CN212271598U - Formwork splicing construction structure - Google Patents

Formwork splicing construction structure Download PDF

Info

Publication number
CN212271598U
CN212271598U CN201922105292.6U CN201922105292U CN212271598U CN 212271598 U CN212271598 U CN 212271598U CN 201922105292 U CN201922105292 U CN 201922105292U CN 212271598 U CN212271598 U CN 212271598U
Authority
CN
China
Prior art keywords
concatenation
splicing
piece
mould shell
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922105292.6U
Other languages
Chinese (zh)
Inventor
马磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922105292.6U priority Critical patent/CN212271598U/en
Application granted granted Critical
Publication of CN212271598U publication Critical patent/CN212271598U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a mould shell piece construction structures, including the support frame, the upper end fixedly connected with backup pad of support frame, a plurality of mould shells have been placed to the upper surface of backup pad, splices through concatenation mechanism between a plurality of mould shells, and beneficial effect lies in: the utility model relates to a mould shell piece construction structures, fixed mould shell position has, guarantee the indeformable characteristics of floor shape, when specifically using, insert the inside of concatenation recess through the concatenation lug and the rubber pad that set up, make two adjacent mould shells accomplish the concatenation, and then prevent that two adjacent mould shells from taking place to reciprocate, U-shaped connecting rod joint through setting up is at first L shape groove and second L shape inslot portion, and then prevent that two adjacent mould shells from taking place horizontal migration, and then the skew takes place for the effectual mould shell that prevents, and then the shape and the size of the concrete that make final formation can not change, and then can make the floor of watering reach predetermined building supporting effect, prevent to cause the building hidden danger.

Description

Formwork splicing construction structure
Technical Field
The utility model relates to a construction field especially relates to a mould shell piece construction structures.
Background
The formwork is a tool in cast-in-place concrete and is also a construction process, the formwork is a tool type formwork for a reinforced concrete cast-in-place ribbed floor slab and a cross beam floor slab, the correct shape and size of the concrete can be effectively ensured in the casting process, and protection and maintenance are carried out in the hardening process; and the method has the characteristics of reducing the construction cost, improving the construction speed and realizing one-step molding and repeated turnover use.
However, in the prior art, the formwork is only placed on the surface of the supporting plate, when concrete is poured among a plurality of formworks, the position of the formwork is changed due to the impact of the concrete because the weight of the formwork is light, and the shape and the size of the finally formed concrete are changed, so that the poured floor slab cannot achieve the preset building supporting effect, and the building hidden danger is caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the quality that exists among the prior art because the mould shell is lighter, and then receives the concrete impact to make the position of mould shell change, and then the shape and the size that make the concrete of final formation change, and then can make the floor of watering not reach predetermined building supporting effect, cause the shortcoming of building hidden danger, and the mould shell piece construction structures who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a mould shell piece construction structures, includes the support frame, the upper end fixedly connected with backup pad of support frame, a plurality of mould shells have been placed to the upper surface of backup pad, and is a plurality of splice through concatenation mechanism between the mould shell.
Preferably, the splicing mechanism comprises splicing blocks, the splicing blocks are fixedly connected to the side edge of the bottom of one side of the formwork, the splicing blocks of the formwork are in contact with the storage blocks of another adjacent formwork, the splicing blocks are far away from the splicing block, the splicing blocks are fixedly connected with splicing lugs on the side wall of one side of the formwork, the splicing lugs are fixedly connected with rubber pads on the surface, splicing grooves are formed in the side wall of one side of the storage block, the splicing lugs and the rubber pads are inserted into the splicing grooves, first L-shaped grooves are formed in the upper surface of the splicing blocks, second L-shaped grooves are formed in the upper surface of the storage blocks, the splicing blocks spliced together are connected with the first L-shaped grooves and the second L-shaped grooves in the surface in a clamped mode through U-shaped connecting rods, and the splicing blocks spliced together are connected with the storage blocks in a clamped mode through the connecting rods.
Preferably, the structures of the plurality of the formworks are the same, the two adjacent bottom side edges of the formworks are fixedly connected with splicing blocks, the two bottom side edges of the formworks corresponding to the two splicing blocks are fixedly connected with accommodating blocks, and the splicing blocks and the accommodating blocks are spliced with each other.
Preferably, the horizontal ends of the first L-shaped groove and the second L-shaped groove which are formed on the surfaces of the splicing block and the accommodating block which are spliced together are in contact arrangement, and the vertical ends of the first L-shaped groove and the second L-shaped groove which are formed on the surfaces of the splicing block and the accommodating block which are spliced together are far away from each other.
Preferably, the splicing convex block and the rubber pad are matched with the splicing groove.
Preferably, two ends of the cover plates are respectively arranged in contact with the side edges of two adjacent formworks, and the splicing mechanisms are completely blocked by the cover plates.
The utility model provides a mould shell piece construction structures, beneficial effect lies in: the utility model relates to a mould shell piece construction structures, fixed mould shell position has, guarantee the indeformable characteristics of floor shape, when specifically using, insert the inside of concatenation recess through the concatenation lug and the rubber pad that set up, make two adjacent mould shells accomplish the concatenation, and then prevent that two adjacent mould shells from taking place to reciprocate, U-shaped connecting rod joint through setting up is at first L shape groove and second L shape inslot portion, and then prevent that two adjacent mould shells from taking place horizontal migration, and then the skew takes place for the effectual mould shell that prevents, and then the shape and the size of the concrete that make final formation can not change, and then can make the floor of watering reach predetermined building supporting effect, prevent to cause the building hidden danger.
Drawings
FIG. 1 is a front view of a formwork splicing construction structure provided by the present invention;
FIG. 2 is a side view of a formwork splicing construction structure according to the present invention;
FIG. 3 is a top view of a formwork splicing construction structure according to the present invention;
FIG. 4 is an enlarged view of the structure at the A position in the formwork butt joint construction structure chart 1 of the present invention.
In the figure: the support frame 1, the support plate 2, the formwork 3, the splicing mechanism 4, the splicing block 41, the accommodating block 42, the splicing convex block 43, the rubber pad 44, the splicing groove 45, the first L-shaped groove 46, the second L-shaped groove 47, the U-shaped connecting rod 48 and the cover plate 49.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a formwork splicing construction structure comprises a support frame 1, a support plate 2 is fixedly connected to the upper end of the support frame 1, a plurality of formworks 3 are placed on the upper surface of the support plate 2, and the formworks 3 are spliced through a splicing mechanism 4.
Wherein, the splicing mechanism 4 comprises a splicing block 41, the splicing block 41 is fixedly connected on the side edge of one side bottom of the formwork 3, the splicing block 41 of the formwork 3 is arranged in contact with a receiving block 42 of another adjacent formwork 3, a splicing lug 43 is fixedly connected on the side wall of the splicing block 41 far away from the formwork 3, a rubber pad 44 is fixedly connected on the surface of the splicing lug 43, a splicing groove 45 is arranged on the side wall of the receiving block 42 far away from the formwork 3, the splicing lug 43 and the rubber pad 44 are inserted into the splicing groove 45, a first L-shaped groove 46 is arranged on the upper surface of the splicing block 41, a second L-shaped groove 47 is arranged on the upper surface of the receiving block 42, the same U-shaped connecting rod 48 is clamped inside the first L-shaped groove 46 and the second L-shaped groove 47 on the surfaces of the splicing block 41 and the receiving block 42 which are spliced together, the same cover plate 49 is arranged on the surfaces of the splicing block, through the concatenation piece 41 that will correspond and accomodate piece 42 and be close to each other, make concatenation lug 43 and rubber pad 44 insert inside corresponding concatenation recess 45, then with a plurality of U-shaped connecting rods 48 joint inside first L shape groove 46 of assorted and second L shape groove 47, and then accomplish the concatenation of a plurality of formworks 3, and then prevent that two adjacent formworks 3 from taking place the removal of vertical direction and horizontal direction, and then the effectual formwork 3 that prevents takes place the skew.
Wherein, a plurality of the structures of mould shell 3 are the same, and fixedly connected with concatenation piece 41 on two adjacent bottom sides of a plurality of mould shell 3, mould shell 3 and two equal fixedly connected with on the bottom side that concatenation piece 41 corresponds accomodate piece 42, concatenation piece 41 and accomodate the mutual concatenation setting of piece 42, make single mould shell 3 can replace through the mould shell 3 of the same setting, and then prevent that single mould shell 3 from taking place to damage the whole unable condition of using of back mould shell 3.
Wherein, the concatenation piece 41 that splices together and the horizontal end contact setting of the first L-shaped groove 46 that offers on accomodating piece 42 surface and second L-shaped groove 47, the concatenation piece 41 that splices mutually and the vertical end of the first L-shaped groove 46 that offers on accomodating piece 42 surface and second L-shaped groove 47 keep away from the setting, and then make U-shaped connecting rod 48 can the joint in the first L-shaped groove 46 and the second L-shaped groove 47 that contact inside.
Wherein, concatenation lug 43 and rubber pad 44 and concatenation recess 45 phase-match, and then prevent that concatenation lug 43 from rocking inside concatenation recess 45, increase the frictional force between concatenation lug 43 and the concatenation recess 45 through rubber pad 44.
Wherein, the both ends of a plurality of apron 49 set up with the side contact of two adjacent formworks 3 respectively, and a plurality of apron 49 block splicing mechanism 4 completely, and then prevent that the concrete from permeating the inside of splice 41 and storage block 42, and then prevent that the concrete from plugging up first L shape groove 46 and second L shape groove 47, and then make formwork 3 can carry out repetitious usage.
The working principle is as follows: the utility model relates to a formwork splicing construction structure, which has the characteristics of fixing the position of a formwork 3 and ensuring the shape of a floor slab to be not deformed, when in specific use, a plurality of formworks 3 are placed on a supporting plate 2, adjacent formworks 3 are spliced, corresponding splicing blocks 41 and accommodating blocks 42 are mutually close to each other, splicing lugs 43 and rubber pads 44 are inserted into corresponding splicing grooves 45, then a plurality of U-shaped connecting rods 48 are clamped inside a first L-shaped groove 46 and a second L-shaped groove 47 which are matched, thereby completing the splicing of a plurality of formworks 3, further preventing two adjacent formworks 3 from moving in the vertical direction and the horizontal direction, further effectively preventing the formworks 3 from deviating, further preventing the shape and the size of finally formed concrete from changing, further leading the poured floor slab to reach the preset building supporting effect and preventing the building hidden danger, place apron 49 on selling through that table of spilling a lie at the concatenation piece 41 of splicing each other and accomodating piece 42, and then prevent that the concrete from permeating the inside of concatenation piece 41 and accomodating piece 42, and then prevent that the concrete from plugging up first L shape groove 46 and second L shape groove 47, and then make mould shell 3 can carry out repetitious usage.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a mould shell piece construction structures, includes support frame (1), its characterized in that: the upper end fixedly connected with backup pad (2) of support frame (1), a plurality of formworks (3) have been placed to the upper surface of backup pad (2), and are a plurality of splice through concatenation mechanism (4) between the formwork (3).
2. A formwork arrangement construction structure as claimed in claim 1, wherein: splicing mechanism (4) is including concatenation piece (41), concatenation piece (41) fixed connection is on one side bottom side edge of mould shell (3), concatenation piece (41) of mould shell (3) and another adjacent mould shell (3) accomodate piece (42) contact setting, fixedly connected with concatenation lug (43) on one side lateral wall that mould shell (3) were kept away from in concatenation piece (41), the surperficial fixedly connected with rubber pad (44) of concatenation lug (43), it has seted up concatenation recess (45) on one side lateral wall that mould shell (3) were kept away from to accomodate piece (42), concatenation lug (43) and rubber pad (44) insert inside concatenation recess (45), set up first L shape groove (46) on the upper surface of concatenation piece (41), set up second L shape groove (47) on the upper surface of accomodating piece (42), concatenation piece (41) and accomodate piece (42) together first L shape groove (46) and second L shape groove (47) on the surface (47) The same U-shaped connecting rod (48) is clamped inside, and the same cover plate (49) is arranged on the surfaces of the splicing block (41) and the accommodating block (42) which are spliced together.
3. A formwork arrangement construction structure as claimed in claim 1, wherein: the structure of a plurality of the formworks (3) is the same, a plurality of the formworks (3) are fixedly connected with splicing blocks (41) on two adjacent bottom side edges, the formworks (3) are fixedly connected with accommodating blocks (42) on two bottom side edges corresponding to the two splicing blocks (41), and the splicing blocks (41) and the accommodating blocks (42) are spliced with each other.
4. A formwork arrangement construction structure as claimed in claim 2, wherein: the horizontal ends of a first L-shaped groove (46) and a second L-shaped groove (47) which are formed in the surfaces of the splicing block (41) and the accommodating block (42) which are spliced together are in contact arrangement, and the vertical ends of the first L-shaped groove (46) and the second L-shaped groove (47) which are formed in the surfaces of the splicing block (41) and the accommodating block (42) which are spliced together are far away from each other.
5. A formwork arrangement construction structure as claimed in claim 2, wherein: the splicing convex blocks (43) and the rubber pads (44) are matched with the splicing grooves (45).
6. A formwork arrangement construction structure as claimed in claim 2, wherein: the two ends of the cover plates (49) are respectively arranged in contact with the side edges of the two adjacent formworks (3), and the splicing mechanisms (4) are completely blocked by the cover plates (49).
CN201922105292.6U 2019-11-29 2019-11-29 Formwork splicing construction structure Expired - Fee Related CN212271598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922105292.6U CN212271598U (en) 2019-11-29 2019-11-29 Formwork splicing construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922105292.6U CN212271598U (en) 2019-11-29 2019-11-29 Formwork splicing construction structure

Publications (1)

Publication Number Publication Date
CN212271598U true CN212271598U (en) 2021-01-01

Family

ID=73872087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922105292.6U Expired - Fee Related CN212271598U (en) 2019-11-29 2019-11-29 Formwork splicing construction structure

Country Status (1)

Country Link
CN (1) CN212271598U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982774A (en) * 2021-04-20 2021-06-18 阿博建材(昆山)有限公司 Construction method for forming multi-ribbed floor based on quick-assembly type keel formwork combined template
CN113356430A (en) * 2021-06-29 2021-09-07 中铁八局集团第一工程有限公司 Construction method of dense rib plate floor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982774A (en) * 2021-04-20 2021-06-18 阿博建材(昆山)有限公司 Construction method for forming multi-ribbed floor based on quick-assembly type keel formwork combined template
CN113356430A (en) * 2021-06-29 2021-09-07 中铁八局集团第一工程有限公司 Construction method of dense rib plate floor
CN113356430B (en) * 2021-06-29 2023-01-17 中铁八局集团第一工程有限公司 Construction method of dense rib plate floor

Similar Documents

Publication Publication Date Title
CN212271598U (en) Formwork splicing construction structure
CN107268995A (en) Cast template splices bridge plate and its application method
CN210622306U (en) Assembly type floor post-cast strip template splicing structure
CN110284729A (en) A kind of historical building wall sectional type cutting disassembling method
JP2024029165A (en) Auxiliary parts and construction methods
CN212104132U (en) Cast-in-place afforestation concrete slope protection structure
CN214658802U (en) Building construction beam column node height low grade concrete separator
CN204590575U (en) Panel for construction plastic formwork
CN204626756U (en) A kind of precast plate
CN204960302U (en) Be used for a superimposed sheet post -cast strip mode structure
CN212336497U (en) Anti-seismic building block for house building
CN204221941U (en) A kind of combined type sycon cable duct mould
CN210563405U (en) Stair antidetonation design support
CN210685361U (en) Template connection structure for building
CN206467999U (en) A kind of construction formwork for placing
CN218813216U (en) Bridge template convenient for nursing
CN205369895U (en) Concrete formwork
CN217838139U (en) Quick spliced crane platform shell
CN212583251U (en) Aluminum die material conveying port die
CN211340674U (en) Link plate formula channel revetment reinforced structure
CN210621492U (en) Deck-type box type arch bridge arch ring bottom plate pressing die structure
CN218779935U (en) Steel form device is used in subsiding crack construction
CN211492166U (en) Concrete pile pouring mold
CN208168365U (en) A kind of building template that can quickly splice
CN210122731U (en) Cement concrete retaining wall construction template installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210101

Termination date: 20211129