CN212453046U - Cut-off equipment, pipeline of installation device - Google Patents

Cut-off equipment, pipeline of installation device Download PDF

Info

Publication number
CN212453046U
CN212453046U CN201922293150.7U CN201922293150U CN212453046U CN 212453046 U CN212453046 U CN 212453046U CN 201922293150 U CN201922293150 U CN 201922293150U CN 212453046 U CN212453046 U CN 212453046U
Authority
CN
China
Prior art keywords
rubber sleeve
rubber
pressurizing
pipeline
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922293150.7U
Other languages
Chinese (zh)
Inventor
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201922293150.7U priority Critical patent/CN212453046U/en
Application granted granted Critical
Publication of CN212453046U publication Critical patent/CN212453046U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses an intercepting device and a pipeline for installing the intercepting device, wherein the intercepting device comprises a rubber sleeve, the rubber sleeve is provided with a through circulation channel, the intercepting device is characterized in that three or four independent pressurizing cavities are arranged in the rubber sleeve, the pressurizing cavities are circumferentially arranged along the rubber sleeve at intervals, the rubber sleeve at the position of each pressurizing cavity is provided with an outer rubber layer and an inner rubber layer, and the outer rubber layer and the inner rubber layer as well as the rubber sleeve outside the pressurizing cavity are of an integrated structure; and the outer rubber layer of each pressurizing cavity is provided with an inlet and outlet hole which is communicated with the pressurizing cavity. The utility model discloses set up in rubber sleeve and pressurize the chamber, whole rubber sleeve structure as an organic whole for prior art, do not have the sealed problem in pressurization chamber, the structure is more simple, installation convenient to use.

Description

Cut-off equipment, pipeline of installation device
Technical Field
The utility model relates to a drainage equipment technical field, concretely relates to cut-off equipment, installation device's pipeline.
Background
The flexible cut-off device is a cut-off facility applied to a water outlet or a discharge port of a flow dividing well, and generally comprises an outer shell and a rubber sleeve, wherein a pressurizing cavity is formed between the outer shell and the rubber sleeve, the end part of the rubber sleeve is connected with the end part of the outer shell in a sealing way through a flange plate, when pressurized gas is filled into the pressurizing cavity, the rubber sleeve is deformed inwards relatively, the inner wall of the rubber sleeve is attached, and a circulation channel is cut off. However, when the pipe diameter of the drainage pipe or the discharge opening butted with the diversion well is larger (if the pipe diameter is more than DN 400), the pipe diameter of the rubber sleeve cannot be larger than the deformation amount, at the moment, the end part of the rubber sleeve and the end part of the outer shell are under larger deformation, the end part of the rubber sleeve slides out between the flange and the end part of the outer shell, and the sealing of the pressurizing cavity is poor. Therefore, a device capable of flexible shutoff is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough of above-mentioned background art, provide cut-off equipment, installation the device's pipeline, have sealed effectual, simple structure's advantage.
The utility model provides a cut-off device, which comprises a rubber sleeve, wherein the rubber sleeve is provided with a through circulation channel, three or four independent pressurizing cavities are arranged in the rubber sleeve, the pressurizing cavities are circumferentially arranged along the rubber sleeve at intervals, the rubber sleeve at the position of each pressurizing cavity is provided with an outer rubber layer and an inner rubber layer, and the outer rubber layer and the inner rubber layer as well as the rubber sleeve outside the pressurizing cavities are in an integral structure;
and the outer rubber layer of each pressurizing cavity is provided with an inlet and outlet hole which is communicated with the pressurizing cavity.
Optionally, the rubber sleeve is divided into three or four parts in the axial and circumferential direction, a pressurizing cavity is arranged in each part of the rubber sleeve, and the rubber sleeve part between the adjacent pressurizing cavities and other parts of the rubber sleeve are integrally formed.
Optionally, the rubber sleeve further comprises a sealing element, the sealing element is located in the flow channel and extends along the axial direction of the flow channel, and the sealing element is at least partially located at the closed position of the rubber sleeve.
Optionally, the sealing element is formed by adhering the sealing protrusion to the inner wall of the rubber sleeve, and the inner rubber layer of each of the pressure chambers is provided with one sealing protrusion.
Optionally, the rubber sleeve further comprises an outer shell, the outer shell is sleeved outside the rubber sleeve, and the end portion of the outer shell is connected with the end portion of the rubber sleeve.
In another aspect, the utility model provides a cut-off equipment's application method, include with the aforesaid cut-off equipment install in the pipeline, set up four independent pressure chambers in cut-off equipment's the rubber sleeve, under the installation status, wherein two pressure chambers are located the latter half of pipeline, and two other pressure chambers are located the first half of pipeline, and the device includes the state of damming and the off-state, selects following shut-off state or off-state according to the user demand:
simultaneously, media with certain pressure are respectively filled into the pressurizing cavities of the cut-off device positioned at the lower half part from the two inlet and outlet holes, the inner rubber layers of the two pressurizing cavities positioned at the lower half part deform to be attached, a certain cut-off height is formed from bottom to top, and the flow channel is in a cut-off state;
and continuously filling media with certain pressure into all the pressurizing cavities of the cut-off device, wherein the inner rubber layers of two adjacent pressurizing cavities are attached, and the flow channel is in a cut-off state.
In another aspect, the utility model also provides an install pipeline of cut-off equipment, include:
the above mentioned cut-off equipment, the cut-off equipment includes a rubber sleeve; the gland, rubber sleeve's one end is provided with a week outside protruding edge, rubber sleeve's the other end is installed in the pipeline, and rubber sleeve's outer wall and the laminating of pipeline inner wall, protruding edge passes through the gland laminating is fixed in around the port of pipeline or eccentric orfice.
Optionally, a control system is further provided, and the control system includes: the monitoring device is used for monitoring a signal of an environment in which the rubber sleeve is used to obtain a monitoring signal; the pressure source station is respectively connected with the rubber sleeve through a conveying pipeline and is used for controlling the pressurization or the depressurization of the rubber sleeve; the monitoring device and the pressure station are respectively in signal connection with the controller, and the controller controls the pressure station to act according to the monitoring signal of the monitoring device and controls the conduction, the cut-off or the interception of the circulation channel of the rubber sleeve.
Optionally, the monitoring device is one or more of a device for monitoring liquid level, a device for monitoring rainfall, a device for monitoring water quality and a device for monitoring time; correspondingly, the monitoring signal is one or more of a liquid level signal, a rainfall signal, a water quality signal and a time signal.
Compared with the prior art, the utility model has the advantages as follows:
(1) the utility model discloses an intercepting device can only adopt the rubber sleeve structure, sets up in rubber sleeve and pressurizes the chamber, and whole rubber sleeve is the integral structure, for prior art, does not have the sealed problem in pressurization chamber, and the structure is more simple, installation convenient to use.
(2) The utility model discloses an intercepting device designs into three-dimensional or quadriversal and warp and closes the cut-off passage, fills the sealing member in the clearance of rubber sleeve closed position department, owing to fill the chamber and set up alone, so rubber sleeve closes the atmospheric pressure that uses less, can realize under lower pressure (being less than 2bar) can realize zero revealing, and is sealed effectual, and atmospheric pressure is low, and seal structure is simple, does not influence the current ability of circulation passageway yet.
Drawings
Fig. 1 is a schematic view of an open state of embodiment 1.
Fig. 2 is a cross-sectional view C-C of fig. 1 with three separate plenum chambers.
Fig. 3 is a schematic view of the arrangement of four independent plenum chambers of fig. 1.
Fig. 4 is a schematic view of the embodiment 3 in which four independent pressurizing chambers are arranged in a shut-off state.
Fig. 5 is a schematic view of a flow stop device of the arrangement of the three-seal configuration of example 4.
Fig. 6 is a schematic view of a flow stop device of the arrangement of the mode two seal structure of example 4.
Fig. 7 is a schematic view of a flow stop device provided with a seal structure according to embodiment 4.
Fig. 8 is a cross-sectional view taken along line D-D of fig. 7.
FIG. 9 is a schematic view of the structure of the embodiment 1 in use.
Reference numerals: 1-rubber sleeve, 10-flow channel, 11-pressurizing cavity, 12-outer rubber layer, 13-inner rubber layer, 14-inlet and outlet hole, 2-outer shell, 3-sealing element and 4-gland.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Example 1
Referring to fig. 1 to 9, the present invention provides a cut-off device, including a rubber sleeve 1, the rubber sleeve 1 is provided with a through flow channel 10, three or four independent pressurizing cavities 11 are arranged in the rubber sleeve 1 in the circumferential direction, the rubber sleeve 1 in this embodiment is cylindrical, the cross-sectional shape of the rubber sleeve 1 is circular, the rubber sleeve 1 at the position of each pressurizing cavity 11 has an outer rubber layer 12 and an inner rubber layer 13, and the outer rubber layer 12 and the inner rubber layer 13 and the rubber sleeve 1 outside the pressurizing cavity 11 are in an integral structure; an inlet and outlet hole 14 is arranged on the outer rubber layer 12 of each pressurizing cavity 1, the inlet and outlet hole 14 is communicated with the pressurizing cavity 11, the inlet and outlet hole 14 can be two holes of an inlet hole and an outlet hole which are arranged on the outer rubber layer 12, and can also be a hole arranged on the outer rubber layer 12, and a branch of an inlet pipeline and a branch of an outlet pipeline are arranged on a conveying pipeline connected with the hole. The rubber structure that forms chamber 11 and the rubber structure of other positions as an organic whole structure is inflated in this embodiment, because rubber sleeve 1 does not constitute chamber 11 with other parts jointly, need not to set up seal structure and is used for sealed chamber 11 that pressurizes to prevent to inflate chamber 11 and reveal, simple structure, easy to assemble, application scope is wide.
Preferably, referring to fig. 2, in the flow stopping device of the present embodiment, three independent pressurizing chambers 11 are provided, which are equally divided into three parts along the circumferential direction of the rubber sleeve 1, each pressurizing chamber 1 is provided with one pressurizing chamber 11, each pressurizing chamber 11 is provided with one inlet and outlet hole 14, and the portion of the rubber sleeve 1 between the adjacent pressurizing chambers 11 is integrally formed with other portions.
Preferably, referring to fig. 3, the shut-off device of the present embodiment is provided with four independent pressurizing chambers 11 equally divided into four parts along the circumferential direction of the rubber sleeve 1, one pressurizing chamber 11 is provided in each rubber sleeve 1, each pressurizing chamber 11 is provided with an inlet and outlet hole 14, and the portion of the rubber sleeve 1 between the adjacent pressurizing chambers 11 is integrally formed with the other portions.
In the scheme, the rubber sleeve is divided into three parts or four parts in equal parts, so that the deformation of the inner rubber layer of each rubber sleeve 1 is ensured to be the same, the charging pressure is the same, and the control is convenient. The three-way or four-way deformation of using this embodiment closes the circulation passageway, and the inlayer rubber layer deflection in each independent pressure chamber is little, and required pressure is less, safe and reliable, and is sealed effectual, and application range is wide.
The integrally molded structure of the rubber sleeve 1 in this embodiment means that the outer rubber layer 12, the inner rubber layer 13 and the rubber between two adjacent pressurizing cavities are all integrally formed, wherein the pressurizing cavity 11 is formed by lost foam casting during the manufacturing of the rubber sleeve 1.
Example 2
Referring to fig. 9, the present embodiment further provides a pipeline with a cut-off device installed thereon, including:
in the flow cut-off device of the embodiment, the flow cut-off device comprises a rubber sleeve 1;
gland 4, rubber sleeve 1's one end is provided with the outside protruding edge of a week, and rubber sleeve 1's the other end is installed in the pipeline, and rubber sleeve 1's outer wall and the laminating of pipeline inner wall, protruding edge passes through gland 4 laminating is fixed in around the pipeline port, inside rubber sleeve 1 fills in the pipeline from the pipeline port during installation, fixes rubber sleeve 1's protruding edge around the pipeline port through gland 4 and bolt, and easy to assemble fixes rubber sleeve 1 in the pipeline through the gland with dismantling, has cancelled this structure of traditional steel dustcoat, has alleviateed the weight of whole product. Meanwhile, because the steel outer cover is removed, the wall thickness of the whole cut-off device is thinner, and the whole rubber sleeve can be directly installed in the existing pipeline, so that the space required by installation equipment is saved, and the installation and the maintenance are convenient.
Further, still include setting up control system, control system includes:
the pressure source comprises a pressure station, a conveying pipeline and a control valve, wherein the pressure station can be a gas station, a water station or an oil station, the conveying pipeline is communicated with the pressurizing cavity 11 and the pressure source, the conveying pipeline is provided with the control valve, the control valve is used for controlling the pressurizing and the depressurizing of the pressurizing cavity 11, the conveying pipeline comprises three or four independent pipelines, each pipeline is communicated with the pressurizing cavity and the pressure source, and each pipeline is provided with the control valve and is respectively used for controlling the pressurizing and the depressurizing of the pressurizing cavity connected with the pipeline;
the monitoring device in the embodiment is one or more of a liquid level monitoring device such as a liquid level meter, a rainfall monitoring device such as a rain gauge, a water quality monitoring device such as a COD water quality monitor and a time monitoring device such as a timer; correspondingly, the monitoring signal is one or more of a liquid level signal, a rainfall signal, a water quality signal and a time signal;
the controller, monitoring devices and control valve are respectively connected with the controller through signals, and the controller is used for controlling the control valve to act according to the monitoring signals of the monitoring devices so as to control the pressurization or the pressure release of the pressurization cavity 11. Specifically, the operation of the pressurizing chamber 11 is controlled according to the operation requirements, such as the flow dividing requirement, the overflow requirement, the backflow prevention requirement, and the like, the operation requirements not described in detail in this embodiment are all the same as the operation requirements of the prior art, and the control logic is also the same as the prior art, only that the operation of controlling the gate or the weir gate or the valve in the prior art is replaced by the operation of controlling the simple cut-off device. The control system of the embodiment has the advantages of simple structure, convenience in control, high automation degree and wide application range.
Example 3
The embodiment also provides a use method of the cut-off device, which comprises the following steps:
install the cut-off equipment that sets up four independent pressure chamber 11 in embodiment 1 in the pipeline, two of them pressure chamber 11 are located the pipeline lower half under the mounted state, and two other pressure chamber 11 are located the pipeline upper half, and the device includes cut-off state and off-state, selects following cut-off state or off-state according to the user demand:
simultaneously, media with certain pressure are filled into the two pressurizing cavities 11 positioned at the lower half part until the inner rubber layers of the two pressurizing cavities 11 are attached, the inner rubber layers 13 of the two pressurizing cavities 111 are deformed upwards to have certain intercepting height, and as shown in the figure 4, the flow channel 10 is in an intercepting state;
and continuously filling media with certain pressure into all the pressurizing cavities of the simple cut-off device, attaching the inner rubber layers 13 of the two adjacent pressurizing cavities, and stopping the flow channel 10.
If the flow stopping state is converted into the stopping state, only the two pressurizing cavities 11 positioned at the upper half part need to be filled with certain pressure to stop, and the flow passage 10 is stopped after the inner rubber layers of the two adjacent pressurizing cavities 11 are attached; if the state is converted into the intercepting state from the cut-off state, only the two pressurizing cavities 11 positioned on the upper half part need to be decompressed, the inner rubber layers of the two pressurizing cavities 11 positioned on the upper half part recover deformation, the upper half part of the rubber sleeve 1 has the flow capacity, and the lower half part is in the intercepting state.
Example 4
Preferably, on the basis of embodiment 1, the shutoff device further comprises a sealing element 3, as shown in fig. 5, 6, 7 and 8, wherein the sealing element 3 is located in the flow passage 10 and extends along the axial direction of the flow passage 10, and the sealing element 3 is at least partially located in the closed position of the rubber sleeve 10. When each pressurizing cavity 11 is pressurized and deformed, the sealing element 3 is filled between the inner rubber layers 13 of each pressurizing cavity 11 and filled in the gap at the closed position of the rubber sleeve 1, the air pressure used for closing the rubber sleeve 1 is small, zero leakage can be realized under low pressure (lower than 2bar), the sealing effect is good, the air pressure, the oil pressure or the water pressure are low, the sealing structure is simple, and the passing capacity of a circulation channel is not influenced.
Among them, it is further preferable that the structure and installation manner of the sealing member 3 are as follows:
in the first mode, as shown in fig. 7 and 8, the sealing protrusion is adhered or vulcanized on the inner wall of the rubber sleeve 1, and a sealing protrusion is arranged at the closed position of the inner rubber layer 13 in each pressurizing chamber 11;
in the second mode, the sealing element can be a rubber tube, the rubber tube is fixed in the flow channel 6 through a support rod and is positioned on the axis of the flow channel 10, and the hardness of the rubber tube is lower than that of the rubber sleeve 1;
mode three, the sealing member passes through the connecting piece and the mounting is fixed, and wherein, the installation department is the rubber boss that two intervals set up, is provided with the mounting hole on the rubber boss, and connecting portion are two rubber bars, and the sealing member is the rubber tube, is equipped with the hollow hole that runs through in the rubber tube, and the one end of rubber bar is located the rubber tube and bonds together with the rubber tube, and the other end bonds together with the mounting hole of rubber boss, fixes the rubber tube between two rubber bosses through the rubber bar. The installation department vulcanizes or the adhesion structure as an organic whole with the rubber sleeve 1 of its mounted position department, and the appearance is pleasing to the eye, does not have unnecessary part, can not block the rubbish of gathering aquatic, and the drainage is smooth. Or, referring to fig. 5, the connecting portion is an elastic rope, the mounting portion is a hook respectively arranged outside the rubber sleeve 1, the sealing element is a rubber tube, a through hollow hole is formed in the rubber tube, and the elastic rope penetrates through the hollow hole and is connected with the hook.
Example 5
Referring to fig. 1, on the basis of embodiment 1, the cut-off device of the present embodiment further includes an outer casing 2, the outer casing 2 is sleeved outside the rubber sleeve 1, and an end of the outer casing 2 is connected with an end of the rubber sleeve 1. Preferably, the rubber sleeve 1 is cylindrical, and the end portion of the rubber sleeve 1 is provided with an outward protruding edge, and the outer shell 2 is also cylindrical, and is sleeved on the outer surface of the rubber sleeve 1 and connected with the protruding edge of the end portion of the rubber sleeve 1 through a flange, so as to reinforce and shape the rubber sleeve 1, and facilitate the installation and use of the rubber sleeve 1.
Various modifications and variations of the embodiments of the present invention may be made by those skilled in the art, and they are within the scope of the present invention provided they are within the scope of the claims and their equivalents.
What is not described in detail in the specification is prior art that is well known to those skilled in the art.

Claims (8)

1. The intercepting device comprises a rubber sleeve (1), wherein the rubber sleeve (1) is provided with a through flow channel (10), and the intercepting device is characterized in that three or four independent pressurizing cavities (11) are arranged in the rubber sleeve (1), the pressurizing cavities (11) are circumferentially arranged along the rubber sleeve (1) at intervals, the rubber sleeve (1) at the position of each pressurizing cavity is provided with an outer rubber layer (12) and an inner rubber layer (13), and the outer rubber layer (12), the inner rubber layer (13) and the rubber sleeve (1) outside the pressurizing cavities (11) are of an integrated structure;
an inlet and outlet hole (14) is formed in the outer rubber layer (12) of each pressurizing cavity (11), and the inlet and outlet hole (14) is communicated with the pressurizing cavity (11).
2. The flow stop apparatus of claim 1, wherein:
the rubber sleeve (1) is axially and circumferentially equally divided into three parts or four parts, a pressurizing cavity (11) is arranged in each part of the rubber sleeve (1), and the rubber sleeve (1) part between the adjacent pressurizing cavities (11) and other parts of the rubber sleeve (1) are integrally formed.
3. The flow stop apparatus of claim 1, wherein:
the sealing device further comprises a sealing element (3), wherein the sealing element (3) is positioned in the flow channel (10) and extends along the axial direction of the flow channel (10), and the sealing element (3) is at least partially positioned at the closed position of the rubber sleeve (1).
4. The flow stop apparatus of claim 3, wherein:
the sealing element (3) is formed by adhering the sealing bulges to the inner wall of the rubber sleeve (1), and the inner rubber layer (13) of each pressurizing cavity (11) is provided with one sealing bulge.
5. The flow stop apparatus according to any one of claims 1 to 4, wherein: still include shell body (2), shell body (2) cover is located outside rubber sleeve (1), the tip of shell body (2) with the end connection of rubber sleeve (1).
6. A conduit fitted with a flow cut-off device, comprising:
the shut-off device according to claim 1, comprising a rubber sleeve (1);
gland (4), the one end of rubber sleeve (1) is provided with an outside protruding edge of a week, the other end of rubber sleeve (1) is installed in the pipeline, and the outer wall and the laminating of pipeline inner wall of rubber sleeve (1), protruding edge passes through gland (4) laminating is fixed in around the port of pipeline or inclined to one side mouthful.
7. A pipeline incorporating flow cut-off equipment as claimed in claim 6, wherein there is further provided a control system comprising:
the monitoring device is used for monitoring signals of the environment in which the rubber sleeve (1) is used to obtain monitoring signals;
the pressure source station is respectively connected with the rubber sleeve (1) through a conveying pipeline and is used for controlling the pressurization or the depressurization of the rubber sleeve (1);
the monitoring device and the pressure station are respectively in signal connection with the controller, and the controller controls the pressure station to act according to the monitoring signal of the monitoring device and controls the conduction, the cut-off or the interception of the circulation channel of the rubber sleeve (1).
8. The conduit fitted with a shut-off device as claimed in claim 7, wherein: the monitoring device is one or more of a liquid level monitoring device, a rainfall monitoring device, a water quality monitoring device and a time monitoring device; correspondingly, the monitoring signal is one or more of a liquid level signal, a rainfall signal, a water quality signal and a time signal.
CN201922293150.7U 2019-12-18 2019-12-18 Cut-off equipment, pipeline of installation device Active CN212453046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922293150.7U CN212453046U (en) 2019-12-18 2019-12-18 Cut-off equipment, pipeline of installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922293150.7U CN212453046U (en) 2019-12-18 2019-12-18 Cut-off equipment, pipeline of installation device

Publications (1)

Publication Number Publication Date
CN212453046U true CN212453046U (en) 2021-02-02

Family

ID=74480919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922293150.7U Active CN212453046U (en) 2019-12-18 2019-12-18 Cut-off equipment, pipeline of installation device

Country Status (1)

Country Link
CN (1) CN212453046U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042306A (en) * 2019-12-18 2020-04-21 武汉圣禹排水系统有限公司 Cut-off device, using method and pipeline provided with cut-off device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042306A (en) * 2019-12-18 2020-04-21 武汉圣禹排水系统有限公司 Cut-off device, using method and pipeline provided with cut-off device

Similar Documents

Publication Publication Date Title
CN212453046U (en) Cut-off equipment, pipeline of installation device
CN111042306A (en) Cut-off device, using method and pipeline provided with cut-off device
CN111075947A (en) Simple cut-off device, using method thereof and pipeline provided with device
CN211057992U (en) Adjustable flexible cut-off device
CN211145431U (en) Regulating valve
CN111043347A (en) Multifunctional intercepting device, control system and use method
CN112283393A (en) Rubber sleeve with mounting structure and pipeline provided with same
CN212455656U (en) Simple cut-off device and pipeline provided with same
CN111022696A (en) Combined cut-off device and pipeline provided with same
CN109027348A (en) A kind of blow valve of changeable gas flow direction
CN212455596U (en) Multifunctional cut-off device and control system
CN214197336U (en) Prevent leaking effectual manual valve tap
CN211447224U (en) Adjustable flexible cut-off device
CN111075948A (en) Flexible cut-off device and pipeline provided with same
CN208816776U (en) A kind of cast steel stop valve
CN211523132U (en) A high efficiency leak protection oil seal structure for hydraulic pressure dam
CN110792156A (en) Adjustable flexible cut-off device and using method thereof
CN212455598U (en) Combined cut-off device and pipeline provided with same
CN215172441U (en) Rubber sleeve with mounting structure and pipeline provided with same
CN208845805U (en) A kind of blow valve of changeable gas flow direction
RU2376179C2 (en) Water supply system shut-off device
CN110656694A (en) Adjustable flexible cut-off device
CN206545718U (en) A kind of fluid power controls annular channel frost-cracking-preventing piston valve
CN211344158U (en) Water pipe valve that hydraulic engineering used
CN211114035U (en) Adjustable flexible cut-off device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430090

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.

Address before: 430056 3rd floor, workshop 1, No. 189, North Qianli Road, Wuhan Economic and Technological Development Zone, Hubei Province

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.

CP03 Change of name, title or address