CN212387788U - Device is put in to effluent disposal basin flocculation liquid for construction - Google Patents

Device is put in to effluent disposal basin flocculation liquid for construction Download PDF

Info

Publication number
CN212387788U
CN212387788U CN202020885456.1U CN202020885456U CN212387788U CN 212387788 U CN212387788 U CN 212387788U CN 202020885456 U CN202020885456 U CN 202020885456U CN 212387788 U CN212387788 U CN 212387788U
Authority
CN
China
Prior art keywords
gear
storage tank
fixedly connected
liquid
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020885456.1U
Other languages
Chinese (zh)
Inventor
林舒音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020885456.1U priority Critical patent/CN212387788U/en
Application granted granted Critical
Publication of CN212387788U publication Critical patent/CN212387788U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a device is put in to effluent disposal basin flocculation liquid for construction relates to construction technical field, including the buoyancy board, the last fixed surface of buoyancy board installs two pull rings. The utility model relates to a rational in infrastructure, it can drive the buoyancy board to waste liquid pond middle part through holding the haulage rope, air compressor circular telegram starts to compress the inside air of storage tank and increases its internal pressure, the inside of making inside flocculation liquid get into the rotating-tube is discharged and waste water contact from the relief hole, the rotating-tube is located inside the waste liquid, avoid the artifical mode of shedding flocculation liquid of tradition, lead to the slower problem of lower floor's waste liquid flocculation speed in the waste water pond, gear motor circular telegram starts to drive axis of rotation and second gear revolve, drive first gear under the effect of second gear, rotating-tube and switch-plate rotate, the switch-plate rotates and pushes the waste water of doping flocculation liquid to all around, waste water treatment efficiency and waste water discharge time have been accelerated.

