CN212478531U - Integral climbing formwork - Google Patents

Integral climbing formwork Download PDF

Info

Publication number
CN212478531U
CN212478531U CN202020853131.5U CN202020853131U CN212478531U CN 212478531 U CN212478531 U CN 212478531U CN 202020853131 U CN202020853131 U CN 202020853131U CN 212478531 U CN212478531 U CN 212478531U
Authority
CN
China
Prior art keywords
plate
fixedly connected
wall
fixing
climbing formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020853131.5U
Other languages
Chinese (zh)
Inventor
邓勇华
吴盛桥
邓翔彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhongyu Template Co ltd
Original Assignee
Jiangxi Yushengchang Steel Structure Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Yushengchang Steel Structure Engineering Co ltd filed Critical Jiangxi Yushengchang Steel Structure Engineering Co ltd
Priority to CN202020853131.5U priority Critical patent/CN212478531U/en
Application granted granted Critical
Publication of CN212478531U publication Critical patent/CN212478531U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a can integral template that climbs, including first fixed plate, first backup pad of bolt fixedly connected with and second backup pad are passed through to the bottom of first fixed plate, first backup pad is located one side of second backup pad, and the bottom of first backup pad and second backup pad passes through bolt fixedly connected with second fixed plate, the welding has first connecting plate on one side outer wall of second fixed plate, pass through the first fixing base of bolt fixedly connected with on one side outer wall of first fixed plate. The integral climbing formwork can divide the climbing formwork component parts into independent structures through the first sliding rod and the second sliding rod, the climbing formwork gradually climbs under the sliding of the first sliding rod and the second sliding rod, the first connecting plate and the second connecting plate are fixed with a wall body in an alternating mode, stable and firm support is provided for climbing of the climbing formwork, and climbing of the climbing formwork is guaranteed.

Description

Integral climbing formwork
Technical Field
The utility model relates to a climbing formwork technical field specifically is a can integral climbing formwork.
Background
The climbing formwork is an effective formwork system of a reinforced concrete structure of a shear wall system and a barrel system in engineering construction, is often applied to high-rise buildings and high-volume structure construction, and is widely popularized and applied in various countries in the world.
However, the existing climbing formwork is difficult to make the formwork climb conveniently in the using process, the climbing formwork is difficult to realize high-speed and high-efficiency climbing, the climbing efficiency is low, the climbing formwork needs a plurality of driving devices to drive, the energy consumption is high, in addition, the existing climbing formwork is difficult to adjust the pouring width of a wall body according to the requirement, and high-efficiency pouring cannot be realized.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can integral template that climbs to it is difficult to realize that high efficiency climbs to provide current template that climbs among the above-mentioned background art, climbs inefficiency, energy consumption big and be difficult to adjust the problem of the width of pouring of wall body according to the demand.
In order to achieve the above object, the utility model provides a following technical scheme: an integral climbing template comprises a first fixing plate, wherein the bottom of the first fixing plate is fixedly connected with a first supporting plate and a second supporting plate through bolts, the first supporting plate is positioned on one side of the second supporting plate, the bottoms of the first supporting plate and the second supporting plate are fixedly connected with a second fixing plate through bolts, a first connecting plate is welded on the outer wall of one side of the second fixing plate, a first fixing seat is fixedly connected onto the outer wall of one side of the first fixing plate through bolts, a first sliding rod is welded at the central position of the top of the first fixing seat, a third fixing plate is sleeved on the outer wall of one side of the first sliding rod, the top of the third fixing plate is fixedly connected with a cylinder support through bolts, the top of the interior of the cylinder support is fixedly connected with a cylinder through bolts, and one end of the cylinder is connected with a welding plate through a telescopic, the welding plate is fixedly connected with the first fixing plate through bolts, a second fixing seat is fixedly connected to the outer wall of one side of the second supporting plate through bolts, a sliding sleeve is fixedly connected to the outer wall of one side of the second fixing seat through bolts, a second sliding rod penetrates through the inside of the sliding sleeve, and a second connecting plate is welded to the bottom end of the second sliding rod.
Preferably, there is a motor through bolt fixedly connected on the outer wall of one side of the second fixing base, the one end of the motor is connected with a left-handed screw through the rotation of a rotating shaft, and a right-handed screw is welded at one end of the left-handed screw.
Preferably, the outer walls of one sides of the left-handed screw rod and the right-handed screw rod are connected with screw nut seats in a screwing mode through threads, and clamping plates are welded at the bottoms of the screw nut seats.
Preferably, the thread turning directions of the left-handed lead screw and the right-handed lead screw are opposite.
Preferably, a reinforcing rib is welded between the first support plate and the second support plate.
Preferably, the third fixing plate and the sliding sleeve are both connected with the second sliding rod in a sliding manner, and the first sliding rod is connected with the third fixing plate in a sliding manner.
Compared with the prior art, the beneficial effects of the utility model are that: this can integral template of climbing, can fall into independent structure with the template component part that climbs through first slide bar and second slide bar, and realize climbing gradually of template under the slip of first slide bar and second slide bar, lead to and fix through first connecting plate and second connecting plate and wall body in turn each other, for climbing of template provide stable firm support, and then guarantee climbing of template, move in opposite directions or the opposite movement through two splint, can provide spacing support for pouring of wall body, guarantee that the wall body pours to the eminence gradually, realize increasing of wall body, be convenient for high efficiency's wall construction, and efficiency is improved.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a rear view of the present invention;
FIG. 3 is a schematic view of the internal structure of the second fixing base of the present invention;
fig. 4 is a side view of the present invention.
In the figure: 1. a first fixing plate; 2. a first support plate; 3. a second support plate; 4. a second fixing plate; 5. a first connecting plate; 6. a first fixed seat; 7. a first slide bar; 8. a third fixing plate; 9. a cylinder support; 10. a cylinder; 11. welding the plate; 12. a second fixed seat; 13. a sliding sleeve; 14. a second slide bar; 15. a second connecting plate; 16. a motor; 17. a left-handed lead screw; 18. a right-handed screw; 19. a screw nut seat; 20. a splint; 21. and (5) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an integral climbing formwork comprises a first fixing plate 1, a first supporting plate 2, a second supporting plate 3, a second fixing plate 4, a first connecting plate 5, a first fixing seat 6, a first slide rod 7, a third fixing plate 8, a cylinder support 9, a cylinder 10, a welding plate 11, a second fixing seat 12, a sliding sleeve 13, a second slide rod 14, a second connecting plate 15, a motor 16, a left-handed screw 17, a right-handed screw 18, a screw nut seat 19, a clamping plate 20 and a reinforcing rib 21, wherein the bottom of the first fixing plate 1 is fixedly connected with the first supporting plate 2 and the second supporting plate 3 through bolts, the first supporting plate 2 is positioned at one side of the second supporting plate 3, the bottoms of the first supporting plate 2 and the second supporting plate 3 are fixedly connected with the second fixing plate 4 through bolts, the first connecting plate 5 is welded on the outer wall of one side of the second fixing plate 4, the first fixing seat 6 is fixedly connected on the outer wall of one side of the first fixing plate 1, first slide bar 7 has been welded to the top central point department of first fixing base 6, the cover is equipped with third fixed plate 8 on the outer wall of one side of first slide bar 7, bolt fixedly connected with cylinder support 9 is passed through at the top of third fixed plate 8, bolt fixedly connected with cylinder 10 is passed through at the inside top of cylinder support 9, the one end of cylinder 10 is connected with welded plate 11 through the telescopic link, pass through bolt fixed connection between welded plate 11 and the first fixed plate 1, pass through bolt fixedly connected with second fixing base 12 on the outer wall of one side of second backup pad 3, pass through bolt fixedly connected with sliding sleeve 13 on the outer wall of one side of second fixing base 12, sliding sleeve 13's inside has run through second slide bar 14, the bottom welding of second slide bar 14 has second connecting plate 15.
Further, through bolt fixedly connected with motor 16 on the outer wall of one side of second fixing base 12, the one end of motor 16 is connected with levogyration lead screw 17 through the pivot rotation, and the welding of the one end of levogyration lead screw 17 has dextrorotation lead screw 18, and the levogyration lead screw 17 of being convenient for drives dextrorotation lead screw 18 and rotates.
Further, all be connected with screw nut seat 19 through the screw thread closure on the one side outer wall of levogyration lead screw 17 and dextrorotation lead screw 18, the bottom welding of screw nut seat 19 has splint 20, through the relative movement of two splint 20, can carry on spacingly with pouring the region to be convenient for subsequent spacing.
Further, the thread directions of the left-handed screw 17 and the right-handed screw 18 are opposite, so that the two clamping plates 20 can move towards each other.
Further, the welding has the strengthening rib 21 between first backup pad 2 and the second backup pad 3, improves the structural strength between first backup pad 2 and the second backup pad 3.
Furthermore, the third fixing plate 8 and the sliding sleeve 13 are both connected with the second sliding rod 14 in a sliding manner, and the first sliding rod 7 is connected with the third fixing plate 8 in a sliding manner, so that the first sliding rod 7 and the second sliding rod 14 can be lifted and slid.
The working principle is as follows: when the concrete pouring device is used, the first connecting plate 5 is fixedly installed on a wall body through bolts, the second connecting plate 15 is fixedly installed at the top of the wall body through bolts, the motor 16 drives the left-handed screw 17 to rotate through the rotating shaft, the left-handed screw 17 drives the right-handed screw 18 to rotate, the left-handed screw 17 and the right-handed screw 18 are both connected with the screw and nut seat 19 in a screwing manner, the screw and nut seat 19 drives the clamping plates 20 to move, the two clamping plates 20 move towards each other, the two clamping plates 20 limit the wall body to be poured, concrete is poured between the two clamping plates 20, after the concrete pouring molding is completed, the first connecting plate 5 is detached from the wall body, the air cylinder 10 pulls the first fixing plate 1 through the telescopic rod, the first fixing plate 1 drives the sliding sleeve 13 to slide upwards on the second sliding rod 14 through the tensile force generated by the work of the air cylinder 10, the third fixing plate 8, the position through first fixed plate 1 rises, realize that the position of second fixed plate 4 and first connecting plate 5 rises, with first connecting plate 5 and wall fixing, detach second connecting plate 15 and wall body top, cylinder 10 promotes first fixed plate 1 through the telescopic link, because first fixed plate 1 and wall fixing, thereby make third fixed plate 8 upwards remove under the reaction force of thrust, upwards remove second connecting plate 15 through second slide bar 14, with second connecting plate 15 and wall fixing, the realization circulation that climbs.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. An integral climbing formwork comprising a first fixing plate (1), characterized in that: the bottom of the first fixing plate (1) is fixedly connected with a first supporting plate (2) and a second supporting plate (3) through bolts, the first supporting plate (2) is located on one side of the second supporting plate (3), the bottoms of the first supporting plate (2) and the second supporting plate (3) are fixedly connected with a second fixing plate (4) through bolts, a first connecting plate (5) is welded on the outer wall of one side of the second fixing plate (4), a first fixing seat (6) is fixedly connected on the outer wall of one side of the first fixing plate (1) through bolts, a first sliding rod (7) is welded at the central position of the top of the first fixing seat (6), a third fixing plate (8) is sleeved on the outer wall of one side of the first sliding rod (7), the top of the third fixing plate (8) is fixedly connected with a cylinder support (9) through bolts, and a cylinder (10) is fixedly connected to the top of the cylinder support (9) through bolts, the one end of cylinder (10) is connected with welded plate (11) through the telescopic link, pass through bolt fixed connection between welded plate (11) and first fixed plate (1), pass through bolt fixedly connected with second fixing base (12) on one side outer wall of second backup pad (3), pass through bolt fixedly connected with sliding sleeve (13) on one side outer wall of second fixing base (12), second slide bar (14) has been run through to the inside of sliding sleeve (13), the bottom welding of second slide bar (14) has second connecting plate (15).
2. The climbing formwork as claimed in claim 1, wherein: the novel multifunctional electric cooker is characterized in that a motor (16) is fixedly connected to the outer wall of one side of the second fixing seat (12) through bolts, one end of the motor (16) is rotatably connected with a left-handed lead screw (17) through a rotating shaft, and a right-handed lead screw (18) is welded to one end of the left-handed lead screw (17).
3. The climbing formwork as claimed in claim 2, wherein: the left-handed screw (17) and the right-handed screw (18) are connected with a screw nut seat (19) through threads in a screwing mode on the outer wall of one side, and a clamping plate (20) is welded at the bottom of the screw nut seat (19).
4. The climbing formwork as claimed in claim 2, wherein: the left-handed screw (17) and the right-handed screw (18) have opposite screw thread directions.
5. The climbing formwork as claimed in claim 1, wherein: reinforcing ribs (21) are welded between the first supporting plate (2) and the second supporting plate (3).
6. The climbing formwork as claimed in claim 1, wherein: the third fixing plate (8) and the sliding sleeve (13) are both in sliding connection with the second sliding rod (14), and the first sliding rod (7) is in sliding connection with the third fixing plate (8).
CN202020853131.5U 2020-05-20 2020-05-20 Integral climbing formwork Active CN212478531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020853131.5U CN212478531U (en) 2020-05-20 2020-05-20 Integral climbing formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020853131.5U CN212478531U (en) 2020-05-20 2020-05-20 Integral climbing formwork

Publications (1)

Publication Number Publication Date
CN212478531U true CN212478531U (en) 2021-02-05

Family

ID=74410285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020853131.5U Active CN212478531U (en) 2020-05-20 2020-05-20 Integral climbing formwork

Country Status (1)

Country Link
CN (1) CN212478531U (en)

Similar Documents

Publication Publication Date Title
CN202358832U (en) Clamping type hoisting device for unit curtain wall plate
CN210561750U (en) Bridge construction is with support bracket with clamping function
CN206041891U (en) Solar -energy photovoltaic power generation device
CN212478531U (en) Integral climbing formwork
CN207048321U (en) A kind of aluminum dipping form board connecting equipment
CN207296360U (en) A kind of climbing frame falling proof mechanism and the climbing frame falling proof seat in the plane lock based on the mechanism
CN210909034U (en) Fixing device is used in reinforcing bar processing
CN214929952U (en) Tool bogie is used in aluminium alloy storage convenient to transportation
CN209491271U (en) A kind of building iron bending press
CN211286644U (en) Template fastener is used in road bridge construction
CN208395682U (en) A kind of novel lifting beam machine
CN205968730U (en) Supplementary frock of screwing up of fluid pressure type bolt
CN207377118U (en) Agent structure increases a layer aluminum alloy mould plate jacking apparatus
CN211058310U (en) Building template clamping device for building construction
CN205668036U (en) Reinforcing bar Bender by roasting
CN220565705U (en) Support knot of post-cast strip template
CN217290185U (en) Reinforcing bar device of buckling for building site
CN216632886U (en) External thread processing device for sleeve connection steel bar
CN211769807U (en) Lifting steel frame of integrated wind power blade web
CN216190566U (en) Novel tower crane attaches wall structure
CN210632839U (en) Portable angle bending machine of screw thread formula
CN211362885U (en) Novel cement paste conversion machine
CN215711124U (en) Lifting device for assembly of assembly type building
CN219672000U (en) Auxiliary device convenient to install stainless steel railing
CN108252507A (en) A kind of building template being easily installed with dismounting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230619

Address after: 332020 West of Keji 1st Avenue and North of Nanwei 8th Road, Gongqingcheng, Jiujiang, Jiangxi

Patentee after: Jiangxi Zhongyu Template Co.,Ltd.

Address before: 330115 Building 8, industrial park of Jiangxi Zhenheng Industrial Co., Ltd., Xinqi zhoushennong West Avenue, north suburb of Nanchang City, Jiangxi Province

Patentee before: JIANGXI YUSHENGCHANG STEEL STRUCTURE ENGINEERING Co.,Ltd.

TR01 Transfer of patent right