged at the bottom end of the connecting plate 13 through bolts, anti-skid casters 11 are fixedly arranged at the bottom ends of the spring columns 14 through a bracket, side plates 1 are arranged on the two sides of the outer wall of the top end of the base 8 through bolts, a lifting groove 5 is arranged in the middle of the inner sides of the two side plates 1, a plurality of stoppers 3 with equal distance are rotatably arranged on the two sides of the inner wall of the lifting, limiting plates 17 are fixedly mounted at the top ends of the inner sides of the two side plates 1, adjusting rods 18 are rotatably mounted in the middle of the limiting plates 17, fixing plates 2 are fixedly connected to the bottom ends of the adjusting rods 18, a plurality of equidistant upper elastic blocks 19 are fixedly mounted in the middle of the outer walls of the bottom ends of the fixing plates 2, and dust removing brushes 20 are fixedly mounted on the two sides of the outer walls of the bottom ends of the fixing plates 2.
In the utility model, the base 8 is a trapezoid with a narrow top and a wide bottom, the two sides of the outer wall of the bottom end of the base 8 are provided with second grooves, the top end of the inner part of each second groove is fixedly provided with a motor 9 through a bolt, the lower end of the motor 9 is rotatably provided with a threaded rod 15 through a shaft coupling, and the outer wall of the circumference of the threaded rod 15 is welded with a positioning claw 10 through a fixed sleeve;
a shell 7 is fixedly arranged on the outer wall of the top end of the base 8, a control box and a storage battery are arranged in the shell 7, so that the control and the use of electric elements are facilitated, a warning lamp is fixedly arranged on the top end of the shell 7, and a high-reflection material is pasted on the outer wall of the shell 7, so that pedestrians and vehicles can be reminded of safety constantly;
the upper elastic block 19 and the lower elastic block 16 are in cross clamping connection, the cable is positioned at the cross clamping connection position of the upper elastic block 19 and the lower elastic block 16, and balls are embedded in the outer walls of the upper elastic block 19 and the lower elastic block 16, so that the cable can move conveniently;
a pushing handle is arranged on the outer wall of one side plate 1 through a bolt, so that a worker can push the device conveniently;
the fixed plate 2 is a V-shaped structure protruding towards the two sides downwards in the middle, and the outer wall of the supporting plate 4 is provided with water permeable holes at equal intervals, so that rainwater, dew and other flow guides are facilitated.
The working principle is as follows: the device is convenient to move and good in damping effect through the cooperation of the hydraulic column 12, the connecting plate 13, the spring column 14 and the anti-skidding caster 11, the lower elastic block 16 is installed at the top end of the supporting plate 4, the upper elastic block 19 is installed at the bottom end of the fixing plate 2, a cable is located at the crossed clamping position of the upper elastic block 19 and the lower elastic block 16, the cable can move between the upper elastic block 19 and the lower elastic block 16 due to the installation of the balls, the device can move on the surface of the cable conveniently, and the insulating surface of the device is prevented from being damaged when the cable is dragged; install dog 3 of a plurality of equidistance through 5 inner walls rotations of lift groove for the height-adjustable of backup pad 4, and 2 top fixedly connected with of fixed plate adjust pole 18, can adapt to the cable of different diameters, increase the practicality of device, have dust removal brush 20 through deciding 2 bottom outer wall both sides fixed mounting of board, remove dust to the cable surface, when fixed position was confirmed to the device, motor 9 work makes locating pawl 10 remove downwards, fastens ground, ensures the stability of device.
Example 2
Referring to fig. 4, the temporary cable supporting device for building construction, further, solar panels 21 are fixedly and obliquely installed on the outer walls of the top ends of two side plates 1 through supporting columns.
The working principle is as follows: solar energy is converted into electric energy through the solar cell panel 21 and is stored and used, energy is saved, the environment is protected, the solar cell panel 21 is installed on the top ends of the two side plates 1 in an inclined mode, and stability of the device is guaranteed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. A building construction temporary cable supporting device comprises a base (8) and is characterized in that a first groove is formed in the middle of the outer wall of the bottom end of the base (8), sliding grooves are formed in the inner walls of two sides of the first groove, a hydraulic column (12) is installed on the inner wall of the top end of the first groove through a bolt, a connecting plate (13) is fixedly installed at the bottom end of the hydraulic column (12), the connecting plate (13) slides in the sliding grooves, two spring columns (14) are installed at the bottom end of the connecting plate (13) through bolts, anti-skidding trundles (11) are fixedly installed at the bottom ends of the spring columns (14) through supports, side plates (1) are installed on two sides of the outer wall of the top end of the base (8) through bolts, lifting grooves (5) are formed in the middle of the inner sides of the two side plates (1), a plurality, and every two sets of four dog (3) that are located same horizontal plane respectively between peg graft and have backup pad (4), backup pad (4) top outer wall fixed mounting have a plurality of equidistant lower elastic block (16), two curb plate (1) inboard top fixed mounting has limiting plate (17), and rotates in the middle of limiting plate (17) and install regulation pole (18), adjust pole (18) bottom fixedly connected with fixed plate (2), and fixed mounting has a plurality of equidistant last elastic block (19) in the middle of fixed plate (2) bottom outer wall, fixed plate (2) bottom outer wall both sides fixed mounting have dust removal brush (20).
2. The temporary cable supporting device for building construction according to claim 1, wherein the base (8) is trapezoidal and has a narrow top and a wide bottom, a second groove is formed on two sides of the outer wall of the bottom end of the base (8), a motor (9) is fixedly mounted at the top end of the inner portion of the second groove through a bolt, a threaded rod (15) is rotatably mounted at the lower end of the motor (9) through a shaft coupling, and a positioning claw (10) is welded on the outer wall of the circumference of the threaded rod (15) through a fixing sleeve.
3. The temporary cable supporting device for building construction according to claim 1, wherein a casing (7) is fixedly installed on the outer wall of the top end of the base (8), a control box and a storage battery are placed inside the casing (7), a warning lamp is fixedly installed on the top end of the casing (7), and a high-light-reflecting material is pasted on the outer wall of the casing (7).
4. The temporary cable supporting device for building construction according to claim 1, wherein the upper elastic block (19) and the lower elastic block (16) are clamped in a crossed manner, and balls are mounted on the outer walls of the upper elastic block (19) and the lower elastic block (16) in an embedded manner.
5. The temporary cable supporting device for building construction according to claim 1, wherein a pushing handle is mounted on the outer wall of one of the side plates (1) through bolts.
6. The temporary cable supporting device for building construction according to claim 5, wherein the fixing plate (2) is V-shaped with two sides protruding from the middle and the outer wall of the supporting plate (4) is provided with water permeable holes with equal distance.
7. The temporary cable supporting device for building construction according to claim 1, wherein the outer wall of the top end of the two side plates (1) is fixedly and obliquely provided with a solar panel (21) through a support column.
CN202021345449.9U 2020-07-10 2020-07-10 Electric cable strutting arrangement is faced in construction Active CN212485981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021345449.9U CN212485981U (en) 2020-07-10 2020-07-10 Electric cable strutting arrangement is faced in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021345449.9U CN212485981U (en) 2020-07-10 2020-07-10 Electric cable strutting arrangement is faced in construction

Publications (1)

Publication Number Publication Date
CN212485981U true CN212485981U (en) 2021-02-05

Family

ID=74455828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021345449.9U Active CN212485981U (en) 2020-07-10 2020-07-10 Electric cable strutting arrangement is faced in construction

Country Status (1)

Country Link
CN (1) CN212485981U (en)

Similar Documents

Publication Publication Date Title
CN212485981U (en) Electric cable strutting arrangement is faced in construction
CN110552513A (en) Foundation trench earth and stone square operation dustproof shed and erection method
CN210263929U (en) A preformed hole template for building civil engineering
CN214337344U (en) Line support device for municipal works
CN213093841U (en) Convenient municipal works who adjusts uses line support
CN213329010U (en) Municipal works are with pile device
CN210659467U (en) Line supports transition device for communication engineering
CN212837092U (en) Town road foundation ditch safety device
CN208884689U (en) A kind of intelligent elevated water-tight device for underground parking
CN209962361U (en) Intelligent monitoring and alarming device for dangerous area of construction site
CN210482077U (en) Bearing device for bridge construction
CN216075145U (en) A excavation supporting device for municipal works construction
CN213753673U (en) Assembled block terminal protection canopy
CN205399270U (en) A base for monitoring rod and traffic signal lamp fixed mounting
CN217732237U (en) Municipal works road laying structure
CN214113315U (en) Civil engineering pipeline placer
CN216641339U (en) Civil engineering construction support
CN217269075U (en) Protective support frame for steel structure engineering construction
CN215212220U (en) Civil engineering construction support
CN214747950U (en) River hydrology monitoring well protection device
CN217620541U (en) Pipe fitting storage rack for civil engineering
CN213484480U (en) Town road construction electric wire draw gear
CN215760399U (en) Civil engineering safety device
CN220365389U (en) Temporary movable supporting pole structure
CN216588056U (en) Highway engineering is with making an uproar protection rail that falls

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant