CN212473396U - Construction foundation engineering construction auxiliary device - Google Patents

Construction foundation engineering construction auxiliary device Download PDF

Info

Publication number
CN212473396U
CN212473396U CN202020636054.8U CN202020636054U CN212473396U CN 212473396 U CN212473396 U CN 212473396U CN 202020636054 U CN202020636054 U CN 202020636054U CN 212473396 U CN212473396 U CN 212473396U
Authority
CN
China
Prior art keywords
chassis
fixedly connected
horizontal pole
foundation engineering
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020636054.8U
Other languages
Chinese (zh)
Inventor
孙启淦
张楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Jialing
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020636054.8U priority Critical patent/CN212473396U/en
Application granted granted Critical
Publication of CN212473396U publication Critical patent/CN212473396U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building foundation engineering construction auxiliary device, including the chassis, the stand, first horizontal pole and second horizontal pole, the quantity of chassis is three, the first horizontal pole of fixedly connected with and second horizontal pole are distinguished to the both sides of one of them chassis, wherein one side of two chassis in addition is the first horizontal pole of fixedly connected with and second horizontal pole respectively, the last fixed surface of first horizontal pole is connected with the gag lever post, the top threaded connection of gag lever post has the top, the spout has been seted up on the surface of second horizontal pole, wherein the equal fixedly connected with installation piece of opposite side of two chassis in addition, the equal threaded connection in both sides of three chassis upper surface has the stand. This building foundation engineering construction auxiliary device through the setting of first horizontal pole, second horizontal pole, gag lever post and spout, can adjust the distance between two chassis according to the site conditions when the installation, and the gag lever post can play the spacing effect of chassis when in the spout, can supply the effectual adjustment the device of environment according to the scene of personnel simultaneously.

Description

Construction foundation engineering construction auxiliary device
Technical Field
The utility model relates to an engineering auxiliary assembly technical field specifically is a building foundation engineering construction auxiliary device.
Background
Along with the development of society, people have an enhanced awareness of environmental protection, so that higher environmental protection requirements are also put forward for building construction. At present, relevant departments issue 'green construction guide' in which green construction refers to construction activities for saving resources and reducing negative influences on the environment to the maximum extent through scientific management and technical progress under the premise of ensuring basic requirements of quality, safety and the like in engineering construction, and four-section one-environment protection, namely energy conservation, land conservation, water conservation, material conservation and environmental protection, is realized. The "guide law" clearly proposes that the overall framework for green construction should be composed of six aspects of construction management, environmental protection, material and material resource utilization, water and water resource utilization, energy and energy utilization, land and construction land protection. Moreover, on the premise of ensuring the engineering safety and quality, material-saving measures should be made. If the material-saving optimization of the construction scheme is carried out, particularly the reduction of the construction waste, the recycling of the construction waste and the like are carried out, a large amount of dust is carried when the existing construction vehicles go in and out, the existing dust removal device is inconvenient to assemble when in use, and meanwhile, the existing device is large in size and is inconvenient to adjust according to the field situation.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building foundation engineering construction auxiliary device has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an auxiliary device for the construction of building foundation engineering comprises three underframe bodies, upright posts, a first cross bar and a second cross bar, two sides of one of the underframe are respectively and fixedly connected with a first cross bar and a second cross bar, one side of the other two underframe is respectively and fixedly connected with a first cross bar and a second cross bar, the upper surface of the first cross bar is fixedly connected with a limiting rod, the top end of the limiting rod is connected with a top through threads, the surface of the second cross bar is provided with a chute, wherein the other sides of the other two bottom frames are fixedly connected with mounting blocks, the two sides of the upper surfaces of the three bottom frames are in threaded connection with upright posts, the surfaces of the upright posts are provided with water spray holes, one side fixedly connected with external water pipe of one of them chassis, three all through connecting water pipe swing joint between the chassis, the upper surface overlap joint of chassis has the backup pad.
Optionally, both sides of the upper surface of the bottom frame are fixedly connected with water spray heads.
Optionally, the upper surface of the supporting plate is provided with anti-skidding lines, and the lower surface of the supporting plate is fixedly connected with supporting legs.
Optionally, the number of the stand columns is six, and the top ends of the six stand columns are provided with the light reflecting strips.
Optionally, the diameter of the limiting rod is matched with the width of the sliding groove.
(III) advantageous effects
The utility model provides a building foundation engineering construction auxiliary device possesses following beneficial effect:
1. this building foundation engineering construction auxiliary device through the setting of first horizontal pole, second horizontal pole, gag lever post and spout, can adjust the distance between two chassis according to the site conditions when the installation, and the gag lever post can play the spacing effect of chassis when in the spout, can supply the effectual adjustment the device of environment according to the scene of personnel simultaneously.
2. This building foundation engineering construction auxiliary device through the setting of stand and top, is using the completion back, and personnel can pull down stand and top, separate the device to can be convenient for personnel's equipment and dismantlement, after the dismantlement was accomplished, the personnel of being convenient for transported and deposit the device simultaneously.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic perspective view of the present invention;
FIG. 3 is a schematic diagram of the structure of the supporting plate of the present invention;
fig. 4 is a schematic structural diagram of the bottom frame and the upright post of the present invention.
In the figure: 1. a chassis; 2. a column; 3. a first cross bar; 4. a second cross bar; 5. mounting blocks; 6. a water spray hole; 7. is externally connected with a water pipe; 8. connecting a water pipe; 9. a support plate; 10. a sprinkler head; 11. supporting legs; 12. a limiting rod; 13. ejecting the head; 14. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a building foundation engineering construction auxiliary device comprises three underframe 1, upright posts 2, a first cross rod 3 and a second cross rod 4, wherein the two sides of one underframe 1 are fixedly connected with the first cross rod 3 and the second cross rod 4 respectively, one side of the other two underframe 1 is fixedly connected with the first cross rod 3 and the second cross rod 4 respectively, the upper surface of the first cross rod 3 is fixedly connected with a limiting rod 12, the top end of the limiting rod 12 is connected with a top head 13 in a threaded manner, after the use is finished, a person can detach the upright posts 2 and the top heads 13 to separate the device, so that the assembly and disassembly of the person can be facilitated, meanwhile, after the disassembly is finished, the person can transport and store the device conveniently, and the surface of the second cross rod 4 is provided with a chute 14;
through the arrangement of the first cross rod 3, the second cross rod 4, the limiting rod 12 and the sliding groove 14, the distance between the two underframe 1 can be adjusted according to the field situation during installation, and when the limiting rod 12 is in the sliding groove 14, the effect of limiting the underframe 1 can be achieved, and meanwhile, the device can be effectively adjusted by people according to the field environment;
wherein, the other sides of the other two underframe 1 are fixedly connected with a mounting block 5, the arrangement of the mounting block 5 is convenient for the vehicle to go up to the upper surface of a support plate 9, thereby avoiding colliding the underframe and causing damage, the two sides of the upper surface of the three underframe 1 are both in threaded connection with upright columns 2, the surface of the upright column 2 is provided with a water spray hole 6, the side surface of the vehicle can be effectively cleaned through the arrangement of the water spray hole 6, and large dust raising caused in the process of driving the vehicle into a construction site is avoided, one side of one underframe 1 is fixedly connected with an external water pipe 7, the three underframe 1 are movably connected through a connecting water pipe 8, the upper surface of the underframe 1 is lapped with the support plate 9, the two sides of the upper surface of the underframe 1 are both fixedly connected with water spray heads 10, through the arrangement of the water spray heads 10, the vehicle bottom and wheels can be effectively cleaned, the upper, the lower fixed surface of backup pad 9 is connected with supporting leg 11, and the quantity of stand 2 is six, and the top of six stands 2 all is provided with anti-light strip, the diameter of gag lever post 12 and the width looks adaptation of spout 14.
As an optimal technical solution of the utility model:
to sum up, this building foundation engineering construction auxiliary device, when the installation, personnel can select the quantity of installation chassis 1 according to the on-the-spot condition, confirms to accomplish the back, inserts gag lever post 12 in spout 14 to fix top 13 on gag lever post 12, after the installation, personnel can adjust the distance between the chassis 1 according to the demand, and at last, place backup pad 9 at the upper surface alright normal use of chassis 1.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a building foundation engineering construction auxiliary device, includes chassis (1), stand (2), first horizontal pole (3) and second horizontal pole (4), its characterized in that: the number of the chassis (1) is three, two sides of one chassis (1) are respectively and fixedly connected with a first cross rod (3) and a second cross rod (4), one side of the other two chassis (1) is respectively and fixedly connected with the first cross rod (3) and the second cross rod (4), the upper surface of the first cross rod (3) is fixedly connected with a limiting rod (12), the top end of the limiting rod (12) is in threaded connection with a top head (13), the surface of the second cross rod (4) is provided with a sliding chute (14), the other side of the other two chassis (1) is respectively and fixedly connected with a mounting block (5), two sides of the upper surface of the three chassis (1) are respectively and fixedly connected with a stand column (2), the surface of the stand column (2) is provided with a water spraying hole (6), one side of one chassis (1) is fixedly connected with an external water pipe (7), all through connecting water pipe (8) swing joint between three chassis (1), the upper surface overlap joint of chassis (1) has backup pad (9).
2. The construction assisting device for building foundation engineering according to claim 1, wherein: both sides of the upper surface of the underframe (1) are fixedly connected with water spray heads (10).
3. The construction assisting device for building foundation engineering according to claim 1, wherein: anti-skidding line has been seted up to the upper surface of backup pad (9), the lower fixed surface of backup pad (9) is connected with supporting leg (11).
4. The construction assisting device for building foundation engineering according to claim 1, wherein: the quantity of stand (2) is six, six the top of stand (2) all is provided with reflection of light strip.
5. The construction assisting device for building foundation engineering according to claim 1, wherein: the diameter of the limiting rod (12) is matched with the width of the sliding groove (14).
CN202020636054.8U 2020-04-24 2020-04-24 Construction foundation engineering construction auxiliary device Expired - Fee Related CN212473396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020636054.8U CN212473396U (en) 2020-04-24 2020-04-24 Construction foundation engineering construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020636054.8U CN212473396U (en) 2020-04-24 2020-04-24 Construction foundation engineering construction auxiliary device

Publications (1)

Publication Number Publication Date
CN212473396U true CN212473396U (en) 2021-02-05

Family

ID=74451389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020636054.8U Expired - Fee Related CN212473396U (en) 2020-04-24 2020-04-24 Construction foundation engineering construction auxiliary device

Country Status (1)

Country Link
CN (1) CN212473396U (en)

Similar Documents

Publication Publication Date Title
CN212473396U (en) Construction foundation engineering construction auxiliary device
CN211549124U (en) Fender is enclosed with digital construction to electric power construction
CN219893280U (en) Solar panel convenient to wash
CN209145012U (en) The removable assembling type steel structure of corner post builds standalone module
CN203296470U (en) Finalization fence
CN214070911U (en) Hail-suppression full-automatic net collecting and releasing equipment for orchard
CN201027505Y (en) Rail-mounted oil tube tackle device
CN210975681U (en) Guardrail cleaning device for municipal administration environmental protection
CN207597842U (en) It is a kind of can transported material scaffold
CN208577945U (en) A kind of tapered pier template multifunctional operating platform
CN216197139U (en) Safety device is used in building engineering building
CN112421437A (en) Electricity-saving appliance that suitability is strong
CN205600196U (en) Rack of welding section of jurisdiction steel construction
TWM513983U (en) Canopy fixing structure for solar module
CN205857803U (en) A kind of portable silver booth
CN212773782U (en) Simply can have enough to meet need interim various steel of regularization and enclose fender
CN217181738U (en) Bridge floor construction safety sign removes bracket
CN204781885U (en) Novel crown cornice shaped steel operation platform that encorbelments
CN218970558U (en) Bidirectional cantilever type frame die moving platform
CN215987979U (en) Can carry out clear urban planning of oneself and use indicating device
CN208540499U (en) One kind saves land lightweight efficient-economical solar-greenhouse
CN214573494U (en) Warning sign for town road
CN215558562U (en) Tower machine standard festival dismouting structure
CN212271554U (en) A overhaul device for building foundation column
CN216762932U (en) Combined stainless steel water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Jialing

Inventor after: Sun Qigan

Inventor after: Zhang Nan

Inventor before: Sun Qigan

Inventor before: Zhang Nan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220810

Address after: No. 32, Xiaoshuiquangoumen, Leizi Village, Siheyong Town, Weichang Manchu and Mongolian Autonomous County, Chengde City, Hebei Province, 068450

Patentee after: Sun Jialing

Address before: Water Affairs Bureau of Zichuan District, Zibo City, Shandong Province

Patentee before: Sun Qigan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210205