CN212248861U - Hoist and mount installation component that suspension furred ceiling system used - Google Patents

Hoist and mount installation component that suspension furred ceiling system used Download PDF

Info

Publication number
CN212248861U
CN212248861U CN202021239561.4U CN202021239561U CN212248861U CN 212248861 U CN212248861 U CN 212248861U CN 202021239561 U CN202021239561 U CN 202021239561U CN 212248861 U CN212248861 U CN 212248861U
Authority
CN
China
Prior art keywords
frame
frame edge
mounting
edge
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021239561.4U
Other languages
Chinese (zh)
Inventor
徐正东
刘明海
刘占维
赵铮
苏婧
张迎港
吴福康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Building Materials Innovation and Technology Research Institute Co Ltd
Original Assignee
China National Building Materials Innovation and Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Building Materials Innovation and Technology Research Institute Co Ltd filed Critical China National Building Materials Innovation and Technology Research Institute Co Ltd
Priority to CN202021239561.4U priority Critical patent/CN212248861U/en
Application granted granted Critical
Publication of CN212248861U publication Critical patent/CN212248861U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)

Abstract

The utility model discloses a hoisting installation component for a suspended ceiling system, which comprises an installation structure for installing a decorative plate and a keel component connected with the installation structure; the mounting structure comprises a mounting frame and a hoisting structure; the mounting frame is connected with the keel assembly through a hoisting structure; the mounting frame comprises a first frame edge, a second frame edge, a third frame edge and a fourth frame edge; the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are connected in sequence; the first frame edge is fixedly connected with the second frame edge to form a first installation frame body, the third frame edge is fixedly connected with the fourth frame edge to form a second installation frame body, and the first installation frame body is detachably connected with the second installation frame body to form an installation frame; or the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are detachably connected in sequence to form an installation frame; the mounting structure is connected with the keel assembly to form an independent mounting assembly, so that the installation is convenient for on-site construction and assembly, and the construction period is shortened.

Description

Hoist and mount installation component that suspension furred ceiling system used
Technical Field
The utility model relates to a decorate furred ceiling technical field, especially relate to a hoist and mount installation component that suspension furred ceiling system used.
Background
The suspended ceiling system is the indispensable building structure in the architectural decoration engineering, and suspended ceiling system has functions such as heat preservation, thermal-insulated, sound insulation, decoration usually to remedy the defect that building house itself exists, increase the stereovision in space, also be the important structure who shelters from spaces such as electric, ventilation air conditioner, communication and fire prevention. The existing ceiling system is mainly composed of main keels and auxiliary keels, the main keels and the auxiliary keels are connected and installed to a ceiling through various connecting pieces, the whole ceiling installation process is complex, heavy and slow, and the ceiling system is a large-area plane hoisting mode, the hoisting effect is limited by means, so that the final hoisting effect is single, and the requirement of people on the indoor decoration effect cannot be met.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems in the prior art, a hoisting installation component for a suspended ceiling system is provided.
According to one aspect of the utility model, a hoisting installation component for a suspended ceiling system is provided, which comprises an installation structure for installing a decorative plate and a keel component connected with the installation structure;
the mounting structure comprises a mounting frame and a hoisting structure;
the mounting frame is connected with the keel assembly through the hoisting structure;
the mounting frame comprises a first frame edge, a second frame edge, a third frame edge and a fourth frame edge;
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are connected in sequence;
the first frame edge and the second frame edge are fixedly connected to form a first installation frame body, the third frame edge and the fourth frame edge are fixedly connected to form a second installation frame body, and the first installation frame body and the second installation frame body are detachably connected to form the installation frame; alternatively, the first and second electrodes may be,
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are detachably connected in sequence to form the mounting frame.
The mounting frame comprises a plurality of inserting parts and inserting grooves matched with the inserting parts;
the plurality of inserting parts are arranged at two ends of the first mounting frame body, and the plurality of inserting grooves are respectively arranged at two ends of the second mounting frame body; or the plurality of inserting parts are arranged at two ends of the second mounting frame body, and the plurality of inserting grooves are respectively arranged at two ends of the first mounting frame body;
the first installation frame body and the second installation frame body are connected with the inserting grooves in an inserting mode through the inserting portions, and the inserting portions correspond to the inserting grooves one to one.
The plurality of inserting parts are arranged at two ends of the first frame edge and two ends of the third frame edge, and the plurality of inserting grooves are respectively arranged at two ends of the second frame edge and two ends of the fourth frame edge; alternatively, the first and second electrodes may be,
the plurality of inserting grooves are respectively formed in two ends of the first frame edge and two ends of the third frame edge, and the plurality of inserting parts are formed in two ends of the second frame edge and two ends of the fourth frame edge;
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are in one-to-one correspondence with the insertion grooves through the insertion parts and are sequentially inserted.
The inserting part comprises a T-shaped structure body, the inserting groove comprises a T-shaped groove body matched with the T-shaped structure body, and the T-shaped structure body is matched with the T-shaped groove body in an inserting mode.
Wherein, the mounting frame is made of an aluminum alloy material.
Wherein, the outer surface of the installation frame is coated with a high-strength corrosion-resistant material.
Wherein, decorative patterns and/or characters are arranged on the mounting frame.
The hoisting structure comprises a plurality of steel wire ropes;
the mounting frame with pass through between the fossil fragments subassembly many wire rope detachably connect.
And a plurality of steel wire ropes are distributed along the circumferential direction of the mounting frame.
The utility model provides a hoist and mount installation component that suspension furred ceiling system used can realize following beneficial effect: the mounting structure is connected with the keel assembly to form an independent mounting assembly, so that the assembly is convenient for on-site construction, the construction period is shortened, and the procedures of high-altitude operation are reduced.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and together with the description, serve to explain the principles of the invention. In the drawings, like reference numerals are used to indicate like elements. The drawings in the following description are directed to some, but not all embodiments of the invention. For a person skilled in the art, other figures can be derived from these figures without inventive effort.
FIG. 1 is a schematic structural view of a ceiling mounting assembly for a suspended ceiling system according to one embodiment of the present application;
FIG. 2 is a diagram illustrating a split view of an installation box, according to an embodiment of the present application;
FIG. 3 is a split view of an installation frame shown in another embodiment of the present application;
FIG. 4 is a split view of an installation frame shown in another embodiment of the present application;
figure 5 is a schematic view of a keel assembly and hoisting structure shown in connection with one embodiment of the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. It should be noted that the embodiments and features of the embodiments in the present application may be arbitrarily combined with each other without conflict.
The application provides a hoist and mount installation component that suspension furred ceiling system used, including the mounting structure that is used for installing the decorative board and the fossil fragments subassembly of being connected with mounting structure. The mounting structure comprises a mounting frame and a hoisting structure, and the mounting frame is connected with the keel assembly through the hoisting structure. The installing frame comprises a first frame edge, a second frame edge, a third frame edge and a fourth frame edge, wherein the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are sequentially connected, the first frame edge is fixedly connected with the second frame edge to form a first installing frame body, the third frame edge is fixedly connected with the fourth frame edge to form a second installing frame body, the first installing frame body is detachably connected with the second installing frame body to form the installing frame, or the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are sequentially detachably connected to form the installing frame. The application provides a hoist and mount installation component that suspension furred ceiling system used, the installing frame becomes detachable construction by current integral type structure, easily field installation, the later maintenance of being convenient for to the cost of later maintenance has been reduced.
The suspended ceiling system is provided with a suspended mounting assembly, and the suspended mounting assembly is used for a suspended ceiling system.
In one exemplary embodiment, as shown in fig. 1 and 2, a suspended ceiling system suspended mounting assembly includes a mounting structure 1 for mounting a trim panel, and a keel assembly 2 connected to the mounting structure 1. The mounting structure 1 comprises a mounting frame 11 and a hoisting structure 12, and the mounting frame 11 is connected with the keel component 2 through the hoisting structure 12. The mounting frame 11 includes a first frame 1111, a second frame 1112, a third frame 1113, and a fourth frame 1114, wherein the first frame 1111, the second frame 1112, the third frame 1113, and the fourth frame 1114 are sequentially connected. In the present embodiment, as shown in fig. 2, the first frame rim 1111 and the second frame rim 1112 are fixedly connected to form the first mounting frame 111, and specifically, the first mounting frame 111 has an L-shaped structure. The third rim 1113 and the fourth rim 1114 are fixedly connected to form the second mounting frame 112, and specifically, the second mounting frame 112 is also L-shaped. The first mounting frame 111 and the second mounting frame 112 are detachably connected to each other to form the mounting frame 11. In the present embodiment, referring to fig. 2, the mounting frame 11 includes a plurality of insertion portions 114 and insertion grooves 115 adapted to the plurality of insertion portions 114. The insertion part 114 includes a T-shaped structure, and the insertion groove 115 includes a T-shaped groove body adapted to the T-shaped structure, and the T-shaped structure is inserted into and fitted to the T-shaped groove body. The plurality of insertion portions 114 are respectively provided at both ends of the first mounting frame 111, and specifically, a first rod of the insertion portion 114 is fixedly connected to one end of the first mounting frame 111. A plurality of insertion grooves 115 are respectively provided at both ends of the second mounting frame 112, and specifically, the insertion grooves 115 are provided at one end of the second mounting frame 112. The first mounting frame 111 and the second mounting frame 112 are connected with the plugging grooves 115 through the plugging portions 114, and the plugging portions 114 correspond to the plugging grooves 115 one by one, or the plugging portions 114 are respectively disposed at both ends of the second mounting frame 112, the plugging grooves 115 are respectively disposed at both ends of the first mounting frame 111, the first mounting frame 111 and the second mounting frame 112 are connected with the plugging grooves 115 through the plugging portions 114, and the plugging portions 114 correspond to the plugging grooves 115 one by one. Different with the integral type framework among the prior art, the framework in this application is detachable construction, and the transportation is convenient, the field assembly of being convenient for, and when the installation decorative board, the decorative board size can laminate with installing frame 11 completely, puts the decorative board earlier, and first installation framework 111 of back combination and second installation framework 112 can not damage the decorative board, reduce construction cost.
In another exemplary embodiment, as shown in fig. 1 and 3, the first frame rim 1111, the second frame rim 1112, and the fourth frame rim 1114 are fixedly connected to form a third mounting frame 113, wherein the third mounting frame 113 has a U-shaped structure and is detachably connected to the third frame rim 1113 to form the mounting frame 11. In this embodiment, the inserting grooves 115 are disposed at two ends of the third mounting frame 113, the inserting portions 114 are disposed at two ends of the third frame edge 1113, the third mounting frame 113 and the third frame edge 1113 are inserted into the inserting portions 114 through the inserting grooves 115, and the inserting grooves 115 are in one-to-one correspondence with the inserting portions 114, or (not shown in the figure), the inserting grooves are disposed at two ends of the third frame edge, the inserting portions are disposed at two ends of the third mounting frame, the third frame edge and the third mounting frame are inserted into the inserting portions through the inserting grooves, and the inserting grooves are in one-to-one correspondence with the inserting portions.
In another exemplary embodiment, as shown in fig. 1 and 4, the first rim 1111, the second rim 1112, the third rim 1113, and the fourth rim 1114 are detachably connected in sequence to form the mounting frame 11. Wherein, a plurality of inserting parts 114 are respectively arranged at two ends of the first frame edge 1111 and two ends of the third frame edge 1113, a plurality of inserting grooves 115 are respectively arranged at two ends of the second frame edge 1112 and two ends of the fourth frame edge 1114, the first frame edge 1111, the second frame edge 1112, the third frame edge 1113 and the fourth frame edge 1114 are respectively corresponding to the inserting grooves 115 one by one and are sequentially inserted through the inserting parts 114, or (not shown in the figure), a plurality of inserting grooves are respectively arranged at two ends of the first frame edge and two ends of the third frame edge, a plurality of inserting parts are arranged at two ends of the second frame edge and two ends of the fourth frame edge, and the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are respectively corresponding to the inserting grooves one by one and are sequentially inserted through the inserting parts.
In this embodiment, as shown in fig. 1-4, the mounting frame 11 is made of an aluminum alloy material, which is light in weight and reduces the weight of the mounting components of the suspended ceiling system. The outer surface of the mounting frame 11 is coated with a high-strength corrosion-resistant material, such as a toughened coating, so that the mounting frame has the advantages of high hardness, scrubbing resistance, no toxicity and no pollution, and has no influence on the health of a human body; for another example, the paint spraying coating has the advantages of high hardness and easy cleaning; for another example, the emulsion paint has the advantages of fire resistance, moisture resistance, corrosion resistance and the like, and is convenient to clean and maintain in the future. The installation frame 11 is provided with decorative patterns and/or characters (not shown in the figure), so that the attractiveness of the installation frame 11 is enhanced, and the use experience of a user is improved.
In this embodiment, as shown in fig. 1 and 5, the hoisting structure 12 includes a plurality of wire ropes 121, the mounting frame 11 is detachably connected to the keel assembly 2 through the plurality of wire ropes 121, specifically, a first end of the wire rope 121 is fixedly connected to a frame body of the mounting frame 11, a second end of the wire rope 121 is detachably connected to the keel assembly 2 through a clamping member 21, wherein the keel assembly 2 may be a molding clamping keel, and the keel assembly 2 may be fixed to a floor slab through an expansion bolt 22. The plurality of wire ropes 121 are distributed along the circumferential direction of the mounting frame 11.
The application provides a hoist and mount installation component that suspension furred ceiling system used, including the mounting structure that is used for installing the decorative board and the fossil fragments subassembly of being connected with mounting structure. The mounting structure comprises a mounting frame and a hoisting structure, and the mounting frame is connected with the keel assembly through the hoisting structure. The utility model provides a furred ceiling installation component that suspension furred ceiling system used becomes solitary installation component by the furred ceiling system of integral type, is convenient for assemble at the site operation, shortens the time limit for a project of construction, has reduced aerial working's procedure, has improved factor of safety.
The above-described embodiments can be implemented individually or in various combinations, and such variations are within the scope of the present invention.
It is to be noted that, in this document, the terms "comprises", "comprising" or any other variation thereof are intended to cover a non-exclusive inclusion, so that an article or apparatus including a series of elements includes not only those elements but also other elements not explicitly listed or inherent to such article or apparatus. Without further limitation, an element defined by the phrase "comprising … …" does not exclude the presence of additional like elements in the article or device comprising the element.
The above embodiments are merely for illustrating the technical solutions of the present invention and are not to be construed as limiting, and the present invention is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that various modifications and equivalent substitutions may be made to the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention, and all the modifications and equivalents should be covered by the scope of the claims of the present invention.

Claims (9)

1. A hoisting installation component for a suspended ceiling system is characterized by comprising an installation structure for installing a decorative plate and a keel component connected with the installation structure;
the mounting structure comprises a mounting frame and a hoisting structure;
the mounting frame is connected with the keel assembly through the hoisting structure;
the mounting frame comprises a first frame edge, a second frame edge, a third frame edge and a fourth frame edge;
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are connected in sequence;
the first frame edge and the second frame edge are fixedly connected to form a first installation frame body, the third frame edge and the fourth frame edge are fixedly connected to form a second installation frame body, and the first installation frame body and the second installation frame body are detachably connected to form the installation frame; alternatively, the first and second electrodes may be,
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are detachably connected in sequence to form the mounting frame.
2. The suspended ceiling system ceiling mounting assembly of claim 1, wherein the mounting frame includes a plurality of mating portions and mating slots for mating with the plurality of mating portions;
the plurality of inserting parts are arranged at two ends of the first mounting frame body, and the plurality of inserting grooves are respectively arranged at two ends of the second mounting frame body; or the plurality of inserting parts are arranged at two ends of the second mounting frame body, and the plurality of inserting grooves are respectively arranged at two ends of the first mounting frame body;
the first installation frame body and the second installation frame body are connected with the inserting grooves in an inserting mode through the inserting portions, and the inserting portions correspond to the inserting grooves one to one.
3. The suspended ceiling system of claim 1, wherein a plurality of said sockets are disposed at both ends of said first rim and at both ends of said third rim, and a plurality of said sockets are disposed at both ends of said second rim and at both ends of said fourth rim; alternatively, the first and second electrodes may be,
the plurality of inserting grooves are respectively formed in two ends of the first frame edge and two ends of the third frame edge, and the plurality of inserting parts are formed in two ends of the second frame edge and two ends of the fourth frame edge;
the first frame edge, the second frame edge, the third frame edge and the fourth frame edge are in one-to-one correspondence with the insertion grooves through the insertion parts and are sequentially inserted.
4. The suspended ceiling system of claim 2 or 3, wherein the socket comprises a T-shaped structure, the socket comprises a T-shaped slot adapted to the T-shaped structure, and the T-shaped structure is in socket fit with the T-shaped slot.
5. The suspended ceiling system ceiling mounting assembly of claim 1, wherein the mounting frame is made of an aluminum alloy material.
6. The suspended ceiling system ceiling mounting assembly of claim 1, wherein the mounting frame is coated on an outer surface with a high strength, corrosion resistant material.
7. The suspended ceiling system ceiling mounting assembly of claim 1, wherein the mounting frame is provided with decorative designs and/or characters.
8. The suspended ceiling system ceiling mounting assembly of claim 1, wherein the lifting structure comprises a plurality of wire ropes;
the mounting frame with pass through between the fossil fragments subassembly many wire rope detachably connect.
9. The suspended ceiling system ceiling mounting assembly of claim 8, wherein a plurality of said wire ropes are distributed circumferentially of said mounting frame.
CN202021239561.4U 2020-06-30 2020-06-30 Hoist and mount installation component that suspension furred ceiling system used Active CN212248861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021239561.4U CN212248861U (en) 2020-06-30 2020-06-30 Hoist and mount installation component that suspension furred ceiling system used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021239561.4U CN212248861U (en) 2020-06-30 2020-06-30 Hoist and mount installation component that suspension furred ceiling system used

Publications (1)

Publication Number Publication Date
CN212248861U true CN212248861U (en) 2020-12-29

Family

ID=73980567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021239561.4U Active CN212248861U (en) 2020-06-30 2020-06-30 Hoist and mount installation component that suspension furred ceiling system used

Country Status (1)

Country Link
CN (1) CN212248861U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922279A (en) * 2022-05-17 2022-08-19 无锡威而特金属制品有限公司 Grid plate and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114922279A (en) * 2022-05-17 2022-08-19 无锡威而特金属制品有限公司 Grid plate and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN212248861U (en) Hoist and mount installation component that suspension furred ceiling system used
CN204983333U (en) Light gauge steel rolls over light trough structure
CN107268849A (en) Modularization environment protection wall board wall surface decoration system
CN212248864U (en) Suspension installation component with sound absorption function and suspended ceiling system thereof
CN216766465U (en) Modular assembly design structure of curved surface metal furred ceiling
CN213233976U (en) Waterproof ceiling structure
CN211172640U (en) Suspended ceiling hanging structure
CN111719761A (en) Suspended ceiling system mounting assembly, suspended ceiling system and mounting process thereof
CN210439534U (en) Green building environmental protection furred ceiling structure
CN212248862U (en) Suspended ceiling system's installation component, suspended ceiling system
CN111719762A (en) Suspension installation assembly with sound absorption function, ceiling system and installation process of suspension installation assembly
CN215978000U (en) Assembled aluminum plate ceiling
CN206070844U (en) A kind of screen aluminum alloy ceiling joist mounting structure
CN212358817U (en) Fast-assembling furred ceiling system
CN217924370U (en) Grid suspended ceiling
CN217232370U (en) Large-space GRG arc-shaped combined ceiling
CN219773352U (en) Building decoration furred ceiling structure
CN219952408U (en) Suspended ceiling keel and suspended ceiling structure thereof
CN213774062U (en) C-shaped aluminum buckle plate for building suspended ceiling
CN218176302U (en) Baking varnish keel structure, main keel structure, auxiliary keel structure and splicing structure
CN217896954U (en) Assembled furred ceiling basic unit construction
CN113338522B (en) Splice member and installation method
CN204919949U (en) Cellular board structure furred ceiling
CN213014949U (en) Furred ceiling binding off structure
CN218843611U (en) Wall aluminum alloy pendant mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant