CN212428203U - Assembled corridor frame - Google Patents
Assembled corridor frame Download PDFInfo
- Publication number
- CN212428203U CN212428203U CN202020620343.9U CN202020620343U CN212428203U CN 212428203 U CN212428203 U CN 212428203U CN 202020620343 U CN202020620343 U CN 202020620343U CN 212428203 U CN212428203 U CN 212428203U
- Authority
- CN
- China
- Prior art keywords
- rod
- piece
- rod piece
- stand
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to an assembled corridor frame structure, include foundation beam, stand and connect the mounting bracket on the stand, the stand can be dismantled and connect on foundation beam, the stand has several tracks along foundation beam logical length direction distribution, the mounting bracket includes girder, secondary beam and boundary beam, girder and secondary beam can be dismantled and connect on the stand, the boundary beam can be dismantled and connect on girder and secondary beam, the logical length direction setting of the parallel foundation beam of logical length direction of girder, the width direction setting of the parallel foundation beam of logical length direction of secondary beam, can dismantle on the mounting bracket and be connected with the roof. The utility model discloses but has assembly and disassembly's effect.
Description
Technical Field
The utility model belongs to the technical field of corridor frame technique and specifically relates to an assembled corridor frame is related to.
Background
At present, a Chinese patent document with an authorization publication number of CN208857949U discloses a leisure corridor frame integrally cast by using fair-faced concrete. Including the leisure corridor frame that adopts clear water concrete integration to pour including corridor frame top, corridor frame body and the stool that clear water concrete integration was pour, the lower extreme on corridor frame top is provided with the light, and the thickness on corridor frame top is the same with the thickness of corridor frame body, and the length of sitting the stool is the same with the length of corridor frame body, is the arc between corridor frame top and the corridor frame body.
The above prior art solutions have the following drawbacks: the existing gallery frame structure is integrally cast and formed by concrete, after long-time use, the damage and deformation occur, the damage and deformation part is repaired difficultly, the existing gallery frame structure is demolished destructively when demolished, the reuse rate is low, and the difficulty of demolishing and replacing the gallery frame structure cannot be increased due to the fact that the existing gallery frame structure cannot be disassembled.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an assembled corridor frame, which has the detachable effect.
The above-mentioned utility model discloses an assembled corridor frame that can realize through following technical scheme, include foundation beam, stand and connect the mounting bracket on the stand, the stand can be dismantled and connect on foundation beam, the stand has several tracks along foundation beam full length direction distribution, is located to set up the people's passageway between two stands in middle part, the mounting bracket includes girder, secondary beam and boundary beam, girder and secondary beam can be dismantled and connect on the stand, the boundary beam can be dismantled and connect on girder and secondary beam, the parallel foundation beam of full length direction of girder leads to the length direction setting, the width direction setting of the parallel foundation beam of full length direction of secondary beam, can dismantle on the mounting bracket and be connected with the roof.
Through adopting above-mentioned technical scheme, compare in prior art, this corridor frame structure center pillar can dismantle with the foundation beam and be connected, girder and stand can dismantle and be connected, secondary beam and stand can dismantle and be connected, and boundary beam and secondary beam can dismantle and be connected, the roof of connecting on the mounting bracket simultaneously is dismantled with the mounting bracket and is connected, make this corridor frame structure wholly dismantle, detachable connected mode makes stand, girder, secondary beam, boundary beam and the roof homoenergetic after dismantling reuse when demolising, can improve corridor frame structure's utilization ratio.
The present invention may be further configured in a preferred embodiment as: the base beam is provided with a plurality of fixing parts at two ends close to the base beam, the fixing parts are distributed along the whole length direction of the base beam, the fixing parts are provided with first bolt pieces, one ends of the first bolt pieces are positioned in the fixing parts, and the other ends of the first bolt pieces extend out of the upper surface of the fixing parts; the bottom of stand is connected in the fixed part upper surface, the bottom of stand sets up the fixed plate, the bottom of fixed plate level surrounding stand, first bolt spare passes the fixed plate.
Through adopting above-mentioned technical scheme, the fixed part is poured with the foundation beam together and is formed, and simultaneously first bolt spare is pre-buried in fixed when pouring. The fixed plate is connected to the stand bottom, and first bolt spare passes the fixed plate for thereby the stand can be dismantled with the fixed part through first bolt spare and fixed plate cooperation and be connected.
The present invention may be further configured in a preferred embodiment as: the stand includes two pole settings that distribute along foundation beam width direction, there is the clearance between two pole settings on the stand.
Through adopting above-mentioned technical scheme, the stand is formed by the pole setting combination that two are connected, and when a pole setting bore horizontal direction's thrust when the atress, another will bear pressure, compare in setting up a pole setting, and the atress of two pole settings is more reasonable firm, and more firm.
The present invention may be further configured in a preferred embodiment as: the main beam comprises a first rod piece arranged in parallel to the full-length direction of the foundation beam, the end part of the first rod piece is connected to the upper part of the upright rod, and two ends of the first rod piece, which are positioned at two ends of the main beam in the full-length direction and are opposite to each other, are arranged in an overhanging manner; the secondary beam comprises a plurality of sections of second rod pieces arranged in parallel with the width direction of the foundation beam, one end of the secondary beam is connected to the upper part of the upright rod, and the other end of the secondary beam is arranged in an overhanging manner; the boundary beam comprises a plurality of sections of third rod pieces which are sequentially connected, the third rod pieces are connected to the end parts of the first rod pieces or the second rod pieces in an overhanging mode, and the plurality of sections of third rod pieces are connected to form a closed annular boundary beam.
Through adopting above-mentioned technical scheme, first member is connected and can be improved connection performance and the stability between the adjacent two stands in the stand top. The first rod piece and the first rod piece one end that are located basic roof beam logical length direction both ends are connected with the stand, and the other end is encorbelmented to the end connection third rod piece of encorbelmenting, the third rod piece is connected simultaneously and is formed cyclic annularly, can strengthen the stability ability that first rod piece and second rod piece encorbelmented one end, thereby can improve the overall stability ability on mounting bracket and stand upper portion.
The present invention may be further configured in a preferred embodiment as: the first rod piece, the second rod piece and the third rod piece can be of an H-shaped steel structure.
Through adopting above-mentioned technical scheme, be first member, second member and the third member of H shaped steel structure for first member, second member and third member have the characteristics that the dead weight is light, stability is good, the operating personnel of being convenient for installation transportation.
The present invention may be further configured in a preferred embodiment as: the upper portion side of pole setting is connected with first conversion, first conversion is including two plates that are L shape and connect, first conversion symmetry sets up on first member or second member width direction's both sides face, the laminating of a first conversion plate and first member or the web side of second member, and another plate is connected with the upper portion of pole setting, be provided with second bolt spare on first member or the second member, second bolt spare sets up along first member or second member width direction, first member or second member are passed to second bolt spare and are located two sets of first conversion of first member or second member both sides.
Through adopting above-mentioned technical scheme, first member and second member are connected through one of them plate of second bolt spare and first conversion respectively, and another plate and the stand of first conversion are connected to make first member and second member realize dismantling with the stand and be connected through two first conversion and second bolt spare.
The present invention may be further configured in a preferred embodiment as: the two ends of the third rod piece are respectively provided with a clamping groove and a notch, and the notches are positioned on the flange plate of the third rod piece and are arranged along the full length direction of the third rod piece; the clamping groove is positioned on the web plate of the third rod piece and is far away from the notch, and the clamping groove is arranged along the full length direction of the third rod piece; the gap extends into the flange plate of the first rod piece or the second rod piece positioned at the upper part; the first rod piece or the second rod piece is positioned in the flange plate at the lower part and extends into the clamping groove.
Through adopting above-mentioned technical scheme, the upper portion of third member sets up the breach, and the joint groove that sets up along the logical length direction of third member is seted up to the lower part of third member web. The third member stretches into the joint inslot through keeping away from the flange board of stand one end lower part with first member or second member for the third member can be dismantled and connect on first member or second member. Simultaneously, one side of the flange plate at the upper part of the first rod piece or the second rod piece extends into the gap, so that the upper surfaces of the first rod piece, the second rod piece and the third rod piece are arranged in a flush manner.
The present invention may be further configured in a preferred embodiment as: the both sides face of the tip width direction that first member and second member were encorbelmented still is provided with the second converting part, the second converting part is including two plates that are L shape and connect, a curb plate and the first member in place or the side of second member encorbelment the end web are connected, the web tip side of third member and the opposite side board laminating of first converting part and be provided with third bolt spare, the web of third member and the curb plate of second converting part laminating third member are passed to the third bolt spare.
Through adopting above-mentioned technical scheme, connect in first member or the second member piece two sets of second dress of the tip both sides of encorbelmenting and trade the piece. One plate of one group of conversion parts is attached to and connected with the side face of the web plate of the first rod part or the second rod part, the other plate is attached to the side face of the web plate of the third rod part and provided with a third bolt part, and the third bolt part penetrates through the web plate of the third rod part and the plate of the web plate of the second connecting part attached to the third rod part, so that the third rod part can be detachably connected to the second rod part or the first rod part.
The present invention may be further configured in a preferred embodiment as: a suspension rod is arranged between two adjacent upright columns close to the end part of the foundation beam, the suspension rods are connected to two side surfaces of the upright columns along the width of the foundation beam, the suspension rods are distributed at intervals along the height direction of the upright columns, and fourth bolt pieces penetrating through the suspension rods and extending into the upright columns are arranged on the suspension rods; the hanging rod is further connected with a decoration brick, a buckling piece is arranged between the decoration brick and the hanging rod, and the decoration brick is connected with the hanging rod through the buckling piece.
Through adopting above-mentioned technical scheme, the side of two stands all can be dismantled through fourth bolt spare and be connected with and hang the pole, hang and be connected with the decorative board through fastener on the pole, polylith decorative board brick forms the wall body in space of separating, and the decorative brick still plays the effect of decorating simultaneously.
The present invention may be further configured in a preferred embodiment as: the top of two vertical rods of one upright post is connected with a connecting rod.
Through adopting above-mentioned technical scheme, the connecting rod can strengthen the connection performance at two pole setting tops that are arranged in same root stand.
To sum up, the utility model discloses a following at least one useful technological effect:
compared with the prior art, the gallery frame structure has the advantages that the upright posts are detachably connected with the foundation beam, the main beam is detachably connected with the upright posts, the secondary beam is detachably connected with the upright posts, the side beams are detachably connected with the secondary beams, the top plate connected to the mounting frame is detachably connected with the mounting frame, so that the gallery frame structure can be integrally detached, the detached upright posts, the main beam, the secondary beams, the side beams and the top plate can be reused in a detachable connection mode during detachment, and the utilization rate of the gallery frame structure can be improved;
the first rod piece is connected to the top end of the stand column, so that the connection performance and the stability between two adjacent stand columns can be improved. The first rod piece and one end of the first rod piece which are positioned at the two ends of the base beam in the through length direction are connected with the upright post, the other end of the first rod piece is cantilevered, the end part of the cantilever is connected with the third rod piece, and meanwhile, the third rod piece is connected to form a ring shape, so that the stability of the cantilevered ends of the first rod piece and the second rod piece can be enhanced, and the overall stability of the mounting frame and the upper part of the upright post can be improved;
the connecting rod can strengthen the connection performance of two pole setting tops that are arranged in same root stand.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the present invention after the veneer cladding is separated;
FIG. 3 is an enlarged view of a portion A of FIG. 1;
FIG. 4 is a schematic cross-sectional view taken along line A-A in FIG. 2;
FIG. 5 is an enlarged view of a portion of the structure of FIG. 4 at D;
FIG. 6 is an enlarged view of a portion B of FIG. 2;
FIG. 7 is an enlarged view of a portion of the structure of FIG. 2 at C;
fig. 8 is a schematic structural view of the third rod of the present invention after the end portion is separated.
Reference numerals: 1. a foundation beam; 2. a column; 3. a mounting frame; 4. a fixed part; 5. a first bolt member; 6. a second bolt member; 7. a third bolt member; 8. a fourth bolt member; 9. erecting a rod; 10. a fixing plate; 11. a first connection hole; 12. a first conversion member; 13. a connecting rod; 14. a suspension rod; 15. decorating the brick; 16. a fastener; 17. a hooking part; 18. a fitting portion; 19. a first bar member; 20. a second bar member; 21. a third bar member; 22. a second conversion member; 23. a clamping groove; 24. a notch; 25. a facing cladding; 26. a fifth bolt member; 27. and (4) passing through a human channel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in figures 1 and 2, the assembled gallery frame comprises a foundation beam 1, an upright post 2 and an installation frame 3 arranged on the upright post 2, wherein the bottom end of the upright post 2 is detachably connected with the foundation beam 1, and the top end of the upright post 2 is detachably connected with the installation frame 3. The side of the upright post 2 can be detachably connected with a decorative brick 15.
The surface of the mounting frame 3 is also provided with a facing cladding 25, and the facing cladding 25 can be formed by splicing aluminum veneers. The veneer covering 25 surrounds the surface of the mounting frame 3, and the upper surface of the veneer covering 25 is further provided with fifth bolt pieces 26, and the fifth bolt pieces 26 vertically penetrate through the veneer covering 25 and the mounting frame 3. The veneer covering 25 is detachably attached to the mounting frame 3 by means of fifth bolt members 26.
As shown in fig. 1 and 3, the cross section of the foundation beam 1 is rectangular, the foundation beam 1 is fixedly connected with a fixing part 4, and the fixing part 4 is formed by pouring the foundation beam 1 together. Four fixing parts 4 are distributed along the length direction of the foundation beam 1, two of the fixing parts 4 are close to one end of the foundation beam 1, and the other two fixing parts are close to the other end of the foundation beam 1 and symmetrically arranged along the middle of the length direction of the foundation beam 1. The fixing part 4 is embedded with a first bolt piece 5, and a bolt rod of the first bolt piece 5 vertically extends out of the fixing part 4.
Four upright posts 2 are arranged corresponding to the fixing part 4, and a passenger passage 27 formed by a gap is arranged between the two upright posts 2 in the middle. Stand 2 includes along two pole settings 9 that distribute along 1 width direction of foundation beam, has the clearance between two pole settings 9, compares in a pole setting 9, and two pole settings 9 along 1 width direction of foundation beam setting have better stable in structure performance.
The bottom fixedly connected with fixed plate 10 of pole setting 9, two pole settings 9 that are located same root stand 2 connect on same fixed plate 10, first connecting hole 11 has been seted up on the fixed plate 10, first connecting hole 11 corresponds the setting of first bolt piece 5 of fixed part 4, stretch into first connecting hole 11 with first bolt piece 5 in, make fixed part 4 and fixed plate 10 can dismantle the connection, make stand 2 and foundation beam 1 can dismantle the connection through fixed plate 10 and the cooperation of fixed part 4.
As shown in fig. 2 and 4, the vertical rod 9 may be a hollow steel column with a rectangular cross section, and the suspension rod 14 is connected between the two vertical columns 2 at one side of the man-passing passageway 27. As shown in fig. 4 and 5, the suspension rods 14 are uniformly distributed in a plurality of ways along the height direction of the upright 2, the suspension rods 14 may be rod members with rectangular cross sections, two ends of the suspension rods 14 are respectively connected to two upright rods 9 of the two uprights 2 located on the same side, and the suspension rods 14 are symmetrically arranged on two sides of the upright 2 along the middle of the base beam 1 in the width direction. The hanging bar 14 is connected with a fourth bolt member 8 extending through the hanging bar 14 into the upright 9, and the hanging bar 14 is detachably connected to the upright 9 by means of the fourth bolt member 8. One side surface of the hanging rod 14 is attached to the side surface of the upright rod 9, and the other side surface of the hanging rod is far away from the upright rod 9 and is connected with a decorative brick 15.
The decorative brick 15 can be a quartz brick, a fastening piece 16 is arranged between the decorative brick 15 and the hanging rod 14, the fastening piece 16 comprises a hooking part 17 connected to the hanging rod 14 and a matching part 18 positioned on the upper part of the back surface of the decorative brick 15, and a connecting piece (not shown in the figure) is arranged between the matching part 18 and the hooking part 17 for connection.
As shown in fig. 2 and 6, the upper parts of the vertical rods 9 are provided with first conversion members 12, and the first conversion joints 12 can be corner connectors. First conversion member 12 is including being the plate that the L shape is connected, and one of them plate laminating pole setting 9's side and with pole setting 9 fixed connection, the perpendicular place side of another plate and the setting of encorbelmenting. The cantilevered plate of the first conversion member 12 is provided with a second bolt member 6 penetrating the cantilevered plate.
The upper part of the upright post 2 is provided with a connecting rod 13, and the connecting rod 13 is connected between the two upright posts 9. Connecting rod 13 is H shaped steel structure, and the web of connecting rod 13 and the laminating of the first piece of changing between the coexistence pole 9 that is located same stand 2 to second bolt spare 6 passes the plate that first piece of changing 12 encorbelmented and connecting rod 13's web, makes connecting rod 13 can dismantle the top of connecting in two poles of standing 9, and connects connecting rod 13 at two poles of standing 9 tops and can strengthen the connection performance between two poles of standing 9 and improve structural strength.
As shown in fig. 2 and 6, the mounting frame 3 includes a main beam, a secondary beam and an edge beam which are all horizontally arranged. The parallel foundation beam 1 setting of logical long direction of girder, girder include the first member 19 of multichannel, and first member 19 is connected between two pole settings 9, and 19 one end of the first member of twice that are located the girder both ends are connected with pole setting 9, and the other end setting of encorbelmenting. The secondary beam is arranged in parallel with the width direction of the foundation beam 1 and comprises a plurality of second rod members 20. And one end is connected with the upright rod 9, and the other end is arranged in a cantilever way. The first rod piece 19 and the second rod piece 20 are both in an H-shaped steel structure, the side faces of the web plate of the first rod piece 19 or the second rod piece 20 are both attached to the overhanging plate of the first conversion piece 12 on the vertical rod 9, and meanwhile, the second bolt piece 6 penetrates through the web plate of the first rod piece 19 or the second rod piece 20 and the overhanging plates of the two groups of first conversion pieces 12. The ends of the first bar 19 and the second bar 20 connected to the uprights 9 are removably connected by means of second bolt members 6.
As shown in fig. 7 and 8, a second conversion member 22 is connected to a side surface of the web at the overhanging end of the first rod member 19 and the second rod member 20, and the second conversion member 22 may be an angle code. The second converting member 22 includes two plate members connected in an L-shape. One side of the plate of one of the second conversion members 22 is fixedly connected to the side of the second rod 20 or the web of the second rod 20, and the other plate is cantilevered. A plate member cantilevered by the second converting member 22 is provided with a third bolt member 7 passing through the plate member.
The boundary beam comprises a plurality of third rod pieces 21, and the third rod pieces 21 are of H-shaped steel structures. The end of the third rod 21 is connected to the overhanging end of the first rod 19 or the second rod 20, and the third rod 21 is perpendicular to the connected first rod 19 or the second rod 20. The end of the third bar 21 is provided with a notch 24 and a clamping groove 23, and the notch 24 is located on the upper portion of the third bar 21 and is arranged along the direction of the entire length of the flange plate of the third bar 21. The clamping groove 23 is located at the lower part of the web of the third rod 21 and is opened along the full length direction of the third rod 21.
When the third rod member 21 is connected, the web plate at the end of the third rod member 21 extends into the space between the flange plates at the overhanging end of the first rod member 19 or the second rod member 20, and the flange plates of the first rod member 19 or the second rod member 20 respectively extend into the clamping groove 23 and the notch 24, at this time, the upper surface of the third rod member 21 is flush with the upper surfaces of the first rod member 19 and the second rod member 20. Then, the side of the cantilever plate member of the second switching member 22 abuts against the side of the web of the third lever member 21, and the third bolt member 7 passes through the second switching member 22 and the third lever member 21, so that the third lever member 21 is connected to the first lever member 19 or the second lever member 20 via the third bolt member 7 and the second switching member 22.
The implementation principle of the embodiment is as follows: the construction sequence of the gallery frame mechanism comprises the following steps: and (3) casting the foundation beam 1 in situ, and simultaneously embedding the first bolt part 5 into the foundation beam 1.
Step two: the upright posts 2 are installed, the first connecting holes 11 on the two upright posts 9 are respectively aligned with the first bolt pieces 5, and the first bolt pieces 5 are detachably and obliquely connected to the foundation beam 1.
Step three: the mounting frame 3 is mounted and the first bar 19 and the second bar 20 are detachably connected to the upper part of the upright 9 by means of the first transition piece 12 and the third bolt piece 7. Meanwhile, the third link 21 allows the third link 21 to be detachably connected to the overhanging ends of the first link 19 and the second link 20 through the second link and the third switching member.
Step four: the facing cladding 25 is mounted and the facing cladding 25 is detachably connected to the mounting frame 3 by means of fifth bolt members 26.
Step five: the decorative tile 15 is installed, and the hanging bar 14 is now connected to the sides of the two uprights 2 by means of the fourth bolt pieces 8. Meanwhile, the decorative bricks 15 are connected to the hanging rod 14 through the fastening pieces 16, so that the decorative bricks 15 positioned at two sides of the man-passing channel 27 respectively form two walls to separate spaces at two sides of the width of the corridor frame.
Finally, the finished grid with decorative effect is mounted on the surface of the decorative tile 15.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (10)
1. An assembled corridor frame which is characterized in that: including foundation beam (1), stand (2) and connect mounting bracket (3) on stand (2), stand (2) can be dismantled and connect on foundation beam (1), stand (2) lead to long direction distribution along foundation beam (1) and have several, are located and set up people's passageway (27) between two stands (2) in middle part, mounting bracket (3) include girder, secondary beam and boundary beam, girder and secondary beam can be dismantled and connect on stand (2), the boundary beam can be dismantled and connect on girder and secondary beam, the parallel foundation beam of the logical length direction of girder (1) leads to long direction and sets up, the width direction setting of the parallel foundation beam of the logical length direction of secondary beam (1), can dismantle on mounting bracket (3) and be connected with the roof.
2. The assembly gallery shelf of claim 1, wherein: a plurality of fixing parts (4) are respectively arranged at two ends, close to the foundation beam (1), of the foundation beam (1), the fixing parts are distributed along the whole length direction of the foundation beam (1), first bolt pieces (5) are arranged on the fixing parts (4), one ends of the first bolt pieces (5) are located in the fixing parts (4), and the other ends of the first bolt pieces extend out of the upper surface of the fixing parts (4); the bottom of stand (2) is connected in fixed part (4) upper surface, the bottom of stand (2) sets up fixed plate (10), the bottom of stand (2) is surrounded to fixed plate (10) level, fixed plate (10) are passed in first bolt spare (5).
3. The assembly gallery shelf of claim 2, wherein: stand (2) include two pole setting (9) that distribute along basic beam (1) width direction, there is the clearance between two pole setting (9) on stand (2).
4. The assembly gallery shelf of claim 3, wherein: the main beam comprises a first rod piece (19) which is arranged in parallel to the full-length direction of the foundation beam (1), the end part of the first rod piece (19) is connected to the upper part of the upright rod (9), and two ends, opposite to each other, of the first rod piece (19) at two ends of the main beam in the full-length direction are arranged in an overhanging way; the secondary beam comprises a plurality of sections of second rod pieces (20) arranged in parallel with the width direction of the foundation beam (1), one end of the secondary beam is connected to the upper part of the upright rod (9), and the other end of the secondary beam is arranged in an overhanging manner; the boundary beam comprises a plurality of sections of third rod pieces (21) which are sequentially connected, the third rod pieces (21) are connected to the end portion of the first rod piece (19) or the second rod piece (20) in an overhanging mode, and the plurality of sections of third rod pieces (21) are connected to form a closed annular boundary beam.
5. The assembly gallery shelf of claim 4, wherein: the first bar member (19), the second bar member (20) and the third bar member (21) may be of an H-shaped steel structure.
6. The assembly gallery shelf of claim 5, wherein: the upper side surface of the upright rod (9) positioned at one side of the passenger passage (27) is connected with a first conversion piece (12), the first conversion piece (12) comprises two plates which are connected in an L shape, the first conversion piece (12) is symmetrically arranged on two side surfaces of the first rod piece (19) or the second rod piece (20) in the width direction, one plate of the first conversion piece (12) is attached to the side surface of the web plate of the first rod piece (19) or the second rod piece (20), the other plate is connected with the upper part of the upright rod (9), a second bolt piece (6) is arranged on the first rod piece (19) or the second rod piece (20), the second bolt member (6) is provided along the width direction of the first pin member (19) or the second pin member (20), the second bolt member (6) passes through the first bar member (19) or the second bar member (20) and two sets of first conversion members (12) located on both sides of the first bar member (19) or the second bar member (20).
7. The assembly gallery shelf of claim 6, wherein: the two ends of the third rod piece (21) are respectively provided with a clamping groove (23) and a notch (24), and the notches (24) are positioned on the flange plate of the third rod piece (21) and are arranged along the whole length direction of the third rod piece (21); the clamping groove (23) is positioned on a web plate of the third rod piece (21) and is far away from the notch (24), and the clamping groove (23) is arranged along the full length direction of the third rod piece (21); the notch (24) extends into the flange plate of the first rod piece (19) or the second rod piece (20) positioned at the upper part; the flange plate of the first rod piece (19) or the second rod piece (20) positioned at the lower part extends into the clamping groove (23).
8. The assembly gallery shelf of claim 7, wherein: first member (19) and second member (20) both sides face of the tip width direction of encorbelmenting still is provided with second conversion spare (22), second conversion spare (22) are including two plates that are L shape and connect, a curb plate and the first member (19) of place or the side of second member (20) encorbelmenting the end web are connected, the web tip side of third member (21) and the other curb plate laminating of first conversion spare (12) and be provided with third bolt spare (7), the web of third member (21) and the curb plate of second conversion spare (22) laminating third member (21) are passed in third bolt spare (7).
9. The assembly gallery shelf of claim 8, wherein: hanging rods (14) are arranged between two adjacent upright columns (2) positioned on one side of the people passing channel (27), the hanging rods (14) are connected to two side faces of the upright columns (2) along the width of the foundation beam (1), the hanging rods (14) are distributed at intervals along the height direction of the upright columns (2), and fourth bolt pieces (8) penetrating through the hanging rods (14) and extending into the upright columns (9) are arranged on the hanging rods (14); the hanging rod (14) is further connected with a decorative brick (15), a fastening piece (16) is arranged between the decorative brick (15) and the hanging rod (14), and the decorative brick (15) is connected with the hanging rod (14) through the fastening piece (16).
10. The assembly gallery shelf of claim 9, wherein: a connecting rod (13) is connected between the tops of two vertical rods (9) of one upright post (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020620343.9U CN212428203U (en) | 2020-04-22 | 2020-04-22 | Assembled corridor frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020620343.9U CN212428203U (en) | 2020-04-22 | 2020-04-22 | Assembled corridor frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212428203U true CN212428203U (en) | 2021-01-29 |
Family
ID=74294221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020620343.9U Active CN212428203U (en) | 2020-04-22 | 2020-04-22 | Assembled corridor frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212428203U (en) |
-
2020
- 2020-04-22 CN CN202020620343.9U patent/CN212428203U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210369345U (en) | Novel light outer wall bracket based on steel construction | |
CN111058555A (en) | Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof | |
CN212428203U (en) | Assembled corridor frame | |
CN219773324U (en) | Concrete beam plate structure | |
CN211396109U (en) | Steel pipe column combination wall | |
CN112388806A (en) | Precast column formwork structure and construction method thereof | |
CN214531897U (en) | Supporting system for construction of assembled prestressed hollow slab floor | |
CN211920567U (en) | Full module assembly formula elevator well | |
CN213682477U (en) | Upper cover structure system applied to track operation line | |
CN213951905U (en) | Assembled construction trestle | |
CN114395988A (en) | Design template construction platform | |
CN212154137U (en) | Assembled support-free hanging die | |
CN213572930U (en) | Self-locking hinged elevator shaft construction platform device | |
CN210002560U (en) | overhanging type aluminum alloy house | |
CN212613456U (en) | Integrally cooperative stress platform end non-column steel structure stair | |
CN212200780U (en) | Quickly detachable and reconstructed assembled composite building | |
CN210880147U (en) | Prefabricated template of concrete arch-shaped T beam | |
CN112095780A (en) | Upper cover structure system applied to track operation line and implementation method thereof | |
CN112576029A (en) | Cast-in-place stand column in civil construction and construction method thereof | |
CN221779113U (en) | A interim staple bolt structure of precast column for coincide roof beam supports | |
CN220285307U (en) | Disassembly-free template supporting system based on assembled mortise-tenon connection combined structure | |
CN220202430U (en) | Steel-concrete composite beam structure of assembled cantilever arm support | |
CN220828039U (en) | Theatre large-span reinforced concrete beam bearing structure | |
CN219653543U (en) | Temporary support is assembled to depression bar of steel case roof beam cable-stay bridge single-column internal inclination steel tower | |
CN220978747U (en) | High-altitude cantilever structure formwork construction platform easy to assemble and disassemble and capable of being turned |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |