CN212271665U - Building protective fence - Google Patents
Building protective fence Download PDFInfo
- Publication number
- CN212271665U CN212271665U CN202020414006.4U CN202020414006U CN212271665U CN 212271665 U CN212271665 U CN 212271665U CN 202020414006 U CN202020414006 U CN 202020414006U CN 212271665 U CN212271665 U CN 212271665U
- Authority
- CN
- China
- Prior art keywords
- isolation
- clamping
- hinge
- plate
- fixedly arranged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a building protective guard, in particular to the building construction field, the top of the base is provided with an isolation mechanism; the isolation mechanism comprises a fixed column, a first hinge is arranged on one side of the fixed column, a first isolation plate is arranged on one side of the first hinge, a second hinge is arranged on one side of the first isolation plate, a second isolation plate is arranged on one side of the second hinge, the fixed column is fixedly connected with the first isolation plate through the first hinge, a first groove is formed in the surface of the top of the second isolation plate, a first spring is fixedly arranged in the first groove, a bearing is fixedly arranged at the top of the first spring, a fixed rod is fixedly arranged at the top of the bearing, and a clamping rod is fixedly arranged on one side of the fixed rod. The utility model discloses a set up isolation mechanism, carry out a plurality of combinations with this utility model to carry out the curve to the position of protection and adjust, encircle first division board and second division board when accomodating and accomodate, reduce occupation space.
Description
Technical Field
The utility model relates to a construction technical field, more specifically say, the utility model relates to a building rail guard.
Background
In the building construction field, the demand of building site to the rail guard is very big, but the ann of rail guard is torn open frequently, sets up and expends time, and the construction enterprise mostly uses scaffold steel pipe and fastener to set up simple and easy rail guard.
Patent application publication No. CN 206707318U's utility model discloses a building protective guard, including two stands, two stand bottom swing joint bases, the base includes connecting pipe and connection base, two stands all cup joint in the connecting pipe, be equipped with a plurality of protection breast boards between two stands, through hinge connection between the adjacent protection breast board, first protection breast board passes through hinge connection with first stand, last protection breast board one side is equipped with the otic placode, be equipped with on the second stand with otic placode matched with otic placode, two otic placodes pass through bolt fixed connection. When the building protective fence is used, the upright post can be directly sleeved in the connecting pipe, and after the building protective fence is used, the upright post can be directly detached, so that the building protective fence is convenient to use and can be repeatedly used; when personnel need pass, can pull down the bolt, fold a plurality of protection breast boards together, it can to one side to rotate again, need not demolish labour saving and time saving.
However, in actual use, the utility model cannot adjust the curve of the protection position in use, and requires a space of a fixed length for storage.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a building protective fence, which is assembled by a plurality of assemblies through an isolation mechanism, wherein the first hinge and the first isolation plate are connected with a plurality of second hinges and second isolation plates, so that the plurality of first isolation plates and second isolation plates can be unfolded, the plurality of first isolation plates and second isolation plates arranged at the same time can be accommodated around a fixed column, then a pulling plate is pulled, the pulling plate drives a clamping rod to rotate by drawing, the clamping rod drives a first spring to extend through a fixed rod, then a structure arranged on the second isolation plate at the farthest end can be used, one end of the clamping rod is overlapped with a clamping groove arranged on the surface of a top plate, the pulling plate is released, the clamping rod is driven to be clamped into the clamping groove after the first spring retracts, so as to fix the plurality of second isolation plates, can carry out the curve to the position of protection and adjust, encircle when accomodating and accomodate first division board and second division board, reduce occupation space to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building protective guard comprises a base, wherein an isolation mechanism is arranged at the top of the base;
the isolation mechanism comprises a fixed column, a first hinge is arranged on one side of the fixed column, a plurality of first isolation plates are arranged on one side of the first hinge, a second hinge is arranged on one side of the first isolation plates, a second isolation plate is arranged on one side of the second hinge, the fixed column is fixedly connected with the first isolation plates through the first hinge, a first groove is formed in the top surface of the second isolation plates, a first spring is fixedly arranged in the first groove, a bearing is fixedly arranged at the top of the first spring, a fixed rod is fixedly arranged at the top of the bearing, a clamping rod is fixedly arranged on one side of the fixed rod, a top plate is arranged at the top of the fixed column, a clamping groove is formed in the surface of the top plate, the clamping rod is matched with the clamping groove in a clamped mode, and a pulling plate is fixedly arranged at the top.
In a preferred embodiment, a second groove is formed in one side surface of the fixing column, a fixing mechanism is arranged in the first groove, the fixing mechanism comprises a plug pin, and an insertion hole is formed in the inner wall of the first groove and is in sliding connection with the insertion hole.
In a preferred embodiment, the plug extends through the insertion hole and to the outside, and a snap ring is fixedly arranged on the outer side of the plug.
In a preferred embodiment, a second spring is fixedly arranged at the top of the snap ring, and the top end of the second spring is fixedly connected with the inner wall of the insertion hole.
In a preferred embodiment, a clamping plate is fixedly arranged on one side of the second isolation plate, and a clamping hole is formed in the surface of the clamping plate and matched with the plug pin.
In a preferred embodiment, the bottom of the base is fixedly provided with universal wheels, and the number of the second hinges of the universal wheels is multiple.
In a preferred embodiment, the top of the top plate is fixedly provided with a pull ring, and the pull ring is hinged with the surface of the top plate.
The utility model discloses a technological effect and advantage:
1. the utility model is combined in a plurality of ways by arranging the isolation mechanism, the first hinge, the first isolation board, the second hinge and the second isolation board are connected with each other, so that the first isolation board and the second isolation board can be unfolded, the first isolation board and the second isolation board which are arranged at the same time can be accommodated around the fixed column, then the pulling board is pulled, the pulling board drives the clamping rod to rotate by drawing, meanwhile, the clamping rod drives the first spring to extend through the fixed rod, then, the structure arranged on the second isolation board at the farthest end can be used, one end of the clamping rod is superposed with the clamping groove arranged on the surface of the top plate, the pulling board is loosened, the clamping rod is driven to be clamped into the clamping groove after the first spring retracts, thereby fixing the second isolation boards, the curve adjustment can be carried out on the protection position, the first isolation board and the second isolation board are accommodated in a surrounding way when being accommodated, the occupied space is reduced;
2. through setting up fixed establishment, during the combined use, this scheme adopts a plurality of the utility model discloses the mode of combined use protects, when using to single guardrail, adopt the mode of pulling bolt, later the bolt drives the snap ring and compresses the second spring, the bolt retracts in the inside slip of jack simultaneously, later insert the first recess of another group's rail guard with the snap plate of a rail guard inside, then loosen second spring behind the bolt and drive the downthehole portion of card that the bolt inserted another group's rail guard through the snap ring, thereby it fixes a rail guard and another group's rail guard to carry out a plurality of rail guard enthusiasm composite connection uses.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural diagram of the fixing mechanism of the present invention.
Fig. 3 is a schematic view of a partial structure of the part a in fig. 1 according to the present invention.
The reference signs are: the device comprises a base 1, an isolation mechanism 2, a fixed column 3, a first hinge 4, a first isolation plate 5, a second hinge 6, a second isolation plate 7, a groove 8, a first spring 9, a bearing 10, a fixed rod 11, a clamping rod 12, a top plate 13, a clamping groove 14, a pulling plate 15, a fixing mechanism 16, a bolt 17, a jack 18, a clamping ring 19, a second spring 20, a clamping plate 21, a clamping hole 22, a universal wheel 23 and a pulling ring 24.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The building protective fence as shown in the attached figures 1 to 3 comprises a base 1, wherein the top of the base 1 is provided with an isolation mechanism 2;
the isolation mechanism 2 comprises a fixed column 3, a first hinge 4 is arranged on one side of the fixed column 3, a first isolation plate 5 is arranged on one side of the first hinge 4, a second hinge 6 is arranged on one side of the first isolation plate 5, a second isolation plate 7 is arranged on one side of the second hinge 6, the fixed column 3 is fixedly connected with the first isolation plate 5 through a first hinge 4, the top surface of the second isolation plate 7 is provided with a first groove 8, a first spring 9 is fixedly arranged in the first groove 8, a bearing 10 is fixedly arranged at the top of the first spring 9, a fixed rod 11 is fixedly arranged at the top of the bearing 10, a clamping rod 12 is fixedly arranged at one side of the fixed rod 11, the top of the fixing column 3 is provided with a top plate 13, the surface of the top plate 13 is provided with a clamping groove 14, the clamping rod 12 is matched with the clamping groove 14 in a clamping mode, and the top of the clamping rod 12 is fixedly provided with a pulling plate 15.
The implementation mode is specifically as follows: when in use, the utility model is combined in a plurality of ways, the first hinge 4, the first isolation board 5, the second hinges 6 and the second isolation boards 7 are connected with each other, so that the first isolation boards 5 and the second isolation boards 7 can be unfolded, the first isolation boards 5 and the second isolation boards 7 which are arranged at the same time can be accommodated around the fixed column 3, then the pulling board 15 is pulled, the pulling board 15 drives the clamping rod 12 to rotate by drawing, meanwhile, the clamping rod 12 drives the first spring 9 to extend through the fixed rod 11, then, the structure arranged on the second isolation board 7 at the farthest end can be used, one end of the clamping rod 12 is superposed with the clamping groove 14 arranged on the surface of the top plate 13, the pulling board 15 is released, the first spring 9 retracts to drive the clamping rod 12 to be clamped into the clamping groove 14, thereby fixing the second isolation boards 7, and carrying out curve adjustment on the protection position, encircle when accomodating and accomodate first division board 5 and second division board 7, reduce occupation space, the position that exists among the prior art can not carry out the curve to the protection has specifically been solved to this embodiment and has been adjusted, needs the space of fixed length to place when accomodating the problem.
The building protective guard as shown in fig. 1 further comprises a fixing mechanism 16, a second groove is formed in one side surface of the fixing column 3, the fixing mechanism 16 comprises a bolt 17, a jack 18 is formed in the inner wall of the first groove 8, and the bolt 17 is connected with the jack 18 in a sliding mode;
the bolt 17 penetrates through the jack 18 and extends to the outside, and a clamping ring 19 is fixedly arranged on the outer side of the bolt 17;
a second spring 20 is fixedly arranged at the top of the snap ring 19, and the top end of the second spring 20 is fixedly connected with the inner wall of the jack 18;
a clamping plate 21 is fixedly arranged on one side of the second isolation plate 7, a clamping hole 22 is formed in the surface of the clamping plate 21, and the clamping hole 22 is matched with the bolt 17;
the bottom of the base 1 is fixedly provided with universal wheels 23, and the number of the universal wheels 23 and the number of the second hinges 6 are multiple;
and a pull ring 24 is fixedly arranged at the top of the top plate 13, and the pull ring 24 is hinged with the surface of the top plate 13.
The implementation mode is specifically as follows: when using in combination, this scheme adopts a plurality of the utility model discloses the mode of using in combination protects, when using to single guardrail, adopt the mode of pulling bolt 17, later bolt 17 drives snap ring 19 and compresses second spring 20, bolt 17 slides the withdrawal in jack 18 inside simultaneously, later insert the cardboard 21 of a rail guard inside the first recess 8 of another group of rail guard, then loosen second spring 20 behind the bolt 17 and drive inside the bolt 17 inserts the card hole 22 of another group of rail guard through snap ring 19, thereby it fixes a rail guard and another group of rail guard, can carry out a plurality of rail guard enthusiasm composite connection uses, this embodiment has specifically solved the problem that can not carry out a plurality of connections that exists in the above-mentioned technique, it is difficult to carry out effective combination and use.
The utility model discloses the theory of operation:
referring to the attached drawings 1-3 of the specification, the utility model is combined in a plurality of ways, the first hinge 4, the first isolation board 5, the second hinges 6 and the second isolation boards 7 are connected with each other, so that the first isolation boards 5 and the second isolation boards 7 can be unfolded, the first isolation boards 5 and the second isolation boards 7 which are arranged at the same time can be accommodated around the fixed column 3, then the pulling board 15 is pulled, the pulling board 15 drives the clamping rod 12 to rotate through pulling, meanwhile, the clamping rod 12 drives the first spring 9 to extend through the fixed rod 11, then, the structure arranged on the second isolation board 7 at the farthest end can be used, one end of the clamping rod 12 is overlapped with the clamping groove 14 arranged on the surface of the top plate 13, the pulling board 15 is loosened, the clamping rod 12 is driven to be clamped into the clamping groove 14 after the first spring 9 retracts, so as to fix the second isolation boards 7, the protection position can be adjusted in a curve mode, the first isolation plate 5 and the second isolation plate 7 are stored in a surrounding mode during storage, and the occupied space is reduced;
referring to the attached drawing 1 of the specification, when the guardrail is used in combination, the scheme adopts a plurality of modes of combined use of the invention to protect, when a single guardrail is used, a mode of pulling the bolt 17 is adopted, then the bolt 17 drives the snap ring 19 to compress the second spring 20, meanwhile, the bolt 17 slides and retracts inside the jack 18, then the snap plate 21 of one guardrail is inserted into the first groove 8 of the other group of guardrails, then the second spring 20 drives the bolt 17 through the snap ring 19 to be inserted into the snap hole 22 of the other group of guardrails after the bolt 17 is loosened, thereby fixing one guardrail and the other group of guardrails, and a plurality of active combinations of guardrails can be used.
And finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a building rail guard, includes base (1), its characterized in that: the top of the base (1) is provided with an isolation mechanism (2);
the isolation mechanism (2) comprises a fixed column (3), a first hinge (4) is arranged on one side of the fixed column (3), a plurality of first isolation plates (5) are arranged on one side of the first hinge (4), a second hinge (6) is arranged on one side of one first isolation plate (5), a second isolation plate (7) is arranged on one side of the second hinge (6), the fixed column (3) is fixedly connected with the first isolation plates (5) through the first hinge (4), a first groove (8) is arranged on the surface of the top of the second isolation plate (7), a first spring (9) is fixedly arranged inside the first groove (8), a bearing (10) is fixedly arranged on the top of the first spring (9), a fixed rod (11) is fixedly arranged on the top of the bearing (10), a clamping rod (12) is fixedly arranged on one side of the fixed rod (11), a top plate (13) is arranged on the top of the fixed column (3), the clamping device is characterized in that a clamping groove (14) is formed in the surface of the top plate (13), the clamping rod (12) is matched with the clamping groove (14) in a clamping mode, and a pulling plate (15) is fixedly arranged at the top of the clamping rod (12).
2. A construction guard rail according to claim 1, wherein: the fixing column (3) is characterized in that a second groove is formed in one side surface of the fixing column (3), a fixing mechanism (16) is arranged in the first groove (8), the fixing mechanism (16) comprises a bolt (17), a jack (18) is formed in the inner wall of the first groove (8), and the bolt (17) is connected with the jack (18) in a sliding mode.
3. A construction guard rail according to claim 2, wherein: the bolt (17) runs through the jack (18) and extends to the outside, and a snap ring (19) is fixedly arranged on the outer side of the bolt (17).
4. A construction guard rail according to claim 3, wherein: and a second spring (20) is fixedly arranged at the top of the clamping ring (19), and the top end of the second spring (20) is fixedly connected with the inner wall of the insertion hole (18).
5. A construction guard rail according to claim 1, wherein: a clamping plate (21) is fixedly arranged on one side of the second isolation plate (7), a clamping hole (22) is formed in the surface of the clamping plate (21), and the clamping hole (22) is matched with the plug pin (17).
6. A construction guard rail according to claim 1, wherein: the base (1) bottom is fixed and is equipped with universal wheel (23), universal wheel (23) and second hinge (6) quantity all set up to a plurality ofly.
7. A construction guard rail according to claim 1, wherein: and a pull ring (24) is fixedly arranged at the top of the top plate (13), and the pull ring (24) is hinged with the surface of the top plate (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020414006.4U CN212271665U (en) | 2020-03-27 | 2020-03-27 | Building protective fence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020414006.4U CN212271665U (en) | 2020-03-27 | 2020-03-27 | Building protective fence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212271665U true CN212271665U (en) | 2021-01-01 |
Family
ID=73883730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020414006.4U Expired - Fee Related CN212271665U (en) | 2020-03-27 | 2020-03-27 | Building protective fence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212271665U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809687A (en) * | 2022-06-09 | 2022-07-29 | 中国十七冶集团有限公司 | Anti-falling enclosure for high-rise building construction |
-
2020
- 2020-03-27 CN CN202020414006.4U patent/CN212271665U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809687A (en) * | 2022-06-09 | 2022-07-29 | 中国十七冶集团有限公司 | Anti-falling enclosure for high-rise building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212271665U (en) | Building protective fence | |
CN220503748U (en) | Assembled protection bent | |
CN112049395A (en) | Anti-tilt scaffold based on independent side-bracing stabilization technology | |
CN206110111U (en) | Drain bar during soft soil foundation reinforcement equips insert equipment of establishing | |
CN211647601U (en) | Fence for collecting and removing houses | |
CN210766506U (en) | Gardens are with protection median | |
CN219298968U (en) | Portable fence for construction | |
CN114086824A (en) | River course cofferdam construction is with strutting arrangement convenient to turnover | |
CN220059165U (en) | Telescopic folding guard rail | |
CN212968827U (en) | Pulley for erecting power transmission line | |
CN213654435U (en) | Insulating fence for electric power construction | |
CN112112094A (en) | Rail transit fare collection queue isolating device | |
CN212389138U (en) | Interim protector of foundation ditch for construction site operation | |
CN217949305U (en) | Light energy-saving steel structure system | |
CN216380836U (en) | A protector for afforestation construction | |
CN220267273U (en) | Building safety protection net | |
CN221608655U (en) | Safety warning device for construction engineering | |
CN206646801U (en) | A kind of construction with can fast fastening scaffold falling proof device | |
CN216811083U (en) | Pile hole protection device for foundation construction | |
CN220434417U (en) | Building concatenation rail | |
CN211228528U (en) | Foundation pit supporting device for house building | |
CN218265388U (en) | Green construction is with device of making an uproar that falls | |
CN220469549U (en) | Security management rail | |
CN211549128U (en) | Safety protective guard for construction | |
CN218991096U (en) | Tent supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |