CN212478488U - Construction work platform is built by laying bricks or stones to chimney inside lining - Google Patents

Construction work platform is built by laying bricks or stones to chimney inside lining Download PDF

Info

Publication number
CN212478488U
CN212478488U CN202020991837.8U CN202020991837U CN212478488U CN 212478488 U CN212478488 U CN 212478488U CN 202020991837 U CN202020991837 U CN 202020991837U CN 212478488 U CN212478488 U CN 212478488U
Authority
CN
China
Prior art keywords
operation platform
chimney
supporting
supporting beam
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020991837.8U
Other languages
Chinese (zh)
Inventor
王亮
蔺雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202020991837.8U priority Critical patent/CN212478488U/en
Application granted granted Critical
Publication of CN212478488U publication Critical patent/CN212478488U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a chimney inside lining masonry construction work platform, including setting up in inside support element, material loading unit and the work platform of chimney, wherein: the supporting unit comprises a supporting unit foundation, a standard knot and a jacking mechanism, and the supporting unit foundation is arranged at the bottom of the chimney; the plurality of standard joints are arranged at the top of the supporting unit foundation, and the jacking mechanism rises upwards along the outer side of each standard joint; the feeding unit comprises a supporting beam and material lifting equipment, the supporting beam is arranged at the top of the supporting unit, and the material lifting equipment is arranged on the supporting beam; the operation platform comprises an operation platform supporting beam, an operation platform panel and a pull rod, wherein the operation platform panel is arranged at the top of the operation platform supporting beam, one end of the pull rod is connected onto the operation platform supporting beam, and the other end of the pull rod is connected with the supporting unit. The beneficial effects of the utility model are that safe high efficiency, practicality are strong and practice thrift construction cost.

Description

Construction work platform is built by laying bricks or stones to chimney inside lining
Technical Field
The utility model belongs to the building construction field especially relates to a reinforced concrete chimney inside lining masonry construction operation platform.
Background
In industrial projects, a masonry construction operation platform needs to be installed inside a chimney during chimney lining masonry construction, a winch machine is often used for feeding operation in a limited space, and due to the fact that the radius inside the chimney gradually changes, the problems that the construction operation platform is frequently installed, operation difficulty is large, and construction efficiency is low often exist during operation.
Particularly, in a chimney lining building project, the inner diameter of the chimney is gradually changed in a segmented construction mode, the building amount of each operating platform in the building project is small after the operating platforms are installed, the operating platforms need to be frequently installed, the overall stability of the operating platforms cannot be guaranteed, and the risk of safety accidents is increased.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an in the chimney inside lining masonry project among the solution background art, the segmentation construction, the chimney internal diameter gradual change builds the construction volume by laying bricks or stones less after every operation platform installation of building by laying bricks or stones engineering, needs frequently to install operation platform, can't guarantee operation platform overall stability, has increased the problem of the risk of taking place the incident, provides a reinforced concrete chimney inside lining construction operation platform of building by laying bricks or stones.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a chimney inside lining masonry construction work platform, is including setting up in inside supporting element, material loading unit and the work platform of chimney, wherein:
the supporting unit comprises a supporting unit foundation, a standard knot and a jacking mechanism, wherein the supporting unit foundation is arranged at the bottom of the chimney; the plurality of standard joints are arranged at the top of the supporting unit foundation, and the jacking mechanism is lifted upwards along the outer side of each standard joint;
the feeding unit comprises a supporting beam and material lifting equipment, wherein the supporting beam is arranged at the top of the supporting unit, and the material lifting equipment is arranged on the supporting beam;
the operation platform comprises an operation platform supporting beam, an operation platform panel and a pull rod, wherein the operation platform panel is arranged at the top of the operation platform supporting beam, one end of the pull rod is connected to the operation platform supporting beam, and the other end of the pull rod is connected with the supporting unit.
Preferably, the work platform support beam comprises a plurality of sections of support beam units, and adjacent support beam units are detachably connected in a socket manner.
Preferably, the work platform further comprises a stand column, and the stand column is arranged at the end part of the outer ring of the work platform panel.
Preferably, the upright post comprises a plurality of upright posts, and the plurality of upright posts are arranged at equal intervals along the end part of the outer ring of the panel of the working platform.
Preferably, the operation platform still includes the guardrail, the guardrail pole setting with the stand adopts socket joint formula can dismantle the connection.
Preferably, the guardrail cross bar is provided as a steel strand.
Preferably, one end of each section of the support beam unit is provided with a first lifting lug, the top of the support unit is provided with a second lifting lug, and the first lifting lug is connected with the second lifting lug through the pull rod.
Preferably, the length of the work platform support beam is less than the maximum radius of the bottom of the chimney.
Preferably, the length of the innermost support beam unit is less than the top radius of the chimney.
The utility model has the advantages and positive effects that: by adopting the technical scheme, the lifting of the operation platform is realized through the jacking mechanism of the supporting unit; the material is transported in the vertical direction through the feeding unit; along with the increase of the operation height, the chimney diameter is littleer and smaller, reduces the chimney construction that the operation platform diameter realized higher position through demolising tip pull rod, a supporting beam unit and panel, has safe high-efficient, reduces the operation risk, can realize that the chimney under the different diameter circumstances is built by laying bricks or stones, and the practicality is strong, can realize once making repetitious usage, practices thrift advantages such as construction cost.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural view of an embodiment of the present invention during a lifting operation;
fig. 3 is a schematic plan view of an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a feeding unit according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a supporting beam of the work platform according to an embodiment of the present invention.
In the figure:
1. supporting unit 2, feeding unit 3 and operation platform
1-1, support unit foundation 1-2, standard knot 1-3 and jacking mechanism
2-1, supporting cross beam 2-2, material lifting equipment 3-1 and operation platform supporting beam
3-2 parts of operation platform panel 3-3 parts of pull rod 3-4 parts of guardrail
3-5, first lifting lugs 3-11, supporting beam unit 4 and chimney
Detailed Description
The embodiment provides a chimney lining masonry construction work platform, and fig. 1 is the schematic structural diagram of this embodiment, as shown in fig. 1, including setting up in inside supporting element 1, the material loading unit 2 and the work platform 3 of chimney 4, wherein:
the supporting unit 1 comprises a supporting unit foundation 1-1, a standard knot 1-2 and a jacking mechanism 1-3, wherein the supporting unit foundation 1-1 is arranged at the bottom of the chimney 4 and used for bearing the load of an upper structure, and in the embodiment, the supporting unit foundation 1-1 is arranged at the central position of the bottom of the chimney;
the standard festival 1-2 includes a plurality ofly, sets up in the top of supporting element basis 1-1, and climbing mechanism 1-3 upwards rises along the outside of standard festival 1-2, specifically, fig. 2 is the structure sketch when the utility model discloses an embodiment promotes the operation, as shown in fig. 2, during the use, climbing mechanism 1-3 can upwards rise according to the operation requirement, when the height of rising is equivalent to a standard festival 1-2 height, can install standard festival 1-2 in climbing mechanism 1-3's inside. The jacking mechanism 1-3 continues to rise, the standard knot 1-2 is installed inside the rising jacking mechanism 1-3 again, and the process is repeated in sequence to achieve rising of the working platform, as shown in fig. 3, the plane schematic diagram of the embodiment is shown.
Fig. 4 is a schematic structural diagram of the feeding unit in this embodiment, and as shown in fig. 4, the feeding unit 2 includes a supporting beam 2-1 and a material lifting device 2-2, the supporting beam 2-1 is disposed at the top of the supporting unit 1 and is used for supporting the material lifting device 2-2 of the supporting unit 2-2 and the weight of the material, the material lifting device 2-2 is disposed on the supporting beam 2-1, and the lifted material is vertically transported in the abdominal cavity of the supporting unit 1 by the material lifting device 2-2;
the operation platform 3 comprises an operation platform supporting beam 3-1, an operation platform panel 3-2 and a pull rod 3-3, wherein the operation platform panel 3-2 is arranged at the top 3-1 of the operation platform supporting beam, one end of the pull rod 3-3 is connected to the operation platform supporting beam 3-1, the other end of the pull rod 3-3 is connected with the supporting unit 1, the width of each operation platform panel 3-2 is set according to the length of each supporting beam unit 3-11, the length of each operation platform panel 3-2 is set according to the distance between the operation platform supporting beams 3-1, and the operation platform supporting beam 3-1 and the operation platform panel 3-2 are ensured to be effectively connected and fixed.
As an alternative embodiment, fig. 5 is a schematic structural diagram of a support beam of the work platform according to the embodiment; the operation platform supporting beam 3-1 comprises a plurality of sections of supporting beam units 3-11, adjacent supporting beam units 3-11 are detachably connected in a socket joint mode, and the supporting beam units 3-11 are fixedly connected, so that the operation platform supporting beam is more stable, and the construction safety is improved. The lifting of the operation platform is realized through the jacking mechanism 1-3 of the supporting unit 1; the material is transported in the vertical direction through the feeding unit 2; along with the increase of the operation height, the diameter of the chimney is smaller and smaller, and the diameter of the operation platform is reduced by removing the end pull rod 3-3, the support beam unit 3-11 and the operation platform panel 3-2, so that the construction of the chimney at a higher position is realized.
As an optional implementation manner, the working platform 3 further includes a plurality of columns, the columns are disposed at the end of the outer ring of the working platform panel 3-2, specifically, the columns are disposed at equal intervals along the end of the outer ring of the working platform panel 3-2, that is, the columns are disposed at equal intervals at the end of the outer ring of each working platform panel 3-2, the working platform further includes a guardrail 3-4, the vertical rods of the guardrail 3-4 are detachably connected with the columns in a socket joint manner, so as to effectively protect the working platform panel 3-2, and ensure the safety of the construction process. Preferably, the cross rods of the guardrails 3-4 are arranged into steel strands, and the guardrail is suitable for protecting the working platform panels with different diameters.
As an optional implementation mode, one end of each section of supporting beam unit 3-11 is provided with a first lifting lug 3-5, the top of the supporting unit 1 is provided with a second lifting lug, the first lifting lug 3-5 is connected with the second lifting lug through a pull rod 3-3, when the supporting platform is used, the first lifting lug 3-5 is arranged at the end part of one side of the supporting unit 1 of each section of supporting beam unit 3-11, the second lifting lug is arranged at the top of the supporting unit 1, and the two lifting lugs are tensioned through the pull rod 3-3 to ensure the overall stability of the supporting beam 3-1 of the operating platform.
As an alternative embodiment, the length of the work platform support beam 3-1 is smaller than the maximum radius of the bottom of the chimney, and in use, the innermost support beam unit 3-11 of the work platform support beam 3-1 is fixedly connected with the support unit 1, and preferably, the length of the innermost support beam unit 3-11 is smaller than the radius of the top of the chimney 4.
The construction method of the chimney lining masonry operation platform comprises the following steps:
s1: arranging a supporting unit foundation at the center of the bottom of the chimney;
s2: installing a standard knot and a jacking mechanism;
s3: a supporting beam and material lifting equipment are arranged at the top of the supporting unit;
s4: mounting an inner ring operation platform supporting cross beam, and tensioning and tightening through a pull rod;
s5: sequentially installing the rest operation platform supporting cross beams, and tensioning the rest operation platform supporting cross beams through pull rods;
s6: laying an operation platform panel, and connecting and fixing the operation platform panel and a platform supporting cross beam;
s7: installing a guardrail on the outermost operation platform panel until the chimney building platform is installed;
s8: carrying out layered building operation of the chimney on the chimney building platform by constructors;
s9: lifting the operation platform by a lifting mechanism along with the increase of the building height;
s10: along with the increase of the height, the diameter of the chimney is reduced, the diameter of the operation platform is reduced by removing the end pull rod, the support beam unit and the panel, and the construction of the chimney at a higher position is realized.
The utility model has the advantages that: the lifting of the operation platform is realized through the supporting unit jacking mechanism; the material is transported in the vertical direction through the feeding unit; along with the increase of the operation height, the chimney diameter is littleer and smaller, reduces the chimney construction that the operation platform diameter realized higher position through demolising tip pull rod, a supporting beam unit and panel, has safe high-efficient, reduces the operation risk, can realize that the chimney under the different diameter circumstances is built by laying bricks or stones, and the practicality is strong, can realize once making repetitious usage, practices thrift advantages such as construction cost.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention, and should not be considered as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (9)

1. The utility model provides a chimney inside lining masonry construction work platform which characterized in that: including setting up in inside supporting element, the material loading unit and the operation platform of chimney, wherein:
the supporting unit comprises a supporting unit foundation, a standard knot and a jacking mechanism, wherein the supporting unit foundation is arranged at the bottom of the chimney; the plurality of standard joints are arranged at the top of the supporting unit foundation, and the jacking mechanism is lifted upwards along the outer side of each standard joint;
the feeding unit comprises a supporting beam and material lifting equipment, wherein the supporting beam is arranged at the top of the supporting unit, and the material lifting equipment is arranged on the supporting beam;
the operation platform comprises an operation platform supporting beam, an operation platform panel and a pull rod, wherein the operation platform panel is arranged at the top of the operation platform supporting beam, one end of the pull rod is connected to the operation platform supporting beam, and the other end of the pull rod is connected with the supporting unit.
2. The chimney lining masonry construction work platform according to claim 1, characterized in that: the operation platform supporting beam comprises a plurality of sections of supporting beam units, and adjacent supporting beam units are detachably connected in a socket joint mode.
3. The chimney lining masonry construction work platform according to claim 1 or 2, characterized in that: the operation platform still includes the stand, the stand set up in the tip of operation platform panel outer lane.
4. The chimney lining masonry construction work platform according to claim 3, characterized in that: the stand includes a plurality ofly, and is a plurality of the stand is followed the tip equidistance of operation platform panel outer lane sets up.
5. The chimney lining masonry construction work platform according to claim 4, characterized in that: the operation platform still includes the guardrail, the guardrail pole setting with the stand adopts socket joint formula can dismantle the connection.
6. The chimney lining masonry construction work platform according to claim 5, characterized in that: the guardrail cross bar is arranged into a steel strand.
7. The chimney lining masonry construction work platform according to claim 1 or 2, characterized in that: and one end of each section of the supporting beam unit is provided with a first lifting lug, the top of the supporting unit is provided with a second lifting lug, and the first lifting lug is connected with the second lifting lug through the pull rod.
8. The chimney lining masonry construction work platform according to claim 1, characterized in that: the length of the operation platform support beam is smaller than the maximum radius of the bottom of the chimney.
9. The chimney lining masonry construction work platform according to claim 1, characterized in that: the length of the innermost support beam unit is less than the top radius of the chimney.
CN202020991837.8U 2020-06-03 2020-06-03 Construction work platform is built by laying bricks or stones to chimney inside lining Active CN212478488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020991837.8U CN212478488U (en) 2020-06-03 2020-06-03 Construction work platform is built by laying bricks or stones to chimney inside lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020991837.8U CN212478488U (en) 2020-06-03 2020-06-03 Construction work platform is built by laying bricks or stones to chimney inside lining

Publications (1)

Publication Number Publication Date
CN212478488U true CN212478488U (en) 2021-02-05

Family

ID=74447836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020991837.8U Active CN212478488U (en) 2020-06-03 2020-06-03 Construction work platform is built by laying bricks or stones to chimney inside lining

Country Status (1)

Country Link
CN (1) CN212478488U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622485A (en) * 2020-06-03 2020-09-04 中冶天工集团有限公司 Chimney lining masonry construction operation platform and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622485A (en) * 2020-06-03 2020-09-04 中冶天工集团有限公司 Chimney lining masonry construction operation platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN102912973B (en) Space truss platform for round building construction and construction method using same
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN209873846U (en) Can have enough to meet need construction elevator basis and return reinforcing apparatus
CN213234203U (en) Disc buckle type upright column ladder cage scaffold
CN212053673U (en) Tower construction operation platform of dome
CN114542079B (en) Efficient shaft creeping formwork construction system
CN212478488U (en) Construction work platform is built by laying bricks or stones to chimney inside lining
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN111622485A (en) Chimney lining masonry construction operation platform and construction method thereof
CN210483094U (en) Inverted triangular pipe truss lifting device
CN107816209A (en) The large-scale Roof Truss construction technology of installation is lifted across outer both sides
CN216616802U (en) Three-layer hydraulic self-lifting construction platform for vertical shaft
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN213233105U (en) Small-span concrete cast-in-place box girder support system
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN211895796U (en) Core cylinder movable arm type tower crane installation climbing structure
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN112854702A (en) Large-span silo roof construction platform and erection method
CN114526078B (en) Assembly line type shaft inner wall pouring method
CN218621853U (en) High mound reinforcing bar installation truss structure
CN218714867U (en) Foundation-free assembly jig frame of large-span prestressed arch dry coal shed
CN220621216U (en) Beehive support system for construction of large-diameter silo roof
CN213773336U (en) Foundation treatment pile
CN110735399B (en) Installation method of cast-in-place support beam system capable of automatically rising or falling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant