CN212399511U - Tool containing box for electric power construction site - Google Patents
Tool containing box for electric power construction site Download PDFInfo
- Publication number
- CN212399511U CN212399511U CN201921868425.9U CN201921868425U CN212399511U CN 212399511 U CN212399511 U CN 212399511U CN 201921868425 U CN201921868425 U CN 201921868425U CN 212399511 U CN212399511 U CN 212399511U
- Authority
- CN
- China
- Prior art keywords
- slider
- placing
- wall
- box
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Casings For Electric Apparatus (AREA)
Abstract
The utility model discloses a box is acceptd to instrument for electric power construction scene, the power distribution box comprises a box body, be equipped with the fixed plate in the box, the lateral wall of fixed plate is equipped with the recess, the inner wall that the recess is relative all is equipped with the guide way, be equipped with the guide bar in the guide way, the both ends fixed connection of guide bar is on the inner wall of guide way, the slider has been cup jointed on the guide bar, slider and guide bar swing joint, the part cover that the guide bar is located between slider and the guide way inner wall is equipped with resilient means, the upper end of slider is equipped with places the board, the upper end middle part of placing the board is equipped with the universal meter standing groove, the upper end of placing the board is equipped with two detection pen standing. The utility model has the advantages of reasonable design, easy operation, precision instruments need not to take off, directly pulls out and can use, has reduced the risk that the instrument damaged at the in-process of taking.
Description
Technical Field
The utility model relates to a detect instrument technical field, especially relate to an electric power is instrument accepting box for job site.
Background
When detecting electrical equipment, many detection tools can be used, such as a sound level meter, a clamp ammeter, a clamp resistance tester, a universal meter, a tachometer, a steel ruler, a steel tape, a screwdriver, a nipper pliers, a dial indicator and the like.
However, the existing detection device is wholly placed in a box body, although the detection device is separated by a plurality of partition plates, collision among tools is still caused, tools are damaged, or hands are injured when the tools are taken, and meanwhile, a precision instrument is easy to damage in the taking process.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the on-spot instrument of using of electric power construction that proposes accepts the box, its easy operation, precision instruments need not to take off, directly pulls out and can use, has reduced the risk that the instrument damaged at the in-process of taking.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a tool containing box for an electric power construction site comprises a box body, wherein a fixed plate is arranged in the box body, a groove is formed in the side wall of the fixed plate, guide grooves are formed in the inner walls, opposite to the groove, of the groove, a guide rod is arranged in each guide groove, the two ends of each guide rod are fixedly connected to the inner walls of the guide grooves, a sliding block is sleeved on each guide rod and movably connected with each guide rod, an elastic device is sleeved on the part, located between the corresponding sliding block and the inner wall of each guide groove, of each guide rod, a placing plate is arranged at the upper end of each sliding block, a universal meter placing groove is arranged in the middle of the upper end of each placing plate, two detection pen placing grooves are arranged at the upper end of each placing plate, the two detection pen placing grooves are respectively located on the two sides of the universal meter placing grooves, a locking device is arranged at, the drying box is characterized in that the side wall of the placing plate is provided with a pull ring, a spongy cushion is arranged in the box body, a first strip-shaped groove which is vertically arranged is formed in the spongy cushion, a second strip-shaped groove which is horizontally arranged is formed in the spongy cushion, a T-shaped groove is formed in the spongy cushion and is located below the second strip-shaped groove, three circular placing grooves are formed in the spongy cushion at equal intervals, and a drying agent placing box is arranged at the inner bottom of the box body.
Preferably, the elastic device is a spring, one end of the elastic device is fixedly connected to the side wall of the sliding block, and the end of the elastic device, far away from the sliding block, is fixedly connected to the inner wall of the guide groove.
Preferably, be equipped with the circle chamber on the slider, the inner wall in circle chamber is equipped with the stopper, the lateral wall of guide bar is equipped with the bar spacing groove with stopper matched with.
Preferably, the side wall of the pull ring is provided with a rubber pad, and the surface of the rubber pad is provided with anti-skid grains.
Preferably, the inner bottom of the universal meter placing groove is provided with a heat radiating net.
During the use, then place straightedge, screwdriver, claw hammer, clearance gauge, flashlight respectively in first bar groove, second bar groove, T-shaped groove and circular standing groove, when using multimeter, the operator pulling pull ring will place the board and take out from the box, then fix it through locking device, then inspect with taking out the detection pen.
The utility model has the advantages of reasonable design, easy operation precision instruments need not to take off, directly pulls out and can use, has reduced the risk that the instrument damaged at the in-process of taking.
Drawings
Fig. 1 is a schematic structural view of a tool storage case for an electric power construction site according to the present invention;
fig. 2 is the utility model provides a structural schematic diagram of instrument containing box fixed plate for electric power construction site.
In the figure: the box is placed to 1 box, 2 pull rings, 3 multimeter standing grooves, 4 detection pen standing grooves, 5 place board, 6 fixed plates, 7 first bar groove, 8 foam-rubber cushion, 9 drier, 10 circular standing grooves, 11T-shaped groove, 12 second bar grooves, 13 guide bars, 14 locking devices, 15 resilient means, 16 sliders.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a tool storage box for an electric power construction site comprises a box body 1, a fixed plate 6 is arranged in the box body 1, a groove is arranged on the side wall of the fixed plate 6, guide grooves are arranged on the inner walls opposite to the groove, a guide rod 13 is arranged in the guide groove, two ends of the guide rod 13 are fixedly connected on the inner wall of the guide groove, a slider 16 is sleeved on the guide rod 13, the slider 16 is movably connected with the guide rod 13, an elastic device 15 is sleeved on the part, located between the slider 16 and the inner wall of the guide groove, of the guide rod 13, a placing plate 5 is arranged at the upper end of the slider 16, the placing plate 5 is drawn out of the box body 1, a universal meter placing groove 3 is arranged in the middle of the upper end of the placing plate 5, two detection pen placing grooves 4 are arranged at the upper end of the placing plate 5, the two detection pen placing grooves 4 are, then fix it through locking device 14, then be equipped with the lockhole with locking device 14 matched with on examining guide bar 13 with taking out the detection pen, the lateral wall of placing board 5 is equipped with pull ring 2, be equipped with foam-rubber cushion 8 in the box 1, be equipped with the first bar groove 7 of a vertical setting on the foam-rubber cushion 8, be equipped with the second bar groove 12 that a level set up on the foam-rubber cushion 8, be equipped with a T-slot 11 on the foam-rubber cushion 8, T-slot 11 is located the below of second bar groove 12, equidistant three circular standing groove 10 that is equipped with on the foam-rubber cushion 8, during the use, then the steel ruler, the screwdriver, the claw hammer, the clearance gauge, the flashlight is placed respectively in first bar groove 7, second bar groove 12, in T-slot 11 and the circular standing groove 10, the interior bottom of box 1 is equipped with the drier and places box 9.
When the multifunctional electric meter is used, the straight steel ruler, the screwdriver, the claw hammer, the feeler gauge and the flashlight are respectively placed in the first strip-shaped groove 7, the second strip-shaped groove 12, the T-shaped groove 11 and the circular placing groove 10, when the multifunctional electric meter is used, an operator pulls the pull ring 2 to draw the placing plate 5 out of the box body 1, then the placing plate is fixed through the locking device 14, and then the testing pen is taken out for checking.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a power construction is instrument for scene accepts box, includes box (1), its characterized in that, be equipped with fixed plate (6) in box (1), the lateral wall of fixed plate (6) is equipped with the recess, the inner wall that the recess is relative all is equipped with the guide way, be equipped with guide bar (13) in the guide way, the both ends fixed connection of guide bar (13) is on the inner wall of guide way, slider (16) has been cup jointed on guide bar (13), slider (16) and guide bar (13) swing joint, the part cover that guide bar (13) are located between slider (16) and the guide way inner wall is equipped with resilient means (15), the upper end of slider (16) is equipped with place board (5), the upper end middle part of placing board (5) is equipped with universal meter standing groove (3), the upper end of placing board (5) is equipped with two detection pen standing grooves (4), the two detection pen placing grooves (4) are respectively positioned at two sides of the universal meter placing groove (3), the upper end of the placing plate (5) is provided with a locking device (14), the guide rod (13) is provided with a lock hole matched with the locking device (14), the side wall of the placing plate (5) is provided with a pull ring (2), a spongy cushion (8) is arranged in the box body (1), the spongy cushion (8) is provided with a first strip-shaped groove (7) which is vertically arranged, a second strip-shaped groove (12) which is horizontally arranged is arranged on the spongy cushion (8), the spongy cushion (8) is provided with a T-shaped groove (11), the T-shaped groove (11) is positioned below the second strip-shaped groove (12), the sponge mat (8) is provided with three circular placing grooves (10) at equal intervals, and the inner bottom of the box body (1) is provided with a drying agent placing box (9).
2. The tool storage box for the electric power construction site as claimed in claim 1, wherein the elastic means (15) is a spring, one end of the elastic means (15) is fixedly connected to a side wall of the slider (16), and one end of the elastic means (15) away from the slider (16) is fixedly connected to an inner wall of the guide groove.
3. The tool storage box for the electric power construction site as claimed in claim 1, wherein a circular cavity is formed in the sliding block (16), a limiting block is arranged on the inner wall of the circular cavity, and a strip-shaped limiting groove matched with the limiting block is formed in the side wall of the guide rod (13).
4. The tool storage box for the electric power construction site as claimed in claim 1, wherein a rubber pad is arranged on the side wall of the pull ring (2), and anti-skid lines are arranged on the surface of the rubber pad.
5. The tool storage box for the electric power construction site as claimed in claim 1, wherein a heat dissipation net is arranged at the inner bottom of the multimeter placing groove (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921868425.9U CN212399511U (en) | 2019-11-01 | 2019-11-01 | Tool containing box for electric power construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921868425.9U CN212399511U (en) | 2019-11-01 | 2019-11-01 | Tool containing box for electric power construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212399511U true CN212399511U (en) | 2021-01-26 |
Family
ID=74400947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921868425.9U Expired - Fee Related CN212399511U (en) | 2019-11-01 | 2019-11-01 | Tool containing box for electric power construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212399511U (en) |
-
2019
- 2019-11-01 CN CN201921868425.9U patent/CN212399511U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102253251B (en) | Replaceable probe apparatus for probing semiconductor wafer | |
CN207779321U (en) | A kind of portable building surface flatness test device | |
CN212399511U (en) | Tool containing box for electric power construction site | |
CN206959726U (en) | A kind of automobile storage battery pallet cubing | |
CN209927045U (en) | Gearbox center height gauge | |
CN212193098U (en) | Portable building engineering quality detection toolbox | |
CN212060397U (en) | Universal meter for battery detection | |
CN211806067U (en) | Toolbox for measurement and detection | |
CN212471432U (en) | Building detects uses multi-functional toolbox | |
CN211426719U (en) | Graphene battery capacity detection device | |
CN210533914U (en) | Portable Leeb hardness tester | |
CN205958609U (en) | Sensor fixing device | |
CN210720267U (en) | Ultrasonic flaw detection device | |
CN206550984U (en) | Electromechanical equipment detects tool box | |
CN210952561U (en) | Deformation ruler | |
CN209181673U (en) | A kind of lead-acid accumulator part dimension measuring device | |
CN113686232B (en) | Outer diameter measuring tool | |
CN216925378U (en) | Handheld tool device for engineering measurement | |
CN204789919U (en) | Circuit module corrects and detects mould | |
CN217901453U (en) | Cement resiliometer convenient to operation | |
CN217330996U (en) | Combined radian gauge | |
CN213932338U (en) | Groove symmetry measuring instrument | |
CN217415962U (en) | Movable detection vehicle for permeability test of concrete in plateau distress area | |
CN213690323U (en) | Temperature control instrument line detection device | |
CN218034743U (en) | Special gap inspection device for elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210126 Termination date: 20211101 |