CN212260914U - Supplementary show board of engineering cost budget - Google Patents
Supplementary show board of engineering cost budget Download PDFInfo
- Publication number
- CN212260914U CN212260914U CN202020315702.XU CN202020315702U CN212260914U CN 212260914 U CN212260914 U CN 212260914U CN 202020315702 U CN202020315702 U CN 202020315702U CN 212260914 U CN212260914 U CN 212260914U
- Authority
- CN
- China
- Prior art keywords
- display board
- engineering cost
- show board
- board
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drawing Aids And Blackboards (AREA)
Abstract
The utility model discloses an engineering cost budget assists show board belongs to engineering cost technical field. An engineering cost budget auxiliary display board comprises a box body, wherein a supporting frame is arranged on the top wall of the box body, a first display board is rotatably connected to the outer wall of the supporting frame, a lock catch is connected to the side wall of the first display board, one end, away from the first display board, of the lock catch is connected with the supporting frame, a second display board and a third display board are connected to the outer portion of the first display board, a slide rail is arranged on the inner wall of the first display board, pulleys are connected to the bottom walls of the second display board and the third display board, the pulleys are matched with the slide rail, an inner supporting column is arranged on the bottom wall of the box body, an outer supporting column is slidably connected to the outer; the utility model discloses simple structure, convenient to use can satisfy engineering cost personnel required show board when discussion or explanation, and the show board height can be adjusted according to self, and the function is various.
Description
Technical Field
The utility model relates to an engineering cost technical field especially relates to an engineering cost budget assists show board.
Background
The project cost refers to the construction price of a project, refers to the total cost expected or actually required for completing the construction of a project, and the cost mainly comprises equipment and tool purchase cost, construction project and installation project cost, other project construction cost, preparation cost, construction period interest and the like, and has the characteristics of large volume, individuality, difference, dynamics and the like; the main task of the project cost is to calculate the direct cost, enterprise management cost, measure cost, planning cost, profit, tax and the like contained in the project according to the drawing, quota and list specifications.
In many cases, data of engineering cost budget needs to be discussed or demonstrated internally for a client to see, and during discussion or demonstration, auxiliary discussion or explanation is usually carried out by means of a display board, but most display boards used by engineering cost personnel at present are of fixed structures, cannot be suitable for drawings with different sizes when drawings need to be posted, are inconvenient, have single functions, do not have auxiliary tools, and the height of the display board cannot be adjusted, so that various inconveniences are brought to the engineering cost personnel during result display; therefore, we provide an auxiliary display board for engineering cost budget.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the display board function singleness among the prior art, mostly do not have appurtenance, and the height of display board can not be adjusted, brings a great deal of inconvenient problem for engineering cost personnel, and the supplementary display board of an engineering cost budget that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an engineering cost budget auxiliary display board, includes the box, the box roof is equipped with the support frame, it is connected with first show board to rotate on the support frame outer wall, the lateral wall of first show board is connected with the hasp, the one end that first show board was kept away from to the hasp links to each other with the support frame, first show board external connection has second show board and third show board, be provided with the slide rail on the first show inboard wall, second show board and third show board diapire are connected with the pulley, the pulley cooperatees with the slide rail, the box diapire is equipped with the inner support post, inner support post outer wall sliding connection has outer support column, outer support column outer wall is equipped with the quick detach buckle.
Preferably, the inner wall of the sliding rail is provided with a first positioning hole, and the first positioning hole is matched with the sliding rail.
Preferably, the outer walls of the inner supporting column and the outer supporting column are respectively provided with a second positioning hole, and the second positioning holes are matched with the quick-release buckles.
Preferably, the inside drawing drawer, the instrument drawer and accomodate the drawer that are equipped with of box.
Preferably, the base is connected to outer support post diapire, the base diapire is equipped with the connecting rod, the connecting rod diapire is connected with the universal wheel.
Compared with the prior art, the utility model provides an engineering cost budgets supplementary show board possesses following beneficial effect:
1. when the auxiliary display board for the engineering cost budget is used, data or drawings of the engineering cost budget which need to be discussed internally or demonstrated to a client are put on the first display board, so that engineering cost personnel can conveniently discuss and explain the data or drawings; the support frame and the lock catch are arranged, so that the first display board, the second display board and the third display board can be turned over conveniently, the angles of the first display board, the second display board and the third display board can be adjusted conveniently, and engineering cost personnel can discuss data or drawings conveniently; the turned display board surface can be fixed through the arranged lock catch, so that the display board surface is not easy to shake in the display process, and the delay of the progress of discussion or explanation is avoided; through the arrangement of the second display board and the third display board, a large amount of data and drawings are needed for display when engineering cost workers discuss or explain, and when the display boards are insufficient, the second display board and the third display board only need to be pulled out through the sliding rails, so that the area of the display boards is increased; the sliding rail and the pulley are arranged, so that a user can conveniently move the second display board and the third display board; the height of the first display board, the second display board and the third display board can be adjusted according to the requirements of users by arranging the inner supporting columns, the outer supporting columns, the second positioning holes and the quick-release buckles, so that the use by engineering cost personnel is facilitated; through being equipped with first locating hole, and then conveniently fix second show board and third show board to avoid rocking back and forth when engineering cost personnel discuss or explain, cause inconvenience.
2. The auxiliary display board for the engineering cost budget can be used for storing drawings by arranging the drawing drawer, and when engineering cost personnel discuss or explain, the explanation can be checked and supplemented in time; through the arrangement of the tool drawer and the storage drawer, tools and other required articles can be placed according to the ordinary requirement of engineering cost personnel, and further help can be provided for a user during discussion or explanation; the base is arranged, so that the safety and the stability of the base and the ground are enhanced; through being equipped with connecting rod and universal wheel, and then make things convenient for engineering cost personnel to remove it when using.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses simple structure, convenient to use can satisfy engineering cost personnel required show board when discussion or explanation, and the show board height can be adjusted according to self, and the function is various.
Drawings
Fig. 1 is a schematic structural view of an auxiliary display board for engineering cost budget provided by the present invention;
fig. 2 is a schematic structural view of a third display board of the construction cost budget auxiliary display board provided by the present invention;
fig. 3 is a schematic structural view of a slide rail of an auxiliary display board for engineering cost budget provided by the present invention;
fig. 4 is a side view of an auxiliary display board for engineering cost budget provided by the present invention;
fig. 5 is an enlarged view of a portion a in fig. 1 of the auxiliary display board for engineering cost budget of the present invention.
In the figure: 1. a first display board; 101. a second display board; 102. a third display board; 103. locking; 104. a slide rail; 105. a first positioning hole; 106. a pulley; 2. a support frame; 3. a box body; 301. a drawing drawer; 302. a tool drawer; 303. a storage drawer; 4. an inner support column; 401. an outer support column; 402. a base; 403. a second positioning hole; 404. a buckle is quickly disassembled; 405. a connecting rod; 406. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1-5, an engineering cost budget auxiliary display board, including box 3, the roof of box 3 is equipped with support frame 2, it is connected with first show board 1 to rotate on the outer wall of support frame 2, the lateral wall of first show board 1 is connected with hasp 103, the one end that first show board 1 was kept away from to hasp 103 links to each other with support frame 2, first show board 1 external connection has second show board 101 and third show board 102, be provided with slide rail 104 on the first show board 1 inner wall, second show board 101 and third show board 102 diapire are connected with pulley 106, pulley 106 cooperatees with slide rail 104, box 3 diapire is equipped with interior support column 4, interior support column 4 outer wall sliding connection has outer support column 401, outer support column 401 outer wall is equipped with quick detach buckle 404.
The inner wall of the slide rail 104 is provided with a first positioning hole 105, and the first positioning hole 105 is matched with the slide rail 104.
The outer walls of the inner support column 4 and the outer support column 401 are both provided with a second positioning hole 403, and the second positioning hole 403 is matched with the quick release buckle 404.
When the display board is used, data or drawings of the project cost budget which need to be discussed internally or demonstrated to a client are put on the first display board 1, so that project cost personnel can conveniently discuss and explain the data or drawings; the support frame 2 and the lock catch 103 are arranged, so that the first display board 1, the second display board 101 and the third display board 102 can be turned over conveniently, the angles of the first display board, the second display board and the third display board can be adjusted conveniently, and engineering cost personnel can discuss data or drawings conveniently; through the arranged lock catch 103, the turned display board surface can be fixed, so that the display board surface is not easy to shake in the display process, and the delay of the progress of discussion or explanation is avoided; through the arrangement of the second display board 101 and the third display board 102, when the engineering cost personnel discuss or explain, a large amount of data and drawings are needed for displaying, and when the display boards are insufficient, the second display board 101 and the third display board 102 only need to be pulled out through the sliding rail 104, so that the area of the display boards is increased; the sliding rail 104 and the pulley 106 are arranged, so that the user can conveniently move the second display board 101 and the third display board 102; the height of the first display board 1, the height of the second display board 101 and the height of the third display board 102 can be adjusted according to the requirements of users by arranging the inner supporting columns 4, the outer supporting columns 401, the second positioning holes 403 and the quick-release buckles 404, so that the use by engineering cost personnel is facilitated; through being equipped with first locating hole 105, and then conveniently fix second show board 101 and third show board 102 to avoid rocking back and forth when engineering cost personnel discuss or explain, cause the inconvenience.
Example 2:
referring to fig. 1 to 5, an auxiliary display board for engineering cost budget is substantially the same as that of embodiment 1, and further, a drawing drawer 301, a tool drawer 302 and a storage drawer 303 are provided inside the box body 3.
The bottom wall of the outer supporting column 401 is connected with a base 402, the bottom wall of the base 402 is provided with a connecting rod 405, and the bottom wall of the connecting rod 405 is connected with a universal wheel 406.
The drawing drawer 301 is arranged, so that drawings can be stored, and when engineering cost workers discuss or explain, the instructions can be checked and supplemented in time; by arranging the tool drawer 302 and the storage drawer 303, tools and other required articles can be placed according to the ordinary requirement of engineering cost personnel, and further help can be provided for a user during discussion or explanation; the base 402 is arranged, so that the safety and the stability of the base and the ground are enhanced; through being equipped with connecting rod 405 and universal wheel 406, and then make things convenient for engineering cost personnel to remove it when using.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides an engineering cost budget supplementary show board, includes box (3), its characterized in that, box (3) roof is equipped with support frame (2), it is connected with first show board (1) to rotate on the support frame (2) outer wall, the lateral wall of first show board (1) is connected with hasp (103), the one end that first show board (1) was kept away from in hasp (103) links to each other with support frame (2), first show board (1) external connection has second show board (101) and third show board (102), be provided with slide rail (104) on first show board (1) inner wall, second show board (101) and third show board (102) diapire are connected with pulley (106), pulley (106) cooperate with slide rail (104), box (3) diapire is equipped with interior support column (4), interior support column (4) outer wall sliding connection has outer support column (401), the outer wall of the outer supporting column (401) is provided with a quick-release buckle (404).
2. The auxiliary display board for engineering cost budget of claim 1, wherein the inner wall of the sliding rail (104) is provided with a first positioning hole (105), and the first positioning hole (105) is matched with the sliding rail (104).
3. The auxiliary display board for engineering cost budget according to claim 2, wherein the outer walls of the inner supporting column (4) and the outer supporting column (401) are respectively provided with a second positioning hole (403), and the second positioning holes (403) are matched with the quick release fasteners (404).
4. The auxiliary display board for engineering cost budget of claim 1, wherein a drawing drawer (301), a tool drawer (302) and a storage drawer (303) are arranged inside the box body (3).
5. An auxiliary display board for engineering cost budget according to claim 4, wherein the bottom wall of the outer supporting column (401) is connected with a base (402), the bottom wall of the base (402) is provided with a connecting rod (405), and the bottom wall of the connecting rod (405) is connected with a universal wheel (406).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020315702.XU CN212260914U (en) | 2020-03-14 | 2020-03-14 | Supplementary show board of engineering cost budget |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020315702.XU CN212260914U (en) | 2020-03-14 | 2020-03-14 | Supplementary show board of engineering cost budget |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212260914U true CN212260914U (en) | 2021-01-01 |
Family
ID=73873655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020315702.XU Expired - Fee Related CN212260914U (en) | 2020-03-14 | 2020-03-14 | Supplementary show board of engineering cost budget |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212260914U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115104869A (en) * | 2022-08-09 | 2022-09-27 | 广州挚道建设项目管理有限公司 | Auxiliary display device for construction cost budget |
-
2020
- 2020-03-14 CN CN202020315702.XU patent/CN212260914U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115104869A (en) * | 2022-08-09 | 2022-09-27 | 广州挚道建设项目管理有限公司 | Auxiliary display device for construction cost budget |
CN115104869B (en) * | 2022-08-09 | 2024-03-26 | 广州挚道建设项目管理有限公司 | Auxiliary display device for budget of construction engineering cost |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204014371U (en) | A kind of hoistable platform cabinet | |
CA2539619C (en) | Tool organizer | |
US3857460A (en) | Combination ladder and tool cart | |
CN212260914U (en) | Supplementary show board of engineering cost budget | |
US20080079292A1 (en) | Organizer attachable to a chair and task utility system and process of providing same | |
CN206102074U (en) | Assembled -type storage cabinet | |
CN204389857U (en) | Multifunctional camera foot rest | |
US20120211616A1 (en) | Method and Apparatus of an Adjustable Scaffold Shelf | |
CN210979201U (en) | Measuring device for construction engineering cost budget | |
CN210963943U (en) | Intelligence-developing assembled toy backpack | |
CN209146671U (en) | A kind of portable Surveying Engineering tripod | |
CN218313460U (en) | Equipment tool kit for measurement | |
CN209973119U (en) | Preventive medicine inspection box | |
CN216316075U (en) | Budget toolbox for engineering cost | |
CN212071854U (en) | Engineering cost budget show toolbox | |
CN208074492U (en) | Tripod and assembly type leg means | |
CN206753005U (en) | A kind of scaffold | |
CN208412650U (en) | A kind of film storage arrangement | |
CN213877274U (en) | Agricultural economic management model structure | |
CN220890067U (en) | A adjust cat ladder for building trade portable | |
CN211407900U (en) | Engineering cost budgets case | |
CN210858559U (en) | Portable ladder of ascending a height | |
CN210000007U (en) | drawing frame for oil painting | |
CN216165987U (en) | On-spot device of drawing for engineering cost | |
CN219811268U (en) | Planning and design road model splicing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210101 Termination date: 20210314 |