Portable floor thickness controller
Technical Field
The utility model relates to a portable floor thickness controller belongs to civil engineering technical field.
Background
With the rapid development of the construction industry, the construction quality standard is higher and higher, the relative requirements on quality control equipment are higher and higher, and a floor thickness controller belongs to one of the requirements. In the building industry, the thickness of the floor slab is always a very important quality point, and therefore, various instruments and equipment for controlling the thickness of the floor slab are born; most of these floor thickness controllers suffer from several disadvantages: 1. after being used, the waste water cannot be recycled, so that the cost is increased; 2. the limitation of the use field, the thickness controller used on the wood mold can not be used on the aluminum mold; 3. the operation is complicated and the accuracy is poor. Therefore, the design of new floor thickness controllers has not been stopped.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a portable floor thickness controller of easy operation, can have enough to meet the need the use to guarantee that the floor pours the thickness of accomplishing back floor and reaches the design standard.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a portable floor thickness controller, includes left pole setting and right pole setting, the structure of left side pole setting and right pole setting is the same, comprises scale bar and threaded rod, and sliding connection has first slider on the scale bar of left pole setting, and threaded connection has first locking screw on the lateral wall of first slider, has seted up the trompil on first slider, and sliding connection has the second slider on the scale bar of right pole setting, and threaded connection has second locking screw on the lateral wall of second slider, has placed wire rope in the one end fixedly connected with of second slider, has accomodate wire rope in the unwrapping wire box, and fixedly connected with couple is served in wire rope's the extension, the couple hang and establish in last trompil.
Furthermore, an upper limiting disc and a lower limiting disc are respectively fixed at two ends of the scale rod.
Furthermore, the centers of the first sliding block, the second sliding block and the pull hole are on the same straight line with the steel wire rope.
Since the technical scheme is used, the utility model discloses an advantage has below: the utility model discloses can control the floor thickness when the floor concretes for the floor is pour and is accomplished back floor thickness and reach the design standard, has easy operation moreover, can have enough to meet the need the use, advantage that the universality is stronger.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the present invention.
Description of reference numerals: 1-left upright stanchion; 2-right upright stanchion; 3-a first slide block; 4-a second slide block; 5-releasing the wire box; 6-steel wire rope; 7-hooking; 8-broaching; 9-a graduated rod; 10-a first locking screw; 11-a second locking screw; 12-an upper limiting disk; 13-a lower limiting disk; 14-threaded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1, a portable floor thickness controller comprises a left upright rod 1 and a right upright rod 2, wherein the left upright rod 1 and the right upright rod 2 have the same structure and are composed of a scale rod 9 and a threaded rod 14, the scale rod 9 of the left upright rod 1 is connected with a first slider 3 in a sliding manner, the side wall of the first slider 3 is connected with a first locking screw 10 in a threaded manner, the first slider 3 is provided with a pull hole 8, the scale rod 9 of the right upright rod 2 is connected with a second slider 4 in a sliding manner, the side wall of the second slider 4 is connected with a second locking screw 11 in a threaded manner, one end of the second slider 4 is fixedly connected with a pay-off box 5, a steel wire rope 6 is accommodated in the pay-off box 5, the extending end of the steel wire rope 6 is fixedly connected with a hook 7, and the hook 7 is hung in the pull hole 8. An upper limiting disc 12 and a lower limiting disc 13 are respectively fixed at two ends of the scale rod 9 to prevent the first sliding block 3 or the second sliding block 4 from slipping. The centers of the first sliding block 3, the second sliding block 4 and the pull hole 8 are on the same straight line with the steel wire rope 6.
Referring to fig. 2, when the floor slab is subjected to formwork construction, a plurality of platforms are erected on two sides of the floor slab according to the distance of 10cm, a hole capable of allowing the threaded rod 14 to penetrate out is reserved in each platform, the elevation of each platform is consistent with the elevation of the bottom surface of the floor slab, when the construction of the formwork, steel bars and other projects is completed, and concrete is to be poured, the right vertical rod 2 is placed on the platform at one end of the slab surface, the threaded rod 14 of the right vertical rod 2 penetrates out of the hole in the platform, then the threaded rod 14 is screwed in by nuts from downward placement, so that the right vertical rod 2 is fixed on the platform, and then the left vertical rod 1 is fixed on the platform at the. At the moment, the steel wire rope 6 is pulled out from the middle paying-off box 5, the hook 7 at the end part of the steel wire rope 6 is hung in the pull hole 8 of the first sliding block 3, then the heights of the first sliding block 3 and the second sliding block 4 are adjusted, the first sliding block 3 and the second sliding block 4 are located on the same scale mark on the scale rod 9, the steel wire rope 6 is consistent with the height of the top of the plate, and therefore the elevation of the plate surface can be controlled by the steel wire rope 6.