CN212365445U - Construction project budget bulletin board - Google Patents

Construction project budget bulletin board Download PDF

Info

Publication number
CN212365445U
CN212365445U CN202021223672.6U CN202021223672U CN212365445U CN 212365445 U CN212365445 U CN 212365445U CN 202021223672 U CN202021223672 U CN 202021223672U CN 212365445 U CN212365445 U CN 212365445U
Authority
CN
China
Prior art keywords
bulletin
bulletin board
board
groove
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021223672.6U
Other languages
Chinese (zh)
Inventor
韦翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaili University
Original Assignee
Kaili University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaili University filed Critical Kaili University
Priority to CN202021223672.6U priority Critical patent/CN212365445U/en
Application granted granted Critical
Publication of CN212365445U publication Critical patent/CN212365445U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a construction project budget bulletin board, including bulletin board main part, the front end of bulletin board main part has been seted up and has been put the groove, has seted up the rolling slot on putting the groove, has placed the gyro wheel in the rolling slot, and the bearing has been put to the cover on the gyro wheel, and it has the connecting rod to alternate in the bearing, and the connecting rod facial make-up is equipped with the show board, and the show board facial make-up is equipped with the fixture block, and the fixture block is built-in to be equipped with the torsional spring. When replacing bulletin, press the fixture block on the show board, can take off old budget bulletin through the torsional spring in the fixture block, after replacing new budget bulletin, loosen the fixture block, when having replaced one show board, can withhold the draw-out groove with the hand and stimulate the show board, because the connecting rod under the show board alternates in the bearing, the bearing housing is put in the gyro wheel, makes the gyro wheel can roll in the roll groove, has avoided managers to come back and move in the front of the bulletin board, thereby solve the difficult problem of replacing of current construction project budget bulletin board bulletin.

Description

Construction project budget bulletin board
Technical Field
The utility model belongs to the technical field of construction equipment, concretely relates to construction project budget bulletin board.
Background
The construction project is a space for people to live and use, such as a house, a bridge, a factory building, a gymnasium, a cave, a water tower, a temple and the like, which is formed by building materials such as earth, bricks, tiles, stones, woods and the like.
What current construction project budget bulletin board adopted usually is simple sticker billboard to the information that will post is pasted on the billboard through bonding tool such as glue, and the manager of being convenient for is under construction watched, and the weak point of existence has: because the information posted on the bulletin board is pasted by the adhesive tool, when the budget information is replaced, the old budget information needs to be removed back and forth, and the old budget information paper is possibly torn in the replacement process, which is not beneficial to the budget information archiving of the construction project.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction project budget bulletin board to solve the difficult problem of replacing of current construction project budget bulletin board bulletin.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction project budget bulletin board, includes bulletin board main part, the front end of bulletin board main part has been seted up and has been put the groove, put and have been seted up the rolling slot on the groove, the gyro wheel has been placed in the rolling slot, the bearing has been put to the cover on the gyro wheel, the cross-under has the connecting rod in the bearing, the connecting rod facial make-up is equipped with the show board, show board facial make-up is equipped with the fixture block, the built-in torsional spring that is equipped with of fixture block, the kerve has been seted.
Preferably, the upper end of the bulletin board main body is provided with a vertical rod, and the vertical rod is provided with a rain baffle.
Preferably, the fixed block has been installed to the front end of bulletin cabinet main part, the pivot has been installed between the fixed block, the apron has been placed in the pivot, seted up the perforation on the apron, the perforation is gone through to insert has the pivot, the pull handle has been installed to the lower extreme of apron.
Preferably, a bottom plate is placed below the bulletin board main body, a sleeve is arranged on the bottom plate, a supporting rod is inserted in the sleeve, an adjusting hole is formed in the supporting rod, a through hole is formed in the sleeve, a fixing pin is inserted in the through hole, a spring is sleeved on the fixing pin, a connecting rod is arranged on the supporting rod, and a roller seat is arranged at the lower end of the bottom plate.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a construction project budget bulletin board, compared with the prior art, when needs replacement bulletin, the administrator can press the fixture block on the show board, old budget bulletin between the fixture block can be taken off through the torsional spring in the fixture block, after new budget bulletin in the replacement, loosen the fixture block, make the fixture block clip the bulletin, when bulletin on the one side show board has been replaced, can withhold the draw-groove pulling show board with the hand, because the connecting rod interlude under the show board is in the bearing, the bearing housing is put in the gyro wheel, make the gyro wheel roll in the rolling groove of bulletin cabinet main part, let next show board move to before, avoided the administrator to come back to walk around in the bulletin cabinet, thereby solve the difficult problem of replacing of current construction project budget bulletin board bulletin.
The utility model provides a construction project budget bulletin board through the weather shield in the pole setting, can avoid the rainwater to enter into the bulletin cabinet, prevents that the bulletin from being taken place by the condition that the rainwater damaged.
The utility model provides a construction project budget bulletin board through the perforation on the apron and pivot normal running fit between the fixed block, can hold the pull handle with the hand and stimulate, makes the apron around the pivot upset, and the replacement of the bulletin of being convenient for can also avoid bulletin impaired when daily use.
The utility model provides a construction project budget bulletin board, gyro wheel in the gyro wheel seat through the bottom plate under, be favorable to the transport of whole bulletin board, after moving to suitable position, can make the bracing piece rebound in the sleeve through upwards spurting the connecting rod, in this while, outwards spurting the fixed pin, the bracing piece moves to suitable high back, can loosen the fixed pin, because the fixed pin receives the pulling force effect of spring, alternate in the regulation hole, can adjust the height of whole bulletin board, the personnel of being convenient for watch.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
FIG. 3 is a schematic left side view taken along line A-A of FIG. 1;
FIG. 4 is an enlarged view of FIG. 3 at b;
fig. 5 is an enlarged schematic view of fig. 3 at c.
In the figure: 1 bulletin board main body, 2 placing grooves, 3 rolling grooves, 4 rollers, 5 bearings, 6 connecting rods, 7 display boards, 8 clamping blocks, 9 torsion springs, 10 drawing grooves, 11 vertical rods, 12 rain baffles, 13 fixing blocks, 14 rotating shafts, 15 cover plates, 16 through holes, 17 pull handles, 18 bottom plates, 19 sleeves, 20 supporting rods, 21 adjusting holes, 22 through holes, 23 fixing pins, 24 springs, 25 connecting rods and 26 roller seats.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5, the present invention provides a technical solution: a construction project budget bulletin board comprises a bulletin board main body 1 which is of a box body structure, a placing groove 2 which is a square groove and is arranged on the front end face of the bulletin board main body 1, rolling grooves 3 which are square grooves are respectively arranged at the upper end and the lower end of the placing groove 2 and are arranged in the middle, rolling wheels 4 which are circular ring structures are arranged in the rolling grooves 3, bearings 5 are sleeved in the middle of the rolling wheels 4, the outer walls of the bearings 5 are in interference fit with the inner walls of the rolling wheels 4, connecting rods 6 are inserted in the bearings 5, the connecting rods 6 are U-shaped structures, the upper ends of the connecting rods 6 are welded on the lower end face of a display plate 7, the display plate 7 is arranged in the placing groove 2 and is a square plate, the number of the two display plates are arranged, clamping blocks 8 are welded on the front end face of the display plate 7 and are of a V-shaped structure, the number of the two clamping blocks 8 are welded between the clamping blocks 9, the type, the restoring force is strong, can take off old budget bulletin between fixture block 8, after new budget bulletin is gone up in the replacement, loosen fixture block 8, can fix the bulletin, pull groove 10 has been seted up respectively to the left and right sides of the preceding terminal surface of show board 7, for square groove, be located the intermediate position, through withholding pull groove 10 with the hand, transversely stimulate show board 7, because connecting rod 6 under show board 7 alternates in bearing 5, bearing 5 cover is put in gyro wheel 4, make gyro wheel 4 can roll in the rolling groove 3 of bulletin cabinet main part 1, let next show board 7 move to in the front of, the administrator has been avoided walking back before the bulletin cabinet.
Referring to fig. 1, 2 and 3, the bulletin board main body 1 has a vertical rod 11 welded to the upper end surface thereof, the number of the vertical rod is 2, a rain shield 12 is placed on the top of the vertical rod 11, the rain shield 12 is an arc-shaped plate, the lower surface of the rain shield 12 is welded to the upper surface of the vertical rod 11, the vertical rod is located at an intermediate position, the rain shield 13 on the vertical rod 12 can prevent rainwater from entering the bulletin board and prevent bulletin from being damaged by rainwater, the front end surface of the bulletin board main body 1 is welded with a fixed block 13, which is a square block, located above the placement groove 2, the number of the vertical rod is 2, a rotating shaft 14 is welded between the two fixed blocks 13, the rotating shaft 14 is a cylindrical structure, a cover plate 15 is placed on the rotating shaft 14, the cover plate 15 is a U-shaped structure, the cover plate is located at the intermediate position, the upper end of the cover plate 15 is provided with a through hole 16, the pull handle 17 is of a U-shaped structure and is located in the middle, the rotating shaft 14 is in rotating fit with the fixing block 13 through the through hole 16 in the cover plate 15, the pull handle 17 can be held by a hand to be pulled, the cover plate 15 is enabled to turn around the rotating shaft 14, replacement of bulletins is facilitated, and damage to the bulletins can be avoided during daily use.
Referring to fig. 1, 2 and 3, a bottom plate 18 is placed below a bulletin board main body 1, the bottom plate is a square plate and is located on the periphery, the number of the bottom plate is 4, sleeves 19 are welded and connected to the upper end of the bottom plate 18, the bottom plate is a cylindrical structure and is located in the middle, the number of the bottom plate is 4, supporting plates 20 are inserted into the sleeves 19, the supporting rods 20 are cylindrical structures, the upper end faces of the supporting rods 20 are welded and connected to the periphery of the lower end of the bulletin board main body 1, adjusting holes 21 are uniformly formed in the supporting rods 20 and are circular holes, through holes 22 are formed in the upper portions of the sleeves 19 and are circular holes, fixing pins 23 are inserted into the adjusting holes 21, springs 24 are sleeved on the fixing pins 23, one ends of the springs 21 are welded and connected to the right end face of the fixing pins 23, the other ends are welded and connected to the sleeves 19, connecting rods 25 are welded and connected, be located the intermediate position, the model is DS94, the quantity is 4, gyro wheel in the gyro wheel seat 26 under bottom plate 19, be favorable to the transport of whole bulletin board, after moving to suitable position, can be through upwards pulling connecting rod 25, make the bracing piece 20 rebound in the sleeve 19, here simultaneously, outside pulling fixed pin 23, after bracing piece 20 moves to suitable height, can loosen fixed pin 23, because fixed pin 23 receives the pulling force effect of spring 24, alternate in adjusting hole 21, can adjust the height of whole bulletin board, the personnel of being convenient for watch.
In practice, the bulletin board is pushed to rotate the roller in the roller seat, after moving to a proper position, the connecting rod 25 is pushed upwards to move the supporting rod 20 in the sleeve 19 upwards, meanwhile, the fixing pin 23 is pulled outwards, after the supporting rod 20 moves to a proper height, the fixing pin 23 can be loosened to enable the fixing pin 23 to penetrate into the adjusting hole 21 through the through hole 22, the height of the whole bulletin board can be adjusted, so that a person can conveniently watch the bulletin board, when the bulletin needs to be replaced, a manager can press the clamping block 8 on the display board 7, the old budget bulletin between the clamping blocks 8 can be taken down through the torsion spring 9 in the clamping block 8, after the new budget bulletin is replaced, the clamping block 8 is loosened to enable the clamping block 8 to clamp the bulletin board, when the bulletin board 7 is replaced, the pulling groove 10 can be buckled by a hand to pull the display board 7, because the connecting rod 6 under the display board 7 penetrates into the, the bearing 5 is sleeved in the roller 4, so that the roller 4 can roll in the rolling groove 3 of the bulletin board main body 1, the next display board 7 can be moved to the front, and the situation that managers move back and forth in front of the bulletin board is avoided, and the problem that the bulletin board for construction project budget is not easy to replace is solved.

Claims (2)

1. The utility model provides a construction project budget bulletin board, includes bulletin cabinet main part (1), its characterized in that: the bulletin board is characterized in that a placement groove (2) is formed in the front end of the bulletin board main body (1), a rolling groove (3) is formed in the placement groove (2), a roller (4) is placed in the rolling groove (3), a bearing (5) is sleeved on the roller (4), a connecting rod (6) is inserted in the bearing (5), a display board (7) is arranged on the connecting rod (6), a clamping block (8) is arranged on the display board (7), a torsion spring (9) is arranged in the clamping block (8), and a pull groove (10) is formed in the display board (7);
the upper end of the bulletin board main body (1) is provided with an upright post (11), and the upright post (11) is provided with a rain shield (12);
fixed block (13) have been installed to the front end of bulletin board main part (1), pivot (14) have been installed between fixed block (13), place apron (15) on pivot (14), seted up on apron (15) and perforated hole (16), pivot (14) have been worn to insert in perforated hole (16), pull handle (17) have been installed to the lower extreme of apron (15).
2. The construction project budget bulletin board of claim 1, wherein: bottom plate (18) have been placed to the below of bulletin board main part (1), bottom plate (18) facial make-up is equipped with sleeve (19), alternates in sleeve (19) has bracing piece (20), regulation hole (21) have been seted up on bracing piece (20), through-hole (22) have been seted up on sleeve (19), it has fixed pin (23) to alternate in through-hole (22), spring (24) have been set on fixed pin (23), bracing piece (20) facial make-up is equipped with connecting rod (25), gyro wheel seat (26) have been installed to the lower extreme of bottom plate (18).
CN202021223672.6U 2020-06-29 2020-06-29 Construction project budget bulletin board Expired - Fee Related CN212365445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021223672.6U CN212365445U (en) 2020-06-29 2020-06-29 Construction project budget bulletin board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021223672.6U CN212365445U (en) 2020-06-29 2020-06-29 Construction project budget bulletin board

Publications (1)

Publication Number Publication Date
CN212365445U true CN212365445U (en) 2021-01-15

Family

ID=74151214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021223672.6U Expired - Fee Related CN212365445U (en) 2020-06-29 2020-06-29 Construction project budget bulletin board

Country Status (1)

Country Link
CN (1) CN212365445U (en)

Similar Documents

Publication Publication Date Title
CN212365445U (en) Construction project budget bulletin board
CN211507927U (en) High-stability fixing structure of electric power grounding pile
CN113585123B (en) Smart tourist person order management system flexible to use and long in service life
CN206571411U (en) A kind of portable double ladder
CN216388445U (en) Telescopic whiteboard for teaching
CN209053516U (en) One kind being easily installed the construction of disassembly high efficiency, and formula is novel encloses shelves
CN212256627U (en) Resident user's smart electric meter is copied and is checked and receive simulation teaching device
CN220964883U (en) Portable station all-in-one of light satellite communication
CN206688161U (en) A kind of football goal structure of dismantled and assembled net
CN216980002U (en) Information publishing signboard with adjustable multi-angle
CN201042251Y (en) Lower nest of umbrella
CN220503870U (en) Roller for modifying surface texture of earthen site
CN214541347U (en) Park is with direction sign
CN214008749U (en) Teaching device for innovative entrepreneurship education course
CN216403238U (en) Cast film production is with mechanism that destatics
CN211662004U (en) Supporting mechanism of electric lifting transfer device
CN220952719U (en) Silicon processing equipment is scribbled to release paper
CN215636274U (en) Teaching course shoots and uses strutting arrangement
CN219794917U (en) Spliced construction coaming
CN214955527U (en) Teaching aid for studying and swimming
CN216157001U (en) But reutilization and remove convenient architectural decoration guardrail
CN221321170U (en) Purification type rainwater garden structure
CN219654414U (en) Arched arc roof heat-insulating breathable tent
CN218388666U (en) Rice transplanter rack structure convenient to disassemble
CN215255171U (en) Building site encloses fender convenient to installation propaganda poster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210115