CN212197082U - Novel coke screening building chute - Google Patents

Novel coke screening building chute Download PDF

Info

Publication number
CN212197082U
CN212197082U CN202020978711.7U CN202020978711U CN212197082U CN 212197082 U CN212197082 U CN 212197082U CN 202020978711 U CN202020978711 U CN 202020978711U CN 212197082 U CN212197082 U CN 212197082U
Authority
CN
China
Prior art keywords
wear
resistant lining
chute
coke
chute body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020978711.7U
Other languages
Chinese (zh)
Inventor
朱应军
朱忠发
孙志明
周绪祥
褚博源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baowu Group Echeng Iron and Steel Co Ltd
Original Assignee
Baowu Group Echeng Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baowu Group Echeng Iron and Steel Co Ltd filed Critical Baowu Group Echeng Iron and Steel Co Ltd
Priority to CN202020978711.7U priority Critical patent/CN212197082U/en
Application granted granted Critical
Publication of CN212197082U publication Critical patent/CN212197082U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model relates to a novel chute for coke screening building, which comprises a chute body with an inclined arrangement, wherein two sides of the chute body are provided with guardrail coamings, the chute body is formed by sequentially obliquely splicing a plurality of wear-resistant lining plates, the joint edge of two adjacent wear-resistant lining plates adopts an alignment splicing mode, the interfaces of the two wear-resistant lining plates are kept parallel and level, and the upper edge of the wear-resistant lining plate with a low position is not higher than the lower edge of the wear-resistant lining plate with a high position; the splicing positions of two adjacent wear-resistant lining plates are connected into a whole by fastening screws, and each wear-resistant lining plate is connected with a corresponding bracket for mounting the chute body; the coke screen chamber chute ensures the operation continuity of the coke screen chamber to be effectively ensured, and the production stability of the coke oven and the blast furnace is obviously improved.

Description

Novel coke screening building chute
Technical Field
The utility model belongs to the technical field of blast furnace ironmaking auxiliary assembly technique and specifically relates to a novel sieve burnt building chute.
Background
The coke is an indispensable raw material in the production process of blast furnace iron making, mainly plays roles in framework, carbon supply, reduction, heat supply and the like, and plays a vital role in whether the blast furnace is normally produced or not. At present, single coal is reasonably distributed, mixed and crushed mainly through a coal preparation process in coke production, and then the single coal is sent to a coke oven carbonization chamber for high-temperature coking. After the coke produced by the coke oven is screened and detected, the qualified coke is sent to a blast furnace to be used as a raw material for production.
Before being conveyed to an iron-making process, coke needs to be screened and classified through a coke screening building so as to meet the requirement of the grain size of blast furnace production. The screened coke needs to enter a coke storage bin through a chute so as to realize the production continuity of the coke oven and the blast furnace. However, the conventional