CN212484637U - Aviation pipeline construction training equipment - Google Patents

Aviation pipeline construction training equipment Download PDF

Info

Publication number
CN212484637U
CN212484637U CN202020790633.8U CN202020790633U CN212484637U CN 212484637 U CN212484637 U CN 212484637U CN 202020790633 U CN202020790633 U CN 202020790633U CN 212484637 U CN212484637 U CN 212484637U
Authority
CN
China
Prior art keywords
training
pipe
training area
hose
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020790633.8U
Other languages
Chinese (zh)
Inventor
郭强华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Vader Aviation Simulator Co ltd
Original Assignee
Xi'an Vader Aviation Simulator Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Vader Aviation Simulator Co ltd filed Critical Xi'an Vader Aviation Simulator Co ltd
Priority to CN202020790633.8U priority Critical patent/CN212484637U/en
Application granted granted Critical
Publication of CN212484637U publication Critical patent/CN212484637U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to the field of aviation training equipment, and discloses aviation pipeline construction training equipment, which comprises a bracket (1) with universal wheels (2) at the bottom, wherein panels (4) fixed by baffles (3) are respectively arranged at the left side and the right side of the bracket (1), and metal pipe training areas (5) are respectively arranged at the front side and the rear side of each panel (4); the hose training area (6) and the four-way high-grade training area (7) are arranged between the two panels (4), and the four-way high-grade training area (7) is arranged at the lower part of the hose training area (6); the hose training area (6) and the four-way high-grade training area (7) are both communicated with the metal pipe training area (5). The utility model discloses the advanced training district of tubular metal resonator training district, hose training district and cross that set up can train basic skill, simulation troubleshooting and carry out the system debugging, also can detect the sealing performance of connecting piece, can also realize projects such as the preparation of pipeline dismouting training and pipeline horn mouth.

Description

Aviation pipeline construction training equipment
Technical Field
The utility model relates to an aviation training equipment field especially relates to an aviation pipeline construction training equipment.
Background
In the daily maintenance work of an aviation hydraulic or pneumatic control system, the phenomenon that a metal hard pipe and a rubber hose in the system are damaged or aged is often encountered, the disassembly, assembly, manufacture and debugging in the pipeline maintenance process are necessary basic skills of a crew, and the training of the skills is usually targeted professional training. When the airplane maintenance is carried out, a maintenance person is required to obtain the qualification certificate and then can operate the airplane, and in order to ensure the quality, irregular maintenance is not allowed, so that the airplane maintenance method is particularly important for professional training and practice of maintenance personnel.
The training and manufacturing of basic skills of a system pipeline are accumulated in the past day by day in work, the existing training equipment is only limited to a training project with a certain single skill, no simulation training equipment in an actual combat mode is available, the system debugging can not be realized by simulation troubleshooting, and a comprehensive product for detecting the sealing performance of a finished product can not be realized.
SUMMERY OF THE UTILITY MODEL
The utility model provides an aviation pipeline construction training equipment solves among the prior art because there is not the simulation training equipment of actual combat form, leads to unable simulation troubleshooting to carry out the system debugging and carry out the problem that detects to the sealing performance of finished product spare.
The utility model discloses a realize through following scheme:
an aviation pipeline construction training device comprises a support, wherein universal wheels are arranged at the bottom of the support, panels fixed by baffles are respectively arranged on the left side and the right side of the support, and metal pipe training areas are arranged on the front side and the rear side of each panel; the hose training area and the four-way high-grade training area are both arranged between the two panels, and the four-way high-grade training area is arranged at the lower part of the hose training area; the hose training area and the four-way high-grade training area are both communicated with the metal pipe training area;
the metal pipe training area comprises a plurality of metal pipes fixed on the panel through-wall through joints, and the metal pipes are connected through a three-way connecting piece;
the hose training area comprises a hose fixed on the baffle through a through-wall straight joint, and the hose is communicated with a metal pipe above the panel;
the four-way advanced training area comprises a pipeline fixed on the baffle through a through-wall straight joint, the pipeline is communicated with a metal pipe below the panel, and a four-way connecting piece is arranged in the middle of the pipeline.
Furthermore, two sides of the bracket are sealed, and a plurality of metal pipes on the front side and the rear side of a panel on one side of the bracket are communicated through-wall through joints; the metal pipes above the front side and the back side of the panel on the other side are communicated through the wall straight-through joint, and the metal pipes below penetrate through the side surface of the bracket and are respectively used as an inlet or an outlet.
Further, the four-way high-level training room also comprises an oil receiving plate arranged at the lower part of the panel and the four-way high-level training area.
Furthermore, the three-way connecting piece comprises a pipe joint, a pipe nut, a pipe sleeve and a fuse, wherein the pipe nut fixes the pipe joint and the pipe sleeve.
Furthermore, the pipe nuts are provided with fixing holes; the fuse is wound on the pipe joint, passes through the fixing hole on each pipe nut and is fixed through the fixing hole.
The utility model has the advantages of it is following:
1) the aviation pipeline construction training equipment is provided with a metal pipe training area, a hose training area and a four-way high-grade training area, so that not only can basic skills be trained, but also troubleshooting can be simulated for carrying out system debugging, and a comprehensive product for detecting the sealing performance of a finished product can be used, so that simple pipeline disassembly and assembly training, more complicated pipeline bell mouth manufacturing and other projects can be realized, and basic problems encountered in daily maintenance work can be trained;
2) the aviation pipeline construction training equipment is designed by simulating various aviation pipeline construction forms by adopting aviation materials and devices according to aviation pipeline standard construction specifications by taking an airplane hydraulic and air pressure control system as reference, so that the problem that the daily work training of pipelines of maintenance personnel for aircraft services is not in place is solved, and the aviation pipeline construction training equipment has strong pertinence;
3) aviation pipeline construction training equipment can satisfy four students and train simultaneously, satisfies the number demand.
Drawings
FIG. 1 is a schematic structural diagram of an aviation pipeline construction training device;
FIG. 2 is a block diagram of a metal tube training area, a hose training area, and a four-way high level training area;
in the figure, 1-bracket, 2-universal wheel, 3-baffle, 4-panel, 5-metal pipe training area, 51-metal pipe, 52-three-way connector, 6-hose training area, 61-hose, 7-four-way high-grade training area, 71-pipeline, 72-four-way connector, 8-wall through joint and 9-oil receiving plate.
Detailed Description
The present invention will be described in detail with reference to the following embodiments.
An aviation pipeline construction training device comprises a support 1 with universal wheels 2 at the bottom, wherein panels 4 fixed by baffles 3 are respectively arranged at the left side and the right side of the support 1, and metal pipe training areas 5 are respectively arranged at the front side and the rear side of each panel 4; the hose training area 6 and the four-way high-grade training area 7 are both arranged between the two panels 4, and the four-way high-grade training area 7 is arranged at the lower part of the hose training area 6; the hose training area 6 and the four-way high-grade training area 7 are both communicated with the metal pipe training area 5.
The metal pipe training area 5 comprises a plurality of metal pipes 51 fixed on the panel 4 through wall through joints 8, and the metal pipes 51 are connected through a three-way connecting piece 52;
the hose training area 6 comprises a hose 61 fixed on the baffle 3 through a through-wall joint 8, and the hose 61 is communicated with a metal pipe 51 positioned above the panel 4;
the four-way high-grade training area 7 comprises a pipeline 71 fixed on a baffle plate through a through-wall through joint 8, the pipeline 71 is communicated with a metal pipe 51 positioned below the panel 4, and a four-way connecting piece 72 is arranged in the middle of the pipeline 71.
The two sides of the bracket 1 are sealed, and a plurality of metal pipes 51 at the front side and the rear side of a panel 4 at one side of the bracket 1 are communicated through wall through joints 8; the metal pipes 51 above the front and back sides of the panel 4 on the other side are communicated through the through-wall joint 8, and the metal pipes 51 below pass through the side surface of the bracket 1 and are respectively used as an inlet or an outlet.
The three-way connector 52 and the four-way connector 72 include a tube connector, a tube nut, a tube sleeve, and a fuse, the tube nut securing the tube connector and the tube sleeve.
The pipe nuts are provided with fixing holes; the fuse is wound on the pipe joint, passes through the fixing hole on each pipe nut and is fixed through the fixing hole.
When the device is used, the metal pipe 51 penetrates through the inlet of the bracket to be connected to an external liquid or gas conveying pipeline, and the metal pipe 51 penetrates through the outlet of the bracket to be connected to an external liquid or gas collecting pipeline; two students are respectively arranged at the front side and the rear side of the bracket 1, and under the guidance of a teacher giving lessons, the students carry out the training of items such as the disassembly, assembly, manufacture and debugging of parts according to corresponding operation specifications; the teacher of giving lessons combines the problem that probably meets in the actual operation, and the comprehensive training in each training district is carried out to the pertinence, and the simulation troubleshooting carries out the system debugging, and simultaneously, the comprehensive product that detects is carried out to the sealing performance of finished product spare, can realize projects such as simple pipeline dismouting training and the preparation of more complicated pipeline horn mouth in each training district.
Training equipment is still including setting up the oil receiving plate 9 in the lower part of panel 4 and the senior training district of cross 7, and the fluid of leaking down of training in-process is collected through oil receiving plate 9, and the instrument that uses in the training process also can be placed on oil receiving plate 9, is convenient for accomodate.
The content of the present invention is not limited to the examples, and any equivalent transformation adopted by the technical solution of the present invention is covered by the claims of the present invention by those skilled in the art through reading the present invention.

Claims (5)

1. The aviation pipeline construction training equipment is characterized by comprising a support (1) with universal wheels (2) arranged at the bottom, panels (4) fixed by baffles (3) are respectively arranged on the left side and the right side of the support (1), and metal pipe training areas (5) are respectively arranged on the front side and the rear side of each panel (4); the hose training area (6) and the four-way high-grade training area (7) are arranged between the two panels (4), and the four-way high-grade training area (7) is arranged at the lower part of the hose training area (6); the hose training area (6) and the four-way high-grade training area (7) are both communicated with the metal pipe training area (5);
the metal pipe training area (5) comprises a plurality of metal pipes (51) fixed on the panel (4) through wall through joints (8), and the metal pipes (51) are connected through a three-way connecting piece (52);
the hose training area (6) comprises a hose (61) fixed on the baffle (3) through a through-wall joint (8), and the hose (61) is communicated with a metal pipe (51) positioned above the panel (4);
the four-way advanced training area (7) comprises a pipeline (71) fixed on a baffle through a through-wall through joint (8), the pipeline (71) is communicated with a metal pipe (51) positioned below the panel (4), and a four-way connecting piece (72) is arranged in the middle of the pipeline (71).
2. The aviation pipeline construction training equipment as claimed in claim 1, wherein two sides of the bracket (1) are sealed, and a plurality of metal pipes (51) on the front side and the rear side of a panel (4) on one side of the bracket (1) are communicated through wall through joints (8); the metal pipes (51) above the front side and the rear side of the panel (4) on the other side are communicated through a through-wall straight joint (8), and the metal pipes (51) below penetrate through the side surface of the bracket (1) and are respectively used as an inlet or an outlet.
3. The aircraft pipeline construction training device of claim 1, further comprising an oil receiving plate (9) disposed at a lower portion of the panel (4) and the four-way high-class training area (7).
4. The aircraft pipeline construction training device of claim 3, wherein the three-way connector (52) and the four-way connector (72) each comprise a pipe joint, a pipe nut, a pipe sleeve, and a fuse, the pipe nut securing the pipe joint and the pipe sleeve.
5. The aircraft pipeline construction training device of claim 4, wherein the pipe nuts are provided with fixing holes; the fuse is wound on the pipe joint, penetrates through the fixing hole in the pipe nut and is fixed through the fixing hole.
CN202020790633.8U 2020-05-13 2020-05-13 Aviation pipeline construction training equipment Active CN212484637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020790633.8U CN212484637U (en) 2020-05-13 2020-05-13 Aviation pipeline construction training equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020790633.8U CN212484637U (en) 2020-05-13 2020-05-13 Aviation pipeline construction training equipment

Publications (1)

Publication Number Publication Date
CN212484637U true CN212484637U (en) 2021-02-05

Family

ID=74460576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020790633.8U Active CN212484637U (en) 2020-05-13 2020-05-13 Aviation pipeline construction training equipment

Country Status (1)

Country Link
CN (1) CN212484637U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113035004A (en) * 2021-03-25 2021-06-25 中国人民解放军空军工程大学航空机务士官学校 Aviation basic maintenance operation simulation training system
CN113570927A (en) * 2021-07-20 2021-10-29 成都航利航空工程职业教育有限公司 Multifunctional aviation aircraft simulation training system
CN113706954A (en) * 2021-08-18 2021-11-26 凌云(宜昌)航空装备工程有限公司 Integrated aircraft maintenance skill training device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113035004A (en) * 2021-03-25 2021-06-25 中国人民解放军空军工程大学航空机务士官学校 Aviation basic maintenance operation simulation training system
CN113570927A (en) * 2021-07-20 2021-10-29 成都航利航空工程职业教育有限公司 Multifunctional aviation aircraft simulation training system
CN113570927B (en) * 2021-07-20 2022-03-18 成都航利航空工程职业教育有限公司 Multifunctional aviation aircraft simulation training system
CN113706954A (en) * 2021-08-18 2021-11-26 凌云(宜昌)航空装备工程有限公司 Integrated aircraft maintenance skill training device
CN113706954B (en) * 2021-08-18 2023-02-07 凌云(宜昌)航空装备工程有限公司 Integrated aircraft maintenance skill training device

Similar Documents

Publication Publication Date Title
CN212484637U (en) Aviation pipeline construction training equipment
CN207750129U (en) A kind of multifunctional vehicle mounted emission attachment device
CN202255800U (en) Airtightness testing apparatus for high/low-pressure rubber hose and assembly thereof
CN102031883A (en) Simulation teaching factory for preparing cyclohexane through benzene hydrogenation
CN203433733U (en) Simulation apparatus for chemical disaster accident
CN213543979U (en) Test experiment device for simulating leakage fault of aviation hydraulic pipeline
CN113063921A (en) Coal and gas outburst disaster-causing visual simulation experiment system
CN109406091B (en) Opposite-impact type air bridge balance system
CN103810916A (en) Fire-fighting leakage training experiment device
CN214042692U (en) Aviation insurance pipeline maintenance operation panel for simulation
CN221225662U (en) Real rack of instructing of aircraft standard pipeline construction
CN205246296U (en) Pipeline microleakage detection device
CN211016122U (en) Bernoulli principle presentation device for physics
CN204241234U (en) A kind of gear test unit of seting out
CN204632161U (en) A kind of fracture acidizing stimulating and training system
CN203300124U (en) Multifunctional teaching practical-training device for air-conditioning refrigeration system
CN202305337U (en) Piping pressure test device
CN206346817U (en) A kind of device for being used to install exhaust hose and hard tube
CN213751455U (en) Aircraft pipeline construction training rack
CN220155057U (en) Pipeline ball receiving and transmitting simulation device
CN109887367A (en) A kind of operative employee's stake and operating system for plumber's training
CN207470985U (en) The gas circuit bindiny mechanism of energy fast assembling-disassembling
SU1742851A1 (en) Trainer for gaining practical skills in assembly and disassembly of pipelines of automobile systems
CN215730333U (en) Pipe joint safety exercise rack
CN219758979U (en) Simulation metal mine ventilation training device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant