CN212295599U CN202020655097.0U CN202020655097U CN212295599U CN 212295599 U CN212295599 U CN 212295599U CN 202020655097 U CN202020655097 U CN 202020655097U CN 212295599 U CN212295599 U CN 212295599U
Authority
CN
China
Prior art keywords
bottom block
briquetting
block
recess
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020655097.0U
Other languages
Chinese (zh)
Inventor
徐鹏真
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Changda Construction Group Ltd
Original Assignee
Weifang Changda Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Changda Construction Group Ltd filed Critical Weifang Changda Construction Group Ltd
Priority to CN202020655097.0U priority Critical patent/CN212295599U/en
Application granted granted Critical
Publication of CN212295599U publication Critical patent/CN212295599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a construction frame, its characterized in that: including horizontal pole and vertical pole, be connected with the fixed block on horizontal pole and/or the vertical pole, the fixed block includes bottom block and briquetting, the one end and the articulated setting of briquetting one end of bottom block, but bottom block and briquetting lock set up, the bottom block is equipped with first recess on one side of briquetting, the briquetting is equipped with the second recess on one side of bottom block. The pipeline of the electric equipment is placed in the first groove or the second groove by connecting the fixed block on the scaffold, so that the pipeline is orderly placed; the arrangement of a plurality of pipelines can be realized simultaneously by arranging a plurality of first grooves and second grooves.

Description

Construction frame
Technical Field
The utility model belongs to the technical field of the construction technique and specifically relates to a construction frame is related to.
Background
Most of the work of the common scaffold in building construction needs workers to stand on the scaffold for completion. The workman can use some electrical equipment at the work, and the pipeline of these electrical equipment can scatter on the side of scaffold, can cause two problems like this, and the pipeline of putting everywhere on the scaffold can bring inconvenience for workman's action, is unfavorable for going on of construction, secondly makes the pipeline everywhere can step on, is unfavorable for the life-span of pipeline on the electrical equipment, and the third can cause careless drawing or playing and drag the pipeline, and the pipeline drives the electrical equipment and removes, influences the life of electrical equipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the weak point of above-mentioned conventional art, provide a simple structure, can accomodate the construction frame of circuit on the electrical equipment.
The purpose of the utility model is achieved through the following technical measures: a construction scaffold, comprising: including horizontal pole and vertical pole, be connected with the fixed block on horizontal pole and/or the vertical pole, the fixed block includes bottom block and briquetting, the one end and the articulated setting of briquetting one end of bottom block, but bottom block and briquetting lock set up, the bottom block is equipped with first recess on one side of briquetting, the briquetting is equipped with the second recess on one side of bottom block.
Connect the fixed block on the scaffold, the pipeline of electrical equipment is fixed on the fixed block, and the fixed block includes bottom block and briquetting, and the one end and the articulated setting of briquetting one end of bottom block, but bottom block and briquetting lock set up, the bottom block is equipped with first recess on one side of briquetting, the briquetting is equipped with the second recess on one side of bottom block, places the pipeline of electrical equipment in first recess or in the second recess to realize putting in order of pipeline.
As a preferred scheme, first recess and second recess all are equipped with a plurality ofly, the both ends of first recess and second recess are the opening setting all.
As a preferred scheme, the first grooves correspond to the second grooves one to one, and when the bottom block is buckled with the pressing block, the first grooves and the second grooves are correspondingly arranged.
As a preferable scheme, when the bottom block is buckled with the pressing block, the first grooves and the second grooves are arranged in a staggered mode.
As a preferred scheme, the one end that bottom block and briquetting articulated is equipped with solid fixed ring, gu fixed ring one side with bottom block fixed connection, the setting of the other side opening.
As a preferred scheme, the opening side of fixed ring is equipped with two connecting plates, two connecting plates set up respectively fixed ring opening side's both ends.
As a preferred scheme, an adjusting channel is formed between the two connecting plates, connecting holes are formed in the two connecting plates, and the two connecting holes are correspondingly formed.
Preferably, one side of the fixing ring, which is connected with the bottom block, is arranged in parallel with the bottom block.
As an optimal scheme, the end, far away from the fixed ring, of the bottom block is provided with a clamping groove, the clamping groove is arranged towards the pressing block, and a clamping block matched with the clamping groove is arranged on the pressing block.
As a preferred scheme, the number of the pressing blocks is two, and the two pressing blocks are respectively arranged on two sides of the bottom block.
Owing to adopted above-mentioned technical scheme, compare with prior art, the utility model has the advantages that: the utility model provides a construction frame, which is characterized in that a fixed block is connected on the construction frame, and a pipeline of an electric device is placed in a first groove or a second groove, thereby realizing the orderly arrangement of the pipeline; the arrangement of a plurality of pipelines can be realized simultaneously by arranging a plurality of first grooves and second grooves.
The present invention will be further described with reference to the accompanying drawings and the following detailed description.
Drawings
Fig. 1 is a schematic structural view of embodiment 1 of the construction frame of the present invention.
Fig. 2 is the overall structure schematic diagram of the utility model relates to a construction frame.
Fig. 3 is an enlarged schematic view of a position a of the construction frame of the present invention.
Fig. 4 is a schematic structural view of embodiment 2 of the construction frame of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Example 1: as shown in fig. 1-3, a construction frame, includes horizontal pole 1 and vertical pole 2, horizontal pole 1 and vertical pole 2 interconnect, be connected with fixed block 3 on horizontal pole 1 and the vertical pole 2, fixed block 3 can set up as required, as shown in fig. 2, in this embodiment, all be equipped with a fixed block 3 on horizontal pole 1 and the vertical pole 2, also can only set up on horizontal pole 1 or vertical pole 2 as required, the quantity of fixed block 3 also can set up according to particular case.
As shown in fig. 1, the fixing block 3 includes a bottom block 31 and a pressing block 32, and one end of the bottom block 31 and one end of the pressing block 32 are hinged, in this embodiment, hinged by a hinge. But bottom piece 31 and briquetting 32 lock set up, be equipped with first recess 5 on the one side of bottom piece 31 orientation briquetting 32, be equipped with second recess 6 on the briquetting 32 one side of orientation bottom piece 31. Connect fixed block 3 on the scaffold, the pipeline of electrical equipment is fixed on fixed block 3, and fixed block 3 includes bottom block 31 and briquetting 32, and the one end of bottom block 31 and the articulated setting of briquetting 32 one end, but bottom block 31 and briquetting 32 lock set up, bottom block 31 is equipped with first recess 5 on one side of briquetting 32, briquetting 32 is equipped with second recess 6 on one side of bottom block 31, places the pipeline of electrical equipment in first recess 5 or in second recess 6 to realize putting in order of pipeline.
The number of the pressing blocks 32 is two, and the two pressing blocks 32 are respectively arranged on two sides of the bottom block 31.
The first groove 5 and the second groove 6 are provided with a plurality of grooves, in this embodiment, the first groove 5 and the second groove 6 are provided with three grooves, and other numbers can be set.
The first grooves 5 correspond to the second grooves 6 one by one, and when the bottom block 31 and the pressing block 32 are buckled, the first grooves 5 correspond to the second grooves 6. In this embodiment, the first groove 5 and the second groove 6 are both semicircular, when the first groove 5 is buckled with the second groove 6, a circular trunking is formed, and the pipeline is placed in the trunking. The first and second recesses 5, 6 may be provided in other shapes, rectangular or semi-elliptical, etc.
The two ends of the first groove 5 and the second groove 6 are both provided with openings, and the openings at the two ends facilitate the placement of pipelines.
Bottom block 31 and briquetting 32 articulated one end are equipped with solid fixed ring 7, gu fixed ring 7 one side with bottom block 31 fixed connection, the opposite side opening sets up. The fixing ring 7 is used for fixing the whole fixing block 3 on the transverse rod 1 or the longitudinal rod 2. In this embodiment, as shown in fig. 1, two connecting plates 8 are disposed on the opening side of the fixing ring 7, and the two connecting plates 8 are disposed at two ends of the opening side of the fixing ring 7 respectively. An adjusting channel 9 is formed between the two connecting plates 8, connecting holes 10 are formed in the two connecting plates 8, and the two connecting holes 10 are correspondingly arranged. Place solid fixed ring 7 on horizontal pole 1 or vertical pole 2, break two connecting plates 8 with the fingers and thumb and will gu fixed ring 7 wraps up horizontal pole 1 or vertical pole 2, pass two connecting holes 10 with the bolt in proper order, reuse nut is with the bolt fastening, can adjust solid fixed ring 7's area of encirclement according to horizontal pole 1 or vertical pole 2's cross section width like this, thereby make solid fixed ring 7 can be fixed on horizontal pole 1 or vertical pole 2 by the at utmost, in this embodiment, gu fixed ring 7's effect is exactly to fix fixed block 3 on horizontal pole 1 or vertical pole 2, consequently solid fixed ring 7 can have rocking of small range along horizontal pole 1 or vertical pole 2 to a certain extent after fixing the bolt nut, so no matter horizontal pole 1 or vertical pole 2's cross section is circular or square, the requirement is all can be realized more.
As shown in fig. 1, the side of the fixing ring 7 connected to the bottom block 31 is disposed parallel to the bottom block 31. The fixing ring 7 and the bottom block 31 are both provided with bolt holes 11, and the fixing ring 7 and the bottom block 31 can be fixedly connected through bolts or screws. In the present embodiment, one bolt hole 11 is provided, and a plurality of bolt holes may be provided as appropriate.
As shown in fig. 1, a clamping groove 12 is formed in one end, away from the fixing ring 7, of the bottom block 31, the clamping groove 12 is arranged towards the pressing block 32, and a clamping block 13 matched with the clamping groove 12 is arranged on the pressing block 32. The number of the pressing blocks 32 is two, and the two pressing blocks 32 are respectively arranged on two sides of the bottom block 31. The bottom block 31 is provided with a clamping groove 12 on two sides facing the two pressing blocks 32, each side is provided with a clamping groove 12, the two clamping grooves 12 are arranged together, the two pressing blocks 32 are provided with clamping blocks 13 corresponding to the clamping grooves 12, and after the pressing blocks 32 are buckled with the bottom block 31, the clamping blocks 13 are positioned in the clamping grooves 12, so that the pressing blocks 32 and the bottom block 31 are fixed.
As shown in fig. 3, a limiting groove 14 is further disposed in each of the slots 12, in this embodiment, a limiting groove 14 is disposed in each of the slots 12, a limiting block 15 is disposed at a position where the fixture block 13 corresponds to the slot 12, the limiting blocks 15 correspond to the slots 12 one to one, and a plurality of limiting grooves 14 may also be disposed. The limiting groove 14 and the limiting block 15 enable the bottom block 31 and the pressing block 32 to be pressed tightly, and the fixing effect is better.
During the use, fix fixed block 3 on horizontal pole 1 or vertical pole 2 through solid fixed ring 7, part two briquetting 32 from bottom block 31, expose first recess 5 and second recess 6, put into first recess 5 and second recess 6 with the pipeline in proper order, press briquetting 32 on bottom block 31 at last, fixture block 13 is fixed in draw-in groove 12, realize the fixed of briquetting 32 and bottom block 31, realize putting in order of pipeline, and simple structure, convenient operation is swift, be worth very much promoting.
Example 2: as shown in fig. 4, when the bottom block 31 and the pressing block 32 are engaged, the first grooves 5 and the second grooves 6 are alternately arranged. Therefore, the first groove 5 and the second groove 6 can be respectively and independently used for containing pipelines, and the independent space for containing the pipelines is increased.
Other parts in this embodiment are the same as those in embodiment 1, and are not described in detail.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. A construction scaffold, comprising: including horizontal pole and vertical pole, be connected with the fixed block on horizontal pole and/or the vertical pole, the fixed block includes bottom block and briquetting, the one end and the articulated setting of briquetting one end of bottom block, but bottom block and briquetting lock set up, the bottom block is equipped with first recess on one side of briquetting, the briquetting is equipped with the second recess on one side of bottom block.
2. A construction frame as claimed in claim 1, wherein: first recess and second recess all are equipped with a plurality ofly, the equal opening setting in both ends of first recess and second recess.
3. A construction frame as claimed in claim 2, wherein: the first grooves correspond to the second grooves one to one, and when the bottom block is buckled with the pressing block, the first grooves correspond to the second grooves.
4. A construction frame as claimed in claim 2, wherein: when the bottom block is buckled with the pressing block, the first grooves and the second grooves are arranged in a staggered mode.
5. A construction frame as claimed in any of claims 3 to 4, wherein: the bottom block and one end hinged to the pressing block are provided with fixing rings, one side of each fixing ring is fixedly connected with the bottom block, and the other side of each fixing ring is open.
6. A construction frame as claimed in claim 5, wherein: the opening side of the fixing ring is provided with two connecting plates, and the two connecting plates are arranged at two ends of the opening side of the fixing ring respectively.
7. A construction frame as claimed in claim 6, wherein: two form between the connecting plate and adjust the passageway, all be equipped with the connecting hole on two connecting plates, two connecting holes correspond the setting.
8. A construction scaffold as claimed in claim 7, wherein: one side of the fixed ring, which is connected with the bottom block, is arranged in parallel with the bottom block.
9. A construction scaffold as claimed in claim 8, wherein: the one end that solid fixed ring was kept away from to the bottom block is equipped with the draw-in groove, the draw-in groove sets up towards the briquetting, be equipped with on the briquetting with draw-in groove complex fixture block.
10. A construction scaffold as claimed in claim 9, wherein: the briquetting is equipped with two, two the briquetting sets up respectively the both sides of bottom block.
CN202020655097.0U 2020-04-27 2020-04-27 Construction frame Active CN212295599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020655097.0U CN212295599U (en) 2020-04-27 2020-04-27 Construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020655097.0U CN212295599U (en) 2020-04-27 2020-04-27 Construction frame

Publications (1)

Publication Number Publication Date
CN212295599U true CN212295599U (en) 2021-01-05

Family

ID=73964160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020655097.0U Active CN212295599U (en) 2020-04-27 2020-04-27 Construction frame

Country Status (1)

Country Link
CN (1) CN212295599U (en)

Similar Documents

Publication Publication Date Title
US10998573B2 (en) Lithium battery package
CN212295599U (en) Construction frame
CN212849640U (en) Easy operation type sorting and arranging device
CN207317842U (en) A kind of hand-held detector
CN218300800U (en) Modularization cable fixture
CN215527874U (en) Be applied to supplementary installing support of battery stationary platen
CN210833708U (en) Anti-dismantling protective gas meter
CN213449815U (en) Underground continuous wall construction enclosure device
CN212485595U (en) Special crimping type equipment fastener of power cable
CN210607411U (en) Battery box
CN213340553U (en) Lithium battery mounting box
CN105390654A (en) Battery pack
CN214429111U (en) Pre-wiring device for IT equipment of machine room
CN218809647U (en) Power line collecting device
CN217307173U (en) Deconcentrator of fixed pencil bifurcation point
CN217335106U (en) Back splint type safety charger
CN212323324U (en) Detachable multi-row wiring terminal
CN219322031U (en) Bus duct hole-free connection structure
CN214013241U (en) Combined wire harness connector
CN210226022U (en) Distribution frame for information technology engineering
CN217720117U (en) Wire joint
CN219725963U (en) Soft packet of electric core smelting tool
CN207968750U (en) A kind of device for preventing network switch cable from loosening
CN217641619U (en) Battery pack mounting structure
CN214674002U (en) Combined type buckle wire

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant