CN212477825U - Pipe jacking building wall structure - Google Patents

Pipe jacking building wall structure Download PDF

Info

Publication number
CN212477825U
CN212477825U CN202021148495.XU CN202021148495U CN212477825U CN 212477825 U CN212477825 U CN 212477825U CN 202021148495 U CN202021148495 U CN 202021148495U CN 212477825 U CN212477825 U CN 212477825U
Authority
CN
China
Prior art keywords
layer
prefabricated
foundation pit
pipe
building wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021148495.XU
Other languages
Chinese (zh)
Inventor
邱太岗
师小娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202021148495.XU priority Critical patent/CN212477825U/en
Application granted granted Critical
Publication of CN212477825U publication Critical patent/CN212477825U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a pipe-jacking building wall structure, which comprises a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer, a plurality of pipe-jacking fender posts are arranged on one side of the foundation pit layer at intervals, the prefabricated layer is arranged on one side of the foundation pit layer close to the pipe-jacking fender posts and is arranged at intervals with the foundation pit layer, the prefabricated layer and the foundation pit layer are arranged side by side, and the lower end face of the prefabricated layer is connected with the upper end face of the structural layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer. The utility model discloses pipe-jacking building wall structure, simple structure and easily construction, construction quality is good, can realize cyclic utilization, the saving building material of prefabricated layer component, and the construction effect is good, but also can realize the protection to the environment, and the while can reduction of erection time improves work efficiency.

Description

Pipe jacking building wall structure
Technical Field
The utility model belongs to the technical field of municipal pipeline engineering construction, especially, relate to a pipe jacking building wall structure.
Background
Along with municipal infrastructure promotes transformation development increase, municipal pipeline push pipe construction technology's application is also more and more extensive. At present, a jack back wall in a top pipe well foundation pit is mostly of a cast-in-place concrete structure, pipe jacking construction can be carried out only after concrete reaches design strength, and the structure is abandoned after the pipe jacking is finished.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pipe-jacking building wall structure has solved cast-in-place concrete structure among the prior art and has leaded to the extravagant serious of material, the time limit for a project longer, the higher technical problem of manufacturing cost, the utility model discloses not only can realize cyclic utilization, the saving building material of prefabricated layer component, the construction effect is good, but also can realize the protection to the environment, can shorten the time limit for a project simultaneously, improves work efficiency.
In order to solve the technical problem, the utility model discloses a technical scheme is:
a pipe-jacking building wall structure comprises a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer.
Further, the thickness of the filling layer is not less than 50 mm.
Further, keep away from at the prefabricated layer foundation ditch layer one side is equipped with the support body layer, the support body layer includes the steel sheet that a plurality of concatenations set up.
Furthermore, the adjacent steel plates are connected and fixed through bolts.
Furthermore, a plurality of connecting pieces are arranged on the frame body layer, and the connecting pieces sequentially penetrate through the frame body layer and the prefabricated layer.
Furthermore, each connecting piece includes a plurality of bolts, and adjacent bolts are connected through the connector, the bolt evaginate in the frame body layer is kept away from prefabricated layer one side is equipped with rather than the complex nut.
Furthermore, one end of the bolt, which is arranged on the prefabricated layer, is of a bent structure, and the bent structure is of an L shape.
Further, the foundation pit layer is an earthwork structure layer.
Further, the prefabricated layer and the structural layer are both concrete structural layers; the filling layer is a fine aggregate concrete structure layer.
Compared with the prior art, the utility model discloses pipe-jacking building wall structure, simple structure and easily construction, construction quality is good, can realize cyclic utilization, the saving building material of prefabricated layer component, and the construction effect is good, but also can realize the protection to the environment, and the while can the reduction of erection time improves work efficiency.
Drawings
Fig. 1 is a schematic structural view of a prefabricated assembled background wall according to an embodiment of the present invention;
fig. 2 is a top view of the prefabricated assembled background wall according to an embodiment of the present invention;
fig. 3 is a side view of the prefabricated assembled background wall according to an embodiment of the present invention.
In the figure:
10. foundation pit layer 20, top pipe fender post 30, prefabricated layer
40. Structural layer 50, filling layer 60, and frame layer
70. Bolt 80 and connecting piece
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
The embodiment provides a pipe-jacking building wall structure, as shown in fig. 1-3, which includes a foundation pit layer 10, a prefabricated layer 30 and a structural layer 40, the prefabricated layer 30 and the structural layer 40 are disposed on one side of the foundation pit layer 10, a plurality of pipe-jacking fender posts 20 are disposed at intervals on one side of the foundation pit layer 10, the pipe-jacking fender posts 20 are vertically disposed on the inner side thereof for placing jacking pipes, the pipe-jacking fender posts 20 can be disposed at intervals according to actual conditions, the foundation pit layer 10 is an earthwork structural layer, and earthwork is filled between adjacent pipe-jacking fender posts 20. The prefabricated layer 30 is arranged on one side, close to the top pipe fender post 20, of the foundation pit layer 10 and is arranged at a distance from the foundation pit layer 10, the prefabricated layer 30 and the foundation pit layer 10 are arranged side by side, and the lower end face of the prefabricated layer 30 is connected with the upper end face of the structural layer 40; structural layer 40 is perpendicular to foundation pit layer 10 and is located directly below precast layer 30. A filling layer 50 is further arranged between the foundation pit layer 10 and the prefabricated layer 30, and the thickness of the filling layer 50 is not less than 50 mm.
Further, be equipped with shelf body layer 60 in the one side of prefabricated layer 30 keeping away from foundation ditch layer 10, shelf body layer 60 includes the steel sheet that a plurality of concatenations set up, connects fixedly by bolt 70 between the adjacent steel sheet. The steel plate structures can be the same or different, the bolts 70 are mainly arranged at the splicing seams between the adjacent steel plates, the number of the bolts 70 can be determined according to the actual situation, and the number is not particularly limited.
Further, a plurality of connecting members 80 are disposed on the shelf body layer 60, and the connecting members 80 sequentially penetrate through the shelf body layer 60 and the prefabricated layer 30. Connecting piece 80's setting is mainly set up in the outward flange department and the junction on support body layer 60, and every connecting piece 80 includes a plurality of bolts, connects through the connector between the adjacent bolt, and the bolt majority is pre-buried in prefabricated layer 30, is equipped with the bolt of part evagination in one side of prefabricated layer 30 of support body layer 60 principle, and the bolt is kept away from one side and the nut cooperation on prefabricated layer 30 at support body layer 60. Further, the one end that the bolt is pre-buried at prefabricated layer 30 is the bending structure, and preferably, the bending structure of bolt at prefabricated layer 30 one end is the L type, increases the intensity that prefabricated layer 30 and support body layer 60 are connected, improves the holistic steadiness of push pipe building wall structure.
In this embodiment, the foundation pit layer 10 is an earth structure layer; both the prefabricated layer 30 and the structural layer 40 are concrete structural layers; the filling layer 40 is a fine-grained concrete structure layer.
A construction method of a pipe-jacking building wall structure adopts the pipe-jacking building wall structure, and comprises the following steps:
s1: and arranging a plurality of jacking pipe fender piles 20 arranged at intervals on the same side of the foundation pit layer 10, namely constructing the foundation pit layer 10 in a working well around the jacking pipe fender piles 20.
S2: and excavating square pits layer by layer from top to bottom to a set depth on one side of the foundation pit layer 10 close to the top pipe fender pile 20 along the height direction of the top pipe fender pile 20.
S3: after the excavation is carried out to the set depth, a concrete structure is poured on the lower end face of the earthwork pit perpendicular to one side of the foundation pit layer 10 as soon as possible to form a structural layer 60.
S4: and then, cleaning soil on the surface of one side of the foundation pit layer 10 close to the top pipe fender post 20, arranging a prefabricated layer 30 on one side of the cleaned foundation pit layer 10, and arranging the prefabricated layer 30 to be vertical to the upper end surface of the structural layer 60. Checking the control line during installation; the prefabricated layer 30 is hoisted and installed in a blocking mode, the prefabricated layer 30 and the foundation pit layer 10 are arranged side by side, and the gap between the prefabricated layer 30 and the foundation pit layer 10 is not smaller than 50 mm; the position, perpendicularity and splice gap of the precast layer 30 are checked during installation.
S5: a shelf layer 60 is disposed outside the precast layer 30, and the shelf layer 60 and the precast layer 30 are connected to each other by a connection member 80.
S6: and pouring fine aggregate concrete between the foundation pit layer 10 and the prefabricated layer 30 to form a filling layer 50, wherein the fine aggregate concrete of the filling layer 50 reaches the preset strength and then can be jacked into the pipeline.
Compared with the prior art, the utility model discloses pipe-jacking building wall structure, simple structure and easily construction, construction quality is good, can realize cyclic utilization, the saving building material of prefabricated layer component, and the construction effect is good, but also can realize the protection to the environment, and the while can the reduction of erection time improves work efficiency.
The embodiments of the present invention have been described in detail, and the description is only for the preferred embodiments of the present invention, and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (9)

1. A pipe-jacking building wall structure is characterized by comprising a foundation pit layer, a prefabricated layer and a structural layer, wherein the prefabricated layer and the structural layer are arranged on one side of the foundation pit layer; the structural layer is vertical to the foundation pit layer and is positioned under the prefabricated layer; and a filling layer is also arranged between the foundation pit layer and the prefabricated layer.
2. A push bench building wall structure as claimed in claim 1, wherein the filler layer is no less than 50mm thick.
3. A pipe-jacking building wall structure as claimed in claim 1 or 2, wherein a frame body layer is provided on the side of the prefabricated layer away from the foundation pit layer, the frame body layer comprising a plurality of spliced steel plates.
4. The pipe-jacking building wall structure according to claim 3, wherein adjacent steel plates are fixed by bolt connection.
5. A push pipe building wall structure as claimed in claim 4, wherein said frame layer is provided with a plurality of connectors, said connectors being sequentially disposed through said frame layer and said prefabricated layer.
6. A push pipe building wall structure as claimed in claim 5, wherein each of said connectors includes a plurality of bolts, adjacent bolts are connected by connectors, and said bolts are provided with nuts engaging with said bolts protruding from said frame layer on a side thereof remote from said prefabricated layer.
7. The pipe-jacking building wall structure according to claim 6, wherein the bolt is arranged at one end of the prefabricated layer and is of a bent structure, and the bent structure is L-shaped.
8. The pipe-jacking building wall structure according to any one of claims 1-2 and 4-7, wherein the foundation pit layer is an earth structure layer.
9. A push pipe building wall structure as claimed in claim 8, wherein said prefabricated layer and said structural layer are both concrete structural layers; the filling layer is a fine aggregate concrete structure layer.
CN202021148495.XU 2020-06-19 2020-06-19 Pipe jacking building wall structure Active CN212477825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021148495.XU CN212477825U (en) 2020-06-19 2020-06-19 Pipe jacking building wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021148495.XU CN212477825U (en) 2020-06-19 2020-06-19 Pipe jacking building wall structure

Publications (1)

Publication Number Publication Date
CN212477825U true CN212477825U (en) 2021-02-05

Family

ID=74412269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021148495.XU Active CN212477825U (en) 2020-06-19 2020-06-19 Pipe jacking building wall structure

Country Status (1)

Country Link
CN (1) CN212477825U (en)

Similar Documents

Publication Publication Date Title
CN110374112B (en) Deep foundation pit supporting system for weak soil field and construction method thereof
CN104652443A (en) Construction method for temporary horizontal supports serving as permanent structural beams simultaneously of deep foundation pit
CN111779025A (en) In-situ protection structure crossing foundation pit municipal pipe network box culvert and construction method
CN111749277A (en) Pipe-jacking building wall structure and construction method thereof
CN112779914A (en) Inclined strut structure and construction method for combined support in foundation pit
CN113529763A (en) Method for constructing sea area shoal cushion cap by utilizing reinforced concrete combined steel cofferdam
CN110158602B (en) Soft soil geological deep foundation pit supporting excavation construction structure and construction method
CN111236952A (en) Full-recovery assembly type rectangular pipe-jacking working well steel structure supporting device and construction method of working well
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN108978680B (en) Mucky soil elevator foundation pit supporting construction device and method
CN105064711A (en) Method for constructing underground garage between residential buildings
CN212801564U (en) Foundation ditch steel sheet pile supporting construction
CN116856932B (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN212477825U (en) Pipe jacking building wall structure
CN216973425U (en) Inclined prefabricated steel pile foundation pit supporting system capable of being supported and excavated firstly
CN110725309A (en) Pile casing structure for treating necking problem at top of foundation pile and construction method
CN213572357U (en) Basement board reinforcing structure under one-column one-pile working condition of top-down construction method
CN212452765U (en) Two-in-one underground pipe gallery structure
CN212336038U (en) Support structure suitable for crossing foundation pit pipeline group
CN114319410A (en) Wind power generation grid-connected power equipment assembly type foundation structure and installation construction process
CN210946927U (en) Repairing structure of lower hinge point base of mast crane boom
CN113090066A (en) Construction method for newly added entrances and exits of existing buildings and elevator shaft
CN202170513U (en) No undergoing force slab prestressed high strength concrete pipe pile base
CN111270681A (en) Construction method and structure of support structure suitable for crossing foundation pit pipeline group
CN217782075U (en) Pit supporting device in mucky soil foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant