CN212317473U - Scaffold fastener firm in connection - Google Patents

Scaffold fastener firm in connection Download PDF

Info

Publication number
CN212317473U
CN212317473U CN202020184707.3U CN202020184707U CN212317473U CN 212317473 U CN212317473 U CN 212317473U CN 202020184707 U CN202020184707 U CN 202020184707U CN 212317473 U CN212317473 U CN 212317473U
Authority
CN
China
Prior art keywords
sleeve
scaffold
connecting rod
connection
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020184707.3U
Other languages
Chinese (zh)
Inventor
马磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Siming Electric Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020184707.3U priority Critical patent/CN212317473U/en
Application granted granted Critical
Publication of CN212317473U publication Critical patent/CN212317473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model belongs to the technical field of the scaffold technique and specifically relates to a firm in connection's scaffold fastener, the connector comprises a connecting piece, the upper and lower both ends of connector are connected with first sleeve pipe respectively, symmetrical connection has the cushion on the first sheathed tube inner wall, four sides all around of connector are connected with the second sleeve pipe respectively, threaded hole is seted up at second sheathed tube upper end middle part, the inside threaded connection of screw hole has the threaded rod, the dead slot has been seted up to the lower extreme of threaded rod, the inside swing joint of dead slot has the connecting rod, just connecting rod and dead slot looks adaptation, the lower extreme of connecting rod is connected with the clamp plate, be connected with the spring coil between the upper end of clamp plate and the second sheathed tube inner wall top. The utility model has the advantages of reasonable design, the simple operation is convenient for realize scaffold frame high-speed joint and fixed, and stability is high, facilitates the use more.

Description

Scaffold fastener firm in connection
Technical Field
The utility model relates to a scaffold frame technical field especially relates to a firm in connection's scaffold frame fastener.
Background
The scaffold is a working platform which is erected for ensuring each construction process to be carried out smoothly, and is mainly used for the up-and-down dry work of constructors, the maintenance of peripheral safety nets, high-altitude installation of components and the like. At present, scaffolds are adopted in building construction, road and bridge construction or ship building industry.
The scaffold frame need use the fastener to come the steel pipe to link together when putting up, but current fastener has certain drawback when using, can not be stable fix the scaffold frame, and dismantlement and installation that can not be quick, reduces work efficiency, and the use of giving people has brought certain influence, inconvenient use. To this end, we propose a securely connected scaffold fastener to address such problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art, and providing a scaffold fastener with firm connection, which is more convenient to use.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the design is a firm in connection's scaffold fastener, including the connecting piece, the upper and lower both ends of connecting piece are connected with first sleeve pipe respectively, symmetrical connection has the cushion on the first sheathed tube inner wall, four sides all around of connecting piece are connected with the second sleeve pipe respectively, threaded hole is seted up at the upper end middle part of second sheathed tube, the inside threaded connection of screw hole has the threaded rod, the dead slot has been seted up to the lower extreme of threaded rod, the inside swing joint of dead slot has the connecting rod, just connecting rod and dead slot looks adaptation, the lower extreme of connecting rod is connected with the clamp plate, be connected with the spring coil between the upper end of clamp plate and the sheathed tube inner wall top of second.
Preferably, the elastic pad is a rubber elastic pad.
Preferably, the first sleeve and the second sleeve are rigidly connected with the connecting piece.
Preferably, the upper end of the threaded rod is connected with a handle.
Preferably, the pressing plate is an arc-shaped pressing plate, and the lower end of the pressing plate is connected with a rubber non-slip mat.
The utility model provides a pair of firm in connection's scaffold fastener, beneficial effect lies in: when in use, the vertically arranged pipe body is inserted in the first sleeve, the friction force borne by the pipe body can be increased by using the elastic cushion of rubber, the sliding of the pipe body is avoided, and the pipe body is inserted in the first sleeve, so that the pipe body can be directly limited by the first sleeve without additional fixation, the horizontally arranged pipe body can be inserted in the second sleeve, the pipe body can be pre-fixed by using the elastic force of the spring ring to drive the pressing plate to move downwards by rotating the threaded rod to be in extrusion contact with the pressing plate, the pressing plate can be fixed, the pipe body is prevented from being separated from the second sleeve, the stability of scaffold connection is enhanced, the stability is stronger, the installation is convenient and fast, when in disassembly, the threaded rod is only required to be rotated to move upwards, the fixing effect on the pipe body can be removed, the horizontally arranged pipe body can be extracted, the vertically arranged pipe body can also be directly extracted from the, thereby making the scaffold convenient to dismantle. Compared with the prior art, the utility model has the advantages of reasonable design, the simple operation is convenient for realize scaffold frame high-speed joint and fixed, and stability is high, facilitates the use more.
Drawings
Fig. 1 is a schematic view of an overall structure of a scaffold fastener with firm connection according to the present invention;
fig. 2 is a schematic view of an inner structure of a second sleeve of the scaffold fastener of the present invention;
fig. 3 is a top view of the scaffold fastener of the present invention.
In the figure: the connecting piece 1, first sleeve pipe 2, cushion 3, second sleeve pipe 4, screw hole 5, threaded rod 6, dead slot 7, connecting rod 8, clamp plate 9, spring ring 10, rubber slipmat 11, handle 12.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a scaffold fastener firm in connection, includes connecting piece 1, and the upper and lower both ends of connecting piece 1 are connected with first sleeve 2 respectively, and the symmetrical elastic pad 3 that is connected on the inner wall of first sleeve 2, elastic pad 3 are the rubber cushion, and the elastic pad 3 that utilizes rubber can increase the frictional force that the body received, avoids its slip.
Four sides all around of connecting piece 1 are connected with second sleeve pipe 4 respectively, are rigid connection between first sleeve pipe 2 and second sleeve pipe 4 and the connecting piece 1, and joint strength is high, and is more reliable and more stable.
Threaded hole 5 is seted up at the upper end middle part of second sleeve 4, and the inside threaded connection of threaded hole 5 has threaded rod 6, and the upper end of threaded rod 6 is connected with handle 12, and the convenience makes power when rotating threaded rod 6, need not additionally with the help of the instrument, convenient and practical more.
Dead slot 7 has been seted up to the lower extreme of threaded rod 6, the inside swing joint of dead slot 7 has connecting rod 8, and connecting rod 8 and 7 looks adaptations of dead slot, can restrict connecting rod 8's removal, avoid it to appear rocking, the lower extreme of connecting rod 8 is connected with clamp plate 9, be connected with spring coil 10 between the upper end of clamp plate 9 and the inner wall top of second sleeve 4, clamp plate 9 is the arc clamp plate, and clamp plate 9's lower extreme is connected with rubber slipmat 11, the arc clamp plate can be better with the laminating of scaffold steel pipe, rubber slipmat 11 then can increase frictional force, help strengthening the fixed action to scaffold steel pipe, it is more firm.
The working principle is as follows: when in use, the vertically arranged tube body is inserted in the first sleeve 2, the friction force applied to the tube body can be increased by the elastic pad 3 of rubber to avoid the tube body from sliding, and the tube body is inserted in the first sleeve 2, so that the tube body can be directly limited by the first sleeve 2 without additional fixation, the horizontally arranged tube body can be inserted in the second sleeve 4, the tube body can be pre-fixed by driving the pressing plate 9 by the elasticity of the spring ring 10, and then the tube body can move downwards to be in extrusion contact with the pressing plate 9 by rotating the threaded rod 6, the pressing plate 9 can be fixed, the tube body can be fixed to avoid being separated from the second sleeve 4, thereby the stability of scaffold connection is enhanced, the stability is stronger, the installation is convenient and quick, when in need of disassembly, the threaded rod 6 only needs to be rotated to move upwards, the fixing effect on the tube body can be removed, and the horizontally arranged tube body can be pulled out, the same vertical body that sets up also can directly be followed and pulled out in first sleeve 2 to make scaffold frame dismantle conveniently.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A scaffold fastener with firm connection comprises a connecting piece (1) and is characterized in that, the upper end and the lower end of the connecting piece (1) are respectively connected with a first sleeve (2), the inner wall of the first sleeve (2) is symmetrically connected with elastic pads (3), the front, the rear, the left and the right side surfaces of the connecting piece (1) are respectively connected with a second sleeve (4), a threaded hole (5) is formed in the middle of the upper end of the second sleeve (4), a threaded rod (6) is connected with the inner thread of the threaded hole (5), the lower end of the threaded rod (6) is provided with a hollow groove (7), the interior of the hollow groove (7) is movably connected with a connecting rod (8), the connecting rod (8) is matched with the empty groove (7), the lower end of the connecting rod (8) is connected with a pressing plate (9), a spring ring (10) is connected between the upper end of the pressure plate (9) and the top end of the inner wall of the second sleeve (4).
2. A securely connected scaffold fastener according to claim 1, characterized in that the resilient pad (3) is a rubber resilient pad.
3. A securely connected scaffold fastener according to claim 1, characterized in that there is a rigid connection between the first (2) and second (4) sleeves and the connector (1).
4. A securely connected scaffold fastener according to claim 1, characterized in that the threaded rod (6) has a handle (12) attached to its upper end.
5. The scaffold fastener of claim 1, wherein the pressing plate (9) is an arc-shaped pressing plate, and a rubber anti-skid pad (11) is connected to the lower end of the pressing plate (9).
CN202020184707.3U 2020-02-19 2020-02-19 Scaffold fastener firm in connection Expired - Fee Related CN212317473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020184707.3U CN212317473U (en) 2020-02-19 2020-02-19 Scaffold fastener firm in connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020184707.3U CN212317473U (en) 2020-02-19 2020-02-19 Scaffold fastener firm in connection

Publications (1)

Publication Number Publication Date
CN212317473U true CN212317473U (en) 2021-01-08

Family

ID=74030383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020184707.3U Expired - Fee Related CN212317473U (en) 2020-02-19 2020-02-19 Scaffold fastener firm in connection

Country Status (1)

Country Link
CN (1) CN212317473U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215336A (en) * 2021-12-17 2022-03-22 浙江铠甲建筑科技有限公司 Building outer wall climbing is stable structure for scaffold frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215336A (en) * 2021-12-17 2022-03-22 浙江铠甲建筑科技有限公司 Building outer wall climbing is stable structure for scaffold frame

Similar Documents

Publication Publication Date Title
CN212317473U (en) Scaffold fastener firm in connection
CN100587534C (en) Optical cable maintenance safe rope ladder
CN209761310U (en) Portable cat ladder for overhaul of equipment
CN211341664U (en) Novel scaffold
CN215673402U (en) High-strength pressed steel wire rope rigging
CN212715534U (en) Resin curtain wall board fixing device
CN211850268U (en) High-shock-resistance low-noise steel bar truss floor bearing plate
CN208565425U (en) A kind of protection fastening clips of power transmission line steel wire rope
CN211271792U (en) Obstetrical hospital bed
CN211162601U (en) Clamp for welding medical bed for obstetrics and gynecology department
CN210947774U (en) Shear wall concrete vibrating device
CN209335560U (en) A kind of auxiliary handle of electric tool enhancing bonding strength
CN211058027U (en) Assembled building element that stability is good
CN207878823U (en) A kind of handrail structure
CN217538350U (en) Clamping middle-working angle aluminum
CN217400109U (en) Stable supporting bracket for building construction
CN211850739U (en) Structure of horizontal truss for climbing frame
CN215136829U (en) Soft package protective structure of unpowered amusement facility
CN215760280U (en) Bending type connecting piece for scaffold
CN215497993U (en) Exempt from to ascend a height unwrapping wire ware
CN214618477U (en) Novel bolt-up P type pipe clamp
CN204645818U (en) A kind of ceiling framework structure of mat shelter
CN220539229U (en) House building template installation fixed knot constructs
CN213510405U (en) Telescopic ladder balancing pole
CN207522769U (en) A kind of sawed-off device of bamboo pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211220

Address after: 311500 No. 458, Jianjian Road, Tonglu County, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Siming Electric Co.,Ltd.

Address before: 073000 xishiyi village, Qingfengdian Town, Dingzhou City, Baoding City, Hebei Province

Patentee before: Ma Lei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210108