CN212230730U - Commercial air conditioner test is with simple and easy power-on device - Google Patents
Commercial air conditioner test is with simple and easy power-on device Download PDFInfo
- Publication number
- CN212230730U CN212230730U CN202021351940.2U CN202021351940U CN212230730U CN 212230730 U CN212230730 U CN 212230730U CN 202021351940 U CN202021351940 U CN 202021351940U CN 212230730 U CN212230730 U CN 212230730U
- Authority
- CN
- China
- Prior art keywords
- power supply
- supply needle
- air conditioner
- bottom plate
- commercial air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 9
- 230000005611 electricity Effects 0.000 description 3
- 210000001503 joint Anatomy 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 2
- 238000010009 beating Methods 0.000 description 2
- 239000000498 cooling water Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The utility model relates to a commercial air conditioner test field, in particular to a simple electrifying device for a commercial air conditioner test, which comprises a bottom plate, wherein the left side of the front end surface of the bottom plate is fixedly connected with a wiring terminal, the right side of the front end surface of the bottom plate is slidably connected with a power supply needle seat, the front end surface of the power supply needle seat is hinged with an end cover, the inner side of the power supply needle seat is provided with a guide block, and the right end surface of the power supply needle seat is provided with a cable, and the electrification operation is completed, and the test is carried out, so that the production efficiency can be improved, and the efficiency of the production line is improved.
Description
Technical Field
The utility model relates to a commercial air conditioner test field specifically is a commercial air conditioner test is with simple and easy power-on device.
Background
Commercial air conditioner is the general name of air conditioning unit more than 3HP, therefore commercial air conditioner kind is many, including air-cooled heat pump type central air conditioning unit, water-cooling screw rod formula cooling water set, centrifugal cooling water set etc. on commercial air conditioner complete machine equipment production line, in order to inspect product quality, need to go up the electricity and test whether various functions of complete machine are normal, because the complete machine power supply adopts binding post power supply more, if every all installs the cable, production efficiency is low, is unfavorable for improving the efficiency of production line.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a commercial air conditioner test is with electric device on simply to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a commercial air conditioner test is with simple and easy power-on device, includes the bottom plate, terminal surface left side fixedly connected with binding post before the bottom plate, terminal surface right side sliding connection has the power supply needle file before the bottom plate, terminal surface hinged joint has the end cover before the power supply needle file, power supply needle file inboard is equipped with the guide block, power supply needle file right-hand member face is equipped with the cable, the cable runs through the power supply needle file, cable and power supply needle file sliding connection, the cable inboard is equipped with insulating cover, insulating cover inboard is equipped with the wire, wire and insulating cover sliding connection, wire outside sliding connection has the power supply needle, the wire runs through the power supply needle.
Preferably, the fixed block outside is rotated and is connected with insulating handle, insulating handle runs through the fixed block, power supply needle outside fixedly connected with stopper, the power supply needle runs through the stopper, stopper and guide block fixed connection, stopper and bottom plate sliding connection.
Preferably, a screw is arranged on the right side of the front end face of the power supply needle, the screw penetrates through the power supply needle, the screw is in threaded connection with the power supply needle, and the screw is in sliding connection with the lead.
Preferably, the insulating sleeves are connected with the cables in a sliding mode, and the number of the insulating sleeves is 3.
Preferably, the guide block is fixedly connected with the power supply needle base, and the guide block is connected with the bottom plate in a sliding mode.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in, binding post through setting up, the end cover, the guide block, cable and power supply needle, when testing commercial air conditioner, fix binding post and bottom plate on the host computer panel beating, the one end of cable is just fixed on corresponding tray as required installation plug in advance, when carrying out the electricity test, put power supply needle file on the bottom plate the upper level and push into binding post relevant position on the bottom plate, accomplish the butt joint, then open the power switch, the electricity operation on the completion, test, thereby can improve production efficiency, the efficiency of improvement production line.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front sectional view of the power supply needle holder of the present invention;
fig. 3 is a schematic view of the mounting structure of the screw according to the present invention.
In the figure: the cable comprises a base plate 1, a wiring terminal 2, a power supply needle base 3, an end cover 4, a guide block 5, a cable 6, a lead 7, a limiting block 8, a power supply needle 9, an insulating sleeve 10 and a screw 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
the utility model provides a commercial air conditioner test is with simple and easy power-on device, comprising a base plate 1, terminal surface left side fixedly connected with binding post 2 before the bottom plate 1, terminal surface right side sliding connection has power supply needle file 3 before the bottom plate 1, terminal surface hinged joint has end cover 4 before the power supply needle file 3, 3 inboards of power supply needle file are equipped with guide block 5, this kind of setting can lead when power supply needle 9 docks with binding post 2, 3 right-hand member faces of power supply needle file are equipped with cable 6, cable 6 runs through power supply needle file 3, cable 6 and 3 sliding connection of power supply needle file, 6 inboards of cable are equipped with insulating cover 10, insulating cover 10 inboards are equipped with wire 7, wire 7 and 10 sliding connection of insulating cover, 7 outside sliding connection of wire has power supply needle 9, wire 7.
The limiting block 8 is fixedly connected to the outer side of the power supply needle 9, the power supply needle 9 penetrates through the limiting block 8, the limiting block 8 is fixedly connected with the guide block 5, the limiting block 8 is connected with the bottom plate 1 in a sliding mode, and the power supply needle 9 can be limited through the arrangement; a screw 11 is arranged on the right side of the front end face of the power supply needle 9, the screw 11 penetrates through the power supply needle 9, the screw 11 is in threaded connection with the power supply needle 9, the screw 11 is in sliding connection with the lead 7, and the lead 7 can be installed and fixed on the power supply needle 9 through the arrangement, so that a power supply is provided for the device; the insulating sleeves 10 are connected with the cables 6 in a sliding mode, the number of the insulating sleeves 10 is 3, and the arrangement can protect the wires 7; the guide block 5 is fixedly connected with the power supply needle base 3, the guide block 5 is connected with the bottom plate 1 in a sliding mode, and the arrangement can guide when the power supply needle 9 is in butt joint with the wiring terminal 2.
The working process is as follows: when testing commercial air conditioner, fix binding post 2 and bottom plate 1 on the host computer panel beating, the one end of cable 6 is in advance as required installation plug and fix on corresponding tray, when carrying out the power-on test, put power supply needle file 3 and put on bottom plate 1 upper level and push into binding post 2 relevant position on bottom plate 1, accomplish the butt joint, then open the power-on switch, accomplish the power-on operation, test to can improve production efficiency, improve the efficiency of production line.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a commercial air conditioner test is with simply going up electric installation, includes bottom plate (1), its characterized in that: terminal surface left side fixedly connected with binding post (2) before bottom plate (1), terminal surface right side sliding connection has power supply needle file (3) before bottom plate (1), terminal surface hinged joint has end cover (4) before power supply needle file (3), power supply needle file (3) inboard is equipped with guide block (5), power supply needle file (3) right-hand member face is equipped with cable (6), power supply needle file (3) are run through in cable (6), cable (6) and power supply needle file (3) sliding connection, cable (6) inboard is equipped with insulating cover (10), insulating cover (10) inboard is equipped with wire (7), wire (7) and insulating cover (10) sliding connection, wire (7) outside sliding connection has power supply needle (9), wire (7) run through power supply needle (9).
2. The simple power-on device for the commercial air conditioner test according to claim 1, wherein: power supply needle (9) outside fixedly connected with stopper (8), power supply needle (9) run through stopper (8), stopper (8) and guide block (5) fixed connection, stopper (8) and bottom plate (1) sliding connection.
3. The simple power-on device for the commercial air conditioner test according to claim 1, wherein: the power supply needle (9) is preceding terminal surface right side and is equipped with screw (11), power supply needle (9) are run through in screw (11), screw (11) and power supply needle (9) threaded connection, screw (11) and wire (7) sliding connection.
4. The simple power-on device for the commercial air conditioner test according to claim 1, wherein: insulating cover (10) and cable (6) sliding connection, the quantity of insulating cover (10) is 3.
5. The simple power-on device for the commercial air conditioner test according to claim 1, wherein: the guide block (5) is fixedly connected with the power supply needle base (3), and the guide block (5) is connected with the bottom plate (1) in a sliding mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021351940.2U CN212230730U (en) | 2020-07-10 | 2020-07-10 | Commercial air conditioner test is with simple and easy power-on device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021351940.2U CN212230730U (en) | 2020-07-10 | 2020-07-10 | Commercial air conditioner test is with simple and easy power-on device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212230730U true CN212230730U (en) | 2020-12-25 |
Family
ID=73910760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021351940.2U Expired - Fee Related CN212230730U (en) | 2020-07-10 | 2020-07-10 | Commercial air conditioner test is with simple and easy power-on device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212230730U (en) |
-
2020
- 2020-07-10 CN CN202021351940.2U patent/CN212230730U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212230730U (en) | Commercial air conditioner test is with simple and easy power-on device | |
CN201909842U (en) | Intelligent automatic rapid wire connection device for testing electric energy meter | |
CN102175984A (en) | Automatic fast wiring device for testing intelligent watt-hour meter | |
CN206602203U (en) | A kind of safety socket with AC-DC function USB interface | |
CN205353152U (en) | Electric energy meter plug connector | |
CN210015218U (en) | High-precision power battery pack charging and discharging cycle test equipment | |
CN206023594U (en) | Split type electric source host | |
CN202975220U (en) | Universal wire and cable connector clip tester | |
CN208833844U (en) | Oil heater anti-outage aging test system | |
CN112834121A (en) | Device for detecting waterproof performance of USB interface | |
CN206451896U (en) | Power supply active modular safety socket | |
CN208768035U (en) | A kind of intelligent photovoltaic component test device | |
CN217034739U (en) | Big data processing server | |
CN211043472U (en) | Double-station single-three-phase compatible virtual ammeter tool | |
CN212010637U (en) | Electric transformer | |
CN219978354U (en) | Multifunctional safety electricity utilization instrument | |
CN220251983U (en) | Auxiliary junction box for electric test of power transformer | |
CN219369897U (en) | Flat wire high-voltage pinhole detection system | |
CN212208294U (en) | Computer information security control device | |
CN220233488U (en) | Asymmetric binding post and binding post row | |
CN218351748U (en) | Module terminal test connection module | |
CN221009342U (en) | Grounding bar | |
CN208156073U (en) | A kind of eight station air switch overvoltage/undervoltage detecting tools | |
CN221199730U (en) | Household energy storage rapid test equipment | |
CN211116348U (en) | Detection device for diesel oil filter of electric pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201225 |
|
CF01 | Termination of patent right due to non-payment of annual fee |