CN212359188U - Steel construction vestibule construction protection facility - Google Patents

Steel construction vestibule construction protection facility Download PDF

Info

Publication number
CN212359188U
CN212359188U CN202020356917.6U CN202020356917U CN212359188U CN 212359188 U CN212359188 U CN 212359188U CN 202020356917 U CN202020356917 U CN 202020356917U CN 212359188 U CN212359188 U CN 212359188U
Authority
CN
China
Prior art keywords
steel
wire rope
profiled
construction
vestibule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020356917.6U
Other languages
Chinese (zh)
Inventor
金振
王超迪
楼群
邵帅帅
李亚龙
王蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongyang Third Construction Engineering Co ltd
Original Assignee
Zhejiang Dongyang Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongyang Third Construction Engineering Co ltd filed Critical Zhejiang Dongyang Third Construction Engineering Co ltd
Priority to CN202020356917.6U priority Critical patent/CN212359188U/en
Application granted granted Critical
Publication of CN212359188U publication Critical patent/CN212359188U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a steel construction vestibule construction protective device belongs to the construction field. The utility model provides a steel construction vestibule construction protective equipment, includes profiled steel sheet, wire rope, U shaped steel muscle pull ring, haulage rope, its characterized in that: the steel wire ropes are used as supporting parts, the profiled steel sheets are spliced with one another, and the front end and the rear end of the spliced profiled steel sheets are provided with traction ropes which are lapped on the steel wire ropes and can move back and forth on the steel wire ropes.

Description

Steel construction vestibule construction protection facility
Technical Field
The utility model relates to a steel construction vestibule construction protective device belongs to the construction field.
Background
In the construction of some steel construction vestibules, for preventing the accident that the thing leads to because of falling from the high altitude in the work progress from appearing, generally can set up safety protection frame in the vestibule below, nevertheless because the construction height of steel construction vestibule is more than tens meters or tens meters, the thing that falls under the action of gravitational acceleration, can produce very big impact force during the whereabouts, probably cause the damage of protection frame, if the quality of the thing that falls is big more, the impact force that causes is also big more, it causes the injury to the personnel of below to probably pierce through the protection frame in the time of seriously.
Disclosure of Invention
The utility model aims at providing a steel construction vestibule construction protective equipment can effectively reduce the destruction that the object that falls from the high altitude caused, provides the guarantee for the safe construction of steel construction vestibule.
In order to achieve the above purpose, the utility model adopts the following technical scheme to solve:
the utility model provides a steel construction vestibule construction protective equipment, includes profiled steel sheet, wire rope, U shaped steel muscle pull ring, haulage rope, its characterized in that: a plurality of steel wire ropes are used as supports, the profiled steel plates are spliced with each other, and the spliced profiled steel plates are moved to the steel wire ropes through traction ropes.
Preferably, every width of profiled steel sheet is 500mm, and long limit both sides respectively have a plurality of aperture, through the galvanized iron wire with a plurality of profiled steel sheet links to each other together, and the minor face direction is then through the overlap joint mode extension the length of profiled steel sheet makes it exceed the width of steel vestibule.
Preferably, two ends of each profiled steel sheet are bent upwards by 90 degrees, and the length of the bent part is 300mm, so that a falling object is prevented from falling onto the profiled steel sheet and then continuously rolling to the edge to cause secondary falling.
Preferably, the steel wire rope is looped with a galvanized iron wire, and both ends of the galvanized iron wire are tied to the profiled steel sheet, so that the profiled steel sheet can only move along the direction of the steel wire rope and can not be deviated to the side edge of the steel wire rope.
Preferably, the U-shaped steel bar pull rings are embedded in the edge areas of the floor slabs of the main body structures at the two ends of the steel structure corridor and are located on the floor slab of the lower floor layer where the steel structure corridor is located.
Preferably, wire rope is used for connecting the pre-buried U shaped steel muscle pull ring in both ends, and the connected mode is wire rope passes behind the U shaped steel muscle pull ring with do not tie up together with the part that passes with the dop, dop quantity is no less than 4, and wherein last dop has 500 mm's interval with preceding one to this section of a safety bend of releasing in the centre, so that detect the dop not hard up and whether wire rope slides.
Preferably, the contact part of the steel wire rope and the floor slab edge is separated by a rubber pad, so that the concrete at the floor slab edge is prevented from being damaged under the continuous abrasion of the steel wire rope.
Preferably, the winch is used for pulling the traction rope to drive the profiled steel sheet to move along the direction of the steel wire rope, and the length of the traction rope meets certain requirements and is slightly longer than that of the steel corridor.
The utility model discloses possess following characteristics:
during the construction of steel structure vestibule, after falling object appears, the high altitude interception is carried out before still not producing great destructive power for the accident that the falling object caused harms and falls to minimumly.
Drawings
Fig. 1 is a three-dimensional schematic diagram of the present invention.
Fig. 2 is an installation schematic diagram of the present invention.
Figure 3 is the utility model discloses with floor connection schematic diagram.
Fig. 4 is a bottom partial schematic view of the present invention.
The labels in the figure are: 1. the steel wire rope comprises a profiled steel plate, 2 steel wire ropes, 3U-shaped steel bar pull rings, 4 traction ropes, 5 steel structure vestibules, 6 chucks, 7 windlasses and 8 galvanized iron wires.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments.
The utility model discloses before the installation, draw 3 rings pre-buried at the assigned position with U shaped steel, the floor edge of one deck under 5 place layers of steel construction vestibule promptly, every pre-buried point will exceed the projection scope of steel construction vestibule 5 at a distance of 500mm, the pre-buried point at both ends, make the profiled sheet 1 of follow-up laying can cover the projection scope of steel construction vestibule 5 completely.
The pre-buried U-shaped steel bar pull ring 3 does not damage the reinforced concrete structure of the floor slab.
As shown in fig. 3, during installation, the steel wire rope 2 firstly penetrates through the U-shaped steel bar pull ring 3 and is bound with the part which does not penetrate through the steel wire rope pull ring by the clamp heads 6, the number of the clamp heads 6 is more than four, the other end, which is not bound with the steel wire rope 2, of the steel wire rope is pulled down to a floor corresponding to the other main body structure through the winch 7, and the steel wire rope 2 is connected to the U-shaped steel bar pull ring 3 on the side by adopting the same method after being straightened as much. After tying up all wire rope 2 and U type reinforcing bar pull ring 3 together, the position of wire rope and floor limit contact is separated with the rubber pad, and whether the check connection is firm simultaneously, and the accessible increases the quantity of dop 6 and strengthens the fastness.
As shown in fig. 2, after the steel wire rope 2 is installed, a first row of profiled steel sheets 1 is laid on the position of the steel wire rope 2 close to the floor edge, a traction rope 4 is tied, the other end of the traction rope 4 is positioned on the other main structure, a winch 7 pulls the traction rope 4 to drive the profiled steel sheets 1 to move towards the other main structure, a row of profiled steel sheets 1 is added every half meter of movement, the profiled steel sheets 1 and the steel wire rope 2 are bound together by galvanized iron wires 8, the steps are repeated until the first row of profiled steel sheets 1 reaches the floor edge of the other main structure, then the hauling rope 4 is tied on the fixing objects such as the post or the guard rail, the last row of profiled steel plates 1 are also fixed on the fixing objects such as the post or the guard rail by the rope, and the profiled steel plates 1 with two ends close to the main body part have certain inclination when being fixed, but are not completely covered on the steel wire rope 2.
After 5 constructions in steel construction vestibule finish, when needing to demolish protective equipment, will break down the rope that both ends are fixed earlier, reuse hoist engine 7 slowly pulls profiled sheet 1, cuts off the iron wire on profiled sheet 1 when pulling to dismantle 1 one of profiled sheet. After the profiled steel sheet 1 is disassembled, the clamping head 6 at one end of the steel wire rope 2 is firstly removed, then the whole steel wire rope 2 is received on the floor slab, and finally the clamping head 6 at the other end is removed. And (4) finishing all the profiled steel sheets 1 and the steel wire ropes 2, and transporting to a specified place for storage through a construction elevator and a tower crane.
The construction attention problem is as follows: when in site construction, the safety helmet is worn and the helmet belt is buckled; when the safety belt is installed or disassembled, a constructor must fasten the safety belt, and one end of the safety belt is buckled on a fixed component to ensure the life safety of the constructor.

Claims (7)

1. The utility model provides a steel construction vestibule construction protective equipment, includes profiled steel sheet, wire rope, U shaped steel muscle pull ring, haulage rope, its characterized in that: the steel wire ropes are used as supporting parts, the profiled steel sheets are spliced with one another, and the front end and the rear end of the spliced profiled steel sheets are provided with traction ropes which are lapped on the steel wire ropes and can move back and forth on the steel wire ropes.
2. The protective facility for steel structure vestibule construction according to claim 1, wherein each of the profiled steel sheets has a width of 500mm, a plurality of small holes are respectively formed on both sides of the long side, a plurality of the profiled steel sheets are connected together by galvanized iron wires, and the length of the profiled steel sheet is extended in the short side direction by overlapping so as to exceed the width of the steel vestibule.
3. The steel structure vestibule construction protection facility as claimed in claim 1, wherein both ends of each of the profiled steel sheets are respectively bent upward by 90 degrees, and the length of the bent portion is 300 mm.
4. The steel structure vestibule construction protection facility as claimed in claim 1, wherein the wire rope is looped with a galvanized iron wire near the wire rope, and both ends of the wire rope are tied to the profiled steel sheet, so that the profiled steel sheet can move only along the direction of the wire rope and cannot be shifted to the side of the wire rope.
5. The steel structure corridor construction protection facility as claimed in claim 1, wherein the U-shaped steel pull rings are pre-embedded in the floor edge regions of the main structure at the two ends of the steel structure corridor and are located on the floor of the floor layer below the floor where the steel structure corridor is located.
6. The steel structure vestibule construction protection facility as claimed in claim 1, wherein the steel wire rope is used to connect the U-shaped steel pull rings embedded at both ends, the connection mode is that the steel wire rope passes through the U-shaped steel pull rings and is bound with the part which does not pass through the U-shaped steel pull rings by using clamping heads, the number of the clamping heads is not less than 4, the last clamping head is 500mm away from the previous clamping head, and a safety bend is arranged at the middle section so as to detect whether the clamping heads are loosened and whether the steel wire rope slides.
7. The steel structure corridor construction protection facility according to claim 1, wherein the contact part of the steel wire rope and the floor slab edge is separated by a rubber pad.
CN202020356917.6U 2020-03-12 2020-03-12 Steel construction vestibule construction protection facility Active CN212359188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020356917.6U CN212359188U (en) 2020-03-12 2020-03-12 Steel construction vestibule construction protection facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020356917.6U CN212359188U (en) 2020-03-12 2020-03-12 Steel construction vestibule construction protection facility

Publications (1)

Publication Number Publication Date
CN212359188U true CN212359188U (en) 2021-01-15

Family

ID=74146863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020356917.6U Active CN212359188U (en) 2020-03-12 2020-03-12 Steel construction vestibule construction protection facility

Country Status (1)

Country Link
CN (1) CN212359188U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115354738A (en) * 2022-05-27 2022-11-18 中国一冶集团有限公司 Protective device for house corridor structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115354738A (en) * 2022-05-27 2022-11-18 中国一冶集团有限公司 Protective device for house corridor structure
CN115354738B (en) * 2022-05-27 2023-10-27 中国一冶集团有限公司 Protection device for house corridor structure

Similar Documents

Publication Publication Date Title
CN110092264B (en) Material lifting system in elevator shaft in building construction stage
CN212359188U (en) Steel construction vestibule construction protection facility
CN109252521B (en) Equipment for pulling out steel pipe pile in water in limited space under steel beam and construction method thereof
CN110593880A (en) Inclined shaft excavation system and method
CN105460759B (en) A kind of method that main shaft winch tail rope is changed
CN211524150U (en) Steel beam edge protection device
CN110065888B (en) Cable crane main cable dismantling construction method
CN210713755U (en) High-altitude combined type steel beam component mounting and operating platform
JP6873435B2 (en) Suspended scaffolding and its erection method
CN201161878Y (en) Movable tower crane face operation construction apparatus
CN108438177B (en) Diving cage for underwater detection operation
CN212668345U (en) Simple pile supply platform equipment for shore-connected wharf pile foundation construction
CN215594999U (en) Sliding device of large-span double-T plate
JP2004107972A (en) Launching method and launching machine for bridge
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN115162184A (en) Suspension bridge steel truss erecting system and method
CN211499876U (en) Super high-rise overhanging safe hard protection shed
CN211498622U (en) A protective apparatus that fixed effectual for slope road construction
CN210655915U (en) Connecting device for climbing frame and tower crane
CN112376427A (en) Installation platform, system and construction method for arch bridge outer concrete bottom die
CN211998356U (en) Construction elevator capable of crossing outer frame and climbing frame
CN219175031U (en) Light combined bridge reconstructed by old bridge gate
CN108560425B (en) A kind of shelter bridge Construction of Steel Structure method
CN202911929U (en) Stepping traction device
CN217997851U (en) Temporary protection device for railway bridge beam surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant