CN212204929U - Green building ventilation structure - Google Patents

Green building ventilation structure Download PDF

Info

Publication number
CN212204929U
CN212204929U CN202020602792.0U CN202020602792U CN212204929U CN 212204929 U CN212204929 U CN 212204929U CN 202020602792 U CN202020602792 U CN 202020602792U CN 212204929 U CN212204929 U CN 212204929U
Authority
CN
China
Prior art keywords
fixed
structure body
dust collection
collection box
ventilation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020602792.0U
Other languages
Chinese (zh)
Inventor
靳学亮
卢红勋
苏丹阳
吴凯
张磊
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Lianhe Chuangyi Architectural Design Co ltd
Original Assignee
Henan Lianhe Chuangyi Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Lianhe Chuangyi Architectural Design Co ltd filed Critical Henan Lianhe Chuangyi Architectural Design Co ltd
Priority to CN202020602792.0U priority Critical patent/CN212204929U/en
Application granted granted Critical
Publication of CN212204929U publication Critical patent/CN212204929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a green building ventilation structure, including structure main part, fixed plate, filter screen, push pedal and dust collection box, the inside one side of structure main part is fixed with the fixed plate, and the equidistant fresh air inlet has all been seted up on the surface of fixed plate, the fixed plate surface mounting of fresh air inlet top has the draught fan, and the fixed plate fixed surface of draught fan below has the baffle, the fixed plate surface mounting of baffle below has the warning piece, the inside dust collection box that is provided with of structure main part of fixed plate one side, and the inside adjusting screw that all articulates of structure main part above the dust collection box, the inside adjusting screw surface threaded connection of structure main part has the push pedal, and the structure main part fixed surface of push pedal one side has the filter screen. The utility model discloses not only improve the quality of ventilation structure during operation air, improved the cleanliness on ventilation structure during operation filter screen surface, avoided ventilation structure during operation moreover to take place the extravagant phenomenon of energy.

Description

Green building ventilation structure
Technical Field
The utility model relates to a green building technical field specifically is a green building ventilation structure.
Background
The ventilation of the green building is to introduce outdoor fresh air into the room to replace indoor dirty air and circulate indoor air, so that the indoor living comfort level is improved, and the ventilation of the green building is generally completed by a ventilation structure.
The ventilation structure on the market is various and can basically meet the use requirements of people, but certain problems still exist, and the specific problems include the following points:
1. the traditional ventilation structure is generally rarely provided with a filtering function when in use, so that the quality of air is reduced when the ventilation structure works;
2. when the traditional ventilation structure is used, dust is rarely cleaned and collected, so that the cleanliness of the surface of the filter screen is reduced when the ventilation structure works;
3. the general fan of this kind of traditional ventilation structure need work always when using to lead to ventilation structure during operation to take place the extravagant phenomenon of energy easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green building ventilation structure to the quality of the ventilation structure during operation air that proposes among the solution above-mentioned background art is poor, the cleanliness on filter screen surface is low, and takes place the extravagant phenomenon problem of energy.
In order to achieve the above object, the utility model provides a following technical scheme: a green building ventilation structure comprises a structure body, a fixing plate, a filter screen, a push plate and a dust collection box, wherein the fixing plate is fixed on one side of the interior of the structure body, air inlet holes with equal intervals are formed in the surface of the fixing plate, an induced draft fan is installed on the surface of the fixing plate above the air inlet holes, a baffle is fixed on the surface of the fixing plate below the induced draft fan, the surface of one end of the baffle is fixedly connected with the inner wall of the structure body, an alarm block is installed on the surface of the fixing plate below the baffle, the dust collection box is arranged inside the structure body on one side of the fixing plate, an adjusting screw rod is hinged inside the structure body above the dust collection box, the surface of one end of the adjusting screw rod extends into the interior of the structure body and is wound with an auxiliary belt, the surface of the adjusting screw rod, and the surface of filter screen and the surface of fresh air inlet are closely laminated, the surface mounting of main structure body has control panel, and the output of the inside singlechip of control panel respectively with the input electric connection of draught fan and warning piece.
Preferably, the inside both sides of main structure body have all seted up the spout, and the inside of spout is provided with the regulating plate, the adjustment tank has all been seted up on the surface of regulating plate.
Preferably, an adsorption layer is arranged inside the structure body on one side of the adjusting groove, rollers are mounted on two sides of the surface of the adsorption layer, and the rollers are located inside the adjusting groove.
Preferably, the two sides of the surface of the dust collection box are hinged with hinged pieces, an extension spring is fixed on the surface of one side of the hinged pieces, and the surface of one end of the extension spring is fixedly connected with the surface of the dust collection box.
Preferably, the surface of the hinged sheet on one side of the extension spring is hinged with a clamping strip, a clamping frame is fixed on the surface of the structure body above the clamping strip, and the clamping frame and the clamping strip are mutually clamped and matched.
Preferably, the fixed plate fixed surface of warning piece below has the slide, and the fixed surface of slide bottom and structure main part be connected, the surface of slide is provided with the arc type piece, and the fixed surface of arc type piece one side has adjusting spring to the fixed surface of adjusting spring one end is connected with structure main part's fixed surface.
Compared with the prior art, the beneficial effects of the utility model are that: the green building ventilation structure not only improves the quality of air when the ventilation structure works and improves the cleanliness of the surface of the filter screen when the ventilation structure works, but also avoids the energy waste phenomenon when the ventilation structure works;
1. the draught fan is controlled to work by arranging the filter screen, the adsorption layer, the adjusting plate and the adjusting groove, so that the draught fan sucks wind into the structure main body, large-particle impurities are filtered out under the action of the filter screen, then the wind is filtered again under the action of the adsorption layer and goes out from between the adjusting plates, meanwhile, under the pushing of wind power, the adsorption layer moves, the adjusting plate is pushed to move under the action of the adjusting groove and the sliding groove, the filtering function of the ventilation structure is realized, and the quality of the air during the work of the ventilation structure is improved;
2. the dust collection box is provided with the adjusting screw rod, the push plate, the dust collection box and the clamping strip, the adjusting screw rod is rotated to drive the push plate to move, dust on the surface of the filter screen is pushed to the interior of the dust collection box, the clamping strip is rotated to enable the bottom end of the clamping strip to be far away from the clamping frame, then the dust collection box is pulled to enable the dust collection box to be far away from the structure main body, and the dust in the dust collection box is cleaned, so that the function of collecting the dust by the ventilation structure is realized, and the cleanliness of the surface of the filter screen is improved when;
3. through being provided with arc type piece, warning piece and slide, when natural wind power reached a definite value, blow the effect of arc type piece at the slide and move down, make its surface and the mutual contact of warning piece surface, make the warning piece send out the police dispatch newspaper, the control panel is operated again, make its control draught fan stop work, make inside natural wind gets into the main part of the structure, ventilate green building, the power regulatory function of ventilation structure has been realized, thereby the extravagant phenomenon of the energy of emergence of ventilation structure during operation has been avoided.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic side view of the cross-sectional structure of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 4 is an enlarged schematic structural diagram of the position B in fig. 2 according to the present invention.
In the figure: 1. a structural body; 2. a control panel; 3. an arc-shaped sheet; 4. clamping the strip; 5. a fixing plate; 6. an induced draft fan; 7. an auxiliary belt; 8. adjusting the screw rod; 9. an air inlet hole; 10. a baffle plate; 11. clamping a frame; 12. a hinged sheet; 13. an adjustment groove; 14. a roller; 15. a filter screen; 16. an adsorption layer; 17. an adjusting plate; 18. a chute; 19. pushing the plate; 20. a dust collecting box; 21. an extension spring; 22. an alarm block; 23. adjusting the spring; 24. a slideway.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments, and furthermore, the terms "first", "second", "third", "upper, lower, left, right", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; can be directly connected with each other, also can be indirectly connected with each other through the intermediary, based on the embodiment in the utility model, all other embodiments that ordinary skilled in the art obtained under the prerequisite of not making creative work all belong to the scope of protection of the utility model.
Referring to fig. 1-4, the present invention provides an embodiment: a green building ventilation structure comprises a structure main body 1, a fixing plate 5, a filter screen 15, a push plate 19 and a dust collection box 20, wherein the fixing plate 5 is fixed on one side inside the structure main body 1, air inlet holes 9 with equal intervals are formed in the surface of the fixing plate 5, an induced draft fan 6 is installed on the surface of the fixing plate 5 above the air inlet holes 9, the type of the induced draft fan 6 can be Y5-47, a baffle 10 is fixed on the surface of the fixing plate 5 below the induced draft fan 6, the surface of one end of the baffle 10 is fixedly connected with the inner wall of the structure main body 1, an alarm block 22 is installed on the surface of the fixing plate 5 below the baffle 10, the type of the alarm block 22 can be FU-JS001, a slide 24 is fixed on the surface of the fixing plate 5 below the alarm block 22, the surface of the bottom of the slide 24 is fixedly connected with the surface of the structure main body 1, an arc-shaped sheet, the surface of one end of the adjusting spring 23 is fixedly connected with the surface of the structure body 1 and is used for power adjustment work of the ventilation structure;
a dust collection box 20 is arranged in the structure body 1 on one side of the fixing plate 5, two sides of the surface of the dust collection box 20 are hinged with hinged pieces 12, an extension spring 21 is fixed on the surface of one side of the hinged piece 12, the surface of one end of the extension spring 21 is fixedly connected with the surface of the dust collection box 20, clamping strips 4 are hinged with the surfaces of two sides of the hinged piece 12, a clamping frame 11 is fixed on the surface of the structure body 1 above the clamping strips 4, the clamping frame 11 and the clamping strips 4 are mutually clamped and matched, an adjusting screw 8 is hinged in the structure body 1 above the dust collection box 20, the surface of one end of the adjusting screw 8 extends into the structure body 1 and is wound with an auxiliary belt 7, and a push plate 19 is connected to the surface of the adjusting screw 8 in the structure body 1 in a threaded manner and used for;
a filter screen 15 is fixed on the surface of the structure body 1 on one side of the push plate 19, the surface of the filter screen 15 is tightly attached to the surface of the air inlet 9, sliding grooves 18 are formed in the surfaces of the structure body 1 on one side of the filter screen 15, an adjusting plate 17 is arranged inside the sliding grooves 18, adjusting grooves 13 are formed in the surfaces of the adjusting plates 17, an adsorption layer 16 is arranged inside the structure body 1 on one side of the adjusting grooves 13, rollers 14 are arranged on two sides of the surface of the adsorption layer 16, and the rollers 14 are located inside the adjusting grooves 13 and used for filtering of a ventilation structure;
the surface mounting of main structure body 1 has control panel 2, and this control panel 2's model can be KTP600, and the output of the inside singlechip of control panel 2 respectively with draught fan 6 and the input electric connection of warning piece 22.
The working principle is as follows: when in use, firstly, the control panel 2 is operated to control the draught fan 6 to work, so that the draught fan sucks wind into the structure main body 1, large granular impurities are filtered under the action of the filter screen 15, then the wind is filtered again under the action of the adsorption layer 16 and goes out from the space between the adjusting plates 17, meanwhile, under the pushing of the wind power, the adsorption layer 16 moves, the adjusting plates 17 are pushed to move under the action of the adjusting grooves 13 and the sliding grooves 18, so that the distance between the adjusting plates 17 is adjusted, the filtering function of the ventilation structure is realized, the air quality during the work of the ventilation structure is improved, then the adjusting screw 8 is rotated under the action of the auxiliary belt 7, the pushing plate 19 is driven to move, dust on the surface of the filter screen 15 is pushed into the dust collection box 20, then the clamping strip 4 is rotated under the action of the hinged sheet 12, the bottom end of the clamping strip is far away from the clamping frame 11, and then the dust collection, make it keep away from main structure body 1, clear up the inside dust of dust collection box 20 again, in order to realize the function that the ventilation structure collected the dust, thereby the cleanliness on filter screen 15 surface when having improved ventilation structure work, when natural wind-force reaches a definite value, blow arc type piece 3 and move under the effect of slide 24, make its surface and alarm block 22 surface contact each other, make alarm block 22 send out the police dispatch newspaper, operate control panel 2 again, make its control draught fan 6 stop work, make natural wind get into inside main structure body 1, ventilate green building, when wind-force was too little, arc type piece 3 keeps away from alarm block 22 under the effect of adjusting spring 23, the work of draught fan 6 is controlled again, in order to realize the power regulatory function of ventilation structure, thereby the energy waste phenomenon takes place when having avoided ventilation structure work, the use work of ventilation structure is finally accomplished.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a green building ventilation structure, includes main structure body (1), fixed plate (5), filter screen (15), push pedal (19) and dust collection box (20), its characterized in that: the structure comprises a structure body (1), wherein a fixing plate (5) is fixed on one side of the inside of the structure body (1), equidistant air inlet holes (9) are formed in the surface of the fixing plate (5), an induced draft fan (6) is installed on the surface of the fixing plate (5) above the air inlet holes (9), a baffle (10) is fixed on the surface of the fixing plate (5) below the induced draft fan (6), the surface of one end of the baffle (10) is fixedly connected with the inner wall of the structure body (1), an alarm block (22) is installed on the surface of the fixing plate (5) below the baffle (10), a dust collection box (20) is arranged inside the structure body (1) on one side of the fixing plate (5), an adjusting screw rod (8) is hinged inside the structure body (1) above the dust collection box (20), and an auxiliary belt (7) is wound on the surface of one end of the adjusting screw, the utility model discloses a fan, including main structure body (1), adjusting screw (8) surface threaded connection of main structure body (1) inside has push pedal (19), and the main structure body (1) surface mounting of push pedal (19) one side has filter screen (15) to the surface of filter screen (15) closely laminates with the surface of fresh air inlet (9), the surface mounting of main structure body (1) has control panel (2), and the output of control panel (2) inside singlechip respectively with the input electric connection of draught fan (6) and alarm block (22).
2. A green building ventilation structure according to claim 1, wherein: sliding grooves (18) are formed in two sides of the interior of the structure body (1), an adjusting plate (17) is arranged inside each sliding groove (18), and adjusting grooves (13) are formed in the surface of each adjusting plate (17).
3. A green building ventilation structure according to claim 2, wherein: the structure body (1) of adjustment tank (13) one side is inside to be provided with adsorbed layer (16), and both sides on adsorbed layer (16) surface all install gyro wheel (14) to gyro wheel (14) are located the inside of adjustment tank (13).
4. A green building ventilation structure according to claim 1, wherein: the two sides of the surface of the dust collection box (20) are hinged with hinged sheets (12), an extension spring (21) is fixed on the surface of one side of the hinged sheets (12), and the surface of one end of the extension spring (21) is fixedly connected with the surface of the dust collection box (20).
5. The green building ventilation structure of claim 4, wherein: the surface of the hinged sheet (12) on one side of the extension spring (21) is hinged with a clamping strip (4), a clamping frame (11) is fixed on the surface of the structure body (1) above the clamping strip (4), and the clamping frame (11) is mutually clamped and matched with the clamping strip (4).
6. A green building ventilation structure according to claim 1, wherein: fixed plate (5) fixed surface of warning piece (22) below has slide (24), and the fixed surface of the surface of slide (24) bottom and structure main body (1) is connected, the surface of slide (24) is provided with arc type piece (3), and the fixed surface of arc type piece (3) one side has adjusting spring (23) to the fixed surface of adjusting spring (23) one end is connected with the fixed surface of structure main body (1).
CN202020602792.0U 2020-04-21 2020-04-21 Green building ventilation structure Active CN212204929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020602792.0U CN212204929U (en) 2020-04-21 2020-04-21 Green building ventilation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020602792.0U CN212204929U (en) 2020-04-21 2020-04-21 Green building ventilation structure

Publications (1)

Publication Number Publication Date
CN212204929U true CN212204929U (en) 2020-12-22

Family

ID=73833938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020602792.0U Active CN212204929U (en) 2020-04-21 2020-04-21 Green building ventilation structure

Country Status (1)

Country Link
CN (1) CN212204929U (en)

Similar Documents

Publication Publication Date Title
CN103353153B (en) Conversion type air purifier
CN212204929U (en) Green building ventilation structure
CN105107308A (en) Intelligent dust removing device with self-cleaning function
CN113601599A (en) Personnel file management binding means based on intelligent control
CN112728688A (en) Intelligent building ventilation equipment
CN219106840U (en) Outdoor low-voltage distribution box with double-sided advertisement structure
CN105148637A (en) Indoor air control system
CN217876270U (en) A ventilation unit that is used for building site place to purify has green dustproof mechanism
CN205014497U (en) Centralized control's indoor gaseous adjusting device
CN205007761U (en) Indoor air purification system
CN213208127U (en) Indoor ventilation device with dust filtering function
CN205007764U (en) Automatic gaseous processing apparatus of regulation formula
CN213208112U (en) Ventilation unit is used in workshop environmental protection production convenient to maintain
CN105115059A (en) Self-cleaning air purifying device
CN211019808U (en) Multi-functional grain feelings system intelligence ventilation control cabinet
CN210107645U (en) Ventilation energy-saving equipment of green building
CN205007762U (en) Ambient air purifier
CN214791659U (en) Energy-conserving ventilation structure for architectural design
CN215175705U (en) Energy-saving fresh air handling unit
CN105115044A (en) Indoor air intelligent adjustment system
CN205007763U (en) Dust remover convenient to clearance
CN220669598U (en) Suspended ceiling type air conditioning unit
CN219889701U (en) Circulation ventilation device for archives warehouse
CN217235822U (en) Air conditioner indoor unit with adjustable motor voltage
CN213066410U (en) Ventilation energy-saving device of green building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant