CN212427778U - Steel construction assembled wallboard - Google Patents

Steel construction assembled wallboard Download PDF

Info

Publication number
CN212427778U
CN212427778U CN202020781410.5U CN202020781410U CN212427778U CN 212427778 U CN212427778 U CN 212427778U CN 202020781410 U CN202020781410 U CN 202020781410U CN 212427778 U CN212427778 U CN 212427778U
Authority
CN
China
Prior art keywords
frame
fixedly connected
outer frame
wall
assembled wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020781410.5U
Other languages
Chinese (zh)
Inventor
许婷婷
张小乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020781410.5U priority Critical patent/CN212427778U/en
Application granted granted Critical
Publication of CN212427778U publication Critical patent/CN212427778U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an assembly type structure technical field just discloses a steel construction assembled wallboard, which comprises a frame, the fixed joint of equidistance has a plurality of fixed frames around the relative one side inner wall of the left and right sides of frame, fixedly connected with wire net in the fixed frame, it is equipped with foam concrete layer to fill between frame and a plurality of wire net, two T shape fixture blocks of symmetry fixedly connected with around the left end outer wall of frame, the T shape draw-in groove that matches the joint with T shape fixture block is seted up to the right side outer wall of frame, the seal plate at both ends about the frame of the equal fixedly connected with crimping in upper and lower both ends, a plurality of location screws and through positioning bolt fixed connection have been seted up to seal plate's surface and the equal symmetry in both ends about the frame. The utility model discloses make the structural strength of wallboard obtain effectual increase, and the assembly installation between two wallboards of being convenient for, improved assembly efficiency greatly.

Description

Steel construction assembled wallboard
Technical Field
The utility model relates to an assembly type structure technical field especially relates to a steel construction assembled wallboard.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and the accessories on the site in a reliable connection mode.
The problem that current assembled wall ubiquitous intensity is low, and need two wallboards of artifical support to correspond in accurate position when two wallboards are installed together, not only waste time and energy and install inconveniently for the installation progress is slow, is not convenient for actual assembly and uses.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the assembled wall ubiquitous intensity among the prior art is low, and need two wallboards of artifical support to correspond in accurate position when two wallboards are installed together, not only waste time and energy and install inconveniently for the installation progress is slow, the problem that actual assembly used is not convenient for, and the steel construction assembled wallboard that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a steel construction assembled wallboard, includes the frame, the fixed joint of equidistance has a plurality of fixed frames around the relative one side inner wall about the frame, fixedly connected with wire net in the fixed frame, it is equipped with foam concrete layer to fill between frame and a plurality of wire net, two T shape fixture blocks of symmetrical fixedly connected with around the left end outer wall of frame, the T shape draw-in groove that matches the joint with T shape fixture block is seted up to the right side outer wall of frame, the seal plate at both ends about the frame of the equal fixedly connected with crimping in upper and lower both ends of frame, a plurality of location screws and through positioning bolt fixed connection have been seted up to seal plate's surface and the equal symmetry in both ends about the frame.
Preferably, the left side of fixed frame is carried on the back the equal fixedly connected with wedge in both sides, the relative one side inside wall is seted up a plurality of dovetails that match the joint with the wedge about the frame.
Preferably, the outer wall of the sealing pressure plate is provided with an embedding groove for embedding and placing the positioning bolt.
Preferably, one side of the sealing pressure plate, which is close to the outer frame, is uniformly and fixedly connected with a plurality of positioning columns, and the upper end and the lower end of the fixing frame are respectively provided with a positioning groove correspondingly spliced with the positioning columns.
Preferably, one side fixedly connected with round annular seal piece that the sealed clamp plate is close to the frame, the annular seal groove of pegging graft with annular seal piece matching is all seted up at the upper and lower both ends of frame.
Compared with the prior art, the utility model provides a steel construction assembled wallboard possesses following beneficial effect:
1. this steel construction assembled wallboard through a plurality of fixed frames and the wire net that is equipped with, utilizes the matching joint effect of wedge and dovetail to make fixed frame can quick joint inboard at the frame, realizes the assurance to whole wallboard structural strength, pours foam concrete layer into in the space between frame and fixed frame and the wire net again, accomplishes pouring fast of wallboard.
2. This steel construction assembled wallboard through the T shape fixture block and the T shape draw-in groove that are equipped with, can make two adjacent wallboards quick accurate relative joint together, does not need the workman to fix a position always and supports, has improved assembly efficiency greatly.
3. This steel construction assembled wallboard through the seal clamp plate that is equipped with, utilizes the cooperation of the sealed piece of annular and ring seal groove to make the quick crimping of seal clamp plate at the upper and lower both ends of frame, and the reference column inserts can realize in the constant head tank that the firm of fixed frame this moment for placing of wire net is more firm, the rapid Assembly production of the wallboard of being convenient for.
And the part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses make the structural strength of wallboard obtain effectual increase, and the assembly installation between two wallboards of being convenient for has improved assembly efficiency greatly.
Drawings
Fig. 1 is a schematic structural view of a steel-structure assembled wallboard according to the present invention;
fig. 2 is the utility model provides a steel construction assembled wallboard's overlook sectional structure sketch map.
In the figure: 1 outer frame, 2 fixed frames, 3 steel wire meshes, 4 foam concrete layers, 5T-shaped fixture blocks, 6T-shaped clamping grooves, 7 sealing press plates, 8 positioning bolts, 9 wedge-shaped blocks, 10 dovetail grooves, 11 positioning columns, 12 positioning grooves, 13 annular sealing blocks and 14 annular sealing grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a steel construction assembled wallboard, including frame 1, the fixed joint of equidistance has a plurality of fixed frames 2 around the relative one side inner wall about frame 1, fixedly connected with wire net 3 in the fixed frame 2, filled foam concrete layer 4 between frame 1 and a plurality of wire net 3, two T shape fixture blocks 5 of symmetry fixedly connected with around the left end outer wall of frame 1, T shape draw-in groove 6 that matches the joint with T shape fixture block 5 is seted up to the right side outer wall of frame 1, the equal fixedly connected with crimping in both ends about frame 1 is at the seal clamp plate 7 of frame 1 both ends about, a plurality of location screws and through 8 fixed connection of positioning bolt have all been seted up symmetrically to seal clamp plate 7's surface and frame 1 both ends about.
The left side and the right side of the fixed frame 2 are back to the back and are fixedly connected with wedge blocks 9, and a plurality of dovetail grooves 10 matched and clamped with the wedge blocks 9 are formed in the inner side wall of the left side and the right side of the outer frame 1.
The outer wall of the sealing pressure plate 7 is provided with an embedding groove for embedding and placing the positioning bolt 8.
The sealing pressure plate 7 is close to the even fixedly connected with many reference columns 11 of one side of frame 1, and the constant head tank 12 that corresponds the grafting with reference column 11 is all seted up at the upper and lower both ends of fixed frame 2.
One side fixedly connected with round annular seal piece 13 that sealed clamp plate 7 is close to frame 1, and the upper and lower both ends of frame 1 all set up the annular seal groove 14 of pegging graft with annular seal piece 13 matching.
In the utility model, when in use, the fixing frames 2 can be quickly clamped inside the outer frame 1 by the matching clamping action of the wedge blocks 9 and the dovetail grooves 10 through the plurality of fixing frames 2 and the steel wire meshes 3, so as to ensure the structural strength of the whole wall panel, then the foam concrete layer 4 is poured into the gap between the outer frame 1 and the fixing frames 2 and the steel wire meshes 3, so as to complete the quick pouring of the wall panel, the adjacent two wall panels can be quickly and accurately connected together by the T-shaped clamping blocks 5 and the T-shaped clamping grooves 6, the worker is not required to always position and support, the assembly efficiency is greatly improved, the sealing pressure plates 7 are quickly pressed at the upper and lower ends of the outer frame 1 by the matching of the annular sealing blocks 13 and the annular sealing grooves 14 through the arranged sealing pressure plates 7, and the positioning columns 11 are inserted into the positioning grooves 12 to realize the stable and spacing of the fixing, so that the steel wire mesh 3 is more stably placed, and the wallboard is convenient to rapidly assemble and produce.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A steel structure assembled wallboard comprises an outer frame (1) and is characterized in that a plurality of fixing frames (2) are fixedly clamped on the inner wall of the left side and the right side of the outer frame (1) at equal intervals in the front and back direction, a steel wire mesh (3) is fixedly connected in the fixed frame (2), a foam concrete layer (4) is filled between the outer frame (1) and the steel wire meshes (3), two T-shaped clamping blocks (5) are symmetrically and fixedly connected with the outer wall of the left end of the outer frame (1) in a front-back manner, the outer wall of the right side of the outer frame (1) is provided with a T-shaped clamping groove (6) which is matched and clamped with the T-shaped clamping block (5), the upper end and the lower end of the outer frame (1) are fixedly connected with sealing pressure plates (7) which are pressed on the upper end and the lower end of the outer frame (1), a plurality of positioning screw holes are symmetrically formed in the surface of the sealing pressing plate (7) and the upper end and the lower end of the outer frame (1) and are fixedly connected through positioning bolts (8).
2. The steel structure assembled wallboard according to claim 1, characterized in that the left and right opposite sides of the fixing frame (2) are fixedly connected with wedge blocks (9), and the inner side wall of the left and right opposite sides of the outer frame (1) is provided with a plurality of dovetail grooves (10) matched and clamped with the wedge blocks (9).
3. The steel structure assembled wallboard of claim 1, wherein the outer wall of the sealing pressure plate (7) is provided with an embedding groove for embedding and placing the positioning bolt (8).
4. The assembled wallboard of steel structure according to claim 1, wherein a plurality of positioning columns (11) are uniformly and fixedly connected to one side of the sealing pressure plate (7) close to the outer frame (1), and positioning grooves (12) correspondingly inserted with the positioning columns (11) are respectively formed at the upper end and the lower end of the fixing frame (2).
5. The steel structure assembled wallboard of claim 1, wherein one side of the sealing pressure plate (7) close to the outer frame (1) is fixedly connected with a ring of annular sealing blocks (13), and the upper end and the lower end of the outer frame (1) are both provided with annular sealing grooves (14) which are matched and spliced with the annular sealing blocks (13).
CN202020781410.5U 2020-05-13 2020-05-13 Steel construction assembled wallboard Expired - Fee Related CN212427778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020781410.5U CN212427778U (en) 2020-05-13 2020-05-13 Steel construction assembled wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020781410.5U CN212427778U (en) 2020-05-13 2020-05-13 Steel construction assembled wallboard

Publications (1)

Publication Number Publication Date
CN212427778U true CN212427778U (en) 2021-01-29

Family

ID=74289933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020781410.5U Expired - Fee Related CN212427778U (en) 2020-05-13 2020-05-13 Steel construction assembled wallboard

Country Status (1)

Country Link
CN (1) CN212427778U (en)

Similar Documents

Publication Publication Date Title
CN109869028B (en) Assembled reinforced concrete silo and manufacturing method thereof
CN111321803B (en) Modular assembly type building
CN211499913U (en) Low-energy-consumption prefabricated house
CN210827999U (en) Water leakage and cracking preventing floor connecting structure for assembly type building
CN209854880U (en) Prefabricated assembled escape canal
CN212427778U (en) Steel construction assembled wallboard
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN209874048U (en) Vertical connection structure of prestressed reinforced concrete prefabricated column
CN105804262A (en) Energy consumption support and assembly type concrete framework dual energy consumption node and assembly method
CN113931340B (en) Assembled semi-embedded external wall panel and building
CN215670297U (en) Brick wall for building
CN212670921U (en) Assembly type building structure
CN214329259U (en) Assembled beam column node structure
CN212104513U (en) Outer wall covers connects shaped steel structure prefabricated building
CN111980300B (en) Assembled building stand module
CN210421510U (en) Aluminum house wall body convenient to install
CN210238850U (en) Hollow prefabricated wallboard convenient to installation
CN210151995U (en) Assembled shear force wall flexible connection device
CN218028983U (en) High-strength building template capable of preventing slurry leakage
CN219690793U (en) Shear wall structure
CN111472471A (en) Multifunctional composite wall
CN110725441A (en) Steel concrete casting structure of large wood-wool cement wallboard and building frame structure of fabricated building
CN214615027U (en) Concrete composite beam with embedded steel plate
CN217870929U (en) Assembled prefabricated component
CN211492073U (en) Platform membrane for manufacturing concrete prefabricated slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210129