CN212484844U - Engineering progress management device - Google Patents
Engineering progress management device Download PDFInfo
- Publication number
- CN212484844U CN212484844U CN202021401028.3U CN202021401028U CN212484844U CN 212484844 U CN212484844 U CN 212484844U CN 202021401028 U CN202021401028 U CN 202021401028U CN 212484844 U CN212484844 U CN 212484844U
- Authority
- CN
- China
- Prior art keywords
- progress
- fixedly connected
- base
- item
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lock And Its Accessories (AREA)
Abstract
The utility model discloses an engineering progress management device, the on-line screen storage device comprises a base, the lower fixed surface of base is connected with brake roller, the flexible post of last fixed surface of base is connected with, the surface of flexible post is provided with adjust knob, the top fixedly connected with fixed block of flexible post, the last fixed surface of fixed block is connected with fixed frame, fixed frame's inner wall fixedly connected with progress panel, the front upper right corner of progress panel is provided with the time schedule for a project. This engineering progress management device, through setting up the progress panel, can be on the progress panel each engineering project record, through setting up each item progress table card, each item of being convenient for is categorised, through setting up metal chute strip, magnetic slide and progress pointer, magnetic slide can drive progress pointer and remove and fix in metal chute strip to mark the mark of each item of every day engineering progress, be convenient for look over and manage.
Description
Technical Field
The utility model relates to an engineering management technical field specifically is an engineering progress management device.
Background
In the process of managing a construction project, the most critical content of management is the construction quality, progress and safety control of the project. The construction progress management means planning the work content, work procedure, duration and connection relation of the construction stage of the engineering project, specifically implementing the progress plan by adopting organizational measures, technical measures, contract measures, economic measures, information measures and the like, frequently checking whether the actual progress is carried out according to the plan requirement in the implementation process, analyzing the reason of the deviation, and adopting remedial measures or adjusting and modifying the original plan until the completion of the engineering and delivery for use. The ultimate goal of the progress control is to determine the achievement of the overall goal of the project progress.
In the project construction process, the progress developed by each project needs to be counted and summarized every day, and a new task is made.
Therefore, we provide a project progress management device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering progress management device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an engineering progress management device, includes the base, the lower fixed surface of base is connected with brake roller, the flexible post of last fixed surface of base is connected with, the surface of flexible post is provided with adjust knob, the top fixedly connected with fixed block of flexible post, the last fixed surface of fixed block is connected with fixed frame, fixed frame's inner wall fixedly connected with progress panel, the positive upper right corner of progress panel is provided with the time limit for a project, the front of progress panel is provided with each item progress table card, the front of progress panel is located each item progress table card below fixedly connected with metal chute strip, the inner wall of metal chute strip is provided with the magnetism slider, the last fixed surface of magnetism slider is connected with progress pointer, fixed frame's interior roof is provided with the light.
Preferably, the number of the braking rollers is four, and the four braking rollers are respectively and fixedly connected to four corners of the lower surface of the base through rotating shafts.
Preferably, the number of the telescopic columns is two, the two telescopic columns are fixedly connected to the upper surface of the base, and threaded holes matched with the knob screws on the adjusting knobs are formed in the surfaces of the telescopic columns.
Preferably, the back fixedly connected with external power cord of progress panel, the side of progress panel is provided with control switch.
Preferably, the quantity of each item progress meter card is three, three each item progress meter card all sets up the front at the progress panel, the quantity of metal spout strip is three, three metal spout strip fixed connection is respectively in the below of three each item progress meter card.
Preferably, the number of magnetic sliding blocks is three, three the magnetic sliding blocks are respectively connected with three metal sliding groove strips in a magnetic mode, the number of the lighting lamps is two, and the lighting lamps are arranged on the inner top wall of the fixed frame.
Advantageous effects
The utility model provides an engineering progress management device possesses following beneficial effect:
1. this engineering progress management device, through setting up the progress panel, can be on the progress panel each engineering project record, through setting up each item progress table card, each item of being convenient for is categorised, through setting up metal chute strip, magnetic slide and progress pointer, magnetic slide can drive progress pointer and remove and fix in metal chute strip to mark the mark of each item of every day engineering progress, be convenient for look over and manage.
2. This engineering progress management device, through setting up brake roller, can the global movement, use when conveniently meeting, through setting up flexible post and adjust knob, the holistic height of adjustment progress panel of being convenient for facilitates the use in the mark, through setting up time limit for a project schedule, can look over the time, contrast with the engineering progress, through setting up the light, can throw light on progress panel surface, conveniently watch to reach the effect that facilitates the use.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: the system comprises a base 1, a brake roller 2, a telescopic column 3, an adjusting knob 4, a fixing block 5, a fixing frame 6, a progress display board 7, a construction period schedule 8, progress meter cards 9, metal chute strips 10, a magnetic slider 11, progress indicator needles 12 and a lighting lamp 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an engineering progress management device, the on-line screen storage device comprises a base 1, base 1's lower fixed surface is connected with brake roller 2, brake roller 2's quantity is four, four brake roller 2 are through the four corners of pivot difference fixed connection at base 1 lower surface, through setting up brake roller 2, can the monolithic moving, use when conveniently opening a meeting, base 1's last fixed surface is connected with flexible post 3, the quantity of flexible post 3 is two, two equal fixed connection of flexible post 3 are at base 1's upper surface, the surface of flexible post 3 is provided with adjust knob 4.
Top fixedly connected with fixed block 5 of flexible post 3, the screw hole with knob screw looks adaptation on adjust knob 4 is seted up on the surface of flexible post 3, the last fixed surface of fixed block 5 is connected with fixed frame 6, the inner wall fixedly connected with progress panel 7 of fixed frame 6, the back fixedly connected with external power source line of progress panel 7, the side of progress panel 7 is provided with control switch, through setting up progress panel 7, can be on progress panel 7 each engineering project record, through setting up flexible post 3 and adjust knob 4, be convenient for adjust the holistic height of progress panel 7, facilitate the use in the time of mark, the front upper right corner of progress panel 7 is provided with time limit for a project table 8, through setting up time limit for a project table 8, can check time, form the contrast with the engineering progress.
The front of progress panel 7 is provided with each item progress table card 9, the quantity of each item progress table card 9 is three, three each item progress table card 9 all sets up in the front of progress panel 7, through setting up each item progress table card 9, be convenient for each item classify, the front of progress panel 7 is located each item progress table card 9 below fixedly connected with metal chute strip 10, the quantity of metal chute strip 10 is three, three metal chute strip 10 is fixed connection in the below of three each item progress table card 9 respectively, the inner wall of metal chute strip 10 is provided with magnetic slider 11, magnetic slider 11's quantity is three, three magnetic slider 11 is connected with three metal chute strip 10 magnetism respectively.
Last fixed surface of magnetic slider 11 is connected with progress pointer 12, through setting up metal spout strip 10, magnetic slider 11 and progress pointer 12, magnetic slider 11 can drive progress pointer 12 and remove and fix in metal spout strip 10, and mark the mark of each item engineering progress every day, be convenient for look over and manage, fixed frame 6's interior roof is provided with light 13, light 13's quantity is two, two light 13 all set up the interior roof at fixed frame 6, through setting up light 13, can throw light on progress panel 7 surface, conveniently watch, thereby reach the effect of facilitating the use.
The working principle is as follows: when this engineering progress management device used, adjust the height of flexible post 3 through adjust knob 4, then fix each item progress table card 9 on progress panel 7, after each item engineering of every day ended, drive progress pointer 12 through magnetic slide 11 and slide in metal chute strip 10, aim at the progress point on each item progress table card 9 with progress pointer 12, mark the progress of each item engineering, when project personnel looked over, each item engineering progress is looked over to the surveyability of being convenient for, thereby reach the effect of facilitating the use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an engineering progress management device, includes base (1), its characterized in that: the lower surface of the base (1) is fixedly connected with a brake roller (2), the upper surface of the base (1) is fixedly connected with a telescopic column (3), the surface of the telescopic column (3) is provided with an adjusting knob (4), the top end of the telescopic column (3) is fixedly connected with a fixed block (5), the upper surface of the fixed block (5) is fixedly connected with a fixed frame (6), the inner wall of the fixed frame (6) is fixedly connected with a progress display board (7), the right upper corner of the front of the progress display board (7) is provided with a construction period time table (8), the front of the progress display board (7) is provided with various progress meter cards (9), the front of the progress display board (7) is positioned below the various progress meter cards (9) and is fixedly connected with a metal chute strip (10), and the inner wall of the metal chute strip (10) is provided with a magnetic slider (11), the upper surface of the magnetic sliding block (11) is fixedly connected with a progress indicator needle (12), and an illuminating lamp (13) is arranged on the inner top wall of the fixed frame (6).
2. The project schedule management apparatus according to claim 1, characterized in that: the number of the braking rollers (2) is four, and the four braking rollers (2) are respectively and fixedly connected to four corners of the lower surface of the base (1) through rotating shafts.
3. The project schedule management apparatus according to claim 1, characterized in that: the quantity of flexible post (3) is two, two the equal fixed connection of flexible post (3) is at the upper surface of base (1), the screw hole with knob screw looks adaptation on adjust knob (4) is seted up on the surface of flexible post (3).
4. The project schedule management apparatus according to claim 1, characterized in that: the back fixedly connected with external power cord of progress panel (7), the side of progress panel (7) is provided with control switch.
5. The project schedule management apparatus according to claim 1, characterized in that: the quantity of each item progress table card (9) is three, and is three each item progress table card (9) all sets up the front at progress panel (7), the quantity of metal spout strip (10) is three, and is three metal spout strip (10) fixed connection is respectively in the below of three each item progress table card (9).
6. The project schedule management apparatus according to claim 1, characterized in that: the quantity of magnetism slider (11) is three, three magnetism slider (11) are connected with three metal chute strip (10) magnetism respectively, the quantity of light (13) is two, two light (13) all set up the interior roof at fixed frame (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021401028.3U CN212484844U (en) | 2020-07-16 | 2020-07-16 | Engineering progress management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021401028.3U CN212484844U (en) | 2020-07-16 | 2020-07-16 | Engineering progress management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212484844U true CN212484844U (en) | 2021-02-05 |
Family
ID=74457337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021401028.3U Expired - Fee Related CN212484844U (en) | 2020-07-16 | 2020-07-16 | Engineering progress management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212484844U (en) |
-
2020
- 2020-07-16 CN CN202021401028.3U patent/CN212484844U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212484844U (en) | Engineering progress management device | |
CN112201143A (en) | Progress management system for construction cost | |
CN210955794U (en) | Simulated display sand table for land management | |
CN216980080U (en) | Building engineering management bulletin board that marks | |
CN209388098U (en) | A kind of display equipment with interaction function | |
CN109619820B (en) | Whole-flow interrogation integrated terminal workbench | |
CN209461126U (en) | A kind of livestock products technical advice propaganda board | |
CN213745929U (en) | Energy-conserving road and bridge progress management display device for engineering | |
CN204808496U (en) | Intelligent terminal of insertible finance IC -card | |
CN219940102U (en) | Display device | |
CN212934086U (en) | Architectural design outward appearance effect show instrument | |
CN214123437U (en) | Real estate valuation information display device | |
CN214541069U (en) | Historical chronology picture and text teaching device | |
CN213123532U (en) | Project management time table | |
CN209729430U (en) | A kind of human resource performance exhibition booth device | |
CN220064898U (en) | Double-screen cash register | |
CN219947732U (en) | Novel drawing frame for architectural design | |
CN114653634A (en) | Enterprise management consultation platform | |
CN214955073U (en) | Attendance device for education management | |
CN211906644U (en) | Innovation and entrepreneurship education show shelf | |
CN213882246U (en) | Building engineering cost manages and uses table based on BIM technique | |
CN219642497U (en) | Engineering progress display device | |
CN220340850U (en) | Work reminding board with different states for office door | |
CN211207871U (en) | Engineering budget show board | |
CN212809712U (en) | Enterprise hatching platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210205 Termination date: 20210716 |