CN212294522U - High big side wall template trolley of hydraulic building - Google Patents

High big side wall template trolley of hydraulic building Download PDF

Info

Publication number
CN212294522U
CN212294522U CN202021217797.8U CN202021217797U CN212294522U CN 212294522 U CN212294522 U CN 212294522U CN 202021217797 U CN202021217797 U CN 202021217797U CN 212294522 U CN212294522 U CN 212294522U
Authority
CN
China
Prior art keywords
support
built
steel
hydraulic
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021217797.8U
Other languages
Chinese (zh)
Inventor
米旺
曹扬
马以宏
顾丽萍
季华
杨明星
吴志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN202021217797.8U priority Critical patent/CN212294522U/en
Application granted granted Critical
Publication of CN212294522U publication Critical patent/CN212294522U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a high big side wall form trolley of hydraulic structure, including truss and the steel shotcrete of branch putting at its both ends, the steel shotcrete is opening U-shaped structure down, comprises a link and two relative settings and highly uniform's support, and the below of support is provided with running gear, and the inside and outside both sides of support are provided with built-up plate and construction platform respectively, and wire rope link connection link is passed through at built-up plate's top, is provided with lead screw adjusting device between built-up plate and the support, connects through split bolt between two built-up plates. The template trolley for the high and large side walls of the hydraulic building can be repeatedly used only through one-time assembly, an inner support frame and an outer support frame and templates do not need to be built each time, the side walls on two sides can be simultaneously poured, the construction efficiency is greatly improved, and the construction cost is reduced; the combined die plate has high structural strength, is not easy to deform under stress, has stable position, can ensure the pouring precision and improves the construction quality.

Description

High big side wall template trolley of hydraulic building
Technical Field
The utility model relates to a construction field, in particular to high big side wall form trolley of hydraulic structure.
Background
Revetment and channel crowning big side wall are mostly cast-in-place structure of U type among the hydraulic engineering, and traditional construction mode is: the full framing scaffold is erected to support, the side walls on two sides are poured by adopting the templates in different bins, the mounting and dismounting workload is large, the construction period is long, the construction cost is high, the templates are easy to deform in the repeated mounting and dismounting process, the precision is not controlled, and the pouring quality is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve is: in order to overcome the defects of the prior art, the template trolley for the high and large side wall of the hydraulic building is provided.
In order to achieve the above technical effect, the utility model discloses a technical scheme is: the utility model provides a high big side wall form trolley of hydraulic structure, includes the truss and divides the steel shotcrete of putting at its both ends, the steel shotcrete is opening U-shaped structure down, comprises a link and two relative settings and highly uniform's support, the below of support is provided with running gear, and the inside and outside both sides of support are provided with built-up plate and construction platform respectively, wire rope connection link is passed through at built-up plate's top, is provided with lead screw adjusting device between built-up plate and the support, connects through split bolt between two built-up plates.
Furthermore, a reinforcing rod is arranged between the steel support and the truss, and the surfaces of the steel support and the truss are coated with corrosion-resistant coatings.
Further, running gear includes a plurality of gyro wheels and three drive arrangement, and each gyro wheel sets up along support length direction interval in proper order, and three drive arrangement installs respectively at the both ends and the intermediate position of support, drive arrangement includes motor, gearbox and drive wheel, motor and gearbox are all installed in the bottom of support, and the motor passes through the gearbox and is connected with the drive wheel transmission, drive wheel and gyro wheel are located same level.
Further, be provided with the control box on the support, be provided with frequency modulator, contactor and wireless remote controller in the control box, frequency modulator and contactor all with motor electric connection.
Furthermore, the built-up plate is formed by splicing a plurality of steel panels, one side of each steel panel, which faces the support, is provided with a back edge, the two sides of each steel panel are provided with connecting holes, and the upper end of each steel panel is provided with a hanging ring for connecting a steel wire rope.
Furthermore, the back edge is formed by welding a plurality of criss-cross channel steel.
Furthermore, construction platform has a plurality of, and each construction platform sets up along support direction of height interval, is provided with the guardrail on the construction platform.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the template trolley for the high and large side walls of the hydraulic building can be repeatedly used only through one-time assembly, an inner support frame and an outer support frame and templates do not need to be built each time, the side walls on two sides can be simultaneously poured, the construction efficiency is greatly improved, and the construction cost is reduced;
2. the combined template has high structure strength, is not easy to deform under stress, has stable position, can ensure the casting precision and improves the construction quality;
3. can adjust the composite template with according to pouring thing size, volume, application scope is wide, and the practicality is strong.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented according to the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and the embodiments, and it is obvious that the described embodiments are some embodiments, not all embodiments of the present invention.
Drawings
FIG. 1 is a schematic structural view of a high and large side wall form trolley of a hydraulic building of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a schematic structural view of the traveling mechanism of the present invention;
fig. 4 is a schematic structural diagram of the composite shuttering of the present invention.
The reference numbers and corresponding designations in the drawings are: 1. the steel structure comprises a truss, 2 steel supports, 3 combined templates, 4 construction platforms, 5 steel wire ropes, 6 lead screw adjusting devices, 7 split bolts, 8 reinforcing rods, 9 driving devices, 10 rollers, 11 control boxes, 12 guardrails, 201 connecting frames, 202 supports, 301 steel panels, 302 back ridges, 303 lifting rings, 901 motors, 902 gearboxes and 903 driving wheels.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic drawings and illustrate the basic structure of the present invention only in a schematic manner, and thus show only the components related to the present invention.
Example (b): as shown in fig. 1-4, the utility model provides a high big side wall form trolley of hydraulic structure, including truss 1 and steel support 2 separately placed at its both ends, steel support 2 is a U-shaped structure with opening down, it is formed by a connecting frame 201 and two supports 202 which are oppositely arranged and have the same height, a running gear is arranged under supports 202, running gear is used to drive the trolley to run, the inside and outside of supports 202 are respectively provided with a combined form 3 and a construction platform 4, a pouring space is formed by two combined forms 3, the construction platform 4 is used for falling feet when working aloft, the top of combined form 3 is connected with connecting frame 201 through wire rope 5, a lead screw adjusting device 6 is arranged between combined form 3 and supports 202, lead screw adjusting device 6 can be according to the space of two combined forms 3 of actual demand, thereby changing the size of pouring space, two combined forms 3 are connected through split bolt 7, the split bolts 7 enhance the structural strength of the two sectional forms 3.
As a preferable scheme of the embodiment, a reinforcing rod 8 is arranged between the steel support 2 and the truss 1, and the surfaces of the steel support 2 and the truss 1 are coated with corrosion-resistant coatings. In the scheme, the reinforcing rods 8 enhance the connection between the truss 1 and the steel support 2, and the overall stability of the template trolley is improved; the corrosion-resistant coating can reduce the corrosion of the trolley caused by external factors and prolong the service life of the trolley.
Wherein, running gear includes a plurality of gyro wheels 10 and three drive arrangement 9, and each gyro wheel 10 sets up along support 202 length direction interval in proper order, and three drive arrangement 9 is installed respectively at the both ends and the intermediate position of support 202, and drive arrangement 9 includes motor 901, gearbox 902 and drive wheel 903, and motor 901 and gearbox 902 are all installed in the bottom of support 202, and motor 901 passes through gearbox 902 and is connected with drive wheel 903 transmission, and drive wheel 903 and gyro wheel 10 are located same level. In the scheme, the three driving devices 9 are arranged at the front, middle and rear parts of the bracket 202, so that stable thrust can be provided, the weight of the bracket 202 is shared by the rollers 10, and the moving stability is further improved.
Wherein, be provided with control box 11 on the support 202, be provided with frequency modulator, contactor and wireless remote controller in the control box 11, frequency modulator and contactor all with motor 901 electric connection. Can realize the wireless remote control operation to this platform truck through control box 11 in this scheme, improve the security and the convenience of operation.
The combined template 3 is formed by splicing a plurality of steel panels 301, one side of each steel panel 301, which faces the support 202, is provided with a back ridge 302, two sides of each steel panel 301 are provided with connecting holes, and the upper end of each steel panel 301 is provided with a hanging ring 303 connected with a steel wire rope 5. In the scheme, the steel panel 301 is adopted as the main body part of the combined template 3, so that the structure strength is high and the service life is long; the adjacent rigid panels can be spliced through bolts and nuts penetrating through the connecting holes; the steel panel 301 is conveniently hoisted by the hoisting ring 303.
The back edge 302 is formed by welding a plurality of criss-cross channel steels. Adopt the channel-section steel to make steel panel 301's skeleton in this scheme, can further improve steel panel 301's structural strength, guarantee its non-deformable damage.
Wherein, construction platform 4 has a plurality of, and each construction platform 4 sets up along support 202 direction of height interval, is provided with guardrail 12 on the construction platform 4. According to the scheme, through the construction platforms 4 with different heights, operators can conveniently pour in layers; the guard rail 12 can improve safety in work.
The working principle is as follows:
before the high and large side walls of the hydraulic building are poured, guide rails are paved on a concrete foundation, the truss 1 and the steel support 2 are spliced, and after the traveling mechanism is installed at the bottom of the support 202, the traveling mechanism is hoisted to the guide rails by using a hoisting device. Then according to the requirements of site construction, a steel panel 301 and a back ridge 302 are used for splicing the combined template 3, a steel wire rope 5 is used for hoisting the combined template 3 to the lower part of the connecting frame 201, the distance between the combined template 3 and the support 202 is adjusted through a screw rod adjusting device 6, the combined template 3 and the support 202 are connected and fixed, two combined templates 3 are connected through split bolts 7, and the installation and the fixation of the combined template 3 are completed. Running gear starts, and drive arrangement 9 promotes support 202 and moves to the assigned position along the guide rail, and the staff can stand on construction platform 4, and the cooperation is pour the equipment and is poured the concrete toward the layering between two composite forms 3, through pouring both sides side wall simultaneously, promotes the efficiency of construction by a wide margin to reduce time and human cost. And after the side wall with partial length is poured, cutting off the split bolts 7, continuously moving to a subsequent position by the travelling mechanism, filling new split bolts 7 between the two combined templates 3, and repeating the pouring operation until the side wall construction is finished.

Claims (7)

1. The utility model provides a high big side wall form trolley of hydraulic structure, its characterized in that, includes the truss and divides the steel shotcrete of putting at its both ends, the steel shotcrete is opening U-shaped structure down, comprises a link and two relative settings and highly uniform's support, the below of support is provided with running gear, and the inside and outside both sides of support are provided with built-up plate and construction platform respectively, wire rope connection link is passed through at built-up plate's top, is provided with lead screw adjusting device between built-up plate and the support, through to the stay bolt connection between two built-up plates.
2. The hydraulic building high large side wall formwork trolley of claim 1, wherein a reinforcing bar is arranged between the steel support and the truss, and the surfaces of the steel support and the truss are coated with corrosion-resistant coatings.
3. The hydraulic building high and large side wall formwork trolley according to claim 1, wherein the traveling mechanism comprises a plurality of rollers and three driving devices, each roller is sequentially arranged at intervals along the length direction of the support, the three driving devices are respectively arranged at two ends and the middle position of the support, the driving devices comprise a motor, a gearbox and a driving wheel, the motor and the gearbox are both arranged at the bottom of the support, the motor is in transmission connection with the driving wheel through the gearbox, and the driving wheel and the rollers are positioned at the same horizontal height.
4. The hydraulic building high and large side wall formwork trolley according to claim 3, wherein a control box is arranged on the support, a frequency modulator, a contactor and a wireless remote controller are arranged in the control box, and the frequency modulator and the contactor are electrically connected with a motor.
5. The form trolley for high and large side walls of hydraulic buildings according to claim 1, wherein the modular forms are composed of a plurality of steel panels which are spliced together, one side of the steel panel facing the support is provided with a back ridge, both sides of the steel panel are provided with connecting holes, and the upper end of the steel panel is provided with a hanging ring for connecting the steel wire rope.
6. The hydraulic building high wall form trolley of claim 5, wherein the back ridges are made of a plurality of criss-cross channels welded to each other.
7. The form trolley for high and large side walls of hydraulic buildings according to claim 1, wherein there are several construction platforms, each of which is arranged at intervals along the height direction of the support, and the construction platforms are provided with guardrails.
CN202021217797.8U 2020-06-28 2020-06-28 High big side wall template trolley of hydraulic building Active CN212294522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021217797.8U CN212294522U (en) 2020-06-28 2020-06-28 High big side wall template trolley of hydraulic building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021217797.8U CN212294522U (en) 2020-06-28 2020-06-28 High big side wall template trolley of hydraulic building

Publications (1)

Publication Number Publication Date
CN212294522U true CN212294522U (en) 2021-01-05

Family

ID=73942794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021217797.8U Active CN212294522U (en) 2020-06-28 2020-06-28 High big side wall template trolley of hydraulic building

Country Status (1)

Country Link
CN (1) CN212294522U (en)

Similar Documents

Publication Publication Date Title
CN113235472B (en) Concrete placement platform truck is contained to apron
CN114961334B (en) High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN112431397B (en) High-rise building construction system and installation and use method thereof
CN106930192A (en) Assembled variable cross-section contracture sliding mode system and its construction method
CN211397597U (en) Template trolley and tunnel construction vehicle set
CN107829408B (en) Rectangular aqueduct construction steel mould trolley
CN112030777B (en) Descending movable formwork support bracket crossing type transfer construction method
CN113152493A (en) Panel pouring slip form construction system and construction method
CN113502756A (en) Thin-wall pier hydraulic creeping formwork system and construction method thereof
CN210766433U (en) Trapezoidal hanging basket structure
CN212294522U (en) High big side wall template trolley of hydraulic building
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN216465307U (en) Precast beam slab concrete pouring trolley capable of walking in self-propelled manner
CN217151958U (en) Tunnel center ditch pouring trolley
CN111576326A (en) High and large side wall formwork trolley for hydraulic building and construction method thereof
CN213267906U (en) Circular foundation ditch is pour and is used pin-connected panel steel form
CN212612003U (en) Hoisting accessory for corrugated steel web PC combined box girder bridge hanging basket
CN211524104U (en) Novel bridge girder erection machine
CN210798994U (en) Concrete structure wall body unilateral template structure
CN212316712U (en) Box culvert construction is with assembled platform truck
CN110748163A (en) Novel bridge girder erection machine
CN206319622U (en) A kind of roof system steel truss sliding rail
CN215978444U (en) Large-volume back-filled concrete double-climbing slip form system
CN213510651U (en) Integral type two lining platform trucks for tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant