CN212295631U - Horizontal construction joint formwork device of concrete structure - Google Patents

Horizontal construction joint formwork device of concrete structure Download PDF

Info

Publication number
CN212295631U
CN212295631U CN202020626317.7U CN202020626317U CN212295631U CN 212295631 U CN212295631 U CN 212295631U CN 202020626317 U CN202020626317 U CN 202020626317U CN 212295631 U CN212295631 U CN 212295631U
Authority
CN
China
Prior art keywords
template
concrete structure
wall
horizontal construction
square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020626317.7U
Other languages
Chinese (zh)
Inventor
康建军
郑贤好
黄忠森
高俊
王玥章
江然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Third Construction Group Co ltd
Anhui Xinxin Engineering Test Detection Co ltd
Original Assignee
Anhui Xinxin Engineering Test Detection Co ltd
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinxin Engineering Test Detection Co ltd, Anhui Sanjian Engineering Co Ltd filed Critical Anhui Xinxin Engineering Test Detection Co ltd
Priority to CN202020626317.7U priority Critical patent/CN212295631U/en
Application granted granted Critical
Publication of CN212295631U publication Critical patent/CN212295631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a horizontal construction joint formwork device of concrete structure, the device includes outer wall, post template, installs the square batten in the template. The outer wall and column template is a lower-layer concrete structure template system which is designed through calculation, meets the size of the section of a concrete structure, and has the strength and the rigidity for bearing all loads when concrete is poured. The square battens installed on the templates are characterized in that the square battens are fixed on the inner sides of the outer walls and the column templates and are parallel to the horizontal construction joints, and the upper openings of the square battens are flush with the horizontal construction joints and are fixed by round nails or wood screws. The device is simple to manufacture and install, slurry leakage of the joint of the horizontal construction joint is eliminated, the joint is straight and attractive, and the appearance quality is good after the formwork is removed. The utility model relates to a rationally, simple structure, safe and reliable have fine using value widely.

Description

Horizontal construction joint formwork device of concrete structure
Technical Field
The utility model relates to a construction engineering technical field structure construction, concretely relates to horizontal construction joint formwork device of concrete structure.
Background
Generally, the outer wall and the column of a high-rise building are integrated into a vertical surface from one floor to the top floor, and horizontal construction joints are inevitably left at the floors of the concrete structure due to the construction of each floor in different times. The method for erecting the formwork of the outer vertical face comprises the following steps: and finishing the construction of the lower concrete structure, and then constructing the upper concrete structure. When the upper concrete structure template is erected, the outer wall and the column template are hung to the lower concrete structure and extend below the horizontal construction joint of the floor. And applying pressure outside the lower hanging template in a manner of reserving bolts and the like to ensure that the inner side of the template is tightly attached to the side surface of the construction joint of the lower concrete structure, and finally pouring the concrete of the upper structure. However, when the lower layer concrete structure is constructed, the upper opening of the structure is difficult to be free from the phenomenon of mold expansion, so that the side edge of the horizontal construction joint is not flat and straight, the lower hanging template of the upper layer concrete structure is difficult to be tightly attached to the concrete surface, and the slurry leakage phenomenon occurs. In addition, due to the fact that the surface of the horizontal construction joint between the lower layer concrete structure and the upper layer concrete structure is roughened, the construction joint is prone to being uneven, and therefore joints at the concrete joint of the horizontal construction joint are uneven, straight and attractive.
Disclosure of Invention
The technical task of the utility model is to solve prior art not enough, provide a horizontal construction joint formwork device of concrete structure, through this device, the horizontal construction joint of concrete structure is straight pleasing to the eye, leak-proof thick liquid.
The utility model discloses the technical scheme who adopts as follows:
the utility model provides a horizontal construction joint formwork device of concrete structure, including prop up locate concrete structure floor outer wall or the inboard template of wall post and prop up locate the outside template in concrete structure floor outer wall or the wall post outside, through split bolt connection, its characterized in that between the inside and outside template: a square strip-shaped template is fixed at the upper edge part of the inner side of the outer side template, and the top surface of the square strip-shaped template is flush with the top surface of the outer side template; the concrete floor outer wall or wall column filling cavity is defined by the inner side template, the outer side template and the square strip-shaped template, and the top surface of the square strip-shaped template is flush with the horizontal construction joint of the concrete floor outer wall or wall column.
The horizontal construction joint formwork device of the concrete structure is characterized in that: the square strip-shaped template is a square wood strip, and the square wood strip is fixed on the outer template through round nails or wood screws.
The concrete structure floor outer wall or the wall column is a lower layer concrete structure floor outer wall or a lower layer concrete structure floor wall or a lower layer concrete structure wall column. The inner and outer formworks are lower-layer concrete structure formwork systems designed through calculation, meet the size of the section of a concrete structure, and have the strength and rigidity for bearing all loads when concrete is poured. The cross-sectional dimension of the square wood strip is 20mm multiplied by 15 mm. The outer wall and the column template of the lower layer concrete structure are 15mm glued templates.
The horizontal construction joint used between the upper concrete structure and the outer wall and the column of the lower concrete structure is characterized in that the corresponding size of the template is adjusted if other horizontal construction joints of different concrete structures are constructed, but the template device is not changed.
The utility model discloses a theory of operation does:
the utility model discloses a along the fixed square strip type module in position on the inboard of outside template, like this, concrete structure floor outer wall or wall post pour the back of form removal, a recess then appears at the position that corresponds square strip type module in concrete structure floor outer wall or wall post, can avoid lower floor's concrete structure the form phenomenon that rises like this, also avoid causing the uneven straight phenomenon of horizontal construction joint side. Therefore, the lower hanging template of the upper concrete structure can be easily attached to the concrete surface, and the slurry leakage phenomenon is avoided.
The utility model has the advantages as follows:
the utility model discloses the preparation installation construction is simple, eliminates horizontal construction seam and leaks thick liquid for the seam is straight pleasing to the eye, and impression quality is good after the form removal. The utility model relates to a rationally, simple structure, convenient operation, safe and reliable have fine using value widely.
Drawings
Fig. 1 is a supporting view of the formwork of the lower concrete structure of the present invention.
Fig. 2 is the supporting drawing of the upper concrete structure formwork of the present invention.
Fig. 3 is a side view of the horizontal construction joint template device of the present invention.
Wherein the reference numerals are respectively: 1. an outer side template; 2. a square bar-shaped template; 3. the concrete structure floor outer wall or wall column; 4. oppositely pulling the bolts; 5. horizontal construction joints; 6. an upper concrete structure; 7. an upper concrete structure outer wall or wall column template; 8. and an inner side template.
Detailed Description
In order to make the aforementioned objects, features and characteristics of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and specific embodiments, which are shown in fig. 1 to 3.
A horizontal construction joint formwork device of a concrete structure comprises an inner side formwork 8 erected on the inner side of a concrete structure floor outer wall or wall column 3 and an outer side formwork 1 erected on the outer side of the concrete structure floor outer wall or wall column 3, wherein the inner side formwork 8 and the outer side formwork 1 are connected through a split bolt 4, a square strip formwork 2 is fixed on the upper edge of the inner side of the outer side formwork 1, and the top surface of the square strip formwork 2 is flush with the top surface of the outer side formwork 1; the inside formwork 8, the outside formwork 1 and the square strip formwork 2 enclose a filling cavity of the concrete floor outer wall or the wall column 3, and the top surface of the square strip formwork 4 is flush with the horizontal construction joint 5 of the concrete floor outer wall or the wall column.
The implementation method comprises the following steps: according to the section design size and load of the concrete structure floor outer wall or wall column, the inner and outer side formworks 8 and 1 are erected, and the inner and outer side formworks 8 and 1 are installed and reinforced. Preparing a square strip-shaped template 2, fixing the square strip-shaped template 2 at the upper edge part of the inner side of the outer template, and making the top surface of the square strip-shaped template 2 coincide with the height of the floor. And then, pouring an outer wall or a wall column 3 of the lower concrete structure floor. And after the concrete reaches the form removal strength, removing the form, and forming a groove on the horizontal construction joint of the lower-layer concrete structure corresponding to the square strip-shaped template 2. And then, erecting an upper concrete structure floor outer wall or wall column template 7, hanging the upper concrete structure outer wall or wall column template 7 downwards and covering a groove at the horizontal construction joint 5, and straightening the upper concrete structure floor outer wall or wall column template 7 at the groove. Next, the upper concrete structure 6 is concreted and the grooves are filled with mortar in the concrete. Finally, the form is removed, and after the form is removed, the concrete horizontal construction joint 5 is flat and beautiful and does not leak slurry.
The above, only be the preferred example of the utility model discloses, not be used for the restriction the utility model discloses, all basis the utility model discloses a technical entity is any slight modification, equivalent replacement and improvement to do the above embodiment, all should be contained within the technical scheme's of the utility model protection within range.

Claims (4)

1. The utility model provides a horizontal construction joint formwork device of concrete structure, including prop up locate concrete structure floor outer wall or the inboard template of wall post and prop up locate the outside template in concrete structure floor outer wall or the wall post outside, through split bolt connection, its characterized in that between the inside and outside template: a square strip-shaped template is fixed at the upper edge part of the inner side of the outer side template, and the top surface of the square strip-shaped template is flush with the top surface of the outer side template; the concrete floor outer wall or wall column filling cavity is defined by the inner side template, the outer side template and the square strip-shaped template, and the top surface of the square strip-shaped template is flush with the horizontal construction joint of the concrete floor structure.
2. The formwork device for a horizontal construction joint of a concrete structure according to claim 1, wherein: the square strip-shaped template is a square wood strip, and the square wood strip is fixed on the outer template through round nails or wood screws.
3. The formwork device for a horizontal construction joint of a concrete structure according to claim 2, wherein: the section size of the square wood strip is 20mm multiplied by 15 mm.
4. The formwork device for a horizontal construction joint of a concrete structure according to claim 2, wherein: the inner template and the outer template are both 15mm gluing templates.
CN202020626317.7U 2020-04-23 2020-04-23 Horizontal construction joint formwork device of concrete structure Active CN212295631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020626317.7U CN212295631U (en) 2020-04-23 2020-04-23 Horizontal construction joint formwork device of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020626317.7U CN212295631U (en) 2020-04-23 2020-04-23 Horizontal construction joint formwork device of concrete structure

Publications (1)

Publication Number Publication Date
CN212295631U true CN212295631U (en) 2021-01-05

Family

ID=73973327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020626317.7U Active CN212295631U (en) 2020-04-23 2020-04-23 Horizontal construction joint formwork device of concrete structure

Country Status (1)

Country Link
CN (1) CN212295631U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395747A (en) * 2020-04-23 2020-07-10 安徽三建工程有限公司 Formwork supporting device for horizontal construction joint of concrete structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395747A (en) * 2020-04-23 2020-07-10 安徽三建工程有限公司 Formwork supporting device for horizontal construction joint of concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN109441151A (en) Prefabricated toilet and its construction and installation method
CN109024987B (en) Post-pouring construction method for toilet shear wall
CN211007032U (en) Concrete bay window plastering-free construction structure
CN212295631U (en) Horizontal construction joint formwork device of concrete structure
CN111395747A (en) Formwork supporting device for horizontal construction joint of concrete structure and construction method thereof
CN103470038B (en) Concrete one-step forming process of building appearance moulding and main structure
CN113073840A (en) Concrete reversed ridge accurate positioning die and reversed ridge construction method
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN208056107U (en) A kind of combined steel formwork support system
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN211735892U (en) Connecting structure of prefabricated external wall panel and cast-in-place wall body
CN213382193U (en) Precast concrete bank platform
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN209082681U (en) A kind of prefabricated assembled bay window constructing structure of residential building
CN102777033B (en) Method for mounting prefabricated kitchen
CN209277619U (en) Prefabricated toilet
CN207228407U (en) A kind of prefabricated partition wall of the staircase with installation base
CN112459474A (en) Method for supporting single post of post-cast strip PVC pipe mould plain concrete
CN209868930U (en) Novel wall body pouring mold
CN216007553U (en) Water-stopping cushion block for reinforced concrete floor
CN218205682U (en) Pouring mold for kitchen and bathroom floor slab connection node
CN110185254A (en) A kind of Combined aluminum alloy template system and its application method
CN203361191U (en) Basement exterior wall structure
CN217602094U (en) Stair formwork erection construction structure
CN216974064U (en) Assembled elevator shaft's well unit and well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee after: Anhui Construction Engineering Third Construction Group Co.,Ltd.

Country or region after: China

Patentee after: Anhui Xinxin engineering test detection Co.,Ltd.

Address before: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee before: ANHUI SANJIAN ENGINEERING Co.,Ltd.

Country or region before: China

Patentee before: Anhui Xinxin engineering test detection Co.,Ltd.

CP03 Change of name, title or address