Description

Device is put in to effluent disposal basin flocculation liquid for construction
Technical Field
The utility model relates to a construction technical field specifically is a device is put in to wastewater disposal basin flocculation liquid for construction.
Background
The building construction refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings refer to the engineering which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of production, living, study and public activities of people.
The wastewater disposal basin is one of main projects in the construction, when handling building waste water, adopts the artifical mode of shedding the flocculation liquid usually, leads to lower floor's waste liquid flocculation speed to be slower in the wastewater disposal basin, has delayed waste water treatment efficiency, has prolonged waste water discharge time. Therefore, the flocculation liquid feeding device of the wastewater pool for building construction is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
One) technical problem to be solved
The utility model aims at providing a device is put in to wastewater disposal basin flocculation liquid for construction in order to compensate prior art not enough.
II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a waste water tank flocculation liquid throwing device for building construction comprises a buoyancy plate, wherein two pull rings are fixedly mounted on the upper surface of the buoyancy plate, a traction rope is fixedly connected to the outer surface of each pull ring, a storage tank is arranged above the buoyancy plate, three support legs are fixedly connected to the bottom surface of the storage tank, the bottoms of the support legs are fixedly connected with the upper surface of the buoyancy plate, an air compressor is fixedly mounted on the upper surface of the storage tank, the upper surface of the storage tank is fixedly communicated with a feed pipe, a valve is fixedly mounted on the outer surface of the feed pipe, a first sealing bearing is fixedly embedded in the bottom surface of the storage tank, a rotating pipe is fixedly connected to the inner ring of the first sealing bearing, a second sealing bearing is fixedly embedded in the upper surface of the buoyancy plate, and the bottom end of the rotating pipe penetrates through the second sealing bearing and extends to the lower side of the buoyancy plate, and the surface of rotating tube and second seal bearing's inner circle fixed connection, the relief hole has been seted up to the surface of rotating tube, the surface fixed connection of rotating tube is the switch-plate of arcuation, the surface of rotating tube is connected with first gear, the last fixed surface of buoyancy plate is connected with gear motor, gear motor's output fixedly connected with axis of rotation, the surface fixed connection of axis of rotation has the second gear, and first gear meshes with the second gear mutually.
Furthermore, air bags are arranged at the left end and the right end of the buoyancy plate, and the two air bags are fixedly connected with the left side surface and the right side surface of the buoyancy plate respectively.
Furthermore, every the equal fixedly connected with of inner wall of relief hole and the filter screen of relief hole looks adaptation, and the material of filter screen is stainless steel.
Furthermore, a stirring assembly is fixedly mounted at the top end of the rotating pipe.
Furthermore, a third sealing bearing is fixedly embedded in the bottom surface of the storage tank, and the outer surface of the top end of the rotating shaft is fixedly connected with an inner ring of the third sealing bearing.
Thirdly), the beneficial effects are as follows:
compared with the prior art, this device is put in to effluent water sump flocculation liquid for construction possesses following beneficial effect:
the utility model discloses a hold haulage rope and drive buoyancy board to waste liquid pond middle part, air compressor circular telegram starts to compress the inside air of storage tank and increases its inside pressure, the inside of making inside flocculation liquid get into the rotating tube is discharged and the waste water contact from the relief hole, the rotating tube is located inside the waste liquid, avoid the artifical mode of shedding flocculation liquid of tradition, lead to the slower problem of lower floor's waste liquid flocculation speed in the waste water pond, gear motor circular telegram starts to drive axis of rotation and second gear revolve, drive first gear under the effect of second gear, rotating tube and switch-plate rotate, the switch-plate rotates and pushes the waste water of doping flocculation liquid around, waste water treatment efficiency and waste water discharge time have been accelerated.
Two, the utility model discloses a be provided with the gasbag, increase the device's buoyancy, avoid the device because of the submerged problem appears greatly in the flocculating solution volume, through being provided with the filter screen, avoid the inside that the inside particle impurity of building sewage got into the relief hole to cause the jam, guarantee its normal use, through being provided with third seal bearing, make the axis of rotation rotate more stably, avoid the axis of rotation to appear rocking when rotating.
Drawings
FIG. 1 is a perspective view of the buoyancy plate of the present invention;
FIG. 2 is a sectional view of the front view of the storage tank of the present invention;
fig. 3 is a front view of the rotating tube of the present invention.
In the figure: 1. supporting legs; 2. a reduction motor; 3. a pull ring; 4. a buoyancy plate; 5. a kick-out plate; 6. rotating the tube; 7. a filter screen; 8. an air bag; 9. a hauling rope; 10. a material storage tank; 11. a feed pipe; 12. a valve; 13. an air compressor; 14. a stirring assembly; 15. a first sealed bearing; 16. a first gear; 17. a second sealed bearing; 18. a rotating shaft; 19. a second gear; 20. a third sealed bearing; 21. a discharge hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, the utility model provides a technical solution: a waste water tank flocculation liquid throwing device for building construction comprises a buoyancy plate 4, two pull rings 3 are fixedly installed on the upper surface of the buoyancy plate 4, a traction rope 9 is fixedly connected to the outer surface of each pull ring 3, a storage tank 10 is arranged above the buoyancy plate 4, three support legs 1 are fixedly connected to the bottom surface of the storage tank 10, the bottom ends of the support legs 1 are fixedly connected with the upper surface of the buoyancy plate 4, an air compressor 13 is fixedly installed on the upper surface of the storage tank 10, a feed pipe 11 is fixedly communicated with the upper surface of the storage tank 10, a valve 12 is fixedly installed on the outer surface of the feed pipe 11, a first sealing bearing 15 is fixedly embedded on the bottom surface of the storage tank 10, a rotating pipe 6 is fixedly connected to the inner ring of the first sealing bearing 15, a second sealing bearing 17 is fixedly embedded on the upper surface of the buoyancy plate 4, the bottom end of the rotating pipe 6 penetrates through the second sealing bearing 17 and extends to the lower portion of the, the outer surface of the rotating pipe 6 is fixedly connected with the inner ring of the second sealing bearing 17, the outer surface of the rotating pipe 6 is provided with a discharge hole 21, the outer surface of the rotating pipe 6 is fixedly connected with an arc-shaped material shifting plate 5, the outer surface of the rotating pipe 6 is connected with a first gear 16, the upper surface of the buoyancy plate 4 is fixedly connected with a speed reducing motor 2, the output end of the speed reducing motor 2 is fixedly connected with a rotating shaft 18, the outer surface of the rotating shaft 18 is fixedly connected with a second gear 19, and the first gear 16 is meshed with the second gear 19.
Furthermore, the left end and the right end of the buoyancy plate 4 are both provided with air bags 8, and the two air bags 8 are respectively fixedly connected with the left side surface and the right side surface of the buoyancy plate 4. The buoyancy of the device is increased, and the problem that the device sinks due to large amount of flocculated liquid is avoided.
Furthermore, the inner wall of each discharge hole 21 is fixedly connected with a filter screen 7 matched with the discharge hole 21, and the filter screen 7 is made of stainless steel. The blockage caused by the fact that particle impurities in the building sewage enter the discharging hole 21 is avoided, and the normal use of the building sewage is guaranteed.
Further, a stirring assembly 14 is fixedly mounted at the top end of the rotating tube 6. The flocculation liquid is stirred, so that the flocculation liquid is more uniform.
Further, a third sealing bearing 20 is fixedly embedded in the bottom surface of the storage tank 10, and the outer surface of the top end of the rotating shaft 18 is fixedly connected with the inner ring of the third sealing bearing 20. The rotation of the rotating shaft 18 is more stable, and the rotating shaft 18 is prevented from shaking during rotation.
The working principle is as follows: the gear motor 2 and the air compressor 13 are connected to a power supply, the apparatus is first placed in a waste liquid tank, pouring flocculating solution into the inside of a storage tank 10 from a feeding pipe 11 to close a valve 12, pulling a traction rope 9 to drive a buoyancy plate 4 to the middle part of a waste liquid pool, compressing the air inside the storage tank 10 by electrifying and starting an air compressor 13 to increase the internal pressure intensity, enabling the internal flocculating solution to enter the inside of a rotating pipe 6 and be discharged from a discharge hole 21 to be contacted with waste water, wherein the rotating pipe 6 is positioned inside the waste liquid to avoid the problem of low flocculation speed of the waste liquid at the lower layer in the waste water pool caused by the traditional manual flocculating solution throwing mode, and a speed reduction motor 2 is electrified and started to drive a rotating shaft 18 and a second gear 19 to rotate, the first gear 16, the rotating pipe 6 and the material shifting plate 5 are driven to rotate under the action of the second gear 19, and the material shifting plate 5 rotates to push the flocculated liquid-doped wastewater to the periphery, so that the wastewater treatment efficiency and the wastewater discharge time are accelerated.
It should be noted that, in this document, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "fixedly," "mounted," "connected," and "connected" are to be construed broadly, e.g., "mounted" may be fixedly connected, or detachably connected, or integrally connected; "connected" may be mechanically or electrically connected; "connected" may be directly connected or indirectly connected through an intermediate member, or may be internal or external to two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a device is put in to effluent disposal basin flocculation liquid for construction, includes buoyancy board (4), its characterized in that: the upper surface of the buoyancy plate (4) is fixedly provided with two pull rings (3), the outer surface of each pull ring (3) is fixedly connected with a traction rope (9), a storage tank (10) is arranged above the buoyancy plate (4), the bottom surface of the storage tank (10) is fixedly connected with three support legs (1), the bottom end of each support leg (1) is fixedly connected with the upper surface of the buoyancy plate (4), an air compressor (13) is fixedly arranged on the upper surface of the storage tank (10), the upper surface of the storage tank (10) is fixedly communicated with an inlet pipe (11), a valve (12) is fixedly arranged on the outer surface of the inlet pipe (11), a first sealing bearing (15) is fixedly embedded on the bottom surface of the storage tank (10), a rotating pipe (6) is fixedly connected with the inner ring of the first sealing bearing (15), a second sealing bearing (17) is fixedly embedded on the upper surface of the buoyancy plate (4), the bottom of rotating tube (6) runs through second sealed bearing (17) and extends to the below of buoyancy board (4), and the surface of rotating tube (6) and the inner circle fixed connection of second sealed bearing (17), relief hole (21) have been seted up to the surface of rotating tube (6), the fixed surface of rotating tube (6) is flitch (5) that are the arcuation, the surface of rotating tube (6) is connected with first gear (16), the last fixed surface of buoyancy board (4) is connected with gear motor (2), the output fixedly connected with axis of rotation (18) of gear motor (2), the fixed surface of axis of rotation (18) is connected with second gear (19), and first gear (16) mesh with second gear (19).
2. The device is put in to pond flocculation liquid for construction according to claim 1, characterized in that: air bags (8) are arranged at the left end and the right end of the buoyancy plate (4), and the two air bags (8) are fixedly connected with the left side face and the right side face of the buoyancy plate (4) respectively.
3. The device is put in to pond flocculation liquid for construction according to claim 1, characterized in that: every equal fixedly connected with of inner wall of relief hole (21) filters (7) with relief hole (21) looks adaptation, and the material of filter screen (7) is stainless steel.
4. The device is put in to pond flocculation liquid for construction according to claim 1, characterized in that: and a stirring assembly (14) is fixedly arranged at the top end of the rotating pipe (6).
5. The device is put in to pond flocculation liquid for construction according to claim 1, characterized in that: the bottom surface of storage tank (10) is fixed to be inlayed and is had third sealed bearing (20), and the surface on axis of rotation (18) top and the inner circle fixed connection of third sealed bearing (20).
CN202020885456.1U 2020-05-25 2020-05-25 Device is put in to effluent disposal basin flocculation liquid for construction Expired - Fee Related CN212387788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020885456.1U CN212387788U (en) 2020-05-25 2020-05-25 Device is put in to effluent disposal basin flocculation liquid for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020885456.1U CN212387788U (en) 2020-05-25 2020-05-25 Device is put in to effluent disposal basin flocculation liquid for construction

Publications (1)

Publication Number Publication Date
CN212387788U true CN212387788U (en) 2021-01-22

Family

ID=74252184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020885456.1U Expired - Fee Related CN212387788U (en) 2020-05-25 2020-05-25 Device is put in to effluent disposal basin flocculation liquid for construction

Country Status (1)

Country Link
CN (1) CN212387788U (en)

Similar Documents

Publication Publication Date Title
CN211069201U (en) Integrated town sewage treatment device
CN212387788U (en) Device is put in to effluent disposal basin flocculation liquid for construction
CN214360334U (en) Reinforced water body repairing device
CN203498171U (en) Oxygen-enriching and oxygenating device
CN210656424U (en) Domestic sewage treatment device
CN107522359A (en) A kind of sewage-treatment plant
CN201932959U (en) Activated carbon backwashing equipment
CN211921276U (en) Silt processing apparatus for hydraulic engineering
CN211057944U (en) Washing wastewater recycling toilet flushing equipment
CN210127149U (en) Integrated treatment device for domestic wastewater
CN215756804U (en) A sewage pretreatment device for municipal administration plumbing
CN208327538U (en) A kind of city river sewage-treatment plant
CN208038276U (en) A kind of small-sized septic tank for rural household's life sewage disposal
CN206352326U (en) It is a kind of to purify the secondary water-supply water-storing device of moisture
CN210764503U (en) Low-emission papermaking wastewater treatment equipment
CN212894387U (en) Cellular-type septic tank of high-efficient hydrolysis
CN211688479U (en) Leading denitrification sewage treatment plant of integration
CN220550035U (en) Micro-power self-circulation rural sewage treatment device
CN214809725U (en) Device for reducing water content in gas supply pipeline
CN102452716A (en) Water treatment equipment with sludge lifting function
CN220868273U (en) Building foundation pit water supply and drainage equipment
CN211078854U (en) Septic tank with sewage treatment integration
CN102452731A (en) Water treatment equipment with backflushing function
CN214192878U (en) Filter equipment for advanced wastewater treatment
CN201857309U (en) Water treatment equipment with sludge lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210122

CF01 Termination of patent right due to non-payment of annual fee