CN212453691U - Construction is with platform of unloading - Google Patents

Construction is with platform of unloading Download PDF

Info

Publication number
CN212453691U
CN212453691U CN202020553410.XU CN202020553410U CN212453691U CN 212453691 U CN212453691 U CN 212453691U CN 202020553410 U CN202020553410 U CN 202020553410U CN 212453691 U CN212453691 U CN 212453691U
Authority
CN
China
Prior art keywords
plate
platform
plate body
supporting
upper portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020553410.XU
Other languages
Chinese (zh)
Inventor
杨小辉
李响
吴迪
张语
张鹏
孙乃夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Construction Engineering Group Co ltd
Original Assignee
Jilin Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Construction Engineering Group Co ltd filed Critical Jilin Construction Engineering Group Co ltd
Priority to CN202020553410.XU priority Critical patent/CN212453691U/en
Application granted granted Critical
Publication of CN212453691U publication Critical patent/CN212453691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a construction is with platform of unloading belongs to construction technical field, be in including bottom plate and setting the bottom plate top and with the bottom plate passes through the roof that the riser links to each other, bottom plate upper portion is provided with a supporting bench, a supporting bench upper portion fixed mounting has first backup pad and second backup pad, roof upper portion is provided with and is used for driving a supporting bench's second drive assembly that reciprocates, first backup pad upper portion articulates there is the platform that holds, it is provided with and is used for driving to hold the platform bottom hold the platform edge first backup pad pivoted drive assembly, the riser orientation one side fixed mounting of a supporting bench has vertical distribution's guide rail, a supporting bench with guide rail sliding fit. The embodiment of the utility model provides a promote building material to the target height after, can carry out automatic and steady unloading to building material, have the effectual advantage of unloading.

Description

Construction is with platform of unloading
Technical Field
The utility model belongs to the technical field of the construction, specifically a platform of unloading for construction.
Background
After the construction of a certain layer of structure of a high-rise building is completed, a template, a steel pipe and equipment of a concrete structure of a construction floor need to be lifted out of the construction floor, the materials and the equipment cannot be transported away in the building, and an unloading platform needs to be erected so as to operate the building materials to a construction site.
Present platform of unloading promotes building material to the eminence when, often all utilizes the manual work to unload of material to unload, and the manual work efficiency of unloading is lower, has certain potential safety hazard simultaneously, and also some are unloaded through mechanical equipment, utilize climbing mechanism jack-up platform of unloading for the platform of unloading takes place to deflect, emptys the material on its upper portion to the construction site on, and this kind of mode causes the damage of material easily.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to above-mentioned prior art, the to-be-solved technical problem of the utility model is to provide a construction is with platform of unloading.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model provides a construction is with platform of unloading, is in including bottom plate and setting the bottom plate top and with the roof that the bottom plate passes through the riser and links to each other, bottom plate upper portion is provided with a supporting bench, supporting bench upper portion fixed mounting has first backup pad and second backup pad, roof upper portion is provided with and is used for driving a second drive assembly that a supporting bench reciprocated, first backup pad upper portion articulates there is the platform that holds, it is provided with and is used for driving to hold the platform bottom hold the platform edge first backup pad pivoted drive assembly, the riser orientation one side fixed mounting of a supporting bench has vertical distribution's guide rail, a supporting bench with guide rail sliding fit, it keeps away from to hold the platform one side of riser is provided with the guide subassembly that is used for steadily transiting the material to superstructure ground.
As a further improvement of the utility model: the second driving assembly comprises an electric hoist fixedly installed on the upper portion of the top plate, a through hole is formed in the top plate, and the output end of the electric hoist penetrates through the through hole through a lifting rope and is connected with the supporting table.
As a further improvement of the utility model: the first driving assembly is a hydraulic push rod.
As a further improvement of the utility model: the bottom plate is connected with the vertical plate through first support angle steel, and the top plate is connected with the vertical plate through second support angle steel.
As a further improvement of the present invention: the material guide assembly comprises a first plate body and a second plate body hinged to the first plate body, a slot used for containing the first plate body and the second plate body is formed in one end, far away from the vertical plate, of the containing table, and the second plate body is located on one side of the deep portion of the slot.
As a further improvement of the present invention: the end, far away from the second plate body, of the first plate body is located outside the slot, and a pulling plate is arranged at the bottom of the end, far away from the second plate body, of the first plate body.
Compared with the prior art, the beneficial effects of the utility model are that:
the embodiment of the utility model provides a promote building material to target height after, can carry out automatic and steady unloading to building material, have the effectual advantage of unloading, through placing building material and holding bench portion, utilize second drive assembly to drive a supporting bench rebound, and then make and hold platform and building material rebound, when holding platform removal to target height position, it rotates along first backup pad to drive to hold the platform through first drive assembly, make and hold bench superstructure ground and deflect, make building material slide to superstructure subaerial from holding bench by oneself, setting through the guide subassembly, make building material can keep steady when unloading, play the transition effect.
Drawings
FIG. 1 is a schematic structural view of a discharging platform for building construction;
FIG. 2 is an enlarged view of area A of FIG. 1;
FIG. 3 is a schematic structural view of a material guiding assembly in a discharging platform for building construction;
in the figure: 1-bottom plate, 2-supporting table, 3-first supporting plate, 4-holding table, 5-enclosing plate, 6-first driving component, 7-vertical plate, 8-second supporting plate, 9-guide rail, 10-first supporting angle steel, 11-lifting rope, 12-second supporting angle steel, 13-top plate, 14-through hole, 15-electric hoist, 16-slot, 17-second plate body, 18-first plate body and 19-pulling plate.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-3, the present embodiment provides a discharging platform for building construction, including a bottom plate 1 and a top plate 13 disposed above the bottom plate 1 and connected to the bottom plate 1 via a vertical plate 7, a supporting platform 2 is arranged at the upper part of the bottom plate 1, a first supporting plate 3 and a second supporting plate 8 are fixedly arranged at the upper part of the supporting platform 2, a second driving component for driving the supporting platform 2 to move up and down is arranged at the upper part of the top plate 13, the upper part of the first supporting plate 3 is hinged with a containing table 4, the bottom of the containing table 4 is provided with a first driving component 6 for driving the containing table 4 to rotate along the first supporting plate 3, a guide rail 9 which is vertically distributed is fixedly arranged on one side of the vertical plate 7 facing the supporting platform 2, the supporting platform 2 is in sliding fit with the guide rail 9, one side of the holding table 4, which is far away from the vertical plate 7, is provided with a material guide assembly for stably transferring materials to the ground of an upper-layer building.
Through placing building material on holding platform 4 upper portion, utilize second drive assembly to drive 2 rebound of brace table, and then make and hold platform 4 and building material rebound, when holding platform 4 and remove to the target height position, it rotates along first backup pad 3 to drive to hold platform 4 through first drive assembly, make and hold platform 4 and deflect to superstructure ground, make building material slide to superstructure subaerial from holding platform 4 by oneself, setting through the guide subassembly, make building material can keep steady when unloading, play transition effect.
Specifically, the second driving assembly comprises an electric hoist 15 fixedly mounted on the upper portion of the top plate 13, a through hole 14 is formed in the top plate 13, and the output end of the electric hoist 15 penetrates through the through hole 14 through a lifting rope 11 and is connected with the supporting table 2.
Drive 11 rolling of lifting rope through electric block 15, and then pull a supporting bench 2 rebound to the building material that will hold platform 4 and hold platform 4 upper portion promotes the eminence.
Specifically, the first driving assembly 6 is a hydraulic push rod.
Further, the bottom plate 1 with link to each other through first angle steel for support 10 between the riser 7, the roof 13 with link to each other through second angle steel for support 12 between the riser 7, through the setting of first angle steel for support 10 with second angle steel for support 12, can strengthen roof 13, riser 7 and bottom plate 1 to guarantee the stability of building material promotion in-process.
Specifically, the material guiding assembly comprises a first plate body 18 and a second plate body 17 hinged to the first plate body 18, a slot 16 used for accommodating the first plate body 18 and the second plate body 17 is formed in one end, far away from the vertical plate 7, of the accommodating table 4, and the second plate body 17 is located on one side of the deep portion of the slot 16.
After the building material was promoted to the eminence, with the outside pulling of first plate body 18, guarantee that first plate body 18 is located completely and holds a 4 outsides, second plate body 17 is located inside slot 16, because first plate body 18 and second plate body 17 are articulated each other, subaerial at high-rise building through supporting first plate body 18 tip this moment, drive through first drive assembly 6 and hold a 4 and rotate along first backup pad 3, make and hold a 4 production slopes, hold the building material on a 4 upper portion and slide to building subaerially by first plate body 18, realize steadily unloading.
In this embodiment, hold 4 top edges of platform and still can set up bounding wall 5, protect building material through bounding wall 5, avoid building material to take place the accident at the promotion in-process and drop to cause the incident.
The working principle of the embodiment is as follows: through placing building material on holding platform 4 upper portion, utilize second drive assembly to drive 2 rebound of brace table, and then make and hold platform 4 and building material rebound, when holding platform 4 and remove to the target height position, it rotates along first backup pad 3 to drive to hold platform 4 through first drive assembly, make and hold platform 4 and deflect to superstructure ground, make building material slide to superstructure subaerial from holding platform 4 by oneself, setting through the guide subassembly, make building material can keep steady when unloading, play transition effect.
After the building material was promoted to the eminence, with the outside pulling of first plate body 18, guarantee that first plate body 18 is located completely and holds a 4 outsides, second plate body 17 is located inside slot 16, because first plate body 18 and second plate body 17 are articulated each other, subaerial at high-rise building through supporting first plate body 18 tip this moment, drive through first drive assembly 6 and hold a 4 and rotate along first backup pad 3, make and hold a 4 production slopes, hold the building material on a 4 upper portion and slide to building subaerially by first plate body 18, realize steadily unloading.
Example 2
Referring to fig. 3, in this embodiment, compared to embodiment 1, an end of the first plate 18 away from the second plate 17 is located outside the slot 6, and a pull plate 19 is disposed at a bottom of an end of the first plate 18 away from the second plate 17.
Through the arrangement of the pulling plate 19, the first plate body 18 can be conveniently pulled out of the slot 16, so that the material guiding effect is conveniently realized.
The embodiment of the utility model provides a promote building material to target height after, can carry out automatic and steady unloading to building material, have the effectual advantage of unloading, through placing building material and holding platform 4 upper portions, utilize second drive assembly to drive a supporting bench 2 rebound, and then make and hold platform 4 and building material rebound, when holding platform 4 and remove to target height position, it holds platform 4 along first backup pad 3 rotation to drive through first drive assembly 6, make and hold platform 4 and deflect to superstructure ground, make building material slide to superstructure subaerial by oneself from holding platform 4, setting through the guide subassembly, make building material can keep steadily when unloading, play the transition effect.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. The discharging platform for building construction is characterized by comprising a bottom plate (1) and a top plate (13) arranged above the bottom plate (1) and connected with the bottom plate (1) through a vertical plate (7), wherein a supporting table (2) is arranged on the upper portion of the bottom plate (1), a first supporting plate (3) and a second supporting plate (8) are fixedly arranged on the upper portion of the supporting table (2), a second driving assembly used for driving the supporting table (2) to move up and down is arranged on the upper portion of the top plate (13), a containing table (4) is hinged to the upper portion of the first supporting plate (3), a first driving assembly (6) used for driving the containing table (4) to rotate along the first supporting plate (3) is arranged at the bottom of the containing table (4), and guide rails (9) which are vertically distributed are fixedly arranged on one side of the vertical plate (7) facing the supporting table (2), the supporting table (2) is in sliding fit with the guide rail (9), and a material guide assembly used for stably transferring materials to the ground of an upper-layer building is arranged on one side, away from the vertical plate (7), of the containing table (4).
2. The discharging platform for building construction according to claim 1, wherein the second driving assembly comprises an electric hoist (15) fixedly mounted on the upper portion of the top plate (13), a through hole (14) is formed in the top plate (13), and an output end of the electric hoist (15) penetrates through the through hole (14) through a lifting rope (11) and is connected with the supporting platform (2).
3. The platform of claim 1, wherein the first drive assembly (6) is a hydraulic ram.
4. The discharging platform for building construction according to claim 1, wherein the bottom plate (1) is connected with the vertical plate (7) through a first support angle (10), and the top plate (13) is connected with the vertical plate (7) through a second support angle (12).
5. The discharging platform for building construction according to any one of claims 1 to 4, wherein the material guiding assembly comprises a first plate body (18) and a second plate body (17) hinged to the first plate body (18), a slot (16) for accommodating the first plate body (18) and the second plate body (17) is formed in one end of the accommodating platform (4) far away from the vertical plate (7), and the second plate body (17) is located on one side of the deep portion of the slot (16).
6. The discharging platform for building construction according to claim 5, wherein the end of the first plate body (18) far away from the second plate body (17) is located outside the slot (16), and a pulling plate (19) is arranged at the bottom of the end of the first plate body (18) far away from the second plate body (17).
CN202020553410.XU 2020-04-15 2020-04-15 Construction is with platform of unloading Active CN212453691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020553410.XU CN212453691U (en) 2020-04-15 2020-04-15 Construction is with platform of unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020553410.XU CN212453691U (en) 2020-04-15 2020-04-15 Construction is with platform of unloading

Publications (1)

Publication Number Publication Date
CN212453691U true CN212453691U (en) 2021-02-02

Family

ID=74472829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020553410.XU Active CN212453691U (en) 2020-04-15 2020-04-15 Construction is with platform of unloading

Country Status (1)

Country Link
CN (1) CN212453691U (en)

Similar Documents

Publication Publication Date Title
JP3076529B2 (en) Perforation device and perforation method
CN212453691U (en) Construction is with platform of unloading
KR100514133B1 (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
CN209974232U (en) Upturning device
CN217652749U (en) Installation trolley for tunnel arch frame
CN214834617U (en) Scaffold capable of lifting and moving
CN217080322U (en) Rotary drilling rig
CN113443032B (en) Double-layer crawler-type carrying stair climbing device and stair climbing method
CN210712584U (en) Movable supporting bracket for road and bridge construction
CN210888003U (en) Movable lifting steel pipe frame operating platform device
CN212002319U (en) High-altitude suspension safety traction device for building construction
CN213418419U (en) Movable cantilever operation rack
CN219237136U (en) Trolley for building engineering construction
CN220845353U (en) Hole pile slag tapping device
CN215249300U (en) Incessant material feeding unit of bottom building for building engineering
CN213419121U (en) 6 long semi-mechanized vertical arch frame trolley of dry tunnel of usefulness of length
CN212769620U (en) Perpendicular conveyer of brickwork
CN217975276U (en) Lifting support for building engineering construction
CN214693118U (en) Movable material safety elevator
CN211992944U (en) Movable large mining height hydraulic support maintenance platform
CN214450866U (en) Movable slope lifting limiting device for wheel
CN218323981U (en) Telescopic platform of unloading
CN214935533U (en) Automatic lifting tower crane
CN217808645U (en) Mechanical arm type lifter for commanding construction site
CN219546652U (en) Elevator for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant