CN212330997U - Pipeline spare arrangement frame for building engineering - Google Patents

Pipeline spare arrangement frame for building engineering Download PDF

Info

Publication number
CN212330997U
CN212330997U CN202020193365.1U CN202020193365U CN212330997U CN 212330997 U CN212330997 U CN 212330997U CN 202020193365 U CN202020193365 U CN 202020193365U CN 212330997 U CN212330997 U CN 212330997U
Authority
CN
China
Prior art keywords
pipe
fixed
clamping plate
arrangement
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020193365.1U
Other languages
Chinese (zh)
Inventor
朱治军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Suyi Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020193365.1U priority Critical patent/CN212330997U/en
Application granted granted Critical
Publication of CN212330997U publication Critical patent/CN212330997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline spare arrangement frame for building engineering, including depositing the base, deposit base top middle part fixed surface and install fixed pipe, fixed pipe top left and right sides surface all is connected with the one end stationary phase of first pivot, every the other end of first pivot all is connected with arrangement pipe fixed surface, every a plurality of centre gripping screws, every are seted up to the inside impartial distance in arrangement pipe top centre gripping screw inside wall all runs through movable mounting and has the holding bolt. The utility model discloses owing to install the arrangement pipe through first pivot on fixed pipe top, can adjust the position of arrangement pipe on fixed pipe surface through the rotation of first pivot, make the arrangement pipe when not needing to use, can rotate adjusting position to hugging closely on fixed pipe surface, and then reduce the whole volume of this device, subsequent transportation of being convenient for is removed, and is comparatively practical, is fit for extensively promoting and using.

Description

Pipeline spare arrangement frame for building engineering
Technical Field
The utility model is suitable for a building engineering auxiliary device field, in particular to pipeline spare arrangement frame for building engineering.
Background
At present, in the building work progress, often need use various types of steel pipe or pipeline, the diameter and the length of these pipelines all differ, need place it in the place during the construction, not only occupy a large amount of areas like this, lead to the reduction in construction place, influence the construction moreover, increase the burden for constructor, and then the pipeline rack that needs is arranged in order the pipeline and is accomodate.
According to a patent (the publication number is "CN 201720381223.6"), pipeline spare arrangement frame for building engineering includes two sets of bearing frame, and is two sets of connect through the connecting rod between the bearing frame, the bearing frame includes the mobile jib, be equipped with on the mobile jib respectively and hold thing board one and hold thing board two, it is located the top of holding thing board two to hold thing board one, it includes two sets of first and two sets of bottom plates one to hold thing board one, two sets of a swing joint of top plate is at the rear end face of mobile jib, two sets of a swing joint of bottom plate is at the preceding terminal surface of mobile jib, the arc wall that has mutual matching is evenly opened to the top of bottom plate one and the bottom of top plate one, and this pipeline spare arrangement frame for building engineering does not account for the space, and convenient to use.
However, there are some disadvantages in the above patents: 1. because the corresponding pipelines are only placed in the arc-shaped grooves in the patent, but the pipelines used in the construction process at present have different width diameters, and the different pipelines cannot be ensured to be tightly attached to the inner side walls of the arc-shaped grooves, so that the stability of the pipelines in the placement process is ensured; 2. to the holistic volume of the pipeline arrangement frame that uses now great, inconvenient dismantlement transportation leads to the shared place great when using. Therefore, the pipeline piece tidying frame for the building engineering is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a pipeline spare arrangement frame for building engineering can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pipeline piece arranging frame for constructional engineering comprises a storage base, wherein a fixed pipe is fixedly arranged on the surface of the middle of the top end of the storage base, the surfaces of the left side and the right side of the top end of the fixed pipe are fixedly connected with one end of a first rotating shaft, the other end of each first rotating shaft is fixedly connected with the surface of an arranging pipe, a plurality of clamping screw holes are uniformly formed in the top end of each arranging pipe, clamping bolts are movably arranged on the inner side wall of each clamping screw hole in a penetrating mode, and the surface of the bottom end of each clamping bolt is fixedly arranged in the middle of a first clamping plate in a penetrating mode through a bearing;
every the centre gripping screw inside wall has all seted up the internal thread, every the external screw thread has all been seted up to centre gripping bolt middle-end lateral wall, external screw thread and internal thread looks adaptation.
Preferably, every equal distance fixed mounting in arrangement pipe bottom inside surface has a plurality of first supporting box, every the equal fixed mounting in first supporting box inside bottom surface has supporting spring, every the equal fixed mounting in supporting spring top surface supports box bottom surface at the second, every the second supports the equal movable mounting of box middle-end lateral wall inside first supporting box top, every the second supports the equal fixed mounting in box top surface and has the second grip block.
Preferably, the surfaces of the left side and the right side of the middle end of the fixed pipe are fixedly connected with one end of a second rotating shaft, the other end of the second rotating shaft is fixedly connected with the surface of the bottom end of a movable rod, a fixed soft buckle is fixedly mounted on the surface of the top end of the movable rod, a fixed opening is formed in the top end of the left side of the fixed soft buckle, a fixed column is fixedly mounted on the surface of the bottom end of the arranging pipe, and the diameter of each fixed column is the same as the diameter of the inner side wall of the fixed opening.
Preferably, the first clamping plate and the second clamping plate are both arc-shaped, and the first clamping plate and the second clamping plate are located at the same vertical position.
Preferably, the storage base, the fixed pipe, the arranging pipe, the first clamping plate, the movable rod and the second clamping plate are all made of stainless steel materials.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a pipeline spare arrangement frame for building engineering, because install the arrangement pipe through first pivot on fixed pipe top, can adjust the position of arrangement pipe on fixed pipe surface through the rotation of first pivot, make the arrangement pipe when not needing to use, can rotate adjusting position to hugging closely on fixed pipe surface, and then reduce the whole volume of this device, subsequent transportation of being convenient for is removed, and the centre gripping screw has been seted up at arrangement inside, and install holding bolt through internal thread and external screw thread looks adaptation inside the centre gripping screw, can rotate the position height that holding bolt adjusted first grip block, be convenient for make first grip block surface can hug closely all the time at the pipeline surface of different width diameters, guarantee the stability of pipeline at depositing the in-process.
2. The utility model discloses a pipeline spare arrangement frame for building engineering, because there is first support box at arrangement intraduct internally mounted, and support the box with the second and install inside first support box, can be placing the pipeline behind second grip block surface, support the box with the second and press to first support box inside, and then change the position height of second grip block, increase the suitability of whole device, and the characteristic that recovers through supporting spring's compression, can make second grip block surface hug closely corresponding pipeline surface all the time, guarantee the stability of pipeline when depositing.
3. The utility model discloses a pipeline spare arrangement frame for building engineering installs the movable rod on fixed pipe surface through the second pivot, can adjust the position back on fixed pipe surface of complete reason pipe, through the rotation of second pivot, adjusts and guarantees that the movable rod can carry out the supporting role to fixed pipe all the time to can put into corresponding fixed mouthful with the fixed column, and then make stable the installing in arrangement pipe surface of movable rod, support fixedly to it.
Drawings
Fig. 1 is a schematic view of an overall front sectional structure of the pipe fitting tidying frame for construction engineering of the present invention;
fig. 2 is the utility model discloses the fixed pipe of pipeline spare arrangement frame for building engineering overlooks the structural schematic diagram.
Reference numerals: deposit base 1, fixed pipe 2, first pivot 3, arrangement pipe 4, centre gripping screw 5, centre gripping bolt 6, bearing 7, first grip block 8, internal thread 9, external screw thread 10, first support box 11, supporting spring 12, second support box 13, second pivot 14, movable rod 15, fixed soft knot 16, fixed mouth 17, fixed column 18, second grip block 19.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
As shown in fig. 1-2, a pipeline piece arranging frame for building engineering comprises a storage base 1, wherein a fixed pipe 2 is fixedly installed on the surface of the middle of the top end of the storage base 1, the surfaces of the left side and the right side of the top end of the fixed pipe 2 are fixedly connected with one end of a first rotating shaft 3, the other end of each first rotating shaft 3 is fixedly connected with the surface of an arranging pipe 4, a plurality of clamping screw holes 5 are equidistantly formed in the top end of each arranging pipe 4, clamping bolts 6 are movably installed on the inner side wall of each clamping screw hole 5 in a penetrating manner, and the surface of the bottom end of each clamping bolt 6 is fixedly installed in the middle end of a first clamping plate 8 in a penetrating manner through a bearing 7;
every 5 inside walls of centre gripping screw all seted up internal thread 9, every external screw thread 10 has all been seted up to the centre gripping bolt 6 middle-end lateral wall, external screw thread 10 and internal thread 9 looks adaptation.
As shown in fig. 1 and 2, in this embodiment, since the arranging pipe 4 is installed on the top end of the fixed pipe 2 through the first rotating shaft 3, the position of the arranging pipe 4 on the surface of the fixed pipe 2 can be adjusted through the rotation of the first rotating shaft 3, so that the arranging pipe 4 can be rotated to be tightly attached to the surface of the fixed pipe 2 when not needed to be used, and further the overall size of the device is reduced, which is convenient for subsequent transportation and movement, and the clamping screw hole 5 is formed inside the arranging pipe 4, and the clamping bolt 6 is installed inside the clamping screw hole 5 through the internal thread 9 and the external thread 10 in an adaptive manner, so that the position height of the first clamping plate 8 can be adjusted by rotating the clamping bolt 6, which is convenient for enabling the surface of the first clamping plate 8 to be tightly attached to the surfaces of pipes with different width diameters all the time, and ensures.
Wherein, every 4 inside surface equi-distance fixed mounting in bottom of arrangement pipe have a plurality of first support box 11, every 11 inside bottom surface of first support box fixed mounting have supporting spring 12, every 12 top surface of supporting spring fixed mounting support 13 bottom surface of box in the second, every 13 middle-end lateral wall of second support box movable mounting support box 13 top inside in first support box 11 top, every 13 top surface of second support box fixed mounting have second grip block 19.
In this embodiment, as shown in fig. 1, the first supporting box 11 is installed inside the tidying pipe 4, and the second supporting box 13 is installed inside the first supporting box 11, so that the second supporting box 13 can be pressed inside the first supporting box 11 after the pipe is placed on the surface of the second clamping plate 19, the position height of the second clamping plate 19 is further changed, the applicability of the whole device is increased, and the surface of the second clamping plate 19 can be always tightly attached to the surface of the corresponding pipe through the compression and recovery characteristics of the supporting spring 12, thereby ensuring the stability of the pipe during storage.
The surface of the left side and the surface of the right side of the middle end of the fixed pipe 2 are fixedly connected with one end of a second rotating shaft 14, each of the surfaces of the left side and the right side of the middle end of the fixed pipe 2 is fixedly connected with the surface of the bottom end of a movable rod 14, the surface of the top end of the movable rod 15 is fixedly provided with a fixed soft buckle 16, a fixed opening 17 is formed in the top end of the left side of each fixed soft buckle 16, a fixed column 18 is fixedly arranged on the surface of the bottom end of the arranging pipe 4, and the diameter of each fixed column 18 is the same as the diameter of the inner side.
In this embodiment, as shown in fig. 1 and fig. 2, the movable rod 15 is installed on the surface of the fixed pipe 2 through the second rotating shaft 14, after the position of the complete arranging pipe 4 on the surface of the fixed pipe 2 is adjusted, the movable rod 15 can be adjusted and ensured to always support the complete arranging pipe 4 through the rotation of the second rotating shaft 14, and the fixed column 18 can be placed into the corresponding fixed port 17, so that the movable rod 15 is stably installed on the surface of the arranging pipe 4 to support and fix the same.
The first clamping plate 8 and the second clamping plate 19 are both arc-shaped, and the first clamping plate 8 and the second clamping plate 19 are located at the same vertical position.
In the embodiment shown in fig. 1, the stored pipes can be always clamped and fixed by the surfaces of the first clamping plate 8 and the second clamping plate 19.
The storage base 1, the fixed pipe 2, the tidying pipe 4, the first clamping plate 8, the movable rod 15 and the second clamping plate 19 are all made of stainless steel materials.
In the embodiment, as shown in fig. 1 and fig. 2, the stainless steel has good rust resistance, so that parts can be prevented from being rusted and damaged under long-term rain wash.
It should be noted that the utility model relates to a pipeline piece arrangement frame for building engineering, which comprises a storage base 1, a fixed pipe 2, a first rotating shaft 3, an arrangement pipe 4, a clamping screw hole 5, a clamping bolt 6, a bearing 7, a first clamping plate 8, an internal thread 9, an external thread 10, a first supporting box 11, a supporting spring 12, a second supporting box 13, a second rotating shaft 14, a movable rod 15, a fixed soft buckle 16, a fixed port 17, a fixed column 18 and a second clamping plate 1, wherein the components are all universal standard components or components known by technicians in the neighborhood, the structure and principle of the components can be known by technicians through technical manuals or conventional experimental methods, during work, the storage base 1 is moved to a corresponding position, the arrangement pipe 4 is rotated to be opened, the movable rod 15 is pulled, the fixed column 18 is placed inside the corresponding fixed port 17, a pipeline to be stored is placed inside the arrangement pipe 4, compared with the traditional auxiliary device for building engineering, the device has the advantages that the top end of the fixed pipe 2 is provided with the arranging pipe 4 through the first rotating shaft 3, the position of the arranging pipe 4 on the surface of the fixed pipe 2 can be adjusted through the rotation of the first rotating shaft 3, the arranging pipe 4 can be rotated to be adjusted to be tightly attached to the surface of the fixed pipe 2 when not in use, the overall size of the device is further reduced, the subsequent transportation and movement are facilitated, the clamping screw hole 5 is formed in the arranging pipe 4, the clamping bolt 6 is arranged in the clamping screw hole 5 through the matching of the internal thread 9 and the external thread 10, the clamping bolt 6 can be rotated to adjust the position height of the first clamping plate 8, and the surface of the first clamping plate 8 can be conveniently and constantly attached to the surfaces of pipelines with different width diameters, the stability of the pipeline in the storage process is ensured.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a pipe fitting arrangement frame for building engineering, is including depositing base (1), its characterized in that: the surface of the middle of the top end of the storage base (1) is fixedly provided with a fixed pipe (2), the surfaces of the left side and the right side of the top end of the fixed pipe (2) are fixedly connected with one end of a first rotating shaft (3), the other end of each first rotating shaft (3) is fixedly connected with the surface of an arranging pipe (4), a plurality of clamping screw holes (5) are formed in the top end of each arranging pipe (4) at equal intervals, clamping bolts (6) are movably installed on the inner side wall of each clamping screw hole (5) in a penetrating mode, and the surface of the bottom end of each clamping bolt (6) is fixedly installed in the middle of a first clamping plate (8) in a penetrating mode through a bearing (7);
every internal thread (9) have all been seted up to centre gripping screw (5) inside wall, every external screw thread (10) have all been seted up to centre gripping bolt (6) middle-end lateral wall, external screw thread (10) and internal thread (9) looks adaptation.
2. The piping member organizing frame for construction engineering according to claim 1, wherein: every the equipartition of arrangement pipe (4) bottom internal surface has a plurality of first support box (11), every apart from fixed mounting first support box (11) inside bottom surface equal fixed mounting have supporting spring (12), every supporting spring (12) top surface equal fixed mounting supports box (13) bottom surface at the second, every the second supports box (13) middle-end lateral wall equal movable mounting inside first support box (11) top, every second supports box (13) top surface equal fixed mounting has second grip block (19).
3. The piping member organizing frame for construction engineering according to claim 1, wherein: fixed pipe (2) middle-end left and right sides surface all with the one end fixed connection of second pivot (14), every the other end of second pivot (14) all is connected with movable rod (15) bottom fixed surface, every the equal fixed mounting in movable rod (15) top surface has fixed soft knot (16), every fixed soft knot (16) left side top is inside all seted up fixed mouthful (17), every the equal fixed mounting in arrangement pipe (4) bottom surface has fixed column (18), every the diameter of fixed column (18) all is the same with the diameter of fixed mouthful (17) inside wall.
4. The piping member organizing frame for construction engineering according to claim 2, wherein: the first clamping plate (8) and the second clamping plate (19) are both arc-shaped, and the first clamping plate (8) and the second clamping plate (19) are located at the same vertical position.
5. The piping member finishing frame for construction engineering according to claim 3, wherein: the storage base (1), the fixed pipe (2), the arranging pipe (4), the first clamping plate (8), the movable rod (15) and the second clamping plate (19) are all made of stainless steel materials.
CN202020193365.1U 2020-02-21 2020-02-21 Pipeline spare arrangement frame for building engineering Active CN212330997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020193365.1U CN212330997U (en) 2020-02-21 2020-02-21 Pipeline spare arrangement frame for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020193365.1U CN212330997U (en) 2020-02-21 2020-02-21 Pipeline spare arrangement frame for building engineering

Publications (1)

Publication Number Publication Date
CN212330997U true CN212330997U (en) 2021-01-12

Family

ID=74064136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020193365.1U Active CN212330997U (en) 2020-02-21 2020-02-21 Pipeline spare arrangement frame for building engineering

Country Status (1)

Country Link
CN (1) CN212330997U (en)

Similar Documents

Publication Publication Date Title
CN204771319U (en) Multiposition welding station frame
CN212330997U (en) Pipeline spare arrangement frame for building engineering
CN211930144U (en) Cable support for electric power convenient to adjust
CN215600922U (en) High unwrapping wire coaster of security that electric power was used
CN211619560U (en) Pay-off for electrical engineering convenient to carry
CN211387514U (en) Elbow upset welding set
CN211465495U (en) Oxygen lance tail supporting clamp
CN211153046U (en) Garden sapling righting device
CN212298376U (en) Quick-adjustment combined connecting piece
CN209800521U (en) Hinge connection's trailing arm direction adjustable structure
CN213477740U (en) Building peripheral steel pipe supporting assembly
CN102133604A (en) Pipe contracting device
CN106670596B (en) Elbow clamp
CN211175640U (en) Flue built-up mounting supporting mechanism convenient to dismouting
CN210676678U (en) Y-shaped and T-shaped tee flaring equipment
CN213332768U (en) Workpiece positioning device for anticorrosion equipment
CN221020970U (en) Discharging frame for construction
CN111946985A (en) Quick-adjustment combined connecting piece
CN215902023U (en) Handheld quick clamping device of nodular cast iron pipe fitting surface coating
CN214870083U (en) Temporary pipeline supporting device during butt joint of gas pipelines
CN215471112U (en) Pipe blank heating and picking device
CN213576181U (en) Adjustable spring support and hanger for pipeline
CN211464902U (en) Punching equipment for steel pipe bundle
CN219994589U (en) Anti-drop pipe strap for building
CN215902121U (en) Quick clamping device for surface coating machine of nodular cast iron pipe fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220824

Address after: 4th Floor, No. 401, No. 99, Jinping Road, Qingyang District, Chengdu, Sichuan 610000

Patentee after: Sichuan Suyi Construction Engineering Co.,Ltd.

Address before: 255000 courtyard, No.39, gongqingtuan East Road, Zhangdian District, Zibo City, Shandong Province

Patentee before: Zhu Zhijun