CN212463423U - Outdoor energy-saving centralized cabinet suitable for 5GBBU - Google Patents

Outdoor energy-saving centralized cabinet suitable for 5GBBU Download PDF

Info

Publication number
CN212463423U
CN212463423U CN202021497430.6U CN202021497430U CN212463423U CN 212463423 U CN212463423 U CN 212463423U CN 202021497430 U CN202021497430 U CN 202021497430U CN 212463423 U CN212463423 U CN 212463423U
Authority
CN
China
Prior art keywords
cabin
equipment
compartment
power
5gbbu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021497430.6U
Other languages
Chinese (zh)
Inventor
缪冬青
章鹏
戴建聪
姚秋飞
李莉华
汤俊勇
陈旭扬
张树园
蒋志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongtian Technology Co Ltd
Zhongtian Broadband Technology Co Ltd
Original Assignee
Jiangsu Zhongtian Technology Co Ltd
Zhongtian Broadband Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtian Technology Co Ltd, Zhongtian Broadband Technology Co Ltd filed Critical Jiangsu Zhongtian Technology Co Ltd
Priority to CN202021497430.6U priority Critical patent/CN212463423U/en
Application granted granted Critical
Publication of CN212463423U publication Critical patent/CN212463423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model discloses a be used for outdoor energy-conserving centralized cabinet of 5GBBU, the cabin setting is handed over in light is in first equipment compartment one side, second equipment compartment one side is connected with first equipment compartment opposite side, the engine compartment sets up at the power cabin upside and one side of engine compartment and power cabin is connected with the opposite side in second equipment compartment, the air-conditioning cabin sets up the opposite side in engine compartment and power cabin, the side is provided with the door plant that can open and shut around each cabin, 5GBBU equipment sets up from top to bottom in first equipment compartment and second equipment compartment and be provided with the horizontal wind guide assembly of BBU between the adjacent 5GBBU equipment, the indoor unit of air conditioner sets up the lower extreme in first equipment compartment and second equipment compartment. The utility model provides a high heat dissipation demand and medium concentrated demand when traditional 4G outdoor base station rack can't satisfy 5GBBU deploys, utilize solar energy to combine the existing equipment in the rack simultaneously to reach energy-conservation and emergency guarantee.

Description

Outdoor energy-saving centralized cabinet suitable for 5GBBU
Technical Field
The utility model relates to an outdoor energy-saving centralized cabinet, especially an outdoor energy-saving centralized cabinet suitable for 5GBBU belongs to 5G equipment rack field.
Background
As 5G technology matures, operators have also increased the deployment of 5G base stations, and conventional 4G BBU devices have shown some problems. Compared with the traditional 4G BBU equipment, the 5G BBU equipment puts forward higher requirements on the aspects of unit power consumption, space utilization and the like on the aspects of a backup power supply and the like, and meanwhile, the requirement that the normal power utilization of the 5G BBU equipment can be ensured after the power failure of the mains supply under high energy consumption is prevented. The guarantee of the improved energy consumption and the power consumption demand puts new requirements on 5G BBU equipment, and in addition, the solar power generation technology is continuously improved, so that the requirement of a 5-cabin 5G BBU outdoor energy-saving centralized cabinet is compelled to be needed under the condition of the demand. Compared with the traditional 4G BBU equipment, the 5G BBU equipment has higher unit power consumption and higher requirement on a backup power supply; but be limited to other problems, for example, the area of original computer lab is not enough or the bearing is unsatisfactory, other supporting areas that possess the computer lab and acquire the region of difficulty etc. current single cabin can only satisfy the basic station demand, and three cabins can only satisfy little concentrated demand, lack a rack that is suitable for medium concentrated demand.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a be applicable to the outdoor energy-conserving centralized cabinet of 5GBBU is provided, high heat dissipation demand and medium concentrated demand when solving the outdoor basic station rack of traditional 4G and can't satisfy 5GBBU and deploy.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides an outdoor energy-conserving centralized cabinet suitable for 5GBBU which characterized in that: comprises a cabinet body, the interior of the cabinet body is divided into a first equipment cabin, a second equipment cabin, a power cabin, a light cross cabin, an air conditioning cabin and a power supply cabin, the light cross cabin is arranged at one side of the first equipment cabin, one side of the second equipment cabin is connected with the other side of the first equipment cabin, the power cabin is arranged at the upper side of the power supply cabin, one sides of the power cabin and the power supply cabin are connected with the other side of the second equipment cabin, the air conditioning cabin is arranged at the other side of the power cabin and the power supply cabin, the front side of the first equipment cabin and the front side of the second equipment cabin, the power cabin and power supply cabin front side, the light traffic cabin side, the air conditioner cabin side, first equipment cabin rear side, second equipment cabin rear side and power cabin and power supply cabin rear side are provided with the door plant that can open and shut respectively, and 5GBBU equipment sets up in first equipment cabin and second equipment cabin and be provided with the horizontal wind guide assembly of BBU between the adjacent 5GBBU equipment from top to bottom, and the air conditioner internal unit sets up the lower extreme in first equipment cabin and second equipment cabin.
Furthermore, the upper end of the cabinet body is provided with an integrated double-slope roof, a solar cell panel is laid on the integrated double-slope roof, a switching power supply and a lithium iron battery are arranged in the first equipment compartment and the second equipment compartment, and the solar cell panel and the lithium iron battery are respectively connected with the switching power supply.
Furthermore, the BBU transverse air guide assembly comprises a square frame, an inclined partition plate and mounting plates, wherein the four L-shaped mounting plates are respectively fixed at four corners of the square frame, the inclined partition plate is arranged in the square frame along a diagonal line of the square frame, two ends of the inclined partition plate are respectively fixed at two opposite corners of the square frame to divide the square frame into two chambers, and ventilation holes for air to enter and exit are formed in the side edges of the square frame corresponding to the two chambers.
Furthermore, a first equipment cabin front door is arranged on the front side of the first equipment cabin, a second equipment cabin front door is arranged on the front side of the second equipment cabin, a power battery cabin front door is arranged on the front sides of the power cabin and the power cabin, a light cross cabin side door is arranged on the side face of the light cross cabin, an air conditioning cabin side door is arranged on the side face of the air conditioning cabin, a first equipment cabin rear door is arranged on the rear side of the first equipment cabin, a second equipment cabin rear door is arranged on the rear side of the second equipment cabin, and a power supply cabin rear door is arranged on the rear sides of the power cabin and the power cabin.
Furthermore, the first equipment compartment front door, the second equipment compartment front door, the power battery compartment rear door, the first equipment compartment rear door and the second equipment compartment rear door are all door plates with shutters, the shutters of the first equipment compartment front door, the second equipment compartment front door and the power battery compartment front door are located on the lower sides of the door plates, the shutters of the power battery compartment rear door, the first equipment compartment rear door and the second equipment compartment rear door are located on the upper sides and the lower sides of the door plates, the optical cross compartment side door is a sealing door plate, and the air conditioner compartment side door is a door plate with meshes.
Further, windows with meshes are arranged on the cabinet body at the two sides of the air conditioning cabin.
Furthermore, a sealing partition plate is arranged between the first equipment cabin and the second equipment cabin, so that the first equipment cabin and the second equipment cabin are only communicated with each other through the front and back side spaces of the equipment, and the second equipment cabin, the power cabin and the battery cabin are also provided with the sealing partition plate, so that the second equipment cabin is only communicated with the power cabin through the front side.
Further, the upper ends of the first equipment cabin and the second equipment cabin are provided with emergency exhaust fan sets, and the emergency exhaust fan sets are located on the rear side of the cabinet body.
Further, the lower end of the cabinet body is provided with a reinforced base.
Furthermore, an antenna bracket is arranged at the upper end of one side face of the cabinet body.
Compared with the prior art, the utility model, have following advantage and effect: the utility model solves the problems that the traditional 4G outdoor base station cabinet can not meet the high heat dissipation requirement and the medium concentration requirement when the 5GBBU is deployed, and simultaneously, the solar energy is combined with the existing equipment in the cabinet to achieve the energy saving and emergency guarantee; the utility model can satisfy the installation space (36U) of 12 BBU devices, reserve at least 14U transmission device installation space, and configure a power supply system, a lithium iron battery system (the standby time is not less than 3 h), an air conditioning system, an emergency exhaust system, a wiring system and the like; and a solar cell panel is additionally arranged at the top end of the cabinet, and forms a solar energy-saving system with an original switching power supply and a lithium iron battery system in the cabinet, so that energy is saved to a certain extent, and the battery endurance is ensured when the commercial power is cut off, thereby ensuring the normal use of a load, a monitoring system and a lighting system in the cabinet.
Drawings
Fig. 1 is a schematic diagram of an outdoor energy-saving centralized cabinet suitable for a 5GBBU of the present invention.
Fig. 2 is a front view of the outdoor energy-saving centralized cabinet suitable for 5GBBU of the present invention.
Fig. 3 is a left side view of the outdoor energy-saving centralized cabinet suitable for 5GBBU of the present invention.
Fig. 4 is a schematic view of the BBU transverse air guiding assembly of the present invention.
Fig. 5 is a top view of the inner cabin of the outdoor energy-saving centralized cabinet suitable for 5GBBU of the present invention.
Detailed Description
To elaborate on the technical solution adopted by the present invention for achieving the predetermined technical purpose, the technical solution in the embodiment of the present invention will be clearly and completely described below by combining with the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a partial embodiment of the present invention, not a whole embodiment, and technical means or technical features in the embodiment of the present invention can be replaced without paying creative efforts, and the present invention will be described in detail below by combining with the embodiments with reference to the drawings.
As shown in fig. 1, 2, 3, and 5, the outdoor energy-saving centralized cabinet suitable for 5GBBU of the present invention comprises a cabinet body 1, the cabinet body 1 is divided into a first equipment compartment 2, a second equipment compartment 3, a power compartment 4, a light traffic compartment 5, an air conditioning compartment 6 and a power compartment 7, the light traffic compartment 5 is disposed on one side of the first equipment compartment 2, one side of the second equipment compartment 3 is connected to the other side of the first equipment compartment 2, the power compartment 4 is disposed on the upper side of the power compartment 7, one side of the power compartment 4 and the power compartment 7 is connected to the other side of the second equipment compartment 3, the air conditioning compartment 6 is disposed on the other side of the power compartment 4 and the power compartment 7, the front side of the first equipment compartment 2, the front side of the second equipment compartment 3, the front sides of the power compartment 4 and the power compartment 7, the side of the light traffic compartment 5, the side of the air conditioning compartment 6, the rear side of the first equipment compartment 2, the rear side of the second equipment compartment 3, and the rear side of the power, the 5GBBU equipment 8 is vertically arranged in the first equipment cabin 2 and the second equipment cabin 3, a BBU transverse air guide assembly 9 is arranged between the adjacent 5GBBU equipment 8, and an air conditioner internal unit 10 is arranged at the lower ends of the first equipment cabin 2 and the second equipment cabin 3. The utility model discloses an outdoor energy-conserving centralized cabinet suitable for 5GBBU mainly divides into 6 function cabins, and two equipment cabins mainly reserve 15U spaces (transmission equipment etc.) for first equipment cabin 2, make things convenient for the installation of 5G BBU equipment 8 and air conditioner internal unit 10 to dispose; the second cabin 3 reserves a total space 39U of 5G BBU devices 8 such as 12 sets of BBUs and the like and a BBU transverse air guide assembly 9 (1U, 1 set of BBU configuration is adopted for each BBU), and the 5G BBU devices 8 need to be installed on the upper portion of the BBU transverse air guide assembly 9 and are installed in a stacked mode. The air conditioner indoor unit 10 arranged in the equipment cabin is installed at the bottom of a 19-inch equipment support in the equipment cabin, cold air is blown out from the upper front part of the air conditioner indoor unit 10, the front surface of the equipment is a cold area, and the cold air passes through the BBU transverse air guide assembly 9, is guided by the guide (the installed BBU equipment enters from the left and exits from the right), brings out heat of the 5G BBU equipment, and is absorbed by a return air inlet at the rear part of the air conditioner indoor unit 10.
The power cabin and the power cabin are separated by a partition plate, the upper power cabin is a switch power supply (including monitoring and power distribution) installation area, the lower part is a lithium iron battery installation area, and the side surface of the power cabin is connected with the power cabin by a cooling fan so as to be connected with an equipment cabin cooling area; the battery compartment uses 2 cooling fans to cool the battery because the heat of the battery is limited. The optical cross connecting cabin can meet the welding storage of the optical cable with 576 cores, and is communicated with devices such as BBU and the like in a short distance, so that the loss of signal transmission can be reduced.
The upper end of the cabinet body 1 is provided with an integrated double-slope roof, a solar cell panel 11 is laid on the integrated double-slope roof, a switching power supply and a lithium iron battery are arranged in the first equipment cabin 2 and the second equipment cabin 3, and the solar cell panel 11 and the lithium iron battery are respectively connected with the switching power supply. The solar cell panel 11 is installed on the top cover of the cabinet, and when sunlight is sufficient, the solar energy-saving system is formed by the solar cell panel, the original switching power supply and the original lithium iron battery system in the cabinet. Energy is saved to a certain extent, and the battery endurance is guaranteed when the mains supply is powered off, so that the normal use of the load, the monitoring system and the lighting system in the cabinet is guaranteed.
As shown in fig. 4, the BBU transverse air guiding assembly 9 includes a square frame 12, inclined partition plates 13 and mounting plates 14, the four L-shaped mounting plates 14 are respectively fixed at four corners of the square frame 12, the inclined partition plates 13 are arranged in the square frame 12 along a diagonal of the square frame 12, two ends of each inclined partition plate 13 are respectively fixed at two opposite corners of the square frame 12 to divide the square frame 12 into two chambers, and the sides of the square frame 12 corresponding to the two chambers are respectively provided with a vent hole for air to enter and exit.
The front side of the first equipment compartment 2 is provided with a first equipment compartment front door 15, the front side of the second equipment compartment 3 is provided with a second equipment compartment front door 16, the front sides of the power compartment 4 and the power compartment 7 are provided with a power battery compartment front door 17, the side of the light cross compartment 5 is provided with a light cross compartment side door 18, the side of the air conditioning compartment 6 is provided with an air conditioning compartment side door 19, the rear side of the first equipment compartment 2 is provided with a first equipment compartment rear door 20, the rear side of the second equipment compartment 3 is provided with a second equipment compartment rear door 21, and the rear sides of the power compartment 4 and the power compartment 7 are provided with a power supply compartment rear door 22.
The first equipment compartment front door 15, the second equipment compartment front door 16, the power battery compartment front door 17, the power battery compartment rear door 22, the first equipment compartment rear door 20 and the second equipment compartment rear door 21 are all door plates with shutters, the shutters of the first equipment compartment front door 15, the second equipment compartment front door 16 and the power battery compartment front door 17 are located on the lower side of the door plates, the shutters of the power battery compartment rear door 22, the first equipment compartment rear door 20 and the second equipment compartment rear door 21 are located on the upper side and the lower side of the door plates, the optical cross-traffic side door compartment 18 is a sealing door plate, and the air-conditioning compartment side door 19 is a door plate with meshes. The cabinet body 1 is provided with windows 23 with meshes at two sides of the air-conditioning cabin 6.
A sealing partition plate 24 is arranged between the first equipment compartment 2 and the second equipment compartment 3, so that the first equipment compartment 2 and the second equipment compartment 3 are only communicated with each other through the front and back spaces of the equipment, and a sealing partition plate 24 is also arranged between the second equipment compartment 3 and the power compartment 4 as well as between the second equipment compartment 3 and the battery compartment 7, so that the second equipment compartment 3 is only communicated with the power compartment 4 through the front side. Therefore, the cold and hot areas of different cabin areas are isolated, and heat flow is prevented from being disordered and influencing other cabin area equipment.
The upper ends of the first equipment compartment 2 and the second equipment compartment 3 are provided with an emergency exhaust fan set 25 and the emergency exhaust fan set 25 is positioned at the rear side of the cabinet body 1. The front and the back of the equipment compartment are provided with emergency air inlet valves, emergency air exhaust valves and a direct current cooling fan, when the commercial power is off, the air conditioner is out of work, a backup power supply is started, enough power supplies are provided for ensuring main equipment such as 5G BBU equipment, the air conditioner cannot work to reduce the loss of the backup power supply, when the temperature in the cabinet reaches a set critical value, the emergency air exhaust device is started, the front door air inlet valve, the rear door air exhaust valve and the cooling fan are started simultaneously, the air valve shutter is opened, and the fan performs forced air exhaust to achieve the function of cooling the equipment. The lower end of the cabinet body 1 is provided with a reinforced base 26. An antenna bracket 27 is arranged at the upper end of one side surface of the cabinet body 1.
The utility model solves the problems that the traditional 4G outdoor base station cabinet can not meet the high heat dissipation requirement and the medium concentration requirement when the 5GBBU is deployed, and simultaneously, the solar energy is combined with the existing equipment in the cabinet to achieve the energy saving and emergency guarantee; the utility model can satisfy the installation space (36U) of 12 BBU devices, reserve at least 14U transmission device installation space, and configure a power supply system, a lithium iron battery system (the standby time is not less than 3 h), an air conditioning system, an emergency exhaust system, a wiring system and the like; and a solar cell panel is additionally arranged at the top end of the cabinet, and forms a solar energy-saving system with an original switching power supply and a lithium iron battery system in the cabinet, so that energy is saved to a certain extent, and the battery endurance is ensured when the commercial power is cut off, thereby ensuring the normal use of a load, a monitoring system and a lighting system in the cabinet.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed with the preferred embodiment, it is not limited to the present invention, and any skilled person in the art can make modifications or changes equivalent to the equivalent embodiment without departing from the technical scope of the present invention, but all the modifications, equivalent substitutions, and improvements made to the above embodiments within the spirit and principle of the present invention still belong to the protection scope of the technical solution of the present invention.

Claims (10)

1. The utility model provides an outdoor energy-conserving centralized cabinet suitable for 5GBBU which characterized in that: comprises a cabinet body, the interior of the cabinet body is divided into a first equipment cabin, a second equipment cabin, a power cabin, a light cross cabin, an air conditioning cabin and a power supply cabin, the light cross cabin is arranged at one side of the first equipment cabin, one side of the second equipment cabin is connected with the other side of the first equipment cabin, the power cabin is arranged at the upper side of the power supply cabin, one sides of the power cabin and the power supply cabin are connected with the other side of the second equipment cabin, the air conditioning cabin is arranged at the other side of the power cabin and the power supply cabin, the front side of the first equipment cabin and the front side of the second equipment cabin, the power cabin and power supply cabin front side, the light traffic cabin side, the air conditioner cabin side, first equipment cabin rear side, second equipment cabin rear side and power cabin and power supply cabin rear side are provided with the door plant that can open and shut respectively, and 5GBBU equipment sets up in first equipment cabin and second equipment cabin and be provided with the horizontal wind guide assembly of BBU between the adjacent 5GBBU equipment from top to bottom, and the air conditioner internal unit sets up the lower extreme in first equipment cabin and second equipment cabin.
2. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: the solar energy power supply cabinet is characterized in that an integrated double-slope top is arranged at the upper end of the cabinet body, a solar cell panel is laid on the integrated double-slope top, a switching power supply and a lithium iron battery are arranged in the first equipment cabin and the second equipment cabin, and the solar cell panel and the lithium iron battery are respectively connected with the switching power supply.
3. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: the BBU transverse air guide assembly comprises a square frame, inclined partition plates and mounting plates, wherein the four L-shaped mounting plates are respectively fixed at four corners of the square frame, the inclined partition plates are arranged in the square frame along a diagonal line of the square frame, two ends of each inclined partition plate are respectively fixed at two opposite corners of the square frame to divide the square frame into two chambers, and ventilation holes for air to enter and exit are formed in the side edges of the square frame corresponding to the two chambers.
4. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: the front side of the first equipment compartment is provided with a front door of the first equipment compartment, the front side of the second equipment compartment is provided with a front door of the second equipment compartment, the front sides of the power compartment and the power compartment are provided with front doors of the power battery compartment, the side of the light cross compartment is provided with a side door of the light cross compartment, the side of the air conditioning compartment is provided with a side door of the air conditioning compartment, the rear side of the first equipment compartment is provided with a rear door of the first equipment compartment, the rear side of the second equipment compartment is provided with a rear door of the second equipment compartment, and the rear sides of the power compartment and the power compartment are provided.
5. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 4, wherein: the door plate with the blind window is arranged on the front door of the first equipment compartment, the front door of the second equipment compartment, the front door of the power battery compartment, the rear door of the first equipment compartment and the rear door of the power battery compartment, the blind windows of the front door of the first equipment compartment, the front door of the second equipment compartment and the front door of the power battery compartment are positioned on the lower side of the door plate, the blind windows of the rear door of the power battery compartment, the rear door of the first equipment compartment and the rear door of the second equipment compartment are positioned on the upper side and the lower side of the door plate, the optical cross-over compartment side door is a sealing.
6. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 4, wherein: and windows with meshes are arranged on the cabinet body at the two sides of the air conditioning cabin.
7. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: a sealing partition plate is arranged between the first equipment cabin and the second equipment cabin, so that the first equipment cabin and the second equipment cabin are only communicated with each other through the front side and the rear side of the equipment, and a sealing partition plate is also arranged between the second equipment cabin and the power cabin and between the second equipment cabin and the battery cabin, so that the second equipment cabin is only communicated with the power cabin through the front side.
8. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: the upper end in first equipment cabin and second equipment cabin is provided with emergent exhaust fan group and emergent exhaust fan group is located the rear side of the cabinet body.
9. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: the lower end of the cabinet body is provided with a reinforced base.
10. An outdoor energy-saving centralized cabinet suitable for 5GBBU according to claim 1, wherein: an antenna bracket is arranged at the upper end of one side face of the cabinet body.
CN202021497430.6U 2020-07-27 2020-07-27 Outdoor energy-saving centralized cabinet suitable for 5GBBU Active CN212463423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021497430.6U CN212463423U (en) 2020-07-27 2020-07-27 Outdoor energy-saving centralized cabinet suitable for 5GBBU

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021497430.6U CN212463423U (en) 2020-07-27 2020-07-27 Outdoor energy-saving centralized cabinet suitable for 5GBBU

Publications (1)

Publication Number Publication Date
CN212463423U true CN212463423U (en) 2021-02-02

Family

ID=74476138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021497430.6U Active CN212463423U (en) 2020-07-27 2020-07-27 Outdoor energy-saving centralized cabinet suitable for 5GBBU

Country Status (1)

Country Link
CN (1) CN212463423U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113811126A (en) * 2021-09-24 2021-12-17 江苏亨通光电股份有限公司 Outdoor integrated cabinet of optical relay station of optical fiber transmission system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113811126A (en) * 2021-09-24 2021-12-17 江苏亨通光电股份有限公司 Outdoor integrated cabinet of optical relay station of optical fiber transmission system

Similar Documents

Publication Publication Date Title
AU2021310843B2 (en) Heat dissipation device of energy storage system and heat dissipation method for energy storage system
CN112616294A (en) Machine cabinet
CN106879233B (en) Air conditioner cabinet with emergency ventilation function
CN107623273A (en) A kind of exchange type outdoor power cabinet system
CN212463423U (en) Outdoor energy-saving centralized cabinet suitable for 5GBBU
CN109412025B (en) Energy storage cabin structure
CN210959210U (en) Air conditioner cabinet system integrating heat exchange function
CN201820865U (en) Air cooled accumulator thermostat
CN113163694B (en) Machine cabinet
CN106285077A (en) Expandable type modular communication machine room
CN207201176U (en) Outdoor cabinet
CN209787687U (en) Modularization integral type device cabinet
CN111641143A (en) Energy-concerving and environment-protective electric power cabinet
CN215819239U (en) Outdoor rack cooling system
CN212463745U (en) Outdoor cabinet for 5GBBU
CN210694746U (en) Air conditioner air outlet system capable of being adjusted for outdoor cabinet
CN213991473U (en) Intelligence heat dissipation BBU rack
CN111386020A (en) Outdoor integrated intelligent machine room for 5G base station
CN209897512U (en) Energy-saving cabinet for electrical equipment
CN219041461U (en) Uninterrupted power source cabinet
CN211607219U (en) Outdoor integrated intelligent machine room for 5G base station
CN220254165U (en) Energy storage cabinet
CN220629896U (en) Cabinet body structure of whole cabinet type industrial and commercial energy storage system
CN212073846U (en) Flywheel UPS energy storage supply vehicle heat abstractor and supply vehicle
CN216437659U (en) Low energy consumption 5G basic station outdoor temperature control cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant