CN212428003U - Operating platform for top construction of container - Google Patents

Operating platform for top construction of container Download PDF

Info

Publication number
CN212428003U
CN212428003U CN202020766010.7U CN202020766010U CN212428003U CN 212428003 U CN212428003 U CN 212428003U CN 202020766010 U CN202020766010 U CN 202020766010U CN 212428003 U CN212428003 U CN 212428003U
Authority
CN
China
Prior art keywords
fixed
operation platform
container
fixed beam
walking beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020766010.7U
Other languages
Chinese (zh)
Inventor
欧茂武
方修华
袁小军
池福军
李福君
杨礼皎
李然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No2 Construction Engineering Co ltd
Original Assignee
Guangxi Construction Engineering Group No2 Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No2 Construction Engineering Co ltd filed Critical Guangxi Construction Engineering Group No2 Construction Engineering Co ltd
Priority to CN202020766010.7U priority Critical patent/CN212428003U/en
Application granted granted Critical
Publication of CN212428003U publication Critical patent/CN212428003U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an operation platform for construction of container top, including bearing frame, carrier net, bear the frame including fixed stabilizer blade, fixed beam, removal stabilizer blade and walking beam, fixed beam connects and installs on fixed stabilizer blade, and the walking beam is connected and is installed on removing the stabilizer blade, fixed beam and walking beam are sliding connection, and the fixed beam forms the rectangle structure with the walking beam, the carrier net comprises 2 or 2 above net pieces connection, net piece size with bear looks adaptation, net piece hasp on fixed beam, walking beam. The utility model discloses an operation platform, simple structure, convenient operation reduce operation platform to the load at container structure top.

Description

Operating platform for top construction of container
Technical Field
The utility model relates to a construction technical field, especially an operation platform for construction of container top.
Technical Field
In order to resist new crown pneumonia epidemic situation, negative pressure wards of container structures are built all over the country, the structure at the top of the container is generally square tube keel and metal sheet, the bearing capacity is low, and when the top of the container is constructed, such as the operation of laying an air pipe at the top of the container, the metal sheet is damaged easily.
How to design an operation platform for the construction of container top, if lay the installation to the top tuber pipe of container structure, the dispersion avoids causing the destruction to the sheet metal at container top to the load at container top, becomes the problem that needs to solve urgently.
Disclosure of Invention
An object of the utility model is to provide an operation platform for construction of container top, simple structure, convenient operation reduce operation platform to the load at container top.
In order to realize the above-mentioned purpose, the utility model discloses an operation platform for construction of container top, including bearing frame, carrier net, bear frame including fixed stabilizer blade, fixed beam, removal stabilizer blade and walking beam, fixed beam connects and installs on fixed stabilizer blade, and the walking beam is connected and is installed on removing the stabilizer blade, fixed beam and walking beam are sliding connection, and the fixed beam constitutes the rectangle structure with the walking beam, the carrier net comprises 2 or 2 above net piece connections, net piece size with bear looks adaptation, net piece hasp on fixed beam, walking beam.
Further, the mesh is a steel mesh.
Furthermore, the fixed beam is movably connected with the fixed support legs, and the movable beam is movably connected with the movable support legs.
Further, fixed beam, walking beam are round tubular structure, and the external diameter looks adaptation of fixed beam and the internal diameter looks adaptation of walking beam and mutual sliding connection cooperation.
Furthermore, the fixed beam and the movable beam are provided with a plurality of round holes, and the screws fix the fixed beam and the movable beam through the round holes.
Furthermore, the bottom of the fixed supporting leg is provided with a pulley supporting leg which is a pulley device, and the pulley supporting leg is a universal wheel with self-locking function.
Furthermore, the bottom of the movable support leg is provided with a load-dividing support leg which is a square tube.
Furthermore, a rubber pad is pasted at the bottom of the square tube.
The utility model discloses a substantive characteristics and progress are:
the utility model discloses an operation platform for the operation of container structure top tuber pipe installation has following advantage:
(1) the fixed support legs of the operating platform are placed on the edge beam of the container, and the movable support legs at the other end of the operating platform are placed on the metal sheet on the top of the container. According to the needs of construction operation, can adjust the length of bearing frame, through the slip of fixed beam and walking beam, adjust the length of bearing frame, be convenient for construction operation.
(2) The bottom of this operation platform branch lotus spike side pipe is pasted and is had the sheet rubber, when effectively dispersing concentrated load, avoids causing the destruction to sheet metal.
(3) The bearing net is formed by connecting 2 or more than 2 steel bar net pieces, has strong bearing capacity and light load, and is convenient to disassemble and convenient to carry and move the operation platform on the fixed beam and the movable beam by virtue of the bearing net hasps.
(4) The pulley arm brace of fixed stabilizer blade bottom, for the universal wheel of taking the auto-lock, operation platform places when container top, locks the universal wheel, and the pulley arm brace that locks makes it unable removal, and operation platform places steadily reliably. When the operation platform is transported and moved, the universal wheels are opened, and the universal wheels of the pulley supporting feet are used for transporting, so that the operation platform is convenient and labor-saving.
(5) The fixed beam is movably connected with the fixed support legs, and the movable beam is movably connected with the movable support legs. After the bearing net is detached, the fixed beam can be erected relative to the fixed support legs, the movable beam can be erected relative to the movable support legs, and the whole bearing frame is erected to facilitate integral carrying and moving.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a left side view of the structure of the present invention.
Fig. 4 is a right side view showing the structure of the present invention.
Fig. 5 is a schematic plan view of the structure of the present invention.
Part numbers and names in the figures:
the device comprises a bearing net 1, a movable beam 2, movable support legs 3, load-sharing support legs 4, a fixed beam 5, fixed support legs 6, pulley support legs 7 and a rubber pad 8.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are for purposes of illustration only and are not to be construed as limitations of the invention. It should be noted that, for convenience of description, only the parts related to the present invention are shown in the drawings.
In the present invention, the embodiments and the features of the embodiments may be combined with each other without conflict. The present invention will be described in detail with reference to the accompanying drawings in conjunction with embodiments.
In at least one embodiment of the utility model, as shown with reference to fig. 1-5, the utility model discloses an operation platform for construction of container top, including bearing frame, bearing net 1, the bearing frame includes fixed stabilizer blade 6, fixed beam 5, removal stabilizer blade 3 and walking beam 2, and fixed beam 5 is connected and is installed on fixed stabilizer blade 6, and walking beam 2 is connected and is installed on removing stabilizer blade 3, fixed beam 5 is sliding connection with walking beam 2, and fixed beam 5 constitutes the rectangle structure with walking beam 2, bearing net 1 comprises 2 or 2 above net piece connections, net piece size with bear a looks adaptation, net piece hasp on fixed beam 5, walking beam 2.
The fixed beam 5 is connected with the movable beam 2, then the net sheets of the bearing net 1 are buckled on the fixed beam 5 and the movable beam 2, the fixed support legs 6 and the movable support legs 3 are placed at the top of the container, and people can stand on the bearing net 1 for construction.
After the construction is finished, the bearing net 1 can be disassembled.
According to the utility model discloses a still another embodiment, the net piece is the reinforcing bar net piece.
The bearing net 1 is formed by connecting a plurality of reinforcing steel bar net sheets, and has strong bearing capacity and light load.
According to the utility model discloses a still another embodiment, fixed beam 5 is swing joint with fixed stabilizer blade 6, walking beam 2 is swing joint with walking stabilizer blade 3.
The fixed beam 5 is movably connected with the fixed support legs 6, and the movable beam 2 is movably connected with the movable support legs 3. After the bearing net 1 is detached, the fixed beam 5 can be erected relative to the fixed support feet 6, the movable beam 2 can be erected relative to the movable support feet 3, and the whole bearing frame is erected to facilitate integral carrying and moving.
According to the utility model discloses a still another embodiment, fixed beam 5, walking beam 2 are the pipe column structure, and the external diameter of fixed beam 5 and the internal diameter looks adaptation of walking beam 2 and mutual sliding connection cooperation.
Different task constructions need bear the length difference of frame, can adjust the length that bears the frame in time according to the construction needs. Fixed beam 5, walking beam 2 are the pipe column structure, and the pipe diameter cooperatees and can slide each other, and the slip of accessible fixed beam 5 and walking beam 2 is adjusted to required length with both's length.
According to the utility model discloses a still another embodiment, fixed beam 5, walking beam 2 all are equipped with a plurality of round holes, and the screw is fixed beam 5, walking beam 2 through the round hole.
Through the slip of fixed beam 5 and walking beam 2, after adjusting length to required length with both, accessible screw and fixed beam 5, the round hole on the walking beam 2 cooperate fixedly.
According to the utility model discloses a still another embodiment, the bottom of fixed stabilizer blade 6 is equipped with pulley arm brace 7, pulley arm brace 7 is the universal wheel of taking the auto-lock.
The pulley arm braces 7 of fixed stabilizer blade 6 bottom, for the universal wheel of taking the auto-lock, when operation platform placed at the container top, lock the universal wheel, and the pulley arm braces 7 that locks makes it unable removal, and operation platform places steadily reliably. When the operation platform is transported and moved, the universal wheels are opened, and the universal wheels of the pulley supporting feet 7 are used for transporting, so that the operation platform is convenient and labor-saving.
According to the utility model discloses a further embodiment, the bottom of removing stabilizer blade 3 is equipped with branch lotus spike 4, divides lotus spike 4 to be square pipe.
The load-sharing supporting feet 4 are placed on the metal sheet at the top of the container, the load-sharing supporting feet 4 are arranged into square tubes, the load is light, and the concentrated load is effectively dispersed.
According to the utility model discloses a still another embodiment, rubber pad 8 is pasted to square bottom of pipe.
The rubber pad 8 can effectively avoid causing destruction to container top sheet metal.
The utility model discloses an operation platform for container structure top tuber pipe mount table, simple structure, convenient operation reduce operation platform to the load at container structure top.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.

Claims (8)

1. An operation platform for construction of container top, its characterized in that: including bearing frame, bearing net (1), bear frame including fixed stabilizer blade (6), fixed beam (5), removal stabilizer blade (3) and walking beam (2), fixed beam (5) are connected and are installed on fixed stabilizer blade (6), and walking beam (2) are connected and are installed on walking beam (3), fixed beam (5) are sliding connection with walking beam (2), and fixed beam (5) and walking beam (2) constitute the rectangle structure, bearing net (1) is connected by 2 or 2 above net pieces and is constituteed, and the net piece size with bear a looks adaptation, net piece hasp on fixed beam (5), walking beam (2).
2. An operation platform for container roof construction according to claim 1, characterised in that: the meshes are reinforcing steel meshes.
3. An operation platform for container roof construction according to claim 1, characterised in that: the fixed beam (5) is movably connected with the fixed support legs (6), and the movable beam (2) is movably connected with the movable support legs (3).
4. An operation platform for container roof construction according to claim 1, characterised in that: fixed beam (5), walking beam (2) are round tubular structure, and the external diameter looks adaptation of fixed beam (5) and the internal diameter looks adaptation of walking beam (2) and mutual sliding connection cooperation.
5. An operation platform for container roof construction according to claim 4, characterised in that: the fixed beam (5) and the movable beam (2) are provided with a plurality of round holes, and the screws fix the fixed beam (5) and the movable beam (2) through the round holes.
6. An operation platform for container roof construction according to claim 1, characterised in that: the bottom of the fixed supporting leg (6) is provided with a pulley supporting leg (7), and the pulley supporting leg (7) is a universal wheel with a self-locking function.
7. An operation platform for container roof construction according to claim 1, characterised in that: the bottom of the movable support leg (3) is provided with a load-sharing support leg (4), and the load-sharing support leg (4) is a square tube.
8. An operation platform for the construction of the top of a container according to claim 7, characterised in that: the bottom of the square tube is pasted with a rubber pad (8).
CN202020766010.7U 2020-05-11 2020-05-11 Operating platform for top construction of container Active CN212428003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020766010.7U CN212428003U (en) 2020-05-11 2020-05-11 Operating platform for top construction of container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020766010.7U CN212428003U (en) 2020-05-11 2020-05-11 Operating platform for top construction of container

Publications (1)

Publication Number Publication Date
CN212428003U true CN212428003U (en) 2021-01-29

Family

ID=74289756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020766010.7U Active CN212428003U (en) 2020-05-11 2020-05-11 Operating platform for top construction of container

Country Status (1)

Country Link
CN (1) CN212428003U (en)

Similar Documents

Publication Publication Date Title
US5076448A (en) Portable hydraulic crane
JP3913360B2 (en) Support work
CN110171768B (en) Truss tower and crossing construction protection equipment comprising same
CN105649523A (en) Multifunctional herring ladder
EP1873115B1 (en) Material storage rackfor an aerial lift with a work platform
CN212428003U (en) Operating platform for top construction of container
US4362295A (en) Log holding device
CN206677557U (en) A kind of folding oblique saw bracket
CN201385308Y (en) Foldable feeding/drawing-back table
CN207088833U (en) A kind of PP material easels of fast demountable
CN207539852U (en) A kind of novel mannequin's steps frame
US5924660A (en) Load handling equipment
CN215978356U (en) Scaffold frame supporting platform for building
CN210482960U (en) Simple, safe and convenient movable working platform
CA1324989C (en) Portable hydraulic crane
US3091312A (en) Vehicle mounted derrick
CN208646900U (en) A kind of multifunctional hand stopping switch operating platform
CN211524683U (en) Elevator construction overhauls with foldable frame of ascending a height
CN206467781U (en) Box steel column butt-joint structural
CN220848616U (en) Folding operation platform for stairwell
CN220364298U (en) Portable hoisting accessory
JP2009121100A (en) Foldable working scaffold
CN210988794U (en) Easy portable wood table of dismouting
CN218596060U (en) Lifting frame
CN217975291U (en) Adjustable inclined plane operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant