CN212478391U - Caulking connection structure for carpet and stone - Google Patents
Caulking connection structure for carpet and stone Download PDFInfo
- Publication number
- CN212478391U CN212478391U CN202020695716.9U CN202020695716U CN212478391U CN 212478391 U CN212478391 U CN 212478391U CN 202020695716 U CN202020695716 U CN 202020695716U CN 212478391 U CN212478391 U CN 212478391U
- Authority
- CN
- China
- Prior art keywords
- carpet
- diaphragm
- strake
- stone
- overlap joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
The utility model relates to a carpet and stone material caulking connection structure belongs to the ground field of decorating, and its technical scheme main points are including the receipts strake that is used for connecting carpet and stone material, the receipts strake is the C type form, and its opening sets up towards carpet side, and the carpet bottom is provided with the rubber mat, after the carpet laid on the rubber mat, the upper surface of carpet and the top surface and the stone material surface of receiving the strake are in on same horizontal plane, and the inboard bottom rigid coupling of receipts strake has the overlap joint piece, the length direction of overlap joint piece along receiving the strake leads to long the setting, a carpet side is inserted downwards to receiving in the strake and is held the card on the overlap joint piece. The utility model has the advantages that be convenient for clean the dust on the carpet, improve indoor travelling comfort.
Description
Technical Field
The utility model belongs to the technical field of the ground decoration and specifically relates to a carpet and stone material caulking connection structure is related to.
Background
At present, carpets become an indispensable part in home decoration, beautiful carpets can create a noble, elegant and comfortable home environment for people, and when the carpets are laid, in order to prevent the stone from edge burst and carpet edge curling, the abutting joint of the stone and the carpets needs to be closed.
Reference is now made to the chinese utility model patent application No. 201510980952.9, it discloses a carpet binding off structure, it includes carpet laying portion, the portion is laid to the stone material, carpet laying portion includes the carpet, the buckle groove, the built-in fitting, the carpet screed-coat of setting on the floor, the stone material is laid the portion and is included the stone material board, the stone material screed-coat of setting on the floor, the stone material board is laid on the stone material screed-coat, the carpet is laid on the carpet screed-coat, the built-in fitting is installed between stone material screed-coat and carpet screed-coat, the buckle groove is installed on the built-in fitting, the buckle groove board is close to stone material board side outside upper end and is equipped with the stone material slot, stone material flange reason is pegged graft in the stone material slot, the carpet tip is equipped with the clamping part that turns over a book downwards, the book position of clamping part is close to the stone material board, clamping part sets up in the buckle groove board, the buckle sets up between clamping part and carpet, the buckle is.
The above prior art solutions have the following drawbacks: there is the gap between carpet and the stone material slot, and the dust is piled up on the catching groove board of gap below easily, is unfavorable for the resident family to clean the dust, and long this past, the dust is amassed more, influences indoor travelling comfort.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a carpet and stone material caulking connection structure, its advantage is convenient for clean the dust on the carpet, improves indoor travelling comfort.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a carpet and stone material caulking connection structure, is including the receipts strake that is used for connecting carpet and stone material, the receipts strake is the C type form, and its opening sets up towards the carpet side, and the carpet bottom is provided with the rubber mat, after the carpet laid on the rubber mat, the upper surface of carpet and the top surface and the stone material surface of receiving the strake are in on same horizontal plane, and the inboard bottom rigid coupling of receipts strake has the overlap joint piece, the length direction of overlap joint piece along receiving the strake leads to long setting, a carpet side is inserted downwards to receiving in the strake and is held the card on the overlap joint piece.
Through adopting above-mentioned technical scheme, insert the receipts strake and with the overlap joint piece card fixed with one side of carpet, the restriction carpet is deviate from receiving the interior accident of strake, upwards fill up certain height with the carpet through the ground cushion for carpet surface flushes with the surface of receiving the strake basically, and like this, the carpet just can not produce towards the sky seam with the junction of receiving the strake or have sunkenly, thereby be convenient for the resident family clean the dust on the carpet, also can improve indoor travelling comfort to a certain extent.
The utility model discloses further set up to: the overlap joint piece has the overlap joint face of an slope, and the height of overlap joint face is reduced to the inboard by the opening side of receipts strake gradually, and the bottom of carpet department of buckling is seted up and is the draw-in groove of three horn shapes, and the rigid coupling has the fixture block that is three horn shapes on the overlap joint face, and fixture block and draw-in groove all set up along the length direction of receipts strake leads to long the carpet inserts receipts strake is set up after on the overlap joint face, the fixture block clamps in the draw-in groove.
Through adopting above-mentioned technical scheme, before the installation, earlier in the vertical draw-in groove of upwards seting up in the bottom of carpet department of buckling, the draw-in groove can be convenient for the installer on the one hand and buckle the carpet, and on the other hand can prevent to buckle back carpet and arch, and the carpet is laid after inserting in the receipts strake and is pasted on the faying surface, and the rigid coupling has the fixture block with draw-in groove looks adaptation on the faying surface, and the fixture block card is held in the draw-in groove to can restrict the carpet from receiving unexpected slippage in.
The utility model discloses further set up to: the lapping surface is provided with a plurality of zigzag bulges which are arranged along the length direction of the lapping surface.
Through adopting above-mentioned technical scheme, the friction between faying face and the carpet can be increased to the arch of cockscomb structure, after the carpet cartridge is in the receipts strake, can prevent that the carpet from following unexpected slippage in the receipts strake.
The utility model discloses further set up to: the receipts strake is including the first diaphragm that is parallel to each other, second diaphragm and the first riser of connecting first diaphragm and second diaphragm, first diaphragm is located the top of second diaphragm, is provided with a plurality of floors along the length direction interval of receipts strake between first diaphragm and the first riser, the side of inserting of carpet is filled tightly the floor with between the overlap joint piece.
Through adopting above-mentioned technical scheme, being provided with of floor does benefit to the more firm of carpet cartridge in the receipts strake, and the floor also can play certain reinforcing effect simultaneously, can prevent to receive the strake and produce the deformation because of suffering trampling for a long time.
The utility model discloses further set up to: the second transverse plate is connected with a countersunk screw in a threaded manner on the outer side of the lap joint block, and the second transverse plate is detachably and fixedly installed on the horizontal ground through the countersunk screw.
By adopting the technical scheme, the edge banding strip can be conveniently fixed on the ground by screwing the countersunk head screw, the operation is simple and convenient, and the disassembly and the replacement are easy.
The utility model discloses further set up to: the bottom of the floor rubber mat facing the second transverse plate side is vertically and upwards provided with a yielding groove, and the part of the second transverse plate outside the lapping block is inserted in the yielding groove.
By adopting the technical scheme, the carpet surface paved on the floor rubber mat can be smoother.
The utility model discloses further set up to: the vertical spacing groove of having seted up downwards on the stone material, first diaphragm inlays towards the stone material side and establishes the spacing inslot, the bottom of first diaphragm is formed with the flange downwards, the flange leads to long the setting along the length direction of first diaphragm, the vertical recess of having seted up downwards with flange looks adaptation of tank bottom of spacing groove.
Through adopting above-mentioned technical scheme, first diaphragm inlays towards the stone material side and establishes and can prevent that the stone material from stepping on because of suffering for a long time and producing the edge bursting phenomenon at the spacing inslot, and the flange of first diaphragm bottom inlays and establishes in the recess on the stone material can make in the recess that receipts strake and stone material are connected more firm.
The utility model discloses further set up to: the first transverse plate deviates from the stone side and exceeds the lapping blocks by 3-5 mm.
Through adopting above-mentioned technical scheme, can press the department of buckling of carpet and hold, make the more smooth-going, natural of the junction transition of carpet and receipts strake.
To sum up, the utility model discloses a beneficial technological effect does:
1. the carpet is inserted and fixed in the edge folding strip, so that a downward seam or a depression can be prevented from being formed between the carpet and the edge folding strip, and a resident can conveniently and thoroughly remove dust on the carpet in the cleaning process, so that the indoor environment is improved;
2. the clamping groove is formed in the bottom end of the carpet bending part, so that the carpet after being bent can be prevented from arching upwards, and the clamping block on the lapping block can be conveniently clamped and matched with the clamping block on the lapping block, and the connection stability between the carpet and the edge folding strip is improved.
Drawings
Fig. 1 is a plan view of the overall structure of the present invention.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is an enlarged view of a portion B in fig. 1.
Fig. 4 is an enlarged view of a portion C in fig. 1.
Fig. 5 shows a schematic structural view of the edge banding.
In the figure, 1, carpet; 11. a card slot; 2. stone materials; 21. a limiting groove; 211. a groove; 3. edging strips; 31. a first transverse plate; 311. a flange; 32. a second transverse plate; 33. a first vertical plate; 34. a rib plate; 4. a floor mat; 41. a yielding groove; 5. countersunk head screws; 6. a lapping block; 61. a lapping surface; 62. a clamping block; 63. and (4) protruding.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a carpet and stone material caulking connection structure, including carpet 1, stone material 2, receipts strake 3 and ground cushion 4, one side cartridge of carpet 1 is in receiving strake 3 to fixed with stone material 2 through receiving strake 3, ground cushion 4 is laid in the bottom of carpet 1, in order to be used for having filled up certain height with carpet 1, makes carpet 1 surface flush with receipts 3 top surfaces of strake basically. Because the carpet 1 is inserted in the edge-closing strip 3, a seam facing the sky cannot be formed between the carpet 1 and the edge-closing strip 3, so that a resident can clean dust on the carpet 1 thoroughly, and the indoor environment is improved.
Referring to fig. 1 and 5, specifically, receipts strake 3 is the C type form that the opening set up towards carpet 1, it is structural including first diaphragm 31, second diaphragm 32 and first riser 33, first diaphragm 31 and second diaphragm 32 parallel arrangement, and first diaphragm 31 is located the top of second diaphragm 32, first riser 33 deviates from carpet 1 side and laminates with stone material 2 mutually, its upper and lower both ends respectively with first diaphragm 31 and second diaphragm 32 fixed connection, the vertical mounting hole that has seted up downwards on the second diaphragm 32, threaded connection has countersunk screw 5 in the mounting hole, second diaphragm 32 passes through countersunk screw 5 detachable to be fixed on the level ground.
Referring to fig. 1 and 5, a lap joint block 6 is fixedly connected to the second transverse plate 32 and on the inner side of the countersunk head screw 5, the lap joint block 6 is arranged along the length direction of the second transverse plate 32, the cross section of the lap joint block 6 is in a right-angle shape and is provided with a lap joint face 61 which is arranged in an inclined manner, an acute angle included angle between the lap joint face 61 and the horizontal plane is in a range of 45-60 degrees, the height of the lap joint face 61 is gradually reduced from the outer side to the inner side of the edge receiving strip 3, a plurality of rib plates 34 are obliquely fixed between the first transverse plate 31 and the first vertical plate 33, the inclination angles of the rib plates 34 are the same as those of the lap joint face 61, during installation, the carpet 1 is tightly plugged between the rib plates 34 and the lap joint block 6 after being bent downwards close to the edge receiving strip 3, and the first transverse plate 31 is far away from the side of the stone 2 and exceeds the lap joint block 63-.
Referring to fig. 1 and 2, further, in order to prevent the carpet 1 after bending from arching upwards, the transition between the stone material 2 and the carpet 1 is smoother, here, the bottom of the carpet 1 at the bending position is vertically upwards provided with a clamping groove 11, the cross section of the clamping groove 11 is in an inverted triangle shape, the top of the overlapping surface 61 is transversely and fixedly connected with a clamping block 62, the clamping block 62 is matched with the clamping groove 11, after the carpet 1 is inserted in place, the clamping block 62 on the overlapping surface 61 is clamped in the clamping groove 11 on the carpet 1, so as to limit the accidental separation of the carpet 1 from the edge-receiving strip 3, and the connection stability between the carpet 1 and the overlapping block 6 is improved. In addition, still be provided with on the faying surface 61 interval a plurality of projections 63 that are the cockscomb structure, projection 63 is long setting along the length direction of faying surface 61 to be used for increasing the frictional force between carpet 1 and the faying surface 61, reduced carpet 1 from receiving the possibility that the interior accident of strake 3 breaks away from.
Referring to fig. 1 and 3, the vertical spacing groove 21 of having seted up downwards in stone material 2 is close to receipts strake 3 side, and first diaphragm 31 extends and the overlap joint in spacing groove 21 towards stone material 2 side level, because the last face of first diaphragm 31 is flush with stone material 2 surface basically, consequently can prevent that the edge of stone material 2 from receiving to trample for a long time and appearing the phenomenon of bursting at the limit, can effectively prevent that the dust from depositing in the gap of stone material 2 with receipts strake 3 butt joint department. The bottom of first diaphragm 31 is formed with flange 311 downwards, and flange 311 leads to long the setting along the length direction of first diaphragm 31, and the vertical recess 211 of seting up with flange 311 looks adaptation downwards of the tank bottom of spacing groove 21, after first diaphragm 31 overlap joint is in spacing groove 21, flange 311 inlays and establishes in recess 211 to can improve the connection stability between stone material 2 and the receipts strake 3.
Referring to fig. 1 and 4, the bottom of the floor mat 4 facing the second transverse plate 32 is vertically and upwardly provided with an abdicating groove 41, after the floor mat 4 is laid, the part of the second transverse plate 32 outside the lapping block 6 is inserted in the abdicating groove 41, so that the transition between the carpet 1 and the stone 2 is smoother and more natural.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a carpet and stone material caulking connection structure which characterized in that: including receipts strake (3) that is used for connecting carpet (1) and stone material (2), receipts strake (3) are the C type form, and its opening sets up towards carpet (1) side, and carpet (1) bottom is provided with rubber mat (4), carpet (1) lay on rubber mat (4) after, the upper surface of carpet (1) and the top surface and stone material (2) surface of receiving strake (3) are in on the same horizontal plane, and the bottom rigid coupling of receiving strake (3) inboard has overlap joint piece (6), overlap joint piece (6) lead to long the setting along the length direction of receiving strake (3), insert in receiving strake (3) and block under carpet (1) one side slant and hold on overlap joint piece (6).
2. The carpet and stone caulking connection structure of claim 1, wherein: overlap joint piece (6) have overlap joint face (61) of an slope, and the height of overlap joint face (61) is reduced to the inboard by the opening side of receipts edge strip gradually, and draw-in groove (11) that are three horn shapes are seted up to the bottom of carpet (1) department of buckling, and the rigid coupling has fixture block (62) that are three horn shapes on overlap joint face (61), and fixture block (62) and draw-in groove (11) all follow the length direction of receipts edge strip (3) and lead to long the setting carpet (1) insert receive edge strip (3) and set up after on overlap joint face (61), fixture block (62) clamp in draw-in groove (11).
3. The carpet and stone caulking connection structure of claim 2, wherein: be provided with a plurality of projections (63) that are the cockscomb structure on faying surface (61), projection (63) are along the length direction full length setting of faying surface (61).
4. The carpet and stone caulking connection structure of claim 1, wherein: receipts strake (3) are including first diaphragm (31), second diaphragm (32) that are parallel to each other and first riser (33) of connecting first diaphragm (31) and second diaphragm (32), first diaphragm (31) are located the top of second diaphragm (32), and the length direction interval along receipts strake (3) is provided with a plurality of floor (34) between first diaphragm (31) and first riser (33), the side of inserting of carpet (1) is packed tightly floor (34) with between overlap joint piece (6).
5. The carpet and stone caulking connection structure of claim 4, wherein: the second transverse plate (32) is connected with a sunk screw (5) in a threaded mode on the outer side of the lapping block (6), and the second transverse plate (32) is detachably and fixedly installed on the horizontal ground through the sunk screw (5).
6. The carpet and stone caulking connection structure of claim 4, wherein: the plastic mat (4) has seted up the groove of stepping down (41) towards the bottom of second diaphragm (32) side is vertical upwards, second diaphragm (32) are inserted in the part in overlap joint piece (6) outside and are established in the groove of stepping down (41).
7. The carpet and stone caulking connection structure of claim 4, wherein: spacing groove (21) have been seted up to vertical downwards on stone material (2), first diaphragm (31) are inlayed towards stone material (2) side and are established in spacing groove (21), the bottom of first diaphragm (31) is formed with flange (311) downwards, the length direction of flange (311) along first diaphragm (31) leads to long the setting, recess (211) with flange (311) looks adaptation are seted up to the vertical downwards of tank bottom of spacing groove (21).
8. The carpet and stone caulking connection structure of claim 4, wherein: the first transverse plate (31) deviates from the stone (2) and exceeds the lapping block (6) by 3-5 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020695716.9U CN212478391U (en) | 2020-04-29 | 2020-04-29 | Caulking connection structure for carpet and stone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020695716.9U CN212478391U (en) | 2020-04-29 | 2020-04-29 | Caulking connection structure for carpet and stone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212478391U true CN212478391U (en) | 2021-02-05 |
Family
ID=74454022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020695716.9U Active CN212478391U (en) | 2020-04-29 | 2020-04-29 | Caulking connection structure for carpet and stone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212478391U (en) |
-
2020
- 2020-04-29 CN CN202020695716.9U patent/CN212478391U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6553651B2 (en) | Panels interconnectable with similar panels to form a finish | |
US20190177984A1 (en) | Floor panel for forming a floor covering, floor covering formed from such floor panels and method for manufacturing such floor panels | |
US9476207B2 (en) | Panel | |
US4452021A (en) | Natural wood suspended wood ceiling or wall system employing clip means | |
CN212478391U (en) | Caulking connection structure for carpet and stone | |
CN206655601U (en) | A kind of combined door pocket | |
CN2761750Y (en) | Matching type wood floor | |
CN102449250A (en) | Flooring-fixing board | |
CN209194903U (en) | Wooden metope structure | |
CN205742910U (en) | A kind of multiduty outer corner body of wall corner ornamental strip | |
CN2764853Y (en) | Parallel-mounted floor and connection clips thereof | |
CN212271487U (en) | Assembled soft or hard package mounting structure | |
CN211257689U (en) | Reset top corner closing-in strip for assembled wallboard | |
CN220167363U (en) | Modeling background wall structure with closely spliced edges | |
CN101984201A (en) | Skirting | |
CN217998593U (en) | Furred ceiling binding off lines | |
CN218758520U (en) | Assembled plug-in skirting line | |
CN221053070U (en) | Adjustable edging subassembly | |
CN216042403U (en) | Prefabricated floor structure | |
CN213979766U (en) | Internal angle lamp belt skirting line | |
CN208777620U (en) | A kind of installation part hanging decorative board for wall | |
CN211499611U (en) | Floor panel | |
CN212002018U (en) | Multipurpose corner protecting plate | |
CN212078558U (en) | Gypsum board binding off structure | |
CN216865852U (en) | Skirting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |