CN212247902U - Hanging basket on bridge - Google Patents

Hanging basket on bridge Download PDF

Info

Publication number
CN212247902U
CN212247902U CN201921816198.5U CN201921816198U CN212247902U CN 212247902 U CN212247902 U CN 212247902U CN 201921816198 U CN201921816198 U CN 201921816198U CN 212247902 U CN212247902 U CN 212247902U
Authority
CN
China
Prior art keywords
bridge
hanging basket
hole
connecting rod
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921816198.5U
Other languages
Chinese (zh)
Inventor
杨民政
许宁
王鹏骁
杨永亮
赵宁
周雷蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201921816198.5U priority Critical patent/CN212247902U/en
Application granted granted Critical
Publication of CN212247902U publication Critical patent/CN212247902U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The application discloses hang basket on bridge includes: a hanging basket body; the fixing part is connected with the hanging basket body and arranged on the road surface of the bridge. The utility model provides a hang basket on bridge through preventing the fixed part at the bridge on the surface, the fixed part is enough long or enough heavy and when making whole string basket + constructor's focus be located the bridge floor, when constructor got into the basket this moment, can guarantee not to fall the bridge. Thus increasing safety and convenience.

Description

Hanging basket on bridge
Technical Field
The application relates to the field of buildings, in particular to a hanging basket on a bridge.
Background
In bridge construction, it is often necessary for a constructor to perform construction work on the outer side of the bridge wall. In the prior art, constructors are often manually dragged to be maintained outside a bridge wall body to carry out construction operation by relying on the force of workers and ropes. Therefore, not only is the construction personnel uncomfortable, but also the potential safety hazard is increased more importantly.
SUMMERY OF THE UTILITY MODEL
In order to achieve the above object, according to one aspect of the present application, there is provided an on-bridge basket, comprising:
a hanging basket body;
the fixing part is connected with the hanging basket body and arranged on the road surface of the bridge.
Optionally, the fixing portion includes:
the cross beam is connected with the hanging basket body;
the moving part is arranged at the bottom of the cross beam and moves on the bridge pavement, so that the hanging basket body is driven to move outside the bridge.
Optionally, the moving part comprises at least two rollers.
Optionally, the moving part comprises at least two track structures.
Optionally, the basket body comprises:
one end of the connecting rod is connected with the cross beam;
and the basket is connected with the other end of the connecting rod.
Optionally, the connecting rod is telescopic.
Optionally, the connecting rod comprises:
the pipe sleeve is provided with a first through hole;
the pipe sleeve is sleeved on the outer side of the pipe core, and the pipe core is provided with a second through hole;
the fixing pin is detachably arranged in the first through hole and the second through hole in a penetrating mode.
Optionally, the connecting rod may be bendable.
Optionally, the connecting rod comprises:
one end of the upper rod is connected with the cross beam;
the first disc is connected with the other end of the upper rod and is provided with a third through hole;
one end of the lower rod is connected with the basket;
the second disc is connected with the other end of the lower rod and is provided with a fourth through hole;
and the fixing pin is detachably arranged in the third through hole and the fourth through hole in a penetrating manner.
The utility model provides a hang basket on bridge through preventing the fixed part at the bridge on the surface, the fixed part is enough long or enough heavy and when making whole string basket + constructor's focus be located the bridge floor, when constructor got into the basket this moment, can guarantee not to fall the bridge. Thus increasing safety and convenience.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, serve to provide a further understanding of the application and to enable other features, objects, and advantages of the application to be more apparent. The drawings and their description illustrate the embodiments of the invention and do not limit it. In the drawings:
FIG. 1 is a side view of an on-bridge pannier according to an embodiment of the present application;
FIG. 2 is a schematic view of a connecting rod according to an embodiment of the present application;
FIG. 3 is a schematic view of a connecting rod according to an embodiment of the present application.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "comprises" and "comprising," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "inner", "outer", "middle", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1, the present application relates to an on-bridge basket comprising: a hanging basket body 1 and a fixing part. The fixing part is connected with the hanging basket body 1 and arranged on the bridge pavement 2.
In an embodiment of the present application, the fixing portion includes: a beam 3 and a moving part 4. Wherein the crossbeam 2 is connected with the cradle body 1. The moving part 3 is arranged at the bottom of the cross beam 2, and the moving part 3 moves on the bridge pavement 2 so as to drive the hanging basket body 1 to move outside the bridge.
In an embodiment of the present application, the moving portion includes at least two rollers 41.
In an embodiment of the application, the moving part comprises at least two track structures.
In an embodiment of the present application, the hanging basket body 1 includes: connecting rod 11 and basket 12. One end of the connecting rod 11 is connected with the beam 3. The basket 12 is connected to the other end of the connection rod 11.
In an embodiment of the present application, the connecting rod 11 is retractable.
As shown in fig. 2, in an embodiment of the present application, the connecting rod 11 includes: a pipe sleeve 111, a pipe core 112 and a fixing pin 113. The tube sleeve 111 is provided with a first perforation. The pipe sleeve 111 is sleeved outside the pipe core 112, and the pipe core 112 is provided with a second through hole. The fixing pin 113 is detachably inserted into the first through hole and the second through hole. When the length of the connecting rod needs to be changed, the fixing pin 113 is pulled out, then different first through holes are aligned with different second through holes, and then the fixing pin is inserted. The purpose of changing the length of the connecting rod can be achieved.
In an embodiment of the present application, the connecting rod may be bendable.
As shown in fig. 3, in an embodiment of the present application, the connecting rod 11 includes: an upper rod 114, a first disc 115, a lower rod 116, a second disc 117 and a fixing pin (not shown). Wherein, one end of the upper rod 114 is connected with the beam 3. The first disk 114 is connected to the other end of the upper rod 114, and the first disk 115 is provided with a third through hole 118. One end of the lower rod 116 is connected to the basket 12. The second disc 117 is connected to the other end of the lower rod 116, and the second disc 117 is provided with a fourth through hole 119. The fixing pin is detachably inserted into the third through hole 118 and the fourth through hole 119. When the angle of the connecting rod needs to be changed, the fixing pin is pulled out, then the different third through holes 118 are aligned with the different fourth through holes 119, and then the fixing pin is inserted. The purpose of changing the angle of the connecting rod can be achieved.
The utility model provides a hang basket on bridge through preventing the fixed part at the bridge on the surface, the fixed part is enough long or enough heavy and when making whole string basket + constructor's focus be located the bridge floor, when constructor got into the basket this moment, can guarantee not to fall the bridge. Thus increasing safety and convenience.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (7)

1. A cradle on bridge, comprising:
a hanging basket body;
the fixing part is connected with the hanging basket body and arranged on the bridge pavement;
the cross beam is connected with the hanging basket body;
the moving part is arranged at the bottom of the cross beam and moves on the bridge pavement, so that the hanging basket body is driven to move outside the bridge;
the moving part comprises at least two track structures.
2. The on-bridge hanging basket of claim 1, wherein the moving portion comprises at least two rollers.
3. The on-bridge hanging basket of claim 2, wherein the hanging basket body comprises:
one end of the connecting rod is connected with the cross beam;
and the basket is connected with the other end of the connecting rod.
4. The on-bridge hanging basket of claim 3, wherein the connecting rod is telescoping.
5. The on-bridge hanging basket of claim 4, wherein the connecting rod comprises:
the pipe sleeve is provided with a first through hole;
the pipe sleeve is sleeved on the outer side of the pipe core, and the pipe core is provided with a second through hole;
the fixing pin is detachably arranged in the first through hole and the second through hole in a penetrating mode.
6. The on-bridge hanging basket of claim 5, wherein the connecting rod is bendable.
7. The on-bridge hanging basket of claim 6, wherein the connecting rod comprises:
one end of the upper rod is connected with the cross beam;
the first disc is connected with the other end of the upper rod and is provided with a third through hole;
one end of the lower rod is connected with the basket;
the second disc is connected with the other end of the lower rod and is provided with a fourth through hole;
and the fixing pin is detachably arranged in the third through hole and the fourth through hole in a penetrating manner.
CN201921816198.5U 2019-10-25 2019-10-25 Hanging basket on bridge Active CN212247902U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921816198.5U CN212247902U (en) 2019-10-25 2019-10-25 Hanging basket on bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921816198.5U CN212247902U (en) 2019-10-25 2019-10-25 Hanging basket on bridge

Publications (1)

Publication Number Publication Date
CN212247902U true CN212247902U (en) 2020-12-29

Family

ID=73972101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921816198.5U Active CN212247902U (en) 2019-10-25 2019-10-25 Hanging basket on bridge

Country Status (1)

Country Link
CN (1) CN212247902U (en)

Similar Documents

Publication Publication Date Title
CN207277982U (en) A kind of construction protective fence
JP5264710B2 (en) Telescopic crane jib
CN212247902U (en) Hanging basket on bridge
CN201439598U (en) Lowering device for reinforcing cage of drilled pile
CN104876131A (en) Method for disassembling large tower crane by utilizing small tower crane
CN212939594U (en) Suspension type wall cleaning mechanical arm
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN205116671U (en) Single ceiling assembly and disassembly tools
CN204827250U (en) Whitewashing drilling tool
JP6527812B2 (en) Insertion method of core material into utility pole
CN209835497U (en) T roof beam sideboard hogging moment muscle stretch-draw jack hangs puts device
CN210659194U (en) Telescopic storage type operating platform
CN207503597U (en) A kind of vocational guidance planning displaying device
CN109230990A (en) A kind of aircraft suspension apparatus and its suspension system
CN206308998U (en) Without scaffold hanging basket
CN205370459U (en) Derrick telescoping device
CN206158601U (en) Telescopic derrick plays to rise auxiliary device
CN205712109U (en) Sinking steel protecting canister leading truck
CN111042728A (en) Self-gravity-stabilized steel pipe tower climbing ladder and use method thereof
CN104840079B (en) A kind of Eriocheir sinensis lifting rope peg
CN204059205U (en) Operation platform is suspended in midair under straddle-type
CN207959213U (en) A kind of steel pipe pile driving construction fast assembling-disassembling device
CN209025048U (en) A kind of power assisting device for receiving face for slope concrete finisher
CN206447508U (en) For both wired template provision for disengagement
CN209853616U (en) Raise lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant