CN212452628U - Geotechnical engineering foundation pit piling equipment - Google Patents

Geotechnical engineering foundation pit piling equipment Download PDF

Info

Publication number
CN212452628U
CN212452628U CN202020749542.XU CN202020749542U CN212452628U CN 212452628 U CN212452628 U CN 212452628U CN 202020749542 U CN202020749542 U CN 202020749542U CN 212452628 U CN212452628 U CN 212452628U
Authority
CN
China
Prior art keywords
base
geotechnical engineering
foundation pit
engineering foundation
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020749542.XU
Other languages
Chinese (zh)
Inventor
高顺昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Shenjia Geotechnical Engineering Co ltd
Original Assignee
Tianjin Shenjia Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Shenjia Geotechnical Engineering Co ltd filed Critical Tianjin Shenjia Geotechnical Engineering Co ltd
Priority to CN202020749542.XU priority Critical patent/CN212452628U/en
Application granted granted Critical
Publication of CN212452628U publication Critical patent/CN212452628U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a geotechnical engineering foundation ditch pile equipment, including the back timber, first removal base and second remove the base, the bottom both ends of back timber are connected the setting with first removal base and second removal base respectively through the second bracing piece, be provided with drive arrangement on the first removal base, the last drive shaft of drive arrangement is connected the setting with the telescopic link drive at top, the telescopic link is connected through the first end of the connection rope of first lifting hook with the top, the second end of connecting the rope passes first band pulley and second band pulley in proper order and is connected through the hammer block of second lifting hook with the bottom, the bottom of hammer block is connected the setting through fourth connecting piece and tup detachable. The utility model has simple structure, small volume weight and floor area of the machine platform, and stronger moving performance by moving the base; first bracing piece passes through expansion bolts and soil property basic unit's connected mode for pile fixity is better, has reduced the deviation of pile position, guarantees the pile effect.

Description

Geotechnical engineering foundation pit piling equipment
Technical Field
The utility model relates to a relevant technical field of architectural equipment especially relates to a geotechnical engineering foundation ditch pile driving equipment.
Background
The foundation pit is a soil pit excavated at the design position of the foundation according to the elevation of the foundation and the plane size of the foundation. Before excavation, an excavation scheme is determined according to geological and hydrological data and the conditions of buildings nearby the site, and waterproof drainage work is performed. The persons with low excavation depth can use the method of putting side slope to make the earth slope stable, and the size of the slope is determined according to the relevant construction project. When a deeper foundation pit and a building adjacent to the deeper foundation pit are excavated, a foundation pit wall supporting method, a concrete-sprayed wall protecting method and a large foundation pit are used, and even an underground continuous wall and a columnar column type bored pile are used for interlocking, so that an outer soil layer is prevented from collapsing; for those who have no influence on nearby buildings, the underground water level can be reduced by a well point method, and slope releasing open cut is adopted; in cold regions, natural cold freezing method can be adopted for excavation and the like. In the process of excavation of an engineering foundation pit, piling equipment is needed, most of the piling equipment in the prior art is complex in structure arrangement, the volume weight and the occupied area of a machine table are large, and the mobility is poor; most piling devices usually adopt a transport trolley form for bearing in order to make up for the deficiency of mobility, but in the piling devices, piling fixing performance is poor due to the transport trolley, and piling positions are deviated.
In view of the above-mentioned defects, the present designer is actively making research and innovation to create a geotechnical engineering foundation pit piling device, so that it has industrial value.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model aims at providing a geotechnical engineering foundation ditch pile driving equipment.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a geotechnical engineering foundation ditch pile equipment, including the back timber, first removal base and second remove the base and are located the below of back timber about both ends position respectively, the bottom both ends of back timber are connected the setting with first removal base and second removal base respectively through the second bracing piece, be provided with drive arrangement on the first removal base, the last drive shaft of drive arrangement is connected the setting with the telescopic link drive at top, the telescopic link is connected through the first end of the rope of being connected of first lifting hook and top, the second end of connecting the rope passes first band pulley and second band pulley in proper order and is connected with the hammer block of bottom through the second lifting hook, the bottom of hammer block is connected the setting through fourth connecting piece and tup detachable.
As a further improvement, the bottom of the first movable base and the second movable base is provided with universal wheels.
As a further improvement, the bottom middle position of the top beam is provided with a third connecting piece, the bottom both ends of the third connecting piece are provided with a first supporting rod, the bottom of the first supporting rod is connected with the soil base layer through an expansion bolt, and the hammer body is positioned between the left and right first supporting rods.
As a further improvement of the utility model, the first belt wheel and the second belt wheel are connected and arranged at the bottom of the top beam through the second connecting piece.
As a further improvement of the utility model, the top and the bottom of the second support rod are connected with the top beam and the first movable base or the second movable base through the first connecting piece.
As a further improvement, the utility model also comprises an oil tank which is connected with the oil inlet of the driving device through the oil outlet.
As a further improvement, the driving device and the oil tank are both fixedly arranged on the first movable base through the installation base.
As a further improvement of the utility model, the driving device is a hydraulic driving motor.
Borrow by above-mentioned scheme, the utility model discloses at least, have following advantage:
the utility model relates to geotechnical engineering foundation pit pile driving equipment, the structure setting is comparatively simple, the volume weight and the floor area of the machine are not large, and the moving performance is stronger through the first moving base and the second moving base; the first supporting rod is connected with the soil base layer through the expansion bolt, so that the piling fixation is good, the deviation of the piling position is reduced, and the piling effect is ensured; the bottom through the hammer block is connected the mode of setting through fourth connecting piece and tup detachable, can conveniently change and maintain the tup, and the flexibility is stronger.
The above description is only an overview of the technical solution of the present invention, and in order to make the technical means of the present invention clearer and can be implemented according to the content of the description, the following detailed description is made with reference to the preferred embodiments of the present invention and accompanying drawings.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is the utility model relates to a geotechnical engineering foundation ditch pile equipment's structural schematic.
In the drawings, the meanings of the reference numerals are as follows.
Figure 586010DEST_PATH_IMAGE001
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In order to make the technical solution of the present invention better understood, the technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiment of the present invention, all other embodiments obtained by the person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
As shown in figure 1 of the drawings, in which,
the utility model provides a geotechnical engineering foundation ditch pile driving equipment, including back timber 1, first removal base 14 and second remove base 20 and are located back timber 1's below left and right sides both ends position respectively, the bottom both ends of back timber 1 are connected the setting with first removal base 14 and second removal base 20 respectively through second bracing piece 8, be provided with drive arrangement 11 on the first removal base 14, the last drive shaft of drive arrangement 11 is connected the setting with the telescopic link 10 drive at top, telescopic link 10 is connected with the first end of the rope 7 of being connected of top through first lifting hook 9, the second end of connecting rope 7 passes first band pulley 5 and second band pulley 17 in proper order and is connected with the hammer block 19 of bottom through second lifting hook 18, the bottom of hammer block 19 is connected the setting through fourth connecting piece 22 and hammer 23 detachable.
Preferably, the universal wheels 15 are arranged at the bottom of the first moving base 14 and the second moving base 20.
Preferably, a third connecting piece 4 is arranged in the middle of the bottom of the top beam 1, first supporting rods 6 are arranged at both ends of the bottom of the third connecting piece 4, the bottom of each first supporting rod 6 is connected with the soil base layer 16 through an expansion bolt 21, and the hammer body 19 is positioned between the left first supporting rod 6 and the right first supporting rod 6.
Preferably, the first belt pulley 5 and the second belt pulley 17 are connected and arranged at the bottom of the top beam 1 through the second connecting piece 3.
Preferably, the top and bottom of the second support bar 8 are connected to the top beam 1 and the first moving base 14 or the second moving base 20 through the first connecting member 2.
Preferably, the device further comprises an oil tank 12, and the oil tank 12 is connected with an oil inlet of the driving device 11 through an oil outlet.
Preferably, the driving device 11 and the oil tank 12 are fixedly arranged on the first movable base 14 through a mounting base 13.
Preferably, the drive means 11 is a hydraulic drive motor.
The first connecting piece 2, the third connecting piece 4 and the fourth connecting piece 22 are all bolt connecting pieces; the second connecting piece 3 is arranged in an inverted triangle structure, the top straight line edge of the second connecting piece 3 is connected with the top beam 1, the bottom of the second connecting piece 3 is provided with a connecting hole and a rotating shaft, and the rotating shaft connects the first belt pulley 5 with the second belt pulley 17 through the connecting hole.
The utility model relates to geotechnical engineering foundation pit pile driving equipment, the structure setting is comparatively simple, the volume weight and the floor area of the machine are not large, and the moving performance is stronger through the first moving base 14 and the second moving base 20; the first supporting rod 6 is connected with the soil base layer 16 through the expansion bolts 21, so that the piling fixation is better, the deviation of the piling position is reduced, and the piling effect is ensured; the bottom of the hammer body 19 is detachably connected with the hammer head 23 through the fourth connecting piece 22, so that the hammer head 23 can be conveniently replaced and maintained, and the flexibility is high.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly referring to the number of technical features being grined. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected: either mechanically or electrically: the terms may be directly connected or indirectly connected through an intermediate member, or may be a communication between two elements.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (8)

1. The geotechnical engineering foundation pit piling equipment is characterized by comprising a top beam (1), a first movable base (14) and a second movable base (20), wherein the first movable base (14) and the second movable base (20) are respectively positioned at the left end and the right end below the top beam (1), the two ends of the bottom of the top beam (1) are respectively connected with the first movable base (14) and the second movable base (20) through a second support rod (8), a driving device (11) is arranged on the first movable base (14), a driving shaft on the driving device (11) is in driving connection with a telescopic rod (10) at the top, the telescopic rod (10) is connected with the first end of a connecting rope (7) above through a first lifting hook (9), the second end of the connecting rope (7) sequentially passes through a first belt wheel (5) and a second belt wheel (17) and is connected with a hammer body (19) at the bottom through a second lifting hook (18), the bottom of the hammer body (19) is detachably connected with the hammer head (23) through a fourth connecting piece (22).
2. Geotechnical engineering foundation pit piling device according to claim 1, characterized in that the bottoms of said first mobile base (14) and second mobile base (20) are provided with universal wheels (15).
3. The geotechnical engineering foundation pit piling equipment as recited in claim 1, wherein a third connecting piece (4) is arranged in the middle of the bottom of the top beam (1), first supporting rods (6) are arranged at both ends of the bottom of the third connecting piece (4), the bottoms of the first supporting rods (6) are connected with a soil base layer (16) through expansion bolts (21), and a hammer body (19) is positioned between the left first supporting rod and the right first supporting rod (6).
4. Geotechnical engineering foundation pit piling equipment according to claim 1, characterized in that the first belt wheel (5) and the second belt wheel (17) are connected and arranged at the bottom of the top beam (1) through the second connecting piece (3).
5. Geotechnical engineering foundation pit piling device according to claim 1, characterized in that the top and bottom of the second support rod (8) are connected with the top beam (1) and the first mobile base (14) or the second mobile base (20) through the first connecting piece (2).
6. Geotechnical engineering foundation pit piling equipment according to claim 1, characterized by further comprising an oil tank (12), wherein said oil tank (12) is connected with an oil inlet of the driving device (11) through an oil outlet.
7. Geotechnical engineering foundation pit piling device according to claim 6, characterized in that said driving device (11) and oil tank (12) are fixedly arranged on the first mobile base (14) through a mounting base (13).
8. Geotechnical engineering foundation pit piling device according to claim 1, characterized in that said driving means (11) is a hydraulic driving motor.
CN202020749542.XU 2020-05-06 2020-05-06 Geotechnical engineering foundation pit piling equipment Active CN212452628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020749542.XU CN212452628U (en) 2020-05-06 2020-05-06 Geotechnical engineering foundation pit piling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020749542.XU CN212452628U (en) 2020-05-06 2020-05-06 Geotechnical engineering foundation pit piling equipment

Publications (1)

Publication Number Publication Date
CN212452628U true CN212452628U (en) 2021-02-02

Family

ID=74463986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020749542.XU Active CN212452628U (en) 2020-05-06 2020-05-06 Geotechnical engineering foundation pit piling equipment

Country Status (1)

Country Link
CN (1) CN212452628U (en)

Similar Documents

Publication Publication Date Title
US20100296876A1 (en) Caisson structures and methods for precisely and stably sinking the caisson structures into ground
KR101354383B1 (en) Working platform for underwater explosion work using small barges
CN113529737A (en) Foundation pit support frame
CN212452628U (en) Geotechnical engineering foundation pit piling equipment
CN209585079U (en) The Yield rainfall relation building enclosure of beam is turned under a kind of subway station
CN212452626U (en) Vertical pile driver for building construction
CN212452627U (en) Simple foundation pit piling device
CN210712860U (en) Tunnel foundation pit supporting structure
CN209989858U (en) River channel desilting appurtenance
CN212375869U (en) Novel waterproof foundation pit structure
CN210917388U (en) Easy dismouting formula underground structure
CN212452667U (en) Foundation ditch strutting arrangement for engineering construction
CN211690296U (en) Underground continuous wall of socket joint formula steel lattice framework
CN209742483U (en) foundation ditch engineering safety device
CN218952214U (en) Steel-concrete combined cofferdam structure
CN212200441U (en) Foundation pit support frame
CN213448497U (en) Be used for excavation supporting double row pile crown beam connecting device
CN214835088U (en) Foundation ditch construction support is used in high-speed railway construction
CN214301773U (en) Foundation pit supporting structure
CN210482322U (en) Foundation ditch rapid hardening bank protection well
CN214301776U (en) Deep basal pit concrete bearing structure
CN213773381U (en) Positioning guide frame for improving positioning precision of SWM construction method pile and assembly thereof
CN115182359B (en) Underground comprehensive pipe gallery foundation pit supporting structure and construction method
CN219930984U (en) Modular detachable elevator foundation pit supporting device
CN213510437U (en) A device that is used for foundation ditch engineering soil to punch usefulness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant