CN212264061U - Big data sewage velocity of flow detects pipeline - Google Patents

Big data sewage velocity of flow detects pipeline Download PDF

Info

Publication number
CN212264061U
CN212264061U CN201921485443.9U CN201921485443U CN212264061U CN 212264061 U CN212264061 U CN 212264061U CN 201921485443 U CN201921485443 U CN 201921485443U CN 212264061 U CN212264061 U CN 212264061U
Authority
CN
China
Prior art keywords
pipe
blow
big data
pressure
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921485443.9U
Other languages
Chinese (zh)
Inventor
胡志武
罗丰
吉强
唐伟华
许文彬
雷明坤
彭煜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wujiu Environmental Protection Technology Development Co ltd
Original Assignee
Hunan Wujiu Environmental Protection Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wujiu Environmental Protection Technology Development Co ltd filed Critical Hunan Wujiu Environmental Protection Technology Development Co ltd
Priority to CN201921485443.9U priority Critical patent/CN212264061U/en
Application granted granted Critical
Publication of CN212264061U publication Critical patent/CN212264061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a big data sewage velocity of flow detection pipeline, including the blow off pipe, the equidistance is provided with the rivers detector that is used for monitoring velocity of flow on the blow off pipe, is provided with a plurality of pressure boost section of thick bamboos between two adjacent rivers detectors, pressure boost section of thick bamboos and blow off pipe intercommunication, the inside spinner that is provided with of pressure boost section of thick bamboo, one side of pressure boost section of thick bamboo is provided with the water pressure post, the water pressure post include with the column casing of blow off pipe intercommunication, the inside sliding connection of column casing has the piston board, is fixed with the polished rod on the piston board, through spring coupling between piston board and. This kind of big data sewage flow rate detection pipeline utilizes external drive equipment to drive the spinner rotation on blockking up a pressure cylinder that the position is anterior nearest for the anterior pressure increase of jam department flushes the plug, also can utilize manual valve one or manual valve to fill the dissolving agent to blow off pipe jam department, also can be according to two manual valves one of the jam position of blow off pipe through external pipeline connection jam department front and back position, carries out the pressure release, simple structure, the simple operation.

Description

Big data sewage velocity of flow detects pipeline
Technical Field
The utility model relates to a sewage treatment field specifically is a big data sewage velocity of flow detection way.
Background
For the unobstructed state of sewage in transportation process pipeline is known in real time to the convenience, the uniform spacing fixed point installation velocity of flow monitoring facilities on the pipeline has been adopted to thereby through the accurate judgement sewage output tube of cloud storage service technique which section appears blockking up, it is very convenient to the diagnosis of sewage output tube, labour saving and time saving and high-efficient swift.
Current sewage output tube is detecting certain section and is blockking up the back, because the interval between two rivers detectors is longer, is not convenient for judge concrete jam, need carry out the cutout to this pipeline when getting rid of the jam moreover to open the junction and handle, resume the installation after handling, the operation is very numerous and diverse, and efficiency is not high.
In order to solve the above problems, we propose a big data sewage flow rate detection pipeline.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a big data sewage velocity of flow detection pipe, in order to solve above-mentioned technical problem, the utility model provides a following technical scheme:
the utility model relates to a big data sewage flow rate detection pipeline, including the blow off pipe, the equidistance is provided with the rivers detector that is used for monitoring velocity of water on the blow off pipe, is provided with a plurality of pressure boost section of thick bamboos between two adjacent rivers detectors, pressure boost section of thick bamboos and blow off pipe intercommunication to the inside spinner that is provided with of pressure boost section of thick bamboo, one side of pressure boost section of thick bamboo is provided with the water pressure post, and the water pressure post includes the column casing with the blow off pipe intercommunication, the inside sliding connection of column casing has the piston board, is fixed with the polished rod on the piston board, passes through spring coupling between.
Preferably, a first manual valve is fixed on the position, close to the pressurizing cylinder, of the sewage discharge pipe, and a second manual valve is fixed on the side wall of the pressurizing cylinder.
Preferably, the first manual valve and the second manual valve can be connected through a medicament tube.
Preferably, the spinner comprises a conical rotating shaft, a shaft lever is fixed at the center of the larger diameter end of the rotating shaft, the shaft lever is fixed on the pressurizing cylinder in a rotating mode, the end portion of the shaft lever is exposed to the outside of the pressurizing cylinder, and the rotating shaft is fixed with a spiral blade.
Preferably, the upper end of the polish rod is exposed to the outside of the column casing, and a limit plate is fixed at the end.
Compared with the prior art, the utility model discloses the beneficial effect who reaches is:
1. the utility model discloses in, through setting up a plurality of rivers detectors and a plurality of pressure cylinder and the water pressure post that correspond on the blow off pipe to can judge the concrete position of jam department according to the reading of rivers detectors and the polished rod extension length on the water pressure post, convenient high-efficient, reduce the processing degree of difficulty, improve treatment effeciency, and utilize external drive equipment to drive the spinner rotation on the nearest pressure cylinder in front of the jam position, make the increase of front pressure of jam department break away the jam, easy operation is high-efficient;
2. in the utility model, the first manual valve and the second manual valve can be communicated by the medicament tube filled with the dissolving agent for dissolving the blocking object, and the first manual valve and the second manual valve are opened, and the screw driver is rotated to pressurize the inside of the blow-off pipe and simultaneously fill the dissolving agent, thereby improving the dredging effect; when the jam position is in the junction of blow off pipe, because the leakproofness of junction is less than other positions, therefore compressive strength is poor, needs carry out interim pressure release and handles, avoids leaking because of the too big junction that leads to of pressure, connects two manual valves one of jam front and back position through external pipeline during the pressure release to open manual valve one simultaneously, carry out the pressure release, easy operation is convenient, improves the treatment effect.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the assembly structure of a big data sewage flow rate detection pipeline according to the present invention;
FIG. 2 is a schematic diagram of the assembly structure of a big data sewage flow rate detection pipeline of the present invention;
fig. 3 is a partial structural schematic view of fig. 1.
In the figure: 1-a sewage draining pipe; 2-a water flow side detector; 31-a first manual valve; 32-manual valve two; 33-a medicament tube; 4-a pressurizing cylinder; 5-a spinner; 6-a water pressure column; 7-a rotating shaft; 8-shaft lever; 9-helical leaves; 10-column casing; 11-a polish rod; 12-a piston plate; 13-a limiting plate; 14-spring.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Examples
As shown in fig. 1-3, a big data sewage velocity detection pipeline, including blow off pipe 1, blow off pipe 1 is last to be provided with the rivers detector 2 that are used for monitoring the velocity of water flow at equidistant interval, be provided with a plurality of pressure boost section of thick bamboo 4 between two adjacent rivers detectors 2, pressure boost section of thick bamboo 4 and blow off pipe 1 intercommunication to pressure boost section of thick bamboo 4 inside is provided with spinner 5, one side of pressure boost section of thick bamboo 4 is provided with water pressure post 6, water pressure post 6 includes the column casing 10 with blow off pipe 1 intercommunication, the inside sliding connection of column casing 10 has piston plate 12, be fixed with polished rod 11 on the piston plate 12, be connected through spring 14 between piston plate 12 and the column casing 10, polished rod 11 upper end exposes to the outside of column casing 10, and the end fixing has limiting plate 13.
In this embodiment, a first manual valve 31 is fixed on the position of the sewage draining pipe 1 close to the pressurizing cylinder 4, a second manual valve 32 is fixed on the side wall of the pressurizing cylinder 4, the first manual valve 31 and the second manual valve 32 are connected through a chemical pipe 33, a dissolving agent for dissolving the internal blockage of the sewage draining pipe 1 is correspondingly arranged in the chemical pipe 33, the rotation starter 5 comprises a tapered rotating shaft 7, a shaft rod 8 is fixed at the center of the larger diameter end of the rotating shaft 7, the shaft rod 8 is connected to the pressurizing cylinder 4 in a fixed-axis rotating manner, the end part of the shaft rod 8 is exposed to the outside of the pressurizing cylinder 4, and a spiral blade 9 is fixed on the rotating shaft 7.
The utility model discloses a principle and advantage: according to the sewage flow rate detection pipeline with the big data, after the water flow detector 2 judges which section of pipeline is blocked, the pipeline enters the site, the formation of the blockage in the sewage discharge pipe 1 has a time accumulation characteristic, namely a process from blocking to complete blocking is carried out, in the process, the flow rate of the water flow at the front section of the blocked part is gradually reduced, and the flow rate at the rear section of the blocked part is gradually increased according to the fluid pressure, so that the pipe 1 at which the section of sewage discharge pipe is blocked can be easily judged according to the numerical values of the water flow detectors 2 at two sides of the blocked part, after the pipe is completely blocked, the water pressure at the front section of the blocked part is higher, the extension length of the polished rod 10 in the water pressure column 6 is longer, the water pressure at the rear section of the blocked part is lower, and the extension length of the polished rod 10 in the water pressure;
as shown in fig. 1 and 3, the arrow in fig. 1 is the water flow direction, the specific position of the blocked position is judged according to the extending length of the polish rod 11 on the hydraulic column 6, the pressure at the front part of the blocked position is higher, the piston plate 12 in the nearest hydraulic column 6 at the front part of the blocked position is acted by the water pressure in the sewage drain pipe 1 to compress the spring 14 and push the polish rod 11 to move to the outer side of the column casing 10, and scales can be marked on the polish rod 10 to judge the specific size of the water pressure at the position;
an external driving device is connected with the shaft lever 8, for example, a motor, an output shaft of the motor is connected with one end, positioned outside the pressurizing cylinder 4, of the shaft lever 8 through a coupler or a speed reducer, the external driving device is started to drive the shaft lever 8 to rotate at a high speed, the shaft lever 8 drives the rotating shaft 7 to rotate synchronously, the pressure inside the pressurizing cylinder 4 is increased through the spiral blade 9, and a vortex is formed, so that the water pressure in the front of a blockage is increased to flush the blockage, the inside of the sewage discharge pipe 1 is kept smooth, and the operation is simple and efficient;
when the pressurization effect is not good, the first manual valve 31 and the second manual valve 32 can be communicated by using the medicament pipe 33 filled with the dissolving agent for dissolving the blockage, the first manual valve 31 and the second manual valve 32 are opened, and the screw driver 5 is rotated to pressurize the interior of the sewage discharge pipe 1 and simultaneously fill the dissolving agent, so that the dredging effect is improved;
when the jam position is in blow off pipe 1's junction, because the leakproofness of junction is less than other positions, therefore compressive strength is poor, need carry out interim pressure release and handle, avoid leaking because of the too big junction that leads to of pressure, as shown in fig. 2, connect two manual valve 31 of jam front and back position through external pipeline during the pressure release, and open manual valve 31 simultaneously, excrete the sewage of plug front end high pressure district to the low-pressure area of plug rear end through external pipeline, carry out the pressure release, form outside passageway, carry out the pressure release protection to blow off pipe 1's junction, need not to discharge the inside sewage of blow off pipe 1 to the outside, avoid enlarging the pollution area, and easy operation is convenient, and the treatment effect is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a big data sewage velocity of flow detection pipe, includes blow off pipe (1), equidistant water flow detector (2) that are used for monitoring velocity of flow that are provided with on blow off pipe (1), its characterized in that: be provided with a plurality of pressure boost section of thick bamboos (4) between two adjacent rivers detectors (2), pressure boost section of thick bamboo (4) and blow off pipe (1) intercommunication to pressure boost section of thick bamboo (4) inside is provided with spinner (5), one side of pressure boost section of thick bamboo (4) is provided with water pressure post (6), water pressure post (6) include with column casing (10) of blow off pipe (1) intercommunication, column casing (10) inside sliding connection has piston board (12), be fixed with polished rod (11) on piston board (12), be connected through spring (14) between piston board (12) and column casing (10).
2. The big data sewage flow rate detection pipeline according to claim 1, characterized in that a first manual valve (31) is fixed on the sewage discharge pipe (1) at a position close to the pressurizing cylinder (4), and a second manual valve (32) is fixed on the side wall of the pressurizing cylinder (4).
3. The big data sewage flow rate detection pipe according to claim 2, wherein the first manual valve (31) and the second manual valve (32) are connected by a medicament pipe (33).
4. The big data sewage flow rate detection pipe according to claim 2, wherein the rotator (5) comprises a tapered rotating shaft (7), a shaft rod (8) is fixed at the center of the larger diameter end of the rotating shaft (7), the shaft rod (8) is connected to the pressurizing cylinder (4) in a fixed-shaft rotating manner, the end of the shaft rod (8) is exposed to the outside of the pressurizing cylinder (4), and a spiral blade (9) is fixed on the rotating shaft (7).
5. The big data sewage flow rate detection pipe according to claim 1, wherein the upper end of the polish rod (11) is exposed to the outside of the column (10), and a stopper plate (13) is fixed to the end.
CN201921485443.9U 2019-09-09 2019-09-09 Big data sewage velocity of flow detects pipeline Active CN212264061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921485443.9U CN212264061U (en) 2019-09-09 2019-09-09 Big data sewage velocity of flow detects pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921485443.9U CN212264061U (en) 2019-09-09 2019-09-09 Big data sewage velocity of flow detects pipeline

Publications (1)

Publication Number Publication Date
CN212264061U true CN212264061U (en) 2021-01-01

Family

ID=73872256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921485443.9U Active CN212264061U (en) 2019-09-09 2019-09-09 Big data sewage velocity of flow detects pipeline

Country Status (1)

Country Link
CN (1) CN212264061U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235713A (en) * 2021-06-18 2021-08-10 许会 Sewage pipeline with self-cleaning function
CN113684915A (en) * 2021-08-19 2021-11-23 浙江大道建设工程有限公司 Intelligent dredging mechanism and dredging method for drainage pipeline
CN114738592A (en) * 2022-05-09 2022-07-12 浙江肥特科技有限公司 Anti-blocking device for water inlet pipeline of irrigation water supply pump and control method thereof
WO2023004751A1 (en) * 2021-07-30 2023-02-02 上海城建物资有限公司 Conveying pipe cleaning method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235713A (en) * 2021-06-18 2021-08-10 许会 Sewage pipeline with self-cleaning function
WO2023004751A1 (en) * 2021-07-30 2023-02-02 上海城建物资有限公司 Conveying pipe cleaning method and device
CN113684915A (en) * 2021-08-19 2021-11-23 浙江大道建设工程有限公司 Intelligent dredging mechanism and dredging method for drainage pipeline
CN113684915B (en) * 2021-08-19 2022-06-03 浙江大道建设工程有限公司 Intelligent dredging mechanism and dredging method for drainage pipeline
CN114738592A (en) * 2022-05-09 2022-07-12 浙江肥特科技有限公司 Anti-blocking device for water inlet pipeline of irrigation water supply pump and control method thereof

Similar Documents

Publication Publication Date Title
CN212264061U (en) Big data sewage velocity of flow detects pipeline
CN203664282U (en) Pipeline dredging device
CN208733770U (en) A kind of anti-blocking pipeline
CN202853467U (en) Condenser efficient and energy-saving rubber ball washing device
CN109629659A (en) A kind of municipal drainage pipeline Accrete clearing device and dredging technique
CN211200620U (en) Dry-wet separation type integrated intelligent intercepting well
CN210078945U (en) Sewage treatment is with preventing stifled device
CN208981494U (en) Working truck
CN208024945U (en) A kind of water hammer abatement valve and water hammer cut down pipeline
CN213174084U (en) Town road drainage structures
CN108221895B (en) A kind of spiral floating material collection system of modularization
CN209180573U (en) Underground piping detection device
CN218517362U (en) Ball passing device for oil conveying pipeline
CN207330403U (en) A kind of breaker of sewage disposal system
CN216711625U (en) Sewage drain outlet treatment device
CN106368304B (en) A kind of drain twists axis hole plugging device
CN219912711U (en) Urban underground drainage pipeline detection device
CN212561858U (en) Novel high-efficient underground pipe network dredging equipment
CN217974735U (en) Sewage lifting device with pipeline anti-blocking effect
CN211849842U (en) Unpowered retaining and flushing device for self-flushing of drainage pipeline
CN216244222U (en) Low-mass flow rate ultra-supercritical boiler water circulation device
CN220013922U (en) Drain pipe
CN219530580U (en) Urban sewage discharge pipe network detection device
CN214503583U (en) Water quality analyzer prevents stifled device
CN216867699U (en) Non-excavation pipeline prosthetic devices of nozzle stub connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ji Qiang

Inventor after: Hu Zhiwu

Inventor after: Luo Feng

Inventor after: Tang Weihua

Inventor after: Lei Mingkun

Inventor after: Peng Yukun

Inventor before: Hu Zhiwu

Inventor before: Luo Feng

Inventor before: Ji Qiang

Inventor before: Tang Weihua

Inventor before: Xu Wenbin

Inventor before: Lei Mingkun

Inventor before: Peng Yukun