CN212422358U - Perforated PE pipe permeation tube - Google Patents

Perforated PE pipe permeation tube Download PDF

Info

Publication number
CN212422358U
CN212422358U CN202020969347.8U CN202020969347U CN212422358U CN 212422358 U CN212422358 U CN 212422358U CN 202020969347 U CN202020969347 U CN 202020969347U CN 212422358 U CN212422358 U CN 212422358U
Authority
CN
China
Prior art keywords
pipe
standard
tube
holes
inner tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020969347.8U
Other languages
Chinese (zh)
Inventor
臧小昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongtao Pipe Technology Co ltd
Original Assignee
Jiangsu Zhongtao Pipe Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtao Pipe Technology Co ltd filed Critical Jiangsu Zhongtao Pipe Technology Co ltd
Priority to CN202020969347.8U priority Critical patent/CN212422358U/en
Application granted granted Critical
Publication of CN212422358U publication Critical patent/CN212422358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a fenestrate PE pipe permeation tube, including inner tube and standard pipe, the surface of inner tube runs through there is first through-hole, and is provided with first trompil in the body wall of inner tube, the standard pipe sets up in the inner tube outside, and the standard pipe surface runs through there is the second through-hole, the outside of standard pipe is provided with the outer tube, and the surface of outer tube runs through there is the third through-hole, be provided with the second trompil in the outer tube body wall, and be provided with the second strengthening rib in the second trompil. This fenestrate PE pipe permeation tube, three-layer pipeline reinforcing apparatus's intensity is provided with first strengthening rib and second strengthening rib in inner tube and the outer tube respectively simultaneously, further reinforcing intensity, hole density on the three-layer pipeline sets up to the difference in addition, and inner tube and outer tube all can rotate the regulation to can be according to user demand adjusting device's infiltration water yield, through the position judgement of standard line and arrow mark, be convenient for confirm the angle regulation of rotating inner tube or outer tube.

Description

Perforated PE pipe permeation tube
Technical Field
The utility model relates to a PE manages permeability tube technical field specifically is a fenestrate PE manages permeability tube.
Background
The infiltration pipe has extensive application in the aspect of earth's surface irrigation, rainwater blowdown, simultaneously in agricultural watering, adopts PE pipe infiltration pipe to water usually, but present most PE pipe infiltration pipe intensity is not high, and simple structure, can not adjust the infiltration pipe, can't adjust the infiltration water yield according to the user demand, consequently need innovate on the basis of original fenestrate PE pipe infiltration pipe and improve.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fenestrate PE pipe infiltration pipe to solve the present most PE pipe infiltration pipe intensity that proposes in the above-mentioned background art not high, and simple structure, can not adjust the infiltration pipe, can't adjust the problem of infiltration water yield according to the user demand.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fenestrate PE pipe permeation tube, includes inner tube and standard pipe, the surface of inner tube runs through there is first through-hole, and is provided with first trompil in the body wall of inner tube, is provided with first strengthening rib in the first trompil simultaneously, the setting of standard pipe is in the inner tube outside, and the surface of standard pipe runs through there is the second through-hole, the outside of standard pipe is provided with the outer tube, and the surface of outer tube runs through there is the third through-hole, be provided with the second trompil in the outer tube body wall, and be provided with the second strengthening rib in the second trompil.
Preferably, the inner pipe, the standard pipe and the outer pipe are all PE pipes.
Preferably, eighteen rows of second through holes are distributed on the standard tube in an annular array, six groups of first through holes are distributed on the inner tube in an annular array, each group of first through holes is formed by five rows of first through holes, six groups of third through holes are distributed on the outer tube in an annular array, and each group of third through holes is formed by three rows of third through holes.
Preferably, the upper end and the lower end of the inner side wall and the outer side wall of the standard pipe are both provided with sliding grooves, the standard pipe is rotatably connected with the inner pipe through the inner side sliding grooves, and meanwhile, the standard pipe is rotatably connected with the outer pipe through the outer side sliding grooves.
Preferably, the upper end and the lower end of the standard pipe are both provided with a lug, and the end face of the standard pipe is provided with a standard line.
Preferably, the end faces of the inner pipe and the outer pipe are provided with arrow marks.
Preferably, the length of the first reinforcing rib is smaller than that of the first opening, and the length of the second reinforcing rib is smaller than that of the second opening.
Compared with the prior art, the beneficial effects of the utility model are that: the perforated PE pipe permeate tube,
(1) the device is provided with an inner pipe, a standard pipe and an outer pipe, the three layers of pipelines enhance the strength of the device, meanwhile, the inner pipe and the outer pipe are respectively provided with a first reinforcing rib and a second reinforcing rib, the strength is further enhanced, the hole densities of the other three layers of pipelines are set to be different, and the inner pipe and the outer pipe can be rotatably adjusted, so that the permeation water quantity of the device can be adjusted according to the use requirement;
(2) the inner pipe or the outer pipe is convenient to rotate, the adjusting angle of the inner pipe or the outer pipe can be conveniently determined through the position judgment of the standard line and the arrow mark, and the use and the operation are more convenient.
Drawings
Fig. 1 is a schematic top view of the cross-sectional structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic top view of the inner tube and the outer tube of FIG. 1 after rotation;
FIG. 4 is a schematic view of the cross-sectional structure of the outer tube of the present invention;
FIG. 5 is a schematic view of a front view structure of a standard pipe of the present invention;
fig. 6 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. the inner pipe, 2, a first through hole, 3, a first opening, 4, a first reinforcing rib, 5, a standard pipe, 6, a second through hole, 7, a bump, 8, a sliding groove, 9, an outer pipe, 10, a third through hole, 11, a second opening, 12, a second reinforcing rib, 13, a standard line, 14 and an arrow mark.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a fenestrate PE pipe infiltration pipe, according to fig. 1, fig. 2, fig. 5 and fig. 6 show, the surface of inner tube 1 runs through there is first through-hole 2, and be provided with first trompil 3 in the body wall of inner tube 1, be provided with first strengthening rib 4 in the first trompil 3 simultaneously, reinforcing inner tube 1 intensity, standard pipe 5 sets up in the inner tube 1 outside, and 5 surfaces of standard pipe run through there is second through-hole 6, the upper and lower both ends of standard pipe 5 all are provided with lug 7, be convenient for carry out the connection between the pipeline through lug 7, and be provided with standard line 13 on the terminal surface of standard pipe 5, be convenient for use this point to confirm subsequent turned angle as the basic point.
According to the drawings of fig. 1, 2, 3, 4 and 6, an outer pipe 9 is arranged on the outer side of a standard pipe 5, a third through hole 10 penetrates through the surface of the outer pipe 9, arrow marks 14 are arranged on the end surfaces of the inner pipe 1 and the outer pipe 9, when the two arrow marks 14 and a standard line 13 are in a line, eighteen rows of second through holes 6 on the standard pipe 5 can be permeated with water, the permeable area of the device is the largest, when the arrow mark 14 on the inner pipe 1 is 10 degrees to the left side or 10 degrees to the right side of the standard line 13, twelve rows of second through holes 6 on the standard pipe 5 can be permeated with water, when the arrow mark 14 on the outer pipe 9 is 10 degrees to the right side of the standard line 13, six rows of second through holes 6 on the standard pipe 5 can be permeated with water, sliding grooves 8 are arranged at the upper end and the lower end of the inner side and the outer side wall of the standard pipe 5, and the standard pipe 5 is, meanwhile, the standard pipe 5 is rotatably connected with the outer pipe 9 through a sliding groove 8 on the outer side, the inner pipe 1 and the outer pipe 9 can be rotated, so that the water seepage amount is adjusted, a second opening 11 is formed in the body wall of the outer pipe 9, a second reinforcing rib 12 is arranged in the second opening 11, the strength of the outer pipe 9 is enhanced, the length of the first reinforcing rib 4 is smaller than that of the first opening 3, the length of the second reinforcing rib 12 is smaller than that of the second opening 11, the first opening 3 or the second opening 11 is conveniently clamped by a tool to rotate the inner pipe 1 and the outer pipe 9, the inner pipe 1, the standard pipe 5 and the outer pipe 9 are all PE pipes, eighteen rows of second through holes 6 are distributed on the standard pipe 5 in an annular array manner, six groups of first through holes 2 are distributed on the inner pipe 1 in an annular array manner, each group of first through holes 2 is composed of five rows of first through holes 2, and six groups of third through holes 10 are distributed, and each group of third through holes 10 is composed of three columns of third through holes 10.
The working principle is as follows: when the standard line 13 and the two arrow marks 14 are positioned on the same line, the second through hole 6 of the standard pipe 5 is completely unobstructed, and the amount of water permeated by the device is the largest, when the inner tube 1 is turned 10 degrees leftwards or rightwards by clamping the tool in the first opening 3, part of the second through holes 6 on the standard tube 5 are shielded by the inner tube 1, only twelve rows of the second through holes 6 are permeated with water, and the arrow mark 14 on the inner tube 1 is positioned at the left side 10 degrees or the right side 10 degrees of the standard line 13, when the outer tube 9 is turned to the right 10 degrees by the tool being clamped in the second opening 11, part of the second through holes 6 on the standard tube 5 are shielded by the outer tube 9, only six rows of the second through holes 6 are permeated with water, and at this time, the arrow mark 14 on the outer tube 9 is located 10 degrees to the right of the standard line 13, wherein the first reinforcing ribs 4 and the second reinforcing ribs 12 both function as reinforcements, and the details not described in detail in this specification are well known to those skilled in the art.
The terms "central," "longitudinal," "lateral," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientation or positional relationship indicated in the drawings for ease of description, but are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the scope of the invention.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. A perforated PE pipe permeate tube comprising an inner tube (1) and a standard pipe (5), characterized in that: the surface of inner tube (1) is run through and is had first through-hole (2), and is provided with first trompil (3) in the body wall of inner tube (1), is provided with first strengthening rib (4) in first trompil (3) simultaneously, standard pipe (5) set up in inner tube (1) outside, and standard pipe (5) surface runs through and has second through-hole (6), the outside of standard pipe (5) is provided with outer tube (9), and the surface of outer tube (9) runs through and has third through-hole (10), be provided with second trompil (11) in outer tube (9) body wall, and be provided with second strengthening rib (12) in second trompil (11).
2. A perforated PE pipe permeate pipe according to claim 1 wherein: the inner pipe (1), the standard pipe (5) and the outer pipe (9) are all PE pipes.
3. A perforated PE pipe permeate pipe according to claim 1 wherein: eighteen rows of second through holes (6) are distributed on the standard pipe (5) in an annular array manner, six groups of first through holes (2) are distributed on the inner pipe (1) in an annular array manner, each group of first through holes (2) is formed by five rows of first through holes (2), six groups of third through holes (10) are distributed on the outer pipe (9) in an annular array manner, and each group of third through holes (10) is formed by three rows of third through holes (10).
4. A perforated PE pipe permeate pipe according to claim 1 wherein: the upper end and the lower end of the inner side wall and the outer side wall of the standard pipe (5) are both provided with sliding grooves (8), the standard pipe (5) is rotatably connected with the inner pipe (1) through the inner side sliding grooves (8), and meanwhile the standard pipe (5) is rotatably connected with the outer pipe (9) through the outer side sliding grooves (8).
5. A perforated PE pipe permeate pipe according to claim 1 wherein: the upper end and the lower end of the standard pipe (5) are both provided with a convex block (7), and the end surface of the standard pipe (5) is provided with a standard line (13).
6. A perforated PE pipe permeate pipe according to claim 1 wherein: the end faces of the inner pipe (1) and the outer pipe (9) are provided with arrow marks (14).
7. A perforated PE pipe permeate pipe according to claim 1 wherein: the length of the first reinforcing rib (4) is smaller than that of the first opening (3), and the length of the second reinforcing rib (12) is smaller than that of the second opening (11).
CN202020969347.8U 2020-06-01 2020-06-01 Perforated PE pipe permeation tube Active CN212422358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020969347.8U CN212422358U (en) 2020-06-01 2020-06-01 Perforated PE pipe permeation tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020969347.8U CN212422358U (en) 2020-06-01 2020-06-01 Perforated PE pipe permeation tube

Publications (1)

Publication Number Publication Date
CN212422358U true CN212422358U (en) 2021-01-29

Family

ID=74270873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020969347.8U Active CN212422358U (en) 2020-06-01 2020-06-01 Perforated PE pipe permeation tube

Country Status (1)

Country Link
CN (1) CN212422358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116762670A (en) * 2021-11-03 2023-09-19 彭诗佳 Gardens intelligence irrigation equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116762670A (en) * 2021-11-03 2023-09-19 彭诗佳 Gardens intelligence irrigation equipment

Similar Documents

Publication Publication Date Title
CN212422358U (en) Perforated PE pipe permeation tube
CN207543908U (en) A kind of Landscape water-saving irrigation device
CN104452650B (en) A kind of lake water shunting irrigation system
CN212103525U (en) Brick that permeates water that can high-efficient drainage
CN205389800U (en) Saline and alkaline land slope planting is with little intercalated duct
CN206355365U (en) A kind of anti-hematocele surgical drainage device of neurosurgery
CN205071813U (en) Synchronous two water supply installation that irrigates
CN207235690U (en) Agricultural automatic irrigation device
CN211621881U (en) Municipal works drainage open channel construction fixing device
CN214257477U (en) Farmland irrigation device
CN205756135U (en) A kind of trees irrigation rig
CN216018323U (en) Flowerpot irrigation equipment
CN211793434U (en) Agricultural irrigation is with dripping pipe convenient to butt joint
CN207569390U (en) A kind of anti-corrosion reinforced concrete sewer pipe
CN209053394U (en) A kind of waterproof material round brush
CN207443640U (en) Roof greening planting grassplot structure
CN210316551U (en) Reinforced concrete location centre gripping template
CN206181976U (en) Efficient irrigation equipment
CN207646722U (en) A kind of ultra-soft soil solidification equipment
CN206562702U (en) A kind of new brick structure of civil engineering
CN217298796U (en) Ecological supporting construction of hydraulic engineering
CN218176054U (en) Assembled PVC water drain pipe beneficial to rotation angle
CN206015541U (en) A kind of pervious concrete plumbing installation
CN205431392U (en) No soil matrix matter is with box of growing seedlings
CN204097969U (en) For the building block of canal for water conveyance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant