CN212428776U - Toe end sliding sleeve and oil well tubular column thereof - Google Patents

Toe end sliding sleeve and oil well tubular column thereof Download PDF

Info

Publication number
CN212428776U
CN212428776U CN202021579074.2U CN202021579074U CN212428776U CN 212428776 U CN212428776 U CN 212428776U CN 202021579074 U CN202021579074 U CN 202021579074U CN 212428776 U CN212428776 U CN 212428776U
Authority
CN
China
Prior art keywords
hole
sliding sleeve
mounting hole
toe end
body joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021579074.2U
Other languages
Chinese (zh)
Inventor
刘斌辉
曲从锋
齐奉忠
张永强
王兆会
卞维坤
郭新超
杨芳
张怀文
袁雄
张瑞典
李军鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Beijing Petroleum Machinery Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Engineering Technology R&D Co Ltd filed Critical China National Petroleum Corp
Priority to CN202021579074.2U priority Critical patent/CN212428776U/en
Application granted granted Critical
Publication of CN212428776U publication Critical patent/CN212428776U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Safety Valves (AREA)

Abstract

The utility model provides a toe end sliding sleeve and oil well tubular column thereof, toe end sliding sleeve includes: the body joint is provided with an axial through hole, a pressure transfer hole, a rupture disc mounting hole and a rotary conduction valve assembly mounting hole, the pressure transfer hole and the axial through hole are arranged in parallel at intervals, the rupture disc mounting hole is arranged along the radial direction of the body joint and is respectively communicated with the pressure transfer hole and the axial through hole, and the rotary conduction valve assembly mounting hole is arranged on one side of the rupture disc mounting hole in parallel at intervals; the sliding sleeve protective sleeve is fixedly sleeved outside the body joint, an annular space is formed between the sliding sleeve protective sleeve and the body joint, and the pressure transfer hole is communicated with the annular space; the sliding sleeve is arranged in the annular space through a shearing pin; the rupture disc is arranged in the rupture disc mounting hole and can seal the pressure transmission hole; and the rotary conduction valve component is arranged in the rotary conduction valve component mounting hole and can control the opening and closing of the pressure transmission hole. The utility model discloses can satisfy the prerequisite that does not exceed the pressure testing pressure value and glide the cover and open the purpose of establishing the fracturing passageway automatically.

Description

Toe end sliding sleeve and oil well tubular column thereof
Technical Field
The utility model relates to an oil drilling and completion engineering field, concretely relates to toe end sliding sleeve and oil well tubular column thereof.
Background
With the continuous progress of drilling technology, horizontal wells of oil and gas wells are longer and longer, and the first-stage fracturing operation mainly based on transmission perforation faces new challenges that a perforating gun cannot be guaranteed to be lowered to the bottom of a well, operation risks are high and the like in ultra-long horizontal wells and deep shale gas horizontal wells. However, most of the various well cementation toe end valves or toe end sliding sleeves in the prior art are unstable in opening pressure and lower than a rated pressure test value (the pressure test pressure of the whole casing is the highest pressure value of fracturing construction operation) of a well casing after well cementation, that is, the requirement of the whole casing pressure test before the first-stage fracturing of an oil and gas well cannot be met, so that the popularization and application of tools are influenced, and inconvenience is brought to later-stage judgment of the integrity and construction operation of the well casing after well cementation.
SUMMERY OF THE UTILITY MODEL
The utility model provides a toe end sliding sleeve and oil well tubular column thereof to reach and to adapt to the whole well casing pressure testing certain time behind the sleeve pipe well cementation, recycle the purpose that the toe end sliding sleeve that is not higher than the hydraulic pressure value opened comes.
The utility model provides a technical scheme that its technical problem adopted is: a toe sleeve comprising: the body joint is provided with an axial through hole, a pressure transfer hole, a rupture disc mounting hole and a rotary conduction valve assembly mounting hole, the pressure transfer hole and the axial through hole are arranged in parallel at intervals, the rupture disc mounting hole is arranged along the radial direction of the body joint and is respectively communicated with the pressure transfer hole and the axial through hole, and the rotary conduction valve assembly mounting hole is arranged on one side of the rupture disc mounting hole in parallel at intervals; the sliding sleeve protective sleeve is fixedly sleeved outside the body joint, an annular space is formed between the sliding sleeve protective sleeve and the body joint, and the pressure transfer hole is communicated with the annular space; the sliding sleeve is arranged in the annular space through a shearing pin; the rupture disc is arranged in the rupture disc mounting hole and can seal the pressure transmission hole; and the rotary conduction valve component is arranged in the rotary conduction valve component mounting hole and can control the opening and closing of the pressure transmission hole.
Further, the rotary conductance valve assembly includes: the rotary conduction valve is arranged along the radial direction of the body joint and is positioned in the pressure transfer hole, a communicating hole is formed in the valve body of the rotary conduction valve, and the pressure transfer hole can be conducted through the communicating hole; the driving motor is arranged in the rotating conduction valve assembly mounting hole and connected with the upper end valve core of the rotating conduction valve, and the driving motor can drive the rotating conduction valve to rotate at the pressure transmission hole.
Furthermore, still be provided with the delay subassembly mounting hole on the body joint, the delay subassembly mounting hole is located between rupture disc mounting hole and the rotatory conduction valve subassembly mounting hole, and delay subassembly mounting hole and rotatory conduction valve subassembly mounting hole intercommunication, and the toe end sliding sleeve still includes the delay subassembly, sets up in the delay subassembly mounting hole and is connected with rotatory conduction valve subassembly electricity.
Further, the delay assembly includes: the piston exciter can be arranged in the time delay assembly mounting hole in a sliding manner;
the battery timer is arranged in the delay assembly mounting hole and can be connected with the piston exciter in an abutting mode, and the battery timer is connected with the driving motor and can supply power to the driving motor.
Further, the upper end of the rupture disc is fixed in the rupture disc mounting hole through a clamp spring.
Further, the sliding sleeve protective sleeve is connected with the body joint through a locking screw.
Further, the sliding sleeve protective sleeve is provided with a plurality of radial first fracturing holes at intervals, the body joint is provided with a plurality of radial second fracturing holes in one-to-one correspondence with the radial first fracturing holes at intervals, the toe end sliding sleeve further comprises a protection plate, and the protection plate is installed in each radial first fracturing hole and each radial second fracturing hole.
Further, a sealing assembly is arranged between the sliding sleeve protective sleeve and the body joint.
Furthermore, a sealing assembly is arranged between the sliding sleeve and the sliding sleeve protective sleeve, and a sealing assembly is also arranged between the sliding sleeve and the body joint.
The utility model also provides an oil well tubular column, including toe end sliding sleeve and oil production pipe body, toe end sliding sleeve is foretell toe end sliding sleeve, oil production pipe body and body articulate.
The beneficial effects of the utility model are that, set up the rupture disk and can satisfy and carry out full pit shaft pressure testing to design pressure and specified pressure testing time before the fracturing behind the well cementation to can control the switching in biography pressure hole through rotatory switch-on valve subassembly after the rupture disk is broken, can satisfy and not exceed the automatic purpose of opening the inside and outside fracturing passageway of establishment sleeve pipe of the prerequisite glide sleeve of pressure testing pressure value.
Drawings
The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the embodiment of the present invention when the sliding sleeve is not opened;
FIG. 2 is an enlarged view of a portion of FIG. 1;
FIG. 3 is a schematic structural view of the embodiment of the present invention when the sliding sleeve is opened;
fig. 4 is a partially enlarged view of fig. 3.
Reference numbers in the figures: 1. a body joint; 2. a clamp spring; 3. a rupture disc; 4. a piston activator; 5. a battery timer; 6. a drive motor; 7. rotating the conduction valve; 8. a pressure transfer hole; 9. a lock screw; 10. a sliding sleeve protective sleeve; 11. a sliding sleeve; 12. a protective sheet; 13. and shearing the pin.
Detailed Description
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1 to 4, the embodiment of the present invention provides a toe end sliding sleeve, which comprises a body joint 1, a sliding sleeve protective sleeve 10, a sliding sleeve 11, a rupture disc 3 and a rotary conduction valve assembly. The body connects 1 and is provided with axial through hole, passes pressure hole 8, rupture disc mounting hole and rotatory valve module mounting hole that switches on, passes pressure hole 8 and the parallel interval setting of axial through hole, and the rupture disc mounting hole connects 1 radial setting and communicates with passing pressure hole 8 and axial through hole respectively along the body, and the rotatory parallel interval setting of valve module mounting hole that switches on sets up in one side of rupture disc mounting hole. The fixed cover of sliding sleeve protective sheath 10 is established outside body connects 1, and forms the annular space between sliding sleeve protective sheath 10 and the body connects 1, passes pressure hole 8 and annular space intercommunication. The sliding sleeve 11 is arranged in the annulus by means of shear pins 13. The rupture disc 3 is disposed in the rupture disc mounting hole and is capable of closing the pressure transfer hole 8. The rotary conducting valve component is arranged in the rotary conducting valve component mounting hole and can control the opening and closing of the pressure transmission hole 8.
The rupture disk 3 is arranged, so that the pressure test of the whole shaft can be carried out to the designed pressure and the specified pressure test time before fracturing after well cementation, the opening and closing of the pressure transmission hole 8 can be controlled through the rotary conduction valve component after the rupture disk 3 is broken, and the purpose that the sleeve 11 is automatically opened to establish the fracturing channel inside and outside the sleeve on the premise that the pressure value of the pressure test is not exceeded can be met.
It should be noted that the upper end of the rupture disk 3 is fixed in the rupture disk mounting hole through the snap spring 2.
Specifically, the rotary conduction valve assembly includes a rotary conduction valve 7 and a drive motor 6. The rotary conduction valve 7 is arranged along the radial direction of the body joint 1 and is positioned in the pressure transfer hole 8, a communicating hole is formed in the valve body of the rotary conduction valve 7, and the communicating hole can conduct the pressure transfer hole 8. The driving motor 6 is fixedly arranged in the rotary conduction valve assembly mounting hole through a bottom clamping groove and is connected with an upper end valve core of the rotary conduction valve 7, and the driving motor 6 can drive the rotary conduction valve 7 to rotate at the pressure transmission hole 8.
The rotation conduction valve 7 in this embodiment is a ball valve-shaped structure, and a communication hole is provided in the radial direction thereof, and the drive shaft of the drive motor 6 is connected to the rotation conduction valve 7, and the rotation conduction valve 7 can be rotated by the rotation of the drive shaft, as shown in fig. 2 and 4. When the rupture disk 3 is not broken, the communication hole is not communicated with the pressure transfer hole 8, and the pressure transfer holes 8 on both sides of the rotary conduction valve 7 are not conducted, so that the pressure transfer holes 8 are closed. When rupture disc 3 is broken, driving motor 6 can drive rotatory conduction valve 7 and rotate 90 to make the intercommunicating pore communicate with biography pressure hole 8, and then make axial through hole and annular space switch on, thereby can drive sliding sleeve 11 and slide.
Preferably, the body joint 1 is further provided with a delay assembly mounting hole, the delay assembly mounting hole is located between the rupture disc mounting hole and the rotary conduction valve assembly mounting hole, the delay assembly mounting hole is communicated with the rotary conduction valve assembly mounting hole, and the toe end sliding sleeve further comprises a delay assembly, the delay assembly mounting hole is arranged in the delay assembly mounting hole and is electrically connected with the rotary conduction valve assembly.
The time delay assembly is arranged, the requirement that the whole shaft is subjected to pressure testing to the design pressure and the specified pressure testing time before fracturing after well cementation can be met, the sliding sleeve 11 is automatically opened to establish a fracturing channel inside and outside the sleeve on the premise that the pressure does not exceed the pressure testing value after the pressure testing is finished, perforation is not required to be transmitted through the continuous oil pipe, the first-stage fracturing operation can be carried out, the well completion operation efficiency is finally improved, and the well completion construction risk is reduced.
Specifically, the time delay assembly includes a piston energizer 4 and a battery timer 5. The piston energizer 4 is slidably disposed in the delay assembly mounting bore. The battery timer 5 is arranged in the delay assembly mounting hole and can be connected with the piston exciter 4 in an abutting mode, and the battery timer 5 is connected with the driving motor 6 and can supply power to the driving motor 6.
The battery timer 5 in this embodiment is fixed in the delay assembly mounting hole through a thread, the lower end of the battery timer is hermetically arranged in the delay assembly mounting hole, and the lower end of the battery timer 5 is connected with the piston exciter 4 through a spring, so that the battery timer and the piston exciter are ensured not to be in contact under a normal state. When the rupture disk 3 is broken, the pressure in the delay assembly mounting hole rises to push the piston exciter 4 to move upwards against the elastic force of the spring, and then the battery timer 5 is triggered to work.
After the set time is delayed, the battery timer 5 supplies power to the driving motor 6 through a lead and enables the driving motor 6 to work, and under the action of the driving motor 6, the rotary conduction valve 7 rotates by 90 degrees so as to conduct the pressure transmission hole 8.
As shown in fig. 1, the sliding sleeve protective sleeve 10 is provided with a plurality of radial first fracturing holes at intervals, the body joint 1 is provided with a plurality of radial second fracturing holes corresponding to the radial first fracturing holes at intervals, the toe end sliding sleeve further comprises a protection sheet 12, and the protection sheet 12 is installed in each radial first fracturing hole and each radial second fracturing hole. The protective sheet 12 of this embodiment can prevent cement from being consolidated, and the structure thereof is the same as that of the protective sheet 12 in the prior art, and the detailed description thereof is omitted here.
It should be noted that, in this embodiment, a sealing assembly is disposed between the sliding sleeve protection sleeve 10 and the body joint 1. A sealing component is arranged between the sliding sleeve 11 and the sliding sleeve protective sleeve 10, and a sealing component is also arranged between the sliding sleeve 11 and the body joint 1. Through setting up above-mentioned seal assembly can guarantee the stable sealed between each part, avoid liquid to leak.
Further, the embodiment of the present invention provides a sealing assembly between each component as required to ensure the normal operation of each component.
Further preferably, the sliding sleeve protective sleeve 10 is connected with the body joint 1 through a locking screw 9 to ensure that the sliding sleeve protective sleeve and the body joint are stably connected.
The utility model also provides an oil well tubular column, including toe end sliding sleeve and oil production pipe body, toe end sliding sleeve is foretell toe end sliding sleeve, and oil production pipe body connects 1 with the body and is connected.
Further, the embodiment of the present invention provides a specific working process as follows:
connecting the embodiment to a well cementation casing string according to design requirements, and descending the well cementation casing string to a preset position to provide temporary plugging for the casing string, and performing normal well cementation operation (the sum of the pressure of a wellhead pump and the pressure of a hydrostatic column at the position of a toe end sliding sleeve opened in a delayed manner is smaller than the rupture pressure value of a rupture disc 3 during the well cementation operation); and after the cement is completely solidified and reaches the designed strength after the well cementation operation, performing fracturing construction. During fracturing construction, normally connecting a fracturing wellhead with a fracturing truck, and testing the pressure of a ground pipeline to a design value; after the pressure of a wellhead is relieved, a wellhead valve is opened to enable the fracturing truck to be communicated with a shaft through a ground pipeline, the fracturing truck is started to carry out pressure test to the whole shaft to reach a designed pressure test value (the sum of the pressure test value and the hydrostatic column pressure at the position of a delay opening toe end sliding sleeve is greater than the rupture pressure value of a rupture disk 3), at the moment, the rupture disk 3 in the delay opening toe end sliding sleeve is ruptured, fluid in the shaft flows to a piston exciter 4 and a rotary conduction valve 7 through the rupture disk 3 and is blocked by the rotary conduction valve 7, meanwhile, the fluid pressure pushes the piston exciter 4 to move outwards along the radial direction of a tool to be in contact with a battery timer 5 and starts timing of the battery timer 5, when the battery timer 5 times to a set value, current is automatically supplied to a driving motor 6, the driving motor 6 is started and drives the rotary conduction valve 7 to rotate for 90 degrees, a pressure transmission hole 8 is conducted, the fluid flows to a sliding sleeve 11 along the pressure, and (3) communicating the fracturing holes on the body joint 1 and the sliding sleeve protective sleeve 10, establishing an inside and outside fracturing channel (as shown in figure 2), and performing normal first-stage fracturing construction operation.
From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects: the utility model discloses the first section fracturing operation after mainly used oil gas well especially horizontal well cementing provides the fracturing passageway between the intraductal and stratum of full pit shaft pressure testing and first section fracturing operation cover for oil gas well fracturing, finally improves well completion operating efficiency and reduces well completion operation construction risk.
The above description is only for the specific embodiments of the present invention, and the scope of the present invention can not be limited by the embodiments, so that the replacement of the equivalent components or the equivalent changes and modifications made according to the protection scope of the present invention should still belong to the scope covered by the present patent. In addition, the utility model provides an between technical feature and the technical feature, between technical feature and the technical scheme, all can the independent assortment use between technical scheme and the technical scheme.

Claims (10)

1. A toe end sleeve, comprising:
the body joint (1) is provided with an axial through hole, a pressure transfer hole (8), a rupture disc mounting hole and a rotary conduction valve assembly mounting hole, the pressure transfer hole (8) and the axial through hole are arranged in parallel at intervals, the rupture disc mounting hole is arranged along the radial direction of the body joint (1) and is respectively communicated with the pressure transfer hole (8) and the axial through hole, and the rotary conduction valve assembly mounting hole is arranged on one side of the rupture disc mounting hole in parallel at intervals;
the sliding sleeve protective sleeve (10) is fixedly sleeved outside the body joint (1), an annular space is formed between the sliding sleeve protective sleeve (10) and the body joint (1), and the pressure transfer hole (8) is communicated with the annular space;
a sliding sleeve (11) arranged in the annular space by a shear pin (13);
a rupture disc (3) which is arranged in the rupture disc mounting hole and can seal the pressure transmission hole (8);
and the rotary conducting valve assembly is arranged in the rotary conducting valve assembly mounting hole and can control the opening and closing of the pressure transmission hole (8).
2. The toe end slide sleeve of claim 1, wherein said rotary conductance valve assembly comprises:
the rotary conduction valve (7) is arranged along the radial direction of the body joint (1) and is positioned in the pressure transfer hole (8), a communicating hole is formed in the valve body of the rotary conduction valve (7), and the communicating hole can conduct the pressure transfer hole (8);
and the driving motor (6) is arranged in the rotary conduction valve assembly mounting hole and is connected with the upper end valve core of the rotary conduction valve (7), and the driving motor (6) can drive the rotary conduction valve (7) to rotate at the pressure transmission hole (8).
3. The toe end sliding sleeve according to claim 2, wherein a delay assembly mounting hole is further provided on the body joint (1), the delay assembly mounting hole is located between the rupture disc mounting hole and the rotary conduction valve assembly mounting hole, and the delay assembly mounting hole is communicated with the rotary conduction valve assembly mounting hole, and the toe end sliding sleeve further comprises a delay assembly which is arranged in the delay assembly mounting hole and electrically connected with the rotary conduction valve assembly.
4. The toe end slide sleeve of claim 3, wherein said time delay assembly comprises:
a piston exciter (4) slidably disposed within the delay assembly mounting bore;
and the battery timer (5) is arranged in the time delay assembly mounting hole and can be connected with the piston exciter (4) in an abutting mode, and the battery timer (5) is connected with the driving motor (6) and can supply power to the driving motor (6).
5. The toe end sliding sleeve according to claim 1, wherein the upper end of the rupture disk (3) is fixed in the rupture disk mounting hole through a snap spring (2).
6. The toe end socket according to claim 1, wherein the socket protection sleeve (10) is connected to the body joint (1) by a locking screw (9).
7. The toe end sliding sleeve according to claim 1, wherein a plurality of radial first fracturing holes are arranged on the sliding sleeve protective sleeve (10) at intervals, a plurality of radial second fracturing holes corresponding to the radial first fracturing holes in a one-to-one mode are arranged on the body joint (1) at intervals, the toe end sliding sleeve further comprises a protective plate (12), and the protective plate (12) is arranged in each radial first fracturing hole and each radial second fracturing hole.
8. The toe end sliding sleeve according to claim 1, wherein a sealing assembly is provided between the sliding sleeve protective sleeve (10) and the body joint (1).
9. The toe end sliding sleeve according to claim 1, wherein a sealing assembly is arranged between the sliding sleeve (11) and the sliding sleeve protective sleeve (10), and a sealing assembly is also arranged between the sliding sleeve (11) and the body joint (1).
10. An oil well string comprising a toe end slide and a riser body, characterized in that the toe end slide is the toe end slide of any one of claims 1 to 9, the riser body being connected with a body joint (1).
CN202021579074.2U 2020-08-03 2020-08-03 Toe end sliding sleeve and oil well tubular column thereof Active CN212428776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021579074.2U CN212428776U (en) 2020-08-03 2020-08-03 Toe end sliding sleeve and oil well tubular column thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021579074.2U CN212428776U (en) 2020-08-03 2020-08-03 Toe end sliding sleeve and oil well tubular column thereof

Publications (1)

Publication Number Publication Date
CN212428776U true CN212428776U (en) 2021-01-29

Family

ID=74273537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021579074.2U Active CN212428776U (en) 2020-08-03 2020-08-03 Toe end sliding sleeve and oil well tubular column thereof

Country Status (1)

Country Link
CN (1) CN212428776U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059983A (en) * 2020-08-03 2022-02-18 中国石油天然气集团有限公司 Toe end sliding sleeve and oil well tubular column thereof
CN115247546A (en) * 2021-04-28 2022-10-28 中石化石油工程技术服务有限公司 Toe end well cementation fracturing sliding sleeve

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059983A (en) * 2020-08-03 2022-02-18 中国石油天然气集团有限公司 Toe end sliding sleeve and oil well tubular column thereof
CN115247546A (en) * 2021-04-28 2022-10-28 中石化石油工程技术服务有限公司 Toe end well cementation fracturing sliding sleeve
CN115247546B (en) * 2021-04-28 2024-04-26 中石化石油工程技术服务有限公司 Toe end well fracturing sliding sleeve

Similar Documents

Publication Publication Date Title
US11203910B2 (en) Casing hanger and annulus sealing device running tool for deepwater drilling, and method for using the same
CN212428776U (en) Toe end sliding sleeve and oil well tubular column thereof
CN107178335B (en) Multifunctional setting ball seat and use method thereof
CN109236189A (en) A kind of downhole drill reamer
CN111706295B (en) Radio electromagnetic wave direct-current control pressure-relief sleeve valve
CN116335579A (en) Oil field well casing packer and non-cementing injection self-plugging staged fracturing method
CN214576950U (en) Well cementation fracturing tool with electric control sliding sleeve
CN208184692U (en) Deepwater drilling casing head and annular space sealing device tripping in tool
CN112943201B (en) Fracturing sliding sleeve of infinite-level mechanical switch and shale oil three-dimensional development fracturing tool
CN2833097Y (en) Inside-packed type water detection and blocking sequence switch
CN114059983A (en) Toe end sliding sleeve and oil well tubular column thereof
CN202788741U (en) Completion tool free of drilling and plugging
CN111502624A (en) Multifunctional thick oil thermal recovery pipe column
CN108457619B (en) Radio frequency triggering type multiple switch bypass valve device assembly
CN207004477U (en) Solvable bridging plug staged fracturing tool
CN212454391U (en) High-pressure testing well opening device
CN213775323U (en) Pressure testing time-delay toe end valve
CN111734350B (en) Separating valve capable of being opened and closed repeatedly
CN113969760B (en) Electric channeling checking and leakage finding device
CN105822256A (en) Hinged type sliding sleeve opening tools capable of achieving staged opening and equal-diameter casing pipe sliding sleeves
CN112482985A (en) Drilling equipment is pressed in area of oil gas well head
CN220539603U (en) Stage cementing device for half-way well cementation and tool string
CN2625571Y (en) Impacting seat for well cementing
CN218816338U (en) Underground switch valve
CN220415318U (en) Shaft hydraulic temporary packing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230621

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.

Patentee after: BEIJING PETROLEUM MACHINERY Co.,Ltd.

Address before: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Patentee before: CNPC ENGINEERING TECHNOLOGY R & D Co.,Ltd.