CN212294708U - Steel-pipe pile cofferdam hasp - Google Patents
Steel-pipe pile cofferdam hasp Download PDFInfo
- Publication number
- CN212294708U CN212294708U CN202020823319.5U CN202020823319U CN212294708U CN 212294708 U CN212294708 U CN 212294708U CN 202020823319 U CN202020823319 U CN 202020823319U CN 212294708 U CN212294708 U CN 212294708U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- sets
- sleeve
- arc
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to the technical field of civil engineering auxiliary devices, in particular to a steel pipe pile cofferdam lock catch, which can adjust the angles of a first clamping plate and a second clamping plate according to the installation requirement on site; the steel pipe pile fixing device comprises a first steel pipe pile, a second steel pipe pile, a first support plate, a second support plate, a first clamping plate, a second clamping plate, a first fixing seat and a second fixing seat, wherein a first sleeve and a second sleeve are respectively welded on the outer sides of the first steel pipe pile and the second steel pipe pile, and a first clamping groove and a second clamping groove are respectively formed in the right side walls of the first fixing seat and the second fixing seat; the first sleeve and the second sleeve are respectively provided with a first arc-shaped groove and a second arc-shaped groove, and the upper half area of the left side wall of the first sleeve and the upper half area of the left side wall of the second sleeve are respectively provided with a first sliding hole and a second sliding hole.
Description
Technical Field
The utility model relates to a civil engineering construction auxiliary device's technical field especially relates to a steel-pipe pile cofferdam hasp.
Background
As is well known, a steel pipe pile cofferdam lock catch is an auxiliary device for connecting steel pipe pile cofferdams, and is widely used in the field of civil engineering construction; the existing steel pipe pile cofferdam lock catch comprises a first steel pipe pile, a second steel pipe pile, a first support plate, a second support plate, a first clamping plate, a second clamping plate, a first fixing seat and a second fixing seat, wherein the outer sides of the first steel pipe pile and the second steel pipe pile are respectively provided with a first sleeve and a second sleeve in a welding mode, the right ends of the first support plate and the second support plate are respectively connected with the central areas of the left side walls of the first sleeve and the second sleeve, the left ends of the first support plate and the second support plate are respectively connected with the central areas of the right side walls of the first clamping plate and the second clamping plate, the left ends of the first fixing seat and the second fixing seat are respectively connected with the central areas of the right side walls of the first sleeve and the second sleeve, the right side walls of the first fixing seat and the second fixing seat are respectively provided with a first clamping groove and a second clamping groove, and the second clamping plate is; when the conventional steel pipe pile cofferdam lock catch is used, the first steel pipe pile and the second steel pipe pile are two adjacent groups, and the second clamping plate is inserted into the first clamping groove, so that the first steel pipe pile and the second steel pipe pile can be connected; found in the use of current steel-pipe pile cofferdam hasp, the angle of first screens board and second screens board is fixed, is not convenient for adjust the angle of first screens board and second screens board according to the installation needs on-the-spot, leads to it to use the limitation higher.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a can adjust the angle of first screens board and second screens board according to the installation needs at scene, reduce the steel-pipe pile cofferdam hasp that uses the limitation.
The utility model discloses a steel-pipe pile cofferdam hasp, including first steel-pipe pile, the second steel-pipe pile, first extension board, the second extension board, first screens board, the second screens board, first fixing base and second fixing base, first steel-pipe pile and second steel-pipe pile outside weld respectively and are provided with first sleeve pipe and second sleeve pipe, first extension board and second extension board left end are connected with first screens board and second screens board right side wall central zone respectively, first fixing base and second fixing base left end are connected with first sleeve pipe and second sleeve pipe right side wall central zone respectively, first fixing base and second fixing base right side wall are provided with first screens groove and second screens groove respectively, the second screens board inserts to first screens inslot; the first sleeve and the second sleeve are respectively provided with a first arc-shaped groove and a second arc-shaped groove, the upper half areas of the left side walls of the first sleeve and the second sleeve are respectively provided with a first sliding hole and a second sliding hole, the first sliding hole and the second sliding hole are respectively communicated with the first arc-shaped groove and the second arc-shaped groove, the first sliding plate and the second sliding plate are respectively fixed in the first arc-shaped groove and the second arc-shaped groove in a sliding mode, and the right ends of the first support plate and the second support plate respectively penetrate through the first sliding hole and the second sliding hole and are respectively connected with the central areas of the left side walls of the first sliding plate and the second sliding plate.
The utility model discloses a steel-pipe pile cofferdam hasp still includes first arc pole and second arc pole, first arc pole and second arc pole one end are connected with first arc wall and second arc wall inner bottom lateral wall respectively, and the first arc pole and the second arc pole other end are connected with first arc wall and second arc wall inner top lateral wall respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes two sets of first anchor strut, two sets of first anchor strut left ends are connected with first sleeve right side wall first region and second region respectively, and two sets of first anchor strut right-hand member is connected with first fixing base top and bottom respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes two sets of second anchor strut, two sets of second anchor strut left ends are connected with second sleeve right side wall first region and second region respectively, and two sets of second anchor strut right-hand members are connected with second fixing base top and bottom respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes two sets of first rubber pads and two sets of second rubber pads, two sets of first rubber pad left ends are connected with first fixing base right side wall first region and second region respectively, two sets of second rubber pad left ends are connected with second fixing base right side wall first region and second region respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes the first in command and the second in command, the first in command and the second in command top are connected with first sleeve pipe and second sleeve pipe bottom respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes that the first in command and second in command lateral wall central zone are provided with first slipmat and second slipmat respectively.
The utility model discloses a steel-pipe pile cofferdam hasp still includes the first steel ball of multiunit and multiunit second steel ball, and first screens groove and the inslot left side wall of second screens are provided with the first draw-in groove of multiunit and multiunit second draw-in groove respectively, the first steel ball of multiunit and multiunit second steel ball are rotatable respectively and can be adorned in the first draw-in groove of multiunit and multiunit second draw-in groove.
Compared with the prior art, the beneficial effects of the utility model are that: first steel-pipe pile and second steel-pipe pile are adjacent two sets ofly, the second screens board inserts to first screens inslot, can accomplish the connection to first steel-pipe pile and second steel-pipe pile, first sliding plate and second sliding plate can slide in first arc wall and second arc wall respectively, first sliding plate and second sliding plate drive first extension board and second extension board rotation respectively, the turned angle of first extension board and second extension board is 90 degrees at most, and then can adjust the angle of first screens board and second screens board according to the installation needs at scene, reduce and use the limitation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1;
FIG. 3 is an enlarged view of a portion B of FIG. 1;
fig. 4 is a schematic perspective view of the connection of the first steel-pipe pile and the first sleeve;
in the drawings, the reference numbers: 1. a first steel pipe pile; 2. a second steel pipe pile; 3. a first support plate; 4. a second support plate; 5. a first clamping plate; 6. a second clamping plate; 7. a first fixed seat; 8. a second fixed seat; 9. a first sleeve; 10. a second sleeve; 11. a first sliding plate; 12. a second sliding plate; 13. a first arcuate bar; 14. a second arcuate bar; 15. a first reinforcing bar; 16. a second reinforcing bar; 17. a first rubber pad; 18. a second rubber pad; 19. a first handle; 20. a second handle; 21. a first non-slip mat; 22. a second non-slip mat; 23. a first steel ball; 24. and the second steel ball.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 4, the utility model discloses a steel-pipe pile cofferdam lock catch, including first steel-pipe pile 1, second steel-pipe pile 2, first extension board 3, second extension board 4, first screens board 5, second screens board 6, first fixing base 7 and second fixing base 8, first steel-pipe pile 1 and second steel-pipe pile 2 outside weld respectively and are provided with first sleeve 9 and second sleeve 10, first extension board 3 and second extension board 4 left end are regional with first screens board 5 and second screens 6 right side wall central authorities respectively, first fixing base 7 and 8 left ends of second fixing base are regional with first sleeve 9 and 10 right side wall centres, first fixing base 7 and 8 right side walls of second fixing base are provided with first screens groove and second screens groove respectively, second screens board 6 inserts to first screens inslot; the first sleeve 9 and the second sleeve 10 are respectively provided with a first arc-shaped groove and a second arc-shaped groove, the upper half areas of the left side walls of the first sleeve 9 and the second sleeve 10 are respectively provided with a first sliding hole and a second sliding hole, the first sliding hole and the second sliding hole are respectively communicated with the first arc-shaped groove and the second arc-shaped groove, the first sliding plate 11 and the second sliding plate 12 can be respectively fixed in the first arc-shaped groove and the second arc-shaped groove in a sliding manner, and the right ends of the first support plate 3 and the second support plate 4 respectively penetrate through the first sliding hole and the second sliding hole and are respectively connected with the central areas of the left side walls of the first sliding plate 11 and the second sliding plate 12; first steel-pipe pile and second steel-pipe pile are adjacent two sets ofly, the second screens board inserts to first screens inslot, can accomplish the connection to first steel-pipe pile and second steel-pipe pile, first sliding plate and second sliding plate can slide in first arc wall and second arc wall respectively, first sliding plate and second sliding plate drive first extension board and second extension board rotation respectively, the turned angle of first extension board and second extension board is 90 degrees at most, and then can adjust the angle of first screens board and second screens board according to the installation needs at scene, reduce and use the limitation.
