CN212389241U - Foundation pit escape ladder - Google Patents
Foundation pit escape ladder Download PDFInfo
- Publication number
- CN212389241U CN212389241U CN202020656067.1U CN202020656067U CN212389241U CN 212389241 U CN212389241 U CN 212389241U CN 202020656067 U CN202020656067 U CN 202020656067U CN 212389241 U CN212389241 U CN 212389241U
- Authority
- CN
- China
- Prior art keywords
- ladder
- column
- locking
- foundation pit
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003780 insertion Methods 0.000 claims description 31
- 230000037431 insertion Effects 0.000 claims description 31
- 239000007787 solid Substances 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 9
- 239000011435 rock Substances 0.000 abstract description 3
- 238000009412 basement excavation Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000009194 climbing Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to a foundation ditch construction technical field, more specifically say, it relates to a foundation ditch emergency ladder, and its technical scheme main points are: the base is fixedly arranged at the bottom of a foundation pit, the footstock is fixedly arranged at the top of the foundation pit, the unit ladder positioned at the bottom is fixedly connected with the base, the unit ladder positioned at the top is fixedly connected with the footstock, the unit ladder positioned at the top comprises two ladder columns which are parallel to each other and a plurality of pedal rods arranged between the two ladder columns, the bottom of the ladder column of the unit ladder is provided with an inserting column, the top of the ladder column of the unit ladder is provided with an inserting groove for the inserting column to be inserted and matched, a locking assembly is arranged between two adjacent unit ladders, and a fixing member is arranged between the unit ladder and the pit wall of the foundation pit; the utility model has the advantages of can freely match unit ladder quantity in order to splice into the emergency ladder according to the foundation ditch degree of depth, and rock less.
Description
Technical Field
The utility model relates to a foundation ditch construction technical field, more specifically say, it relates to a foundation ditch emergency ladder.
Background
With the development of economy, land resources tend to be tense. Civil engineering works, particularly those in busy places in cities, are beginning to develop and utilize underground spaces on a large scale. At present, building structures in China, particularly commercial building structures, are generally provided with one-layer or two-layer basements. Some large building structures even comprise three-layer or four-layer basements, and the excavation depth of foundation pits of the large building structures reaches below 16 m. Meanwhile, with the development of rail transit in recent years, excavation of foundation pits of subway stations is more and more common, and the excavation depth of the foundation pits of the subway stations generally exceeds 20 m. The foundation pit engineering construction has certain danger, and the larger the excavation depth of the foundation pit is, the higher the danger degree is. Once major safety accidents of foundation pit engineering occur, the casualty number of construction operators is often very large. In order to ensure the personal safety of construction operators, according to the safety production policy of 'safety first, prevention first' and 'emergency first', not only the prevention in advance is achieved, but also emergency safety measures after accidents occur are required to be made. Therefore, measures for ensuring that construction operators evacuate timely after a foundation pit accident occurs are very important.
At present, once an emergency safety accident occurs in the foundation pit construction process, construction operators generally escape from the foundation pit by using an escape rope ladder. The traditional escape rope ladder is composed of two steel wire ropes in the vertical direction and a plurality of square wood transverse partitions in the horizontal direction, wherein the steel wire ropes are generally composed of galvanized wire rope penetrating cores with the diameter of 6mm in the center and nylon ropes with the diameter of 18mm outside, and the top ends of the steel wire ropes are bound on a compression head beam of a foundation pit.
The above prior art solutions have the following drawbacks: because the steel wire rope is made of flexible materials, when people climb the rope ladder in the escape process, the rope ladder can greatly shake, people can feel nervous and frightened, the difficulty of escape and rescue work is increased, the length of the traditional escape rope ladder is certain, when the excavation depth of a foundation pit exceeds the length of the rope ladder, the safety of the rope ladder butted at a construction site cannot meet the requirement, and the rope ladder can only be contacted with a manufacturer, is specially ordered and is troublesome, so that the improvement is needed.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a foundation ditch emergency ladder has and can freely matches unit ladder quantity in order to splice into emergency ladder according to the foundation ditch degree of depth, and rocks less advantage.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a foundation pit emergency ladder, includes base and footstock, and arranges along vertical direction and sets up the base with a plurality of unit ladder between the footstock, base fixed mounting is in the foundation pit bottom, footstock fixed mounting is at the foundation pit top, is located the below the unit ladder with fixed connection between the base, be located the top the unit ladder with fixed connection between the footstock, the unit ladder includes two terraced posts that are parallel to each other, and a plurality of setting is two the foot bar between the terraced post, the unit ladder the terraced post bottom is provided with the grafting post, the unit ladder the terraced post top is seted up and is supplied grafting post grafting complex inserting groove, is provided with locking Assembly between two adjacent unit ladders from top to bottom, be provided with the mounting between unit ladder and the foundation pit wall.
Through adopting above-mentioned technical scheme, operating personnel freely matches unit ladder quantity according to the actual foundation ditch degree of depth, arrange a plurality of unit ladders along vertical direction, base fixed mounting is in the foundation ditch bottom, footstock fixed mounting is at the foundation ditch top, the spliced pole that is located the unit ladder bottom of top between two adjacent unit ladders inserts the inserting groove that inserts the unit ladder top that is located the below, then it is fixed with two adjacent unit ladders through the closure subassembly, the mounting is with unit ladder and foundation ditch hole wall between relatively fixed, when the realization can freely match unit ladder quantity in order to splice into the emergency ladder according to the foundation ditch degree of depth, good stability has, it is less to rock.
The present invention may be further configured in a preferred embodiment as: the locking assembly comprises a locking groove arranged on one side wall of the top of the ladder column and a locking column penetrating through the locking groove, the locking column vertically penetrates through the side wall of the ladder column and extends into the insertion groove, and the insertion column is correspondingly provided with a socket for the insertion and matching of the locking column.
By adopting the technical scheme, the locking column is inserted into the insertion opening of the insertion column, so that the two adjacent unit ladders are relatively fixed; the locking column is pulled outwards to separate the insertion between the locking column and the insertion opening, and two adjacent unit ladders up and down can be unlocked.
The present invention may be further configured in a preferred embodiment as: the locking post is sleeved with a spring, a baffle is fixedly arranged on the locking post, the spring is positioned between the baffle and the locking groove, when the spring is in a natural state, the baffle is abutted against the side wall of the locking groove, and the locking post is inserted in the insertion groove.
Through adopting above-mentioned technical scheme, the spring can make the more firm grafting of locking post in the socket, and the baffle can prevent that the locking post from breaking away from the locking groove, and the restoring force of spring makes when the locking post is so that the locking post breaks away from the grafting with the socket in the pulling locking post simultaneously, and the hand of loosing can realize that the locking post reinserts in the socket under the restoring force effect of spring.
The present invention may be further configured in a preferred embodiment as: the top of one end of the locking column inserted in the insertion groove is provided with an inclined surface, and the inclined surface of the locking column is mutually abutted to the insertion column and slides relatively.
Through adopting above-mentioned technical scheme, the setting of inclined plane makes operating personnel need not outwards to pull the locking post and can peg graft the plug post in the inserting groove.
The present invention may be further configured in a preferred embodiment as: and an unlocking block is fixedly arranged at one end of the locking column far away from the ladder column.
Through adopting above-mentioned technical scheme, the unblock piece makes things convenient for operating personnel to pull the locking post, makes things convenient for follow-up dismantlement.
The present invention may be further configured in a preferred embodiment as: the mounting is including setting up stock on the ladder post, the stock runs through perpendicularly the ladder post sets up, the stock includes that solid fixed cylinder and one end are connected the locating lever of solid fixed cylinder bottom portion, gu fixed cylinder activity runs through the ladder post, the locating lever is located gu fixed cylinder is close to one side of foundation ditch hole wall, gu fixed cylinder with the connection can be dismantled to the locating lever.
Through adopting above-mentioned technical scheme, the setting dismantled of a fixed section of thick bamboo and locating lever, with unit ladder and locating lever split transportation, simultaneously operating personnel can the on-the-spot equipment stock.
The present invention may be further configured in a preferred embodiment as: the positioning rod is in threaded connection with the fixed cylinder.
Through adopting above-mentioned technical scheme, the threaded connection of locating lever and solid fixed cylinder for the locating lever is firm to be fixed on solid fixed cylinder, and simple structure.
The present invention may be further configured in a preferred embodiment as: the surface of the pedal rod is provided with anti-skid grains.
Through adopting above-mentioned technical scheme, the condition that skids when anti-skidding line can reduce the climbing takes place.
To sum up, the utility model discloses a following at least one useful technological effect:
1. an operator freely matches the number of the unit ladders according to the actual depth of the foundation pit, the unit ladders are arranged in the vertical direction, the base is fixedly installed at the bottom of the foundation pit, the footstock is fixedly installed at the top of the foundation pit, the splicing columns at the bottom of the unit ladders above the two adjacent unit ladders are inserted into the splicing grooves at the top of the unit ladders below the two adjacent unit ladders, then the two adjacent unit ladders are fixed through the locking assembly, the fixing member relatively fixes the unit ladders and the pit wall, the escape ladders can be spliced by freely matching the number of the unit ladders according to the depth of the foundation pit, and the escape ladders have good stability;
2. the fixed cylinder and the positioning rod are detachably arranged, the unit ladder and the positioning rod are disassembled and transported, and meanwhile, an operator can assemble the anchor rod on site;
3. the antiskid line can reduce the condition of skidding when climbing and take place.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is an assembly diagram of an upper unit ladder and a lower unit ladder in the embodiment of the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is an assembly diagram of the fixing cylinder and the positioning rod according to the embodiment of the present invention.
Reference numerals: 1. a base; 2. a top seat; 3. a unit ladder; 31. ladder posts; 32. a foot bar; 4. an anchor rod; 41. a fixed cylinder; 42. positioning a rod; 6. inserting the column; 7. inserting grooves; 8. a locking groove; 9. a locking post; 10. a socket; 11. a spring; 12. a baffle plate; 13. and (4) unlocking the block.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a foundation pit emergency ladder, refer to fig. 1, including base 1 and footstock 2, and arrange a plurality of unit ladder 3 that sets up between base 1 and footstock 2 along vertical direction, base 1 passes through expansion bolts fixed mounting in the foundation pit bottom, footstock 2 fixed mounting is at the foundation pit top, the unit ladder 3 that is located the below passes through welded fastening with base 1, the unit ladder 3 that is located the top passes through welded fastening with footstock 2, unit ladder 3 includes two terraced posts 31 that are parallel to each other, and five fixed mounting are at the foot bar 32 between two terraced posts 31, the transversal rectangle of personally submitting of terraced post 31, five foot bar 32 are parallel to each other and perpendicular to terraced post 31, the transversal circular form of foot bar 32, the condition that skids when foot bar 32 surface is provided with anti-skidding line in order to reduce the climbing takes place.
Referring to fig. 2 and 3, the bottom end face of the ladder post 31 of the unit ladder 3 is fixedly provided with an insertion post 6, the cross section of the insertion post 6 is rectangular, the top end face of the ladder post 31 of the unit ladder 3 is vertically provided with an insertion groove 7 for the insertion and matching of the insertion post 6, a locking component is arranged between two adjacent unit ladders 3, the locking component comprises a locking groove 8 arranged on one side wall of the top of the ladder post 31 and a locking post 9 penetrating through the locking groove 8, the locking post 9 vertically penetrates through the side wall of the ladder post 31 and extends into the insertion groove 7, the insertion post 6 is correspondingly provided with a socket 10 for the insertion and matching of the locking post 9, the top of one end of the locking post 9 inserted into the insertion groove 7 is provided with an inclined face, the inclined face of the locking post 9 is abutted against and slides relative to the insertion post 6, the locking post 9 is sleeved with a spring 11, the locking post 9 is fixedly provided with a baffle 12, the spring 11 is located between the baffle 12 and the side wall of the locking groove 8 far away from the insertion groove 7, when the spring 11 is in a natural state, the baffle 12 is abutted against the side wall of the locking groove 8, the locking column 9 is inserted into the insertion groove 7, the inclined surface is arranged so that an operator can insert the insertion column 6 into the insertion groove 7 without pulling the locking column 9 outwards, the locking column 9 retreats into the locking groove 8 under the sliding abutting of the insertion column 6, the spring 11 is compressed, and when the socket 10 is aligned with the locking column 9, the locking column 9 is inserted into the socket 10 again under the elastic force of the spring 11. In addition, an unlocking block 13 is fixedly arranged at one end of the locking column 9 far away from the ladder column 31, so that an operator can conveniently pull the locking column 9.
Referring to fig. 4, a fixing member is arranged between the unit ladder 3 and the wall of the foundation pit, the fixing member includes an anchor rod 4 arranged on the ladder post 31, the anchor rod 4 vertically penetrates through the ladder post 31, the anchor rod 4 includes a fixed cylinder 41 and a positioning rod 42 with one end connected to the bottom of the fixed cylinder 41, the fixed cylinder 41 movably penetrates through the ladder post 31, the positioning rod 42 is located on one side of the fixed cylinder 41 close to the wall of the foundation pit, the fixed cylinder 41 is detachably connected with the positioning rod 42, so that the unit ladder 3 and the positioning rod 42 can be detachably transported, and an operator can assemble the anchor rod 4 on site, specifically, the positioning rod 42 is in threaded connection with.
The implementation principle of the embodiment is as follows: the base 1 is fixedly installed at the bottom of a foundation pit through expansion bolts, the footstock 2 is fixedly installed at the top of the foundation pit, then the number of unit ladders 3 is freely matched according to the actual depth of the foundation pit, a plurality of unit ladders 3 are arranged between the base 1 and the footstock 2 along the vertical direction, the unit ladders 3 positioned at the top are fixedly welded with the footstock 2, the splicing columns 6 at the bottoms of the unit ladders 3 positioned at the top between two adjacent unit ladders 3 are spliced into the splicing grooves 7 at the top of the unit ladders 3 positioned at the bottom, the locking columns 9 are retreated into the locking grooves 8 under the sliding butt of the splicing columns 6, when the spigots 10 are aligned with the locking grooves 8, the locking columns 9 are re-spliced in the spigots 10 under the restoring force action of the springs 11, the fixation between the two adjacent unit ladders 3 is realized, the positioning rods 42 are connected with the fixed cylinders 41 through threads to form anchor rods 4, namely, the unit ladder 3 and the pit wall of the foundation pit are relatively fixed; meanwhile, when the foundation pit is constructed, when the unit ladder 3 is dug to the depth, the lowermost unit ladder 3 and the base 1 can be detached together, and one unit ladder 3 is added; the escape ladder has good stability and is small in shaking when the number of the unit ladders 3 is freely matched according to the depth of the foundation pit so as to be spliced into the escape ladder.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. A foundation pit escape ladder is characterized in that: comprises a base (1), a top seat (2) and a plurality of unit ladders (3) arranged between the base (1) and the top seat (2) along the vertical direction, wherein the base (1) is fixedly arranged at the bottom of a foundation pit, the top seat (2) is fixedly arranged at the top of the foundation pit, the unit ladder (3) positioned at the lowest part is fixedly connected with the base (1), the unit ladder (3) positioned at the uppermost part is fixedly connected with the top seat (2), the unit ladder (3) comprises two mutually parallel ladder columns (31) and a plurality of pedal rods (32) arranged between the two ladder columns (31), the bottom of the ladder column (31) of the unit ladder (3) is provided with an inserting column (6), the top of the ladder column (31) of the unit ladder (3) is provided with an inserting groove (7) for the inserting and matching of the inserting column (6), a locking assembly is arranged between the two adjacent unit ladders (3) at the upper part and the lower part, and a fixing part is arranged between the unit ladder (3) and the pit wall of the foundation pit.
2. A foundation pit escape ladder as claimed in claim 1, wherein: the locking assembly comprises a locking groove (8) formed in one side wall of the top of the ladder column (31) and a locking column (9) penetrating through the locking groove (8), the locking column (9) vertically penetrates through the side wall of the ladder column (31) and extends into the insertion groove (7), and the insertion column (6) is correspondingly provided with a socket (10) for the insertion and matching of the locking column (9).
3. A foundation pit escape ladder as claimed in claim 2, wherein: the locking post (9) is sleeved with a spring (11), the locking post (9) is fixedly provided with a baffle (12), the spring (11) is located between the baffle (12) and the locking groove (8), when the spring (11) is in a natural state, the baffle (12) is abutted against the side wall of the locking groove (8), and the locking post (9) is inserted into the insertion groove (7).
4. A foundation pit escape ladder as claimed in claim 3, wherein: the top of one end of the locking column (9) inserted in the insertion groove (7) is provided with an inclined surface, and the inclined surface of the locking column (9) is mutually abutted and slides relative to the insertion column (6).
5. A foundation pit escape ladder as claimed in claim 3, wherein: an unlocking block (13) is fixedly arranged at one end of the locking column (9) far away from the ladder column (31).
6. A foundation pit escape ladder as claimed in claim 1, wherein: the mounting is including setting up stock (4) on ladder post (31), stock (4) run through perpendicularly ladder post (31) set up, stock (4) are connected including solid fixed cylinder (41) and one end locating lever (42) of solid fixed cylinder (41) bottom, gu fixed cylinder (41) activity runs through ladder post (31), locating lever (42) are located gu fixed cylinder (41) are close to one side of foundation ditch pot wall, gu fixed cylinder (41) with locating lever (42) can be dismantled and be connected.
7. A foundation pit escape ladder as claimed in claim 6, wherein: the positioning rod (42) is in threaded connection with the fixed cylinder (41).
8. A foundation pit escape ladder as claimed in claim 6, wherein: the surface of the pedal rod (32) is provided with anti-skid grains.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020656067.1U CN212389241U (en) | 2020-04-26 | 2020-04-26 | Foundation pit escape ladder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020656067.1U CN212389241U (en) | 2020-04-26 | 2020-04-26 | Foundation pit escape ladder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212389241U true CN212389241U (en) | 2021-01-22 |
Family
ID=74249289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020656067.1U Expired - Fee Related CN212389241U (en) | 2020-04-26 | 2020-04-26 | Foundation pit escape ladder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212389241U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417563A (en) * | 2021-07-19 | 2021-09-21 | 刘春萍 | Single-person elevator for fruit picking in orchard |
CN114059910A (en) * | 2021-11-22 | 2022-02-18 | 汪秋华 | Deep foundation pit escape ladder capable of adapting to different depths and different gradients |
-
2020
- 2020-04-26 CN CN202020656067.1U patent/CN212389241U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113417563A (en) * | 2021-07-19 | 2021-09-21 | 刘春萍 | Single-person elevator for fruit picking in orchard |
CN114059910A (en) * | 2021-11-22 | 2022-02-18 | 汪秋华 | Deep foundation pit escape ladder capable of adapting to different depths and different gradients |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212389241U (en) | Foundation pit escape ladder | |
CN202483194U (en) | Construction engineering boundary protection fence net | |
CN211006800U (en) | Pile foundation detects static load test structure | |
CN111188269B (en) | Cable tower and construction method thereof | |
CN116289488A (en) | Steel trestle capable of resisting flood season rapid flow and construction method thereof | |
CN203270588U (en) | Mini-pile antiskid structure | |
CN104499724B (en) | Edge protection fence | |
CN101675199A (en) | Scaffold with handrail frame of the column sections of being provided with | |
CN112832691A (en) | Oil derrick reinforced structure | |
CN113047594A (en) | Movable climbing frame for elevator shaft and erection method thereof | |
CN111455854A (en) | Semi-automatic protective shed frame used in construction of viaduct crossing railway and erection method | |
CN113502710B (en) | Construction method of anchored high-altitude cantilever plank road | |
CN211547440U (en) | Municipal building sound insulation wall structure | |
CN217680685U (en) | High-rise civil engineering outer wall interlude prevents pounding canopy | |
CN220644165U (en) | Four-leg small-sized wellhead A-type platform assembly suitable for Bohai sea area standardization | |
CN108547487A (en) | A kind of parking systems established above existing building | |
CN218787284U (en) | Portable cable crane equipment pile anchor type anchoring system | |
CN210482151U (en) | Road rail guard for municipal works | |
CN215329956U (en) | High slope anchor cable construction system based on hanging flower basket and slide rail | |
CN211473514U (en) | Wall-leaning bidirectional steel ladder for foundation pit or vertical shaft construction | |
CN217328812U (en) | Safety protection device for petroleum transmission pipeline | |
JP3236306U (en) | Stairs structure | |
CN211776077U (en) | Foundation ditch combination formula ladder cage system of encorbelmenting | |
CN115288414B (en) | Construction method of hydraulic climbing operation frame of super high-rise core tube special-shaped shaft | |
CN103032085B (en) | Application and construction process of tunnel head-on wall carving prevention net |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210122 |