CN212361049U - Prefabricated heat preservation plastic conduit of central heating - Google Patents
Prefabricated heat preservation plastic conduit of central heating Download PDFInfo
- Publication number
- CN212361049U CN212361049U CN202020228766.6U CN202020228766U CN212361049U CN 212361049 U CN212361049 U CN 212361049U CN 202020228766 U CN202020228766 U CN 202020228766U CN 212361049 U CN212361049 U CN 212361049U
- Authority
- CN
- China
- Prior art keywords
- shell
- support
- central heating
- pipeline
- lead screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 18
- 238000004321 preservation Methods 0.000 title claims description 15
- 238000013016 damping Methods 0.000 claims abstract description 17
- 238000009413 insulation Methods 0.000 claims abstract description 10
- 239000012634 fragment Substances 0.000 claims abstract description 8
- 230000001681 protective effect Effects 0.000 claims description 12
- 229920000742 Cotton Polymers 0.000 claims description 8
- 238000012856 packing Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Thermal Insulation (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a prefabricated insulation plastic pipe of central heating, the on-line screen storage device comprises a base, the top of base is provided with the casing, the casing is hollow cuboid structure, the casing is inside to be connected with the lead screw through the bearing rotation, the nut has been cup jointed through the screw thread in the both ends of lead screw, the sliding sleeve has been cup jointed in the both ends activity of lead screw, be provided with damping spring between the side of sliding sleeve and the nut, it is connected with the connecting rod to rotate on the sliding sleeve. The utility model discloses a set up knob, lead screw, thread bush, sliding sleeve, connecting rod and mount pad, conveniently adjust the height of pipeline, when not co-altitude installation, remain the level of pipeline all the time, through the multiunit damping spring who sets up and support fossil fragments, damping spring has improved the stability of device, and support fossil fragments have improved the holistic rigidity of device, improve the life of device, through setting up locking bolt, pivot and support, make things convenient for the pipeline to carry out angular adjustment, improve the use flexibility of device.
Description
Technical Field
The utility model relates to a plastic conduit technical field especially relates to a prefabricated heat preservation plastic conduit of central heating.
Background
Plastic pipe is a generic term for pipes made of plastic material. The plastic pipeline has the characteristics of light dead weight, sanitation, safety, small water flow resistance, energy conservation, metal conservation, improvement on living environment, long service life, safety, convenience and the like, and is favored by the pipeline engineering industry.
The existing heat-preservation plastic pipeline is mostly fixed through a pipe clamp, the fixing mode is convenient, but the pipeline is damaged once being collided during use due to the fact that a damping device is lacked, and the use cost is increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a prefabricated heat-preservation plastic pipeline for central heating.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a prefabricated heat-preservation plastic pipeline for central heating comprises a base, wherein a shell is arranged at the top of the base, the shell is of a hollow cuboid structure, a lead screw is rotatably connected inside the shell through a bearing, nuts are sleeved at two ends of the lead screw through threads, sliding sleeves are movably sleeved at two ends of the lead screw, a damping spring is arranged between the side face of each sliding sleeve and each nut, a connecting rod is rotatably connected onto each sliding sleeve, the top of each connecting rod is rotatably connected with an installation seat, the top of each installation seat is fixedly connected with a sliding plate, each sliding plate is slidably connected with the inner side wall of the shell, the top of each sliding plate is fixedly connected with a connecting block, the top of each connecting block is fixedly connected with a protective shell, a pipeline body is movably connected inside the protective shell, the pipeline body is of a hollow cylinder structure, the inside of heat preservation cotton is provided with the support fossil fragments.
Preferably, the mounting groove has been seted up at the top of base, the inside fixedly connected with support of mounting groove, it is connected with the pivot to rotate through the bearing on the support, the pivot rotates with the casing to be connected, the spout has been seted up to the bottom of casing, there is locking bolt the side of support through threaded connection, locking bolt runs through the support and passes through threaded connection with the spout.
Preferably, fixing bolts penetrate through the periphery of the top of the base, and fix the base and the wall body through the fixing bolts.
Preferably, the screw rod is parallel to the inner bottom of the shell, and the screw rod penetrates through the side face of the shell and is connected with the knob.
Preferably, the number of the support keels is two, and the two support keels are parallel to the protective shell.
Preferably, the threads on the inside of the two screw caps are opposite in direction.
Compared with the prior art, the beneficial effects of the utility model are that:
when the utility model is used, the pipeline body is inserted into the protective shell, the knob is rotated to drive the lead screw through the fixing bolt, the lead screw drives the screw cap through the screw transmission, the screw cap drives the damping spring, the damping spring drives the sliding sleeve, the sliding sleeve drives the connecting rod, the connecting rod drives the mounting seat, the mounting seat drives the sliding plate, the sliding plate drives the connecting block, the connecting block drives the outer shell, the height of the pipeline is adjusted through adjusting the height of the outer shell, the pipeline is always kept horizontal when the pipeline is mounted at different heights, the damping spring improves the stability of the device through the multiple groups of damping springs and the supporting keel, the supporting keel improves the rigidity of the whole device, the service life of the device is prolonged, when the angle of the pipeline body is required to be adjusted, the locking bolt is firstly rotated to separate the bracket from the shell in a locking state, the shell is, the shell drives the rotating shaft, the locking bolt is rotated again after the angle adjustment is completed, the shell support enters a locking state again, and the use flexibility of the device is improved.
Drawings
Fig. 1 is a schematic structural view of a prefabricated central heating heat-insulating plastic pipe according to a first embodiment of the present invention;
fig. 2 is a top view of a prefabricated heat-insulating plastic pipe for central heating according to the present invention;
fig. 3 is a schematic structural view of a second embodiment of the prefabricated central heating insulation plastic pipeline provided by the present invention;
fig. 4 is a bottom view of the shell of the prefabricated heat preservation plastic pipeline for central heating according to the present invention.
In the figure: the heat insulation device comprises a base 1, a fixing bolt 2, a shell 3, a knob 4, a lead screw 5, a nut 6, a damping spring 7, a sliding sleeve 8, a connecting rod 9, a mounting seat 10, a sliding plate 11, a connecting block 12, a protective shell 13, heat insulation cotton 14, a pipeline body 15, a supporting keel 16, a rotating shaft 17, a support 18, a locking bolt 19 and a sliding groove 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
The first embodiment is as follows:
referring to fig. 1-2, a prefabricated central heating thermal insulation plastic pipeline comprises a base 1, a shell 3 is arranged on the top of the base 1, the shell 3 is of a hollow cuboid structure, a lead screw 5 is rotatably connected inside the shell 3 through a bearing, nuts 6 are sleeved on two ends of the lead screw 5 through threads, sliding sleeves 8 are movably sleeved on two ends of the lead screw 5, a damping spring 7 is arranged between the side surface of the sliding sleeve 8 and the nuts 6, a connecting rod 9 is rotatably connected on the sliding sleeve 8, an installation seat 10 is rotatably connected on the top of the connecting rod 9, a sliding plate 11 is fixedly connected on the top of the installation seat 10, the sliding plate 11 is slidably connected with the inner side wall of the shell 3, a connecting block 12 is fixedly connected on the top of the sliding plate 11, a protection shell 13 is fixedly connected on the top of the connecting block 12, a, the outside of pipeline body 15 is filled with heat preservation cotton 14, and the inside of heat preservation cotton 14 is provided with support keel 16.
Wherein, fixing bolt 2 has run through all around at the top of base 1, and fixing bolt 2 is fixed base 1 and wall body.
Wherein, the screw rod 5 is parallel with the inner bottom of the shell 3, and the screw rod 5 penetrates through the side surface of the shell 3 and is connected with the knob 4.
Wherein, the quantity of support fossil fragments 16 is two, and two support fossil fragments 16 all are parallel with protective housing 13.
Wherein the threads inside the two nuts 6 are turned in opposite directions.
Example two:
referring to fig. 2-4, a prefabricated central heating thermal insulation plastic pipeline comprises a base 1, a shell 3 is arranged on the top of the base 1, the shell 3 is of a hollow cuboid structure, a lead screw 5 is rotatably connected inside the shell 3 through a bearing, nuts 6 are sleeved on two ends of the lead screw 5 through threads, sliding sleeves 8 are movably sleeved on two ends of the lead screw 5, a damping spring 7 is arranged between the side surface of the sliding sleeve 8 and the nuts 6, a connecting rod 9 is rotatably connected on the sliding sleeve 8, an installation seat 10 is rotatably connected on the top of the connecting rod 9, a sliding plate 11 is fixedly connected on the top of the installation seat 10, the sliding plate 11 is slidably connected with the inner side wall of the shell 3, a connecting block 12 is fixedly connected on the top of the sliding plate 11, a protection shell 13 is fixedly connected on the top of the connecting block 12, a, the outside of pipeline body 15 is filled with heat preservation cotton 14, and the inside of heat preservation cotton 14 is provided with support keel 16.
Wherein, the mounting groove has been seted up at base 1's top, and the inside fixedly connected with support 18 of mounting groove rotates through the bearing on the support 18 and is connected with pivot 17, and pivot 17 rotates with casing 3 to be connected, and spout 20 has been seted up to casing 3's bottom, and there is locking bolt 19 support 18's side through threaded connection, and locking bolt 19 runs through support 18 and passes through threaded connection with spout 20.
Wherein, fixing bolt 2 has run through all around at the top of base 1, and fixing bolt 2 is fixed base 1 and wall body.
Wherein, the screw rod 5 is parallel with the inner bottom of the shell 3, and the screw rod 5 penetrates through the side surface of the shell 3 and is connected with the knob 4.
Wherein, the quantity of support fossil fragments 16 is two, and two support fossil fragments 16 all are parallel with protective housing 13.
Wherein the threads inside the two nuts 6 are turned in opposite directions.
The working principle is as follows: when the device is used, the pipeline body 15 is inserted into the protective shell 13, the knob 4 is rotated through the fixing bolt 2, the knob 4 drives the screw rod 5, the screw rod 5 drives the screw cap 6 through thread transmission, the screw cap 6 drives the damping spring 7, the damping spring 7 drives the sliding sleeve 8, the sliding sleeve 8 drives the connecting rod 9, the connecting rod 9 drives the mounting seat 10, the mounting seat 10 drives the sliding plate 11, the sliding plate 11 drives the connecting block 12, the connecting block 12 drives the outer shell 13, the height of the pipeline 15 is adjusted by adjusting the height of the outer shell 13, the pipeline 15 is always kept horizontal when the device is mounted at different heights, the damping spring 7 improves the stability of the device through the multiple groups of damping springs 7 and the supporting keel 16 when the protective shell 13 is impacted, the supporting keel 16 improves the integral rigidity of the device, the service life of the device is prolonged, and when the angle of the pipeline body, firstly, the locking bolt 19 is rotated to enable the bracket 18 and the shell 3 to be separated from a locking state, the shell 3 is rotated, the shell 3 drives the rotating shaft 17, the locking bolt 19 is rotated again after the angle adjustment is completed, the bracket 18 of the shell 3 enters the locking state again, and the use flexibility of the device is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The prefabricated heat-preservation plastic pipeline for central heating comprises a base (1) and is characterized in that a shell (3) is arranged at the top of the base (1), the shell (3) is of a hollow cuboid structure, a lead screw (5) is rotatably connected inside the shell (3) through a bearing, nuts (6) are sleeved at two ends of the lead screw (5) through threads, sliding sleeves (8) are movably sleeved at two ends of the lead screw (5), a damping spring (7) is arranged between the side surface of each sliding sleeve (8) and each nut (6), a connecting rod (9) is rotatably connected on each sliding sleeve (8), a mounting seat (10) is rotatably connected at the top of each connecting rod (9), a sliding plate (11) is fixedly connected at the top of each mounting seat (10), the sliding plate (11) is slidably connected with the inner side wall of the shell (3), and a connecting block (12) is fixedly connected at the top of each sliding plate (, the top fixedly connected with protective housing (13) of connecting block (12), the inside swing joint of protective housing (13) has pipeline body (15), pipeline body (15) are hollow cylinder structure, the outside packing of pipeline body (15) has heat preservation cotton (14), the inside of heat preservation cotton (14) is provided with support fossil fragments (16).
2. The prefabricated heat-insulation plastic pipeline for central heating according to claim 1, characterized in that a mounting groove is formed in the top of the base (1), a support (18) is fixedly connected to the inside of the mounting groove, a rotating shaft (17) is rotatably connected to the support (18) through a bearing, the rotating shaft (17) is rotatably connected to the casing (3), a sliding groove (20) is formed in the bottom of the casing (3), a locking bolt (19) is connected to the side surface of the support (18) through a thread, and the locking bolt (19) penetrates through the support (18) and is connected to the sliding groove (20) through a thread.
3. Prefabricated central heating insulation plastic pipe according to claim 1, characterized in that fixing bolts (2) are arranged around the top of the base (1), and the fixing bolts (2) fix the base (1) to the wall.
4. Prefabricated central heating insulation plastic pipe according to claim 1, characterized in that the screw (5) is parallel to the inner bottom of the shell (3), the screw (5) penetrates the side of the shell (3) and is connected with the knob (4).
5. Prefabricated central heating insulation plastic pipe according to claim 1, characterized in that said number of support keels (16) is two, both support keels (16) being parallel to the protective shell (13).
6. Prefabricated central heating insulating plastic pipe according to claim 1, characterized in that the threads inside the two screw caps (6) are turned in opposite directions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020228766.6U CN212361049U (en) | 2020-02-29 | 2020-02-29 | Prefabricated heat preservation plastic conduit of central heating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020228766.6U CN212361049U (en) | 2020-02-29 | 2020-02-29 | Prefabricated heat preservation plastic conduit of central heating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212361049U true CN212361049U (en) | 2021-01-15 |
Family
ID=74145190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020228766.6U Active CN212361049U (en) | 2020-02-29 | 2020-02-29 | Prefabricated heat preservation plastic conduit of central heating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212361049U (en) |
-
2020
- 2020-02-29 CN CN202020228766.6U patent/CN212361049U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208992089U (en) | A kind of steel pipe welding pipeline clamping device | |
CN212361049U (en) | Prefabricated heat preservation plastic conduit of central heating | |
CN205725605U (en) | A kind of solar tracking device | |
CN212420304U (en) | Adjustable cylindrical pipe sleeve welding fixing frame | |
CN203418255U (en) | Adjustable pipe fitting fitting-up bracket | |
CN208001249U (en) | A kind of adjustable solar holder | |
CN210461424U (en) | Adjustable multifunctional bearing seat | |
CN201748838U (en) | Heat exchanger screw-threaded locking ring screwing-in device | |
CN209992166U (en) | Adjusting device for no-load offline test bed of distribution box | |
CN211693986U (en) | Anti-seismic support and hanger based on disk spring vibration reduction | |
CN111853366A (en) | Size-adjustable support hanger | |
CN220871159U (en) | Trough type solar heat collector bracket provided with damper | |
CN216143281U (en) | A gallows with shock resistance | |
CN214399658U (en) | Reinforcement type jacking device for building angle modulation of being convenient for | |
CN212273279U (en) | Size-adjustable support hanger | |
CN216503520U (en) | Nonrust steel pipe processing fixing device | |
CN214756179U (en) | Solar panel installing support for new forms of energy | |
CN219175957U (en) | Bearing support structure is built in room | |
CN213452358U (en) | Antidetonation support convenient to installation is fixed | |
CN210374122U (en) | Mounting system of flat plate type heat collector in wall-mounted solar water heater | |
CN217486115U (en) | Pipeline hanger for electric power facility installation | |
CN212156434U (en) | Wireless communication equipment base | |
CN220637635U (en) | PP tubular product processing fixer | |
CN218327088U (en) | Sensor mounting rack | |
CN219413961U (en) | Support and hanger with compensation anti-moment disc spring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210511 Address after: Room 20402, building 6, civil affairs community, No.9, Qujiang Avenue, Qujiang New District, Xi'an City, Shaanxi Province, 710000 Patentee after: Shaanxi Derun Plastics Technology Development Co.,Ltd. Address before: 551800 No.12 Pingfeng formation, Jinjiang village, Yankong Town, Jinsha County, Bijie City, Guizhou Province Patentee before: Chen Douqin |
|
TR01 | Transfer of patent right |