The utility model discloses a steel-pipe pile cofferdam hasp, still include first arc pole 13 and second arc pole 14, first arc pole 13 and 14 one end of second arc pole are connected with the inner bottom lateral wall of first arc wall and second arc wall respectively, the other end of first arc pole 13 and 14 other ends of second arc pole are connected with the inner top lateral wall of first arc wall and second arc wall respectively; first arc pole and second arc pole can be respectively spacing to first sliding plate and second sliding plate, improve stability in use.
The utility model discloses a steel-pipe pile cofferdam hasp, still include two sets of first anchor rods 15, two sets of first anchor rods 15 left ends are connected with first sleeve 9 right side wall first half region and second half region respectively, two sets of first anchor rods 15 right ends are connected with first fixing base 7 top and bottom respectively; two sets of first strengthening rods can be fixed first fixing base, improve and use the reliability.
The utility model discloses a steel-pipe pile cofferdam hasp, still include two sets of second anchor rods 16, the left end of two sets of second anchor rods 16 is connected with second sleeve 10 right side wall first half region and second half region respectively, the right end of two sets of second anchor rods 16 is connected with 8 tops of second fixing base and bottom respectively; two sets of second strengthening rods can be fixed the second fixing base, improve and use the reliability.
The utility model discloses a steel-pipe pile cofferdam hasp, still include two sets of first rubber pads 17 and two sets of second rubber pads 18, the left end of two sets of first rubber pads 17 is connected with first fixing base 7 right side wall first half region and second half region respectively, the left end of two sets of second rubber pads 18 is connected with second fixing base 8 right side wall first half region and second half region respectively; two sets of first rubber pads and two sets of second rubber pads can play the effect that the spring supported, improve stability in use.
The steel pipe pile cofferdam lock catch of the utility model also comprises a first handle 19 and a second handle 20, the top ends of the first handle 19 and the second handle 20 are respectively connected with the bottom ends of the first sleeve 9 and the second sleeve 10; the first handle and the second handle can be convenient for workers to move the device, and the use flexibility is improved.
The steel pipe pile cofferdam lock catch of the utility model also comprises a first handle 19 and a second handle 20, wherein the central areas of the outer side walls are respectively provided with a first anti-skid pad 21 and a second anti-skid pad 22; first slipmat and second slipmat can protect staff's palm, improve the safety in utilization.
The utility model discloses a steel-pipe pile cofferdam hasp, still include multiunit first steel ball 23 and multiunit second steel ball 24, the left side wall is provided with multiunit first draw-in groove and multiunit second draw-in groove respectively in first screens groove and the second screens groove, multiunit first steel ball 23 and multiunit second steel ball 24 can rotate respectively and adorn in multiunit first draw-in groove and multiunit second draw-in groove; the first clamping plate and the second clamping plate can be conveniently inserted by the multiple groups of first steel balls and the multiple groups of second steel balls, and the use smoothness is improved.
The utility model discloses a steel-pipe pile cofferdam hasp, it is at the during operation, first steel-pipe pile and second steel-pipe pile are adjacent two sets ofly, the second screens board inserts to first screens inslot, can accomplish the connection to first steel-pipe pile and second steel-pipe pile, first sliding plate and second sliding plate can slide in first arc wall and second arc wall respectively, first sliding plate and second sliding plate drive first extension board and second extension board rotation respectively, the rotation angle of first extension board and second extension board is maximum 90 degrees, and then can adjust the angle of first screens board and second screens board according to the installation needs in the scene, reduce and use the limitation; the first arc-shaped rod and the second arc-shaped rod can limit the first sliding plate and the second sliding plate respectively, so that the use stability is improved; the two groups of first reinforcing rods can fix the first fixing seat, so that the use reliability is improved; the two groups of second reinforcing rods can fix the second fixing seat, so that the use reliability is improved; the two groups of first rubber pads and the two groups of second rubber pads can play a role of supporting by springs, so that the use stability is improved; the first handle and the second handle can facilitate workers to move the device, so that the use flexibility is improved; the first anti-skid pad and the second anti-skid pad can protect the palm of a worker, so that the use safety is improved; the first clamping plate and the second clamping plate can be conveniently inserted by the multiple groups of first steel balls and the multiple groups of second steel balls, and the use smoothness is improved.
The utility model discloses a steel-pipe pile cofferdam hasp, above the mounting means, the connected mode or the mode that sets up of all parts are common mechanical system to the concrete structure, model and the coefficient index of all its parts are its from taking the technique, as long as can reach all can implementing of its beneficial effect, so do not add at many and give unnecessary details.
The steel pipe pile cofferdam lock of the utility model, under the condition of not explaining the contrary, the orientation words contained in the terms of 'up-down, left-right, front-back, inside-outside and vertical and horizontal' only represent the orientation of the term under the normal use state, or be a trivial term understood by those skilled in the art, and should not be considered as limiting the term, at the same time, the numerical terms "first," "second," and "third," etc. do not denote any particular quantity or order, but rather are used to distinguish one from another, furthermore, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements, but also includes other elements not expressly listed or inherent to such process, method, article, or apparatus.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.
Claims (8)
1. A steel pipe pile cofferdam lock catch comprises a first steel pipe pile (1), a second steel pipe pile (2), a first support plate (3), a second support plate (4), a first clamping plate (5), a second clamping plate (6), a first fixing seat (7) and a second fixing seat (8), wherein the outer sides of the first steel pipe pile (1) and the second steel pipe pile (2) are respectively welded with a first sleeve (9) and a second sleeve (10), the left ends of the first support plate (3) and the second support plate (4) are respectively connected with the central areas of the right side walls of the first clamping plate (5) and the second clamping plate (6), the left ends of the first fixing seat (7) and the second fixing seat (8) are respectively connected with the central areas of the right side walls of the first sleeve (9) and the second sleeve (10), the right side walls of the first fixing seat (7) and the second fixing seat (8) are respectively provided with a first clamping groove and a second clamping groove, the second clamping plate (6) is inserted into the first clamping groove; the novel support plate is characterized by further comprising a first sliding plate (11) and a second sliding plate (12), wherein a first arc-shaped groove and a second arc-shaped groove are formed in the first sleeve (9) and the second sleeve (10) respectively, a first sliding hole and a second sliding hole are formed in the upper half area of the left side wall of the first sleeve (9) and the upper half area of the left side wall of the second sleeve (10) respectively, the first sliding hole and the second sliding hole are communicated with the first arc-shaped groove and the second arc-shaped groove respectively, the first sliding plate (11) and the second sliding plate (12) are fixed in the first arc-shaped groove and the second arc-shaped groove in a sliding mode respectively, and the right ends of the first support plate (3) and the second support plate (4) penetrate through the first sliding hole and the second sliding hole respectively and are connected with the central areas of the left side walls of the first sliding plate (11) and the second sliding plate (12.
2. The steel pipe pile cofferdam lock of claim 1, further comprising a first arc rod (13) and a second arc rod (14), wherein one end of the first arc rod (13) and one end of the second arc rod (14) are respectively connected with the inner bottom side wall of the first arc groove and the inner bottom side wall of the second arc groove, and the other end of the first arc rod (13) and the other end of the second arc rod (14) are respectively connected with the inner top side wall of the first arc groove and the inner top side wall of the second arc groove.
3. The steel pipe pile cofferdam lock of claim 2, further comprising two sets of first reinforcing bars (15), wherein the left ends of the two sets of first reinforcing bars (15) are connected with the upper half area and the lower half area of the right side wall of the first sleeve (9), respectively, and the right ends of the two sets of first reinforcing bars (15) are connected with the top end and the bottom end of the first fixing seat (7), respectively.
4. The steel pipe pile cofferdam lock of claim 3, further comprising two sets of second reinforcing bars (16), wherein the left ends of the two sets of second reinforcing bars (16) are connected with the upper half area and the lower half area of the right side wall of the second sleeve (10), respectively, and the right ends of the two sets of second reinforcing bars (16) are connected with the top end and the bottom end of the second fixing seat (8), respectively.
5. The steel pipe pile cofferdam lock of claim 4, further comprising two sets of first rubber pads (17) and two sets of second rubber pads (18), wherein the left ends of the two sets of first rubber pads (17) are respectively connected with the upper half area and the lower half area of the right side wall of the first fixing seat (7), and the left ends of the two sets of second rubber pads (18) are respectively connected with the upper half area and the lower half area of the right side wall of the second fixing seat (8).
6. The steel pipe pile cofferdam lock of claim 5, further comprising a first handle (19) and a second handle (20), wherein the top ends of the first handle (19) and the second handle (20) are respectively connected with the bottom ends of the first sleeve (9) and the second sleeve (10).
7. The steel pipe pile cofferdam lock of claim 6, further comprising a first anti-skid pad (21) and a second anti-skid pad (22) respectively arranged at the central area of the outer side wall of the first handle (19) and the second handle (20).
8. The steel pipe pile cofferdam lock of claim 7, further comprising a plurality of sets of first steel balls (23) and a plurality of sets of second steel balls (24), wherein the left side wall of the first locking groove and the second locking groove are respectively provided with a plurality of sets of first locking grooves and a plurality of sets of second locking grooves, and the plurality of sets of first steel balls (23) and the plurality of sets of second steel balls (24) are respectively rotatably installed in the plurality of sets of first locking grooves and the plurality of sets of second locking grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020823319.5U CN212294708U (en) | 2020-05-15 | 2020-05-15 | Steel-pipe pile cofferdam hasp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020823319.5U CN212294708U (en) | 2020-05-15 | 2020-05-15 | Steel-pipe pile cofferdam hasp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212294708U true CN212294708U (en) | 2021-01-05 |
Family
ID=73968603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020823319.5U Active CN212294708U (en) | 2020-05-15 | 2020-05-15 | Steel-pipe pile cofferdam hasp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212294708U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062341A (en) * | 2021-03-31 | 2021-07-02 | 广州市市政集团有限公司 | 8 font CT hasp steel-pipe pile and larsen steel sheet pile combination cofferdam structure |
CN116446381A (en) * | 2023-06-16 | 2023-07-18 | 中建铁投轨道交通建设有限公司 | Waterproof latch assembly of steel pipe pile |
-
2020
- 2020-05-15 CN CN202020823319.5U patent/CN212294708U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062341A (en) * | 2021-03-31 | 2021-07-02 | 广州市市政集团有限公司 | 8 font CT hasp steel-pipe pile and larsen steel sheet pile combination cofferdam structure |
CN113062341B (en) * | 2021-03-31 | 2022-04-12 | 广州市市政集团有限公司 | 8 font CT hasp steel-pipe pile and larsen steel sheet pile combination cofferdam structure |
CN116446381A (en) * | 2023-06-16 | 2023-07-18 | 中建铁投轨道交通建设有限公司 | Waterproof latch assembly of steel pipe pile |
CN116446381B (en) * | 2023-06-16 | 2023-09-05 | 中建铁投轨道交通建设有限公司 | Waterproof latch assembly of steel pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212294708U (en) | Steel-pipe pile cofferdam hasp | |
WO2011031300A1 (en) | Clamp for fastening concrete rebar intersections | |
CN102979108A (en) | Locating sleeve rack for locating anchor bolt group | |
CN205676918U (en) | A kind of underlying structure of tower crane steel Platform pipe column foundation | |
CN212562556U (en) | Anti-tilting device for discharging platform | |
CN212670313U (en) | High-strength track template for bridge construction | |
GB2143883A (en) | Elevation indicator | |
CN221001112U (en) | Auxiliary tool for raft foundation reinforcement construction | |
CN220815065U (en) | Supporting device at bottom of shear wall | |
CN212534182U (en) | Pile foundation with good anti-skid effect | |
CN215211907U (en) | Concrete floor pours and uses reinforcing bar protective layer thickness control device | |
CN216446858U (en) | Karst foundation pile drilling platform | |
CN211597291U (en) | Stone curtain wall hanging device | |
CN109056532B (en) | I-beam construction platform | |
CN212866816U (en) | Novel guide rail assembly for attached lifting scaffold | |
CN215671465U (en) | Stiffness column anchor bolt and section steel column simultaneous embedded supporting structure | |
CN214498368U (en) | Template support convenient to dismantle | |
CN217000946U (en) | Steel reinforcement cage is fixed deposits support convenient to remove | |
CN210947433U (en) | Split heads muscle of field processing | |
CN213173489U (en) | Pier protection device for down-passing high-speed rail construction | |
CN211853207U (en) | Special support of concrete spreader arm brace | |
CN215105284U (en) | Safety protection equipment for building pile foundation construction | |
CN211850699U (en) | Novel decoration engineering device | |
CN216476405U (en) | Cast-in-place structural upper plate muscle protection is with hanging bench | |
CN117328481A (en) | Raft foundation reinforcement construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |