CN212406079U - Installation device for embedded part of embedded intelligent integral jacking platform supporting system - Google Patents

Installation device for embedded part of embedded intelligent integral jacking platform supporting system Download PDF

Info

Publication number
CN212406079U
CN212406079U CN202020822216.7U CN202020822216U CN212406079U CN 212406079 U CN212406079 U CN 212406079U CN 202020822216 U CN202020822216 U CN 202020822216U CN 212406079 U CN212406079 U CN 212406079U
Authority
CN
China
Prior art keywords
embedded
buried
jacking platform
horizontal
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020822216.7U
Other languages
Chinese (zh)
Inventor
王敉鹏
李应心
阴光华
张业
耿永力
秦家顺
刘王奇
冯泽权
晁自如
康维
孟磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202020822216.7U priority Critical patent/CN212406079U/en
Application granted granted Critical
Publication of CN212406079U publication Critical patent/CN212406079U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to an installation device of a pre-embedded intelligent integral jacking platform support system pre-embedded part, which comprises a pre-embedded sleeve, wherein the surface of the pre-embedded sleeve is provided with a horizontal connecting rib, the surface of the horizontal connecting rib is provided with a connecting plate, and the surface of the connecting plate is provided with a vertical supporting rib; the beneficial effects are that: the utility model provides a pre-buried mounted position of braced system built-in fitting is confirmed through the unwrapping wire earlier during installation of the whole jacking platform braced system built-in fitting of pre-buried intelligence, then weld the built-in fitting on pre-buried installation device according to the technological requirement, later weld pre-buried installation device's fixed setting element on the vertical reinforcing bar of wall body is online, the horizontal reinforcing bar of last ligature wall body carries out the compound die, realize the accurate of the pre-buried installation location of braced system built-in fitting and the simplification of construction, with the needs that satisfy site operation repeatability and generalizability.

Description

Installation device for embedded part of embedded intelligent integral jacking platform supporting system
Technical Field
The utility model relates to a construction technical field specifically is an installation device of whole jacking platform braced system built-in fitting of pre-buried intelligence.
Background
At present, in the construction of a super high-rise structure, a supporting system of a low-level jacking construction technology adopts a supporting box girder as a stress device, the installation of the supporting box girder needs to be performed with a hole in advance on a wall structure, the size of the hole in the wall structure is large due to the large cross-sectional size of the supporting box girder, the arrangement of longitudinal and horizontal reinforcing steel bars of the wall body in a large range is influenced, the stress concentration phenomenon is caused around a hole, the structural stress and the waterproof weak point are formed, the structural influence is large, the later repair of the large wall structure penetrating through the hole in the construction of the super high-rise structure is very difficult, the construction difficulty is large, the repair cost is high, and the local appearance quality of the structure is poor; therefore, the utility model provides an installation device of whole jacking platform braced system built-in fitting of pre-buried intelligence is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation device of whole jacking platform braced system built-in fitting of pre-buried intelligence to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an installation device of whole jacking platform braced system built-in fitting of pre-buried intelligence, includes pre-buried sleeve pipe, pre-buried sleeve pipe's surface is provided with the horizontally connect muscle, the surface of horizontally connect muscle is provided with the connecting plate, the surface of connecting plate is provided with the vertical braces muscle, the surface of vertical braces muscle is provided with fixed setting element, the surface of fixed setting element is provided with horizontal connector, horizontal connector's surface is provided with pre-buried steel box.
Preferably, the embedded sleeves are arranged in two groups, the two groups of embedded sleeves are symmetrically distributed about the height center of the vertical support rib, the number of the upper group of embedded sleeves is three, the number of the lower group of embedded sleeves is two, and the distance between two adjacent embedded sleeves of the upper group of three embedded sleeves is one half of the distance between two embedded sleeves of the lower group of three embedded sleeves
Preferably, the horizontal connection muscle is provided with two, and two horizontal connection muscle are provided with three about embedded sleeve's long limit central symmetry distribution, and three connecting plate is connected simultaneously on the surface of two horizontal connection muscle.
Preferably, the vertical support ribs are provided with two groups, the two groups of vertical support ribs are symmetrically distributed about the center of the long edge of the connecting plate, the fixed positioning piece is perpendicular to the vertical support ribs, and the fixed positioning piece is perpendicular to the horizontal connecting piece.
Preferably, the embedded steel boxes are of a right trapezoid frame structure, the embedded steel boxes are provided with two groups, the two groups of embedded steel boxes are distributed in an up-down arrangement mode, each group of embedded steel boxes is provided with two, and the two embedded steel boxes are distributed at two ends of the horizontal connecting piece respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model provides an during the installation device construction of pre-buried intelligent whole jacking platform braced system built-in fitting, confirm the pre-buried mounted position of braced system built-in fitting through the unwrapping wire earlier, then weld the built-in fitting on pre-buried mounted device according to the technological requirement, later weld the fixed setting element of pre-buried mounted device on wall body longitudinal reinforcement net, the horizontal reinforcing bar of ligature wall body carries out the compound die at last, realize the accurate and the simplification of construction of pre-buried mounted position of braced system built-in fitting to satisfy the needs of site operation repeatability and generalizability;
2. the utility model provides a bury whole jacking platform braced system built-in fitting of intelligence installation device compares in the prior art that the entrance to a cave installation support girder steel was reserved at the wall body to traditional low-order jacking, and the method that the invention adopted the pre-buried built-in fitting of installation device welding can reduce the influence of arranging concrete structure and wall body reinforcing bar, reduces the later stage entrance to a cave and restores the degree of difficulty, practices thrift the cost, is favorable to more extensive popularization and application.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is the structural schematic diagram of the embedded steel box of the utility model.
In the figure: the embedded steel box comprises an embedded sleeve 1, a horizontal connecting rib 2, a connecting plate 3, a vertical supporting rib 4, a fixed positioning piece 5, a horizontal connecting piece 6 and an embedded steel box 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 2, the present invention provides a technical solution: the installation device comprises embedded sleeves 1, wherein two groups of the embedded sleeves 1 are arranged, the two groups of the embedded sleeves 1 are symmetrically distributed about the height center of a vertical support rib 4, three groups of the embedded sleeves 1 are arranged on an upper group, two groups of the embedded sleeves 1 are arranged on a lower group, and the distance between two adjacent embedded sleeves 1 on the upper group is half of the distance between two embedded sleeves 1 on the lower group; the surface of the embedded sleeve 1 is welded with horizontal connecting ribs 2, the surface of each horizontal connecting rib 2 is welded with a connecting plate 3, the number of the horizontal connecting ribs 2 is two, the two horizontal connecting ribs 2 are symmetrically distributed about the center of the long side of the embedded sleeve 1, the number of the connecting plates 3 is three, and the three connecting plates 3 are simultaneously connected to the surfaces of the two horizontal connecting ribs 2;
the surface of the connecting plate 3 is welded with vertical supporting ribs 4, the surface of each vertical supporting rib 4 is welded with a fixed positioning piece 5, the surface of each fixed positioning piece 5 is welded with a horizontal connecting piece 6, the vertical supporting ribs 4 are provided with two groups, the two groups of vertical supporting ribs 4 are symmetrically distributed about the center of the long edge of the connecting plate 3, the fixed positioning pieces 5 are perpendicular to the vertical supporting ribs 4, and the fixed positioning pieces 5 are perpendicular to the horizontal connecting pieces 6;
the surface welding of horizontal connecting piece 6 has pre-buried steel box 7, and pre-buried steel box 7 is right trapezoid frame structure, and pre-buried steel box 7 is provided with two sets ofly, and two sets of pre-buried steel box 7 are the upper and lower row and arrange the distribution, and every pre-buried steel box 7 of group is provided with two, and two pre-buried steel box 7 distribute respectively at the both ends of horizontal connecting piece 6.
The working principle is as follows: during actual construction, a total station is used for releasing control points of elevation and horizontal position of the embedded part, the embedded part and the installation device are temporarily fixed at a position to be embedded, the fixed positioning piece 5 is welded with a longitudinal rib of a wall body, rechecking inspection is carried out on the position of the embedded part, the wall body is assembled, concrete is poured, a template is removed, and a finished product is protected; the embedded steel box 7 is made of Q345 steel, the cross section of the embedded steel box is in a right trapezoid shape, the inclined edge of the trapezoid is arranged on the upper portion when the embedded steel box is placed, the right-angle edge of the trapezoid is arranged on the lower portion, and the opening faces the outer side of the wall body.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides an installation device of whole jacking platform braced system built-in fitting of pre-buried intelligence, includes buried sleeve (1), its characterized in that: the surface of pre-buried sleeve pipe (1) is provided with horizontal connection muscle (2), the surface of horizontal connection muscle (2) is provided with connecting plate (3), the surface of connecting plate (3) is provided with vertical braces (4), the surface of vertical braces (4) is provided with fixed positioning part (5), the surface of fixed positioning part (5) is provided with horizontal connecting piece (6), the surface of horizontal connecting piece (6) is provided with pre-buried steel box (7).
2. The mounting device of the embedded part of the embedded intelligent integral jacking platform supporting system according to claim 1, characterized in that: the embedded sleeves (1) are arranged in two groups, the two groups of embedded sleeves (1) are symmetrically distributed about the height center of the vertical support rib (4), the number of the upper group of embedded sleeves (1) is three, the number of the lower group of embedded sleeves (1) is two, and the distance between two adjacent upper groups of three embedded sleeves (1) is half of the distance between the lower group of two embedded sleeves (1).
3. The mounting device of the embedded part of the embedded intelligent integral jacking platform supporting system according to claim 1, characterized in that: horizontal connection muscle (2) are provided with two, and two horizontal connection muscle (2) are provided with threely about the long limit central symmetry distribution of buried sleeve (1), connecting plate (3), and three connecting plate (3) are connected simultaneously on the surface of two horizontal connection muscle (2).
4. The mounting device of the embedded part of the embedded intelligent integral jacking platform supporting system according to claim 1, characterized in that: the vertical support ribs (4) are arranged in two groups, the two groups of vertical support ribs (4) are symmetrically distributed about the center of the long edge of the connecting plate (3), the fixed positioning piece (5) is perpendicular to the vertical support ribs (4), and the fixed positioning piece (5) is perpendicular to the horizontal connecting piece (6).
5. The mounting device of the embedded part of the embedded intelligent integral jacking platform supporting system according to claim 1, characterized in that: the embedded steel boxes (7) are of a right-angle trapezoid frame structure, two groups of embedded steel boxes (7) are arranged in an upper row and a lower row, two embedded steel boxes (7) are arranged in each group, and the two embedded steel boxes (7) are respectively distributed at two ends of the horizontal connecting piece (6).
CN202020822216.7U 2020-05-18 2020-05-18 Installation device for embedded part of embedded intelligent integral jacking platform supporting system Active CN212406079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020822216.7U CN212406079U (en) 2020-05-18 2020-05-18 Installation device for embedded part of embedded intelligent integral jacking platform supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020822216.7U CN212406079U (en) 2020-05-18 2020-05-18 Installation device for embedded part of embedded intelligent integral jacking platform supporting system

Publications (1)

Publication Number Publication Date
CN212406079U true CN212406079U (en) 2021-01-26

Family

ID=74376893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020822216.7U Active CN212406079U (en) 2020-05-18 2020-05-18 Installation device for embedded part of embedded intelligent integral jacking platform supporting system

Country Status (1)

Country Link
CN (1) CN212406079U (en)

Similar Documents

Publication Publication Date Title
CN212053673U (en) Tower construction operation platform of dome
CN210031910U (en) Movable formwork supporting system for underground comprehensive pipe gallery
CN214531887U (en) Template reinforcing system for arc-shaped wall
CN212406079U (en) Installation device for embedded part of embedded intelligent integral jacking platform supporting system
CN111608700A (en) Rack-free arch center for tunnel and installation method thereof
CN218061492U (en) Device for pouring concrete platform on steel structure frame
CN213573011U (en) Pipeline centralized reserved hole modular assembly
CN213976724U (en) Curtain cell cube track hoisting structure
CN215443391U (en) Transmission line and 5G communication sharing steel pipe pole
CN210440050U (en) Tunnel concrete lining structural steel bar
CN210238492U (en) Crown beam type miniature pile construction formwork capable of being circulated
CN113738102A (en) Template building block for civil engineering and manufacturing method and using method thereof
CN220452922U (en) Building main foundation support changing device containing complex underground pipeline
CN219528531U (en) Up-down channel of steel cofferdam
CN220450829U (en) Ground wall joint device for tunnel portal position by shield method
CN112110330B (en) Curtain wall unit body rail hoisting system and method
CN214459662U (en) A construction work platform for double column pier
CN217812628U (en) Civil engineering structure based on construction of thermal power plant capital construction
CN103938867A (en) Method and device for constructing combining position of floor and toilet or balcony
CN114278019B (en) Assembled roof frame and preparation process and construction method thereof
CN218373993U (en) Stride across basic abnormal shape template and support frame base pouring system greatly
CN214035014U (en) Communication tower base structure
CN109119929B (en) Pipe ditch high-voltage cable concrete support mounting and fixing structure and construction method thereof
CN219906683U (en) Integral forming hoisting structure for column steel mould and reinforcement cage
CN213709846U (en) Self-heat-insulation building with assembled steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant