CN212389585U - Jib installation component and contain its ceiling fan - Google Patents

Jib installation component and contain its ceiling fan Download PDF

Info

Publication number
CN212389585U
CN212389585U CN202020819850.5U CN202020819850U CN212389585U CN 212389585 U CN212389585 U CN 212389585U CN 202020819850 U CN202020819850 U CN 202020819850U CN 212389585 U CN212389585 U CN 212389585U
Authority
CN
China
Prior art keywords
hole
mounting
boom
ceiling
mounting assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020819850.5U
Other languages
Chinese (zh)
Inventor
吴玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020819850.5U priority Critical patent/CN212389585U/en
Application granted granted Critical
Publication of CN212389585U publication Critical patent/CN212389585U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a jib installation component and contain its ceiling fan, jib installation component for install the jib in the ceiling, it includes: the fixing seat is used for being fixedly connected to a ceiling and is provided with a bearing part and a mounting hole; the connecting seat is used for being fixedly connected to the suspender, a first through hole is formed in the connecting seat, and the connecting seat can be lapped on the bearing part; hoisting the cross rod; when the suspender, the connecting seat and the fixing seat are assembled, the hoisting cross rod passes through the first through hole and the hoisting hole which is formed in advance in the suspender and is connected to the mounting hole. The utility model also discloses a ceiling fan that contains above-mentioned jib installation component. The suspender is installed through the suspender installation component, and the operation is convenient.

Description

Jib installation component and contain its ceiling fan
Technical Field
The utility model relates to a ceiling fan field, in particular to jib installation component and contain its ceiling fan.
Background
In existing ceiling fans, the ceiling fan is mounted to the ceiling by a hanger rod. In order to ensure the stability of the hoisting, hoisting holes are usually formed in the hoisting rod, the hoisting cross rod penetrates through the hoisting holes and is installed on the ceiling through some connecting structures, and therefore the ceiling fan is hoisted. When installing the jib on the ceiling, installer need support the ceiling fan while installing the hoist and mount horizontal pole, and because the quality of ceiling fan is heavier, therefore needs two people to cooperate usually, and the installation is very troublesome, wastes time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a jib installation component, through this jib installation component installation jib, convenient operation.
The utility model also provides a ceiling fan of having above-mentioned jib installation component.
According to the utility model discloses a jib installation component of first aspect embodiment for install the jib in the ceiling, it includes: the fixing seat is used for being fixedly connected to a ceiling and is provided with a bearing part and a mounting hole; the connecting seat is used for being fixedly connected to the hanging rod, a first through hole is formed in the connecting seat, and the connecting seat can be lapped on the bearing part; hoisting the cross rod; when the suspender, the connecting seat and the fixing seat are assembled, the hoisting cross rod penetrates through the first through hole and a hoisting hole which is formed in the suspender in advance and is connected to the mounting hole.
According to the utility model discloses jib installation component has following beneficial effect at least: when the suspender is installed, the fixing seat is fixedly connected to the ceiling, the connecting seat is fixedly connected with the suspender, the connecting seat is lapped on the bearing part of the fixing seat, the bearing part supports the suspender, the hoisting transverse rod can be installed at the moment, the hoisting transverse rod penetrates through the first through hole in the connecting seat and the hoisting hole in the suspender, and the hoisting transverse rod is connected to the mounting hole, so that the installation of the suspender is realized. Foretell installation, jib can be through the cooperation of connecting seat and bearing part carry in the fixing base in advance, then install hoist and mount horizontal pole, convenient operation also can realize the installation of above-mentioned jib alone.
According to some embodiments of the utility model, be provided with the second through-hole on the connecting seat, be provided with first threaded fastener in the second through-hole, first threaded fastener is used for passing second through-hole and lock attach to the fixed screw that sets up in advance on the jib, so that the connecting seat with jib fixed connection.
According to the utility model discloses a some embodiments still include the earth connection, the one end of earth connection is fixed in the connecting seat.
According to the utility model discloses a some embodiments, the mounting hole is the screw hole, the hoist and mount horizontal pole be screw rod and threaded connection in the mounting hole.
According to the utility model discloses a some embodiments, be provided with on the fixing base and be used for the holding the recessed part of jib, the both sides of the opening part of recessed part are provided with the bearing part, the both sides correspondence of connecting seat is provided with overlap joint portion, overlap joint portion can overlap joint in corresponding the bearing part.
According to some embodiments of the utility model, be provided with on the bearing part and prevent the spacing convex part of overlap joint portion slippage.
According to some embodiments of the utility model, be provided with the third through-hole on the overlap joint portion, be provided with second threaded fastener in the third through-hole, second threaded fastener spiro union in the fixing base is so that connecting seat and fixing base press from both sides tightly the jib.
According to some embodiments of the present invention, the fixing base is provided with a notch portion, and the mounting hole is disposed on a side wall of the notch portion; the connecting seat is provided with an inserting block, an inserting port is formed at the opening of the concave portion, the inserting block is matched with the inserting port, and when the connecting seat is lapped on the bearing portion, the inserting block is matched with the inserting port in an inserting mode.
According to the utility model discloses a some embodiments still include the mounting bracket, the fixing base is fixed in the ceiling through the mounting bracket, the mounting bracket includes U-shaped portion and two installation ears, the U-shaped portion includes bottom plate and two curb plates, two the curb plate connect in the both sides of bottom plate, two the installation ear is connected respectively in two the upper end of curb plate, be provided with the through-hole that is used for supplying the screw to pass on the installation ear, the fixing base install in the up end of bottom plate.
According to the utility model discloses a ceiling fan of second aspect embodiment, it includes: a ceiling fan body; one end of the hanging rod is connected with the ceiling fan body, and the other end of the hanging rod is fixed on a ceiling through any one of the hanging rod mounting assemblies.
According to the utility model discloses ceiling fan has following beneficial effect at least: the hanging rod is installed by adopting the hanging rod installation component, so that the ceiling fan is convenient to install.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic perspective view of an embodiment of the present invention;
fig. 2 is an exploded view of an embodiment of the present invention;
FIG. 3 is a schematic structural view of an embodiment of a boom and a connecting base;
FIG. 4 is a schematic structural view of an embodiment of a fixing base;
FIG. 5 is a schematic structural diagram of an embodiment of a connecting socket;
FIG. 6 is a second schematic structural view of the embodiment of the fixing base;
FIG. 7 is a second schematic structural view of the connecting socket embodiment;
figure 8 is a block diagram of the embodiment of the holder mating with the embodiment of the connector holder.
Reference numerals: suspender 1, lifting hole 11, fixing screw hole 12, fixing base 100, bearing part 110, limiting convex part 111, mounting hole 120, concave part 130, gap part 140, interface 150, connecting seat 200, first through hole 210, second through hole 220, first threaded fastener 230, notch 240, grounding wire 250, bridging part 260, third through hole 261, second threaded fastener 262, plug block 270, hoisting cross bar 300, mounting bracket 400, U-shaped part 410, bottom plate 411, abdicating port 4111, side plate 412 and mounting lug 420.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated with respect to the orientation description, such as up, down, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, a plurality of means are one or more, a plurality of means are two or more, and the terms greater than, less than, exceeding, etc. are understood as not including the number, and the terms greater than, less than, within, etc. are understood as including the number. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless there is an explicit limitation, the words such as setting, installation, connection, etc. should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above words in combination with the specific contents of the technical solution.
Referring to fig. 1 to 2, a boom mounting assembly for mounting a boom 1 to a ceiling, includes: the fixing base 100 is used for being fixedly connected to a ceiling, and a bearing part 110 and a mounting hole 120 are arranged on the fixing base 100; the connecting base 200 is used for being fixedly connected to the suspension rod 1, a first through hole 210 is formed in the connecting base 200, and the connecting base 200 can be lapped on the bearing part 110; and, hoisting the cross bar 300; when the suspension rod 1, the connecting seat 200 and the fixing seat 100 are assembled, the hoisting cross bar 300 passes through the first through hole 210 and the hoisting hole 11 pre-opened on the suspension rod 1 and is connected to the mounting hole 120.
In this embodiment, still include mounting bracket 400, fixing base 100 is fixed in the ceiling through mounting bracket 400, and mounting bracket 400 includes U-shaped portion 410 and two installation ears 420, and U-shaped portion 410 includes bottom plate 411 and two curb plates 412, and both sides board 412 are connected in the both sides of bottom plate 411, and two installation ears 420 are connected respectively in the upper end of both sides board 412, are provided with the through-hole that is used for supplying the screw to pass on installation ear 420, and fixing base 100 installs in the up end of bottom plate 411. The fixing base 100 and the mounting bracket 400 are fixed to the ceiling together by using screws which pass through the through holes of the mounting ears 420 and are then screwed to the ceiling. In some embodiments, the mounting bracket 400 may have other configurations. Of course, the fixing base 100 can also be directly fixed to the ceiling.
When the suspender 1 is installed, the fixing base 100 is fixedly connected to the ceiling, the connecting base 200 is fixedly connected with the suspender 1, the connecting base 200 is lapped on the bearing part 110 of the fixing base 100, the bearing part 110 supports the suspender 1, and at this time, the hoisting cross rod 300 can be installed, so that the hoisting cross rod 300 passes through the first through hole 210 on the connecting base 200 and the hoisting hole 11 on the suspender 1 and is connected to the mounting hole 120, and the installation of the suspender 1 is realized. In the installation process, the suspender 1 can be firstly mounted on the fixing seat 100 through the matching of the connecting seat 200 and the bearing part 110, and then the hoisting cross rod 300 is installed, so that the operation is convenient, and the installation of the suspender 1 can be realized by one person.
Referring to fig. 2 and 3, the connecting base 200 is provided with a second through hole 220, a first threaded fastener 230 is provided in the second through hole 220, and the first threaded fastener 230 is used for passing through the second through hole 220 and being locked to a fixing screw hole 12 provided in advance on the suspension rod 1, so that the connecting base 200 is fixedly connected with the suspension rod 1. The first screw fastener 230 is used to fix the connection seat 200 to the suspension rod 1, and the assembly is convenient. In this embodiment, a notch 240 adapted to the suspension rod 1 is provided on the connecting seat 200, so that the suspension rod 1 and the connecting seat 200 can be attached to each other, and the assembly is more secure. The first threaded fastener 230 may be a screw or a threaded rod.
Of course, in some embodiments, the connection base 200 may be fixedly connected to the suspension rod 1 by other methods, for example, the connection base 200 may be fixedly connected to the suspension rod 1 by welding or clipping.
Referring to fig. 2 and 3, a ground wire 250 is further included, and one end of the ground wire 250 is fixed to the connection holder 200. By arranging the grounding wire 250, convenience can be provided for grounding the ceiling fan so as to meet the safety requirement.
In this embodiment, the mounting holes 120 are threaded holes, and the lifting cross bar 300 is a screw and is threaded into the mounting holes 120. Through foretell structure installation hoist and mount horizontal pole 300, the cost is lower, simple to operate, and hoist and mount horizontal pole 300 installation is firm.
Of course, in other embodiments, the mounting hole 120 may also be a light hole, and the hoisting cross bar 300 is inserted into the mounting hole 120. Further, can set up the mounting hole 120 into the through-hole, hoist and mount horizontal pole 300 passes mounting hole 120, and hoist and mount horizontal pole 300 passes the one end of mounting hole 120 and prevents through anti-disengaging structure that hoist and mount horizontal pole 300 deviates from mounting hole 120, and anti-disengaging structure can be the bayonet lock of the one end of radial insertion hoist and mount horizontal pole 300, or the joint in the C type jump ring of hoist and mount horizontal pole 300 one end, or the nut of spiro union in hoist and mount horizontal pole 300 one end.
Referring to fig. 4 and 5, the fixing base 100 is provided with a recess 130 for accommodating the suspension rod 1, two sides of an opening of the recess 130 are provided with bearing parts 110, two sides of the connecting base 200 are correspondingly provided with overlapping parts 260, and the overlapping parts 260 can overlap the corresponding bearing parts 110. With the above structure, the support of the boom 1 and the connecting seat 200 lapped on the bearing part 110 is more stable. When the fixing base 100 is fixed to the ceiling by using the mounting block 400 of the embodiment, the bottom plate 411 of the mounting block 400 needs to be provided with an abdicating hole 4111 corresponding to the recessed portion 130 so that the suspension rod 1 can enter the recessed portion 130.
Referring to fig. 5, the coupling socket 200 has an asymmetrical structure in which one bridging part 260 is located closer to the mounting hole 120 than the other bridging part 260, thereby providing convenience in providing the second through hole 220 and the first threaded fastener 230, and the first threaded fastener 230 is not easily interfered with in lifting the crossbar 300.
Referring to fig. 4, in order to prevent the connection holder 200, which is overlapped on the bearing part 110, from being unintentionally slid off, the bearing part 110 is provided with a position-limiting protrusion 111 for preventing the overlapping part 260 from being slid off.
Referring to fig. 2, 4 and 5, in the present embodiment, a third through hole 261 is formed in the overlapping part 260, a second threaded fastener 262 is disposed in the third through hole 261, and the second threaded fastener 262 is screwed to the fixing base 100 so that the connecting base 200 and the fixing base 100 clamp the suspension rod 1. The connecting seat 200 and the fixed seat 100 are further clamped on the suspension rod 1 through the second threaded fastener 262, and the suspension rod 1 is installed more firmly. The second threaded fastener 262 may be a screw or a bolt.
Referring to fig. 4, in the present embodiment, the fixing base 100 is provided with a notch 140, and the mounting hole 120 is provided on a side wall of the notch 140. The extension of the lifting rail 300 may be viewed through the cutaway portion 140 to facilitate the aligned mounting of the lifting rail 300 to the mounting hole 120.
Referring to fig. 6 to 8, in the embodiment, the connection seat 200 is provided with the insertion block 270, the insertion port 150 is formed at the opening of the concave portion 130, the insertion block 270 is adapted to the insertion port 150, and when the connection seat 200 is overlapped on the bearing portion 110, the insertion block 270 is inserted into and matched with the insertion port 150, so that the overlapping is more stable, and the positioning of the connection seat 200 on the fixing seat 100 is facilitated.
The above-mentioned 1 fixing device of jib can be applied to the ceiling fan, and the ceiling fan includes: a ceiling fan body; one end of the hanging rod 1 is connected with the ceiling fan body, and the other end of the hanging rod 1 is fixed on the ceiling through the hanging rod mounting assembly. The ceiling fan and the suspension rod 1 are installed on the ceiling through the suspension rod 1 fixing device, and the operation is convenient. Of course, in some embodiments, the above-mentioned fixing device for the suspension rod 1 is not limited to be used for installing ceiling fans, but can also be used for installing ceiling lamps or other objects to be hung by the suspension rod 1.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (10)

1. Boom mounting assembly for mounting a boom (1) to a ceiling, comprising:
the fixing seat (100) is fixedly connected to a ceiling, and a bearing part (110) and a mounting hole (120) are arranged on the fixing seat (100);
the connecting base (200) is used for being fixedly connected to the suspension rod (1), a first through hole (210) is formed in the connecting base (200), and the connecting base (200) can be lapped on the bearing part (110); and the number of the first and second groups,
hoisting a cross bar (300);
when the hanger rod (1), the connecting seat (200) and the fixing seat (100) are assembled, the hoisting cross rod (300) penetrates through the first through hole (210) and a hoisting hole (11) formed in the hanger rod (1) in advance and is connected to the mounting hole (120).
2. Boom mounting assembly according to claim 1, characterized in that a second through hole (220) is provided in the connecting socket (200), and a first threaded fastener (230) is provided in the second through hole (220), the first threaded fastener (230) being adapted to pass through the second through hole (220) and to be locked to a pre-drilled fastening screw hole (12) in the boom (1) for fixedly connecting the connecting socket (200) with the boom (1).
3. The boom mounting assembly of claim 1, further comprising a ground wire (250), wherein one end of the ground wire (250) is fixed to the connection seat (200).
4. The boom mounting assembly of claim 1, wherein the mounting hole (120) is a threaded hole and the lifting rail (300) is a threaded rod and is threadedly attached to the mounting hole (120).
5. Boom mounting assembly according to claim 1, wherein a recess (130) for accommodating the boom (1) is provided on the fixed base (100), the bearing part (110) is provided on both sides of the opening of the recess (130), and a lapping part (260) is correspondingly provided on both sides of the connecting base (200), the lapping part (260) being capable of lapping on the corresponding bearing part (110).
6. Boom mounting assembly according to claim 5, characterized in that the carrier part (110) is provided with a limit lug (111) preventing the bridge part (260) from slipping off.
7. Boom mounting assembly according to claim 5, characterized in that a third through hole (261) is provided in the bridge (260), and a second threaded fastener (262) is provided in the third through hole (261), the second threaded fastener (262) being screwed to the holder (100) so that the attachment (200) and holder (100) clamp the boom (1).
8. The boom mounting assembly according to claim 5, wherein a notch portion (140) is provided on the fixing base (100), and the mounting hole (120) is provided on a side wall of the notch portion (140); the connecting base (200) is provided with an inserting block (270), an inserting port (150) is formed at the opening of the concave portion (130), the inserting block (270) is matched with the inserting port (150), and when the connecting base (200) is lapped on the bearing portion (110), the inserting block (270) is matched with the inserting port (150) in an inserting mode.
9. The boom mounting assembly according to claim 1, further comprising a mounting bracket (400), wherein the fixing base (100) is fixed to a ceiling through the mounting bracket (400), the mounting bracket (400) comprises a U-shaped portion (410) and two mounting ears (420), the U-shaped portion (410) comprises a bottom plate (411) and two side plates (412), the two side plates (412) are connected to two sides of the bottom plate (411), the two mounting ears (420) are respectively connected to upper ends of the two side plates (412), through holes for screws to pass through are formed in the mounting ears (420), and the fixing base (100) is mounted on an upper end face of the bottom plate (411).
10. A ceiling fan, comprising:
a ceiling fan body;
a hanger rod (1) having one end connected to the ceiling fan body and the other end secured to the ceiling by the hanger rod mounting assembly of any one of claims 1 to 9.
CN202020819850.5U 2020-05-15 2020-05-15 Jib installation component and contain its ceiling fan Expired - Fee Related CN212389585U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020819850.5U CN212389585U (en) 2020-05-15 2020-05-15 Jib installation component and contain its ceiling fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020819850.5U CN212389585U (en) 2020-05-15 2020-05-15 Jib installation component and contain its ceiling fan

Publications (1)

Publication Number Publication Date
CN212389585U true CN212389585U (en) 2021-01-22

Family

ID=74250917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020819850.5U Expired - Fee Related CN212389585U (en) 2020-05-15 2020-05-15 Jib installation component and contain its ceiling fan

Country Status (1)

Country Link
CN (1) CN212389585U (en)

Similar Documents

Publication Publication Date Title
CN212389585U (en) Jib installation component and contain its ceiling fan
CN105650764A (en) Wiring board mounting structure and outdoor unit comprising same
CN218498221U (en) Energy storage device and fixing mechanism
CN218442176U (en) Lamp fitting
CN105485584A (en) Panel lamp with multiple mounting manners
CN212777080U (en) Assembled lamp holder with multiple mounting modes
CN220169340U (en) Novel fan lamp hanger structure
CN212005384U (en) Ceiling lamp mounting structure
CN211738978U (en) Lamp fixing structure
CN210717178U (en) Wall-mounted lamp
JPH084714A (en) Lifting fitting for stringing
CN220038019U (en) Mounting bracket and terminal mounting structure
CN213930032U (en) Hoisting mechanism and display device
CN214591851U (en) Sound box mounting frame and sound box thereof
CN219160063U (en) Wall-mounted mounting device for display screen
CN218347634U (en) A hoist and mount subassembly and fan lamp for fan lamp
CN218627071U (en) Hook and air conditioner
CN217741229U (en) Wire casing fixed knot constructs
CN216952814U (en) Mounting assembly for preventing lamp from shaking and lamp using same
CN215001257U (en) Split type screw-free installation lamp
CN215570165U (en) Street lamp battery box installation device convenient to installation
CN219690806U (en) Toughened glass partition
CN217503482U (en) Mounting structure and dull and stereotyped lamp of dull and stereotyped lamp
CN212776659U (en) Support for mounting suspension type advertisement display screen
CN214744769U (en) High-altitude fixing assembly for power equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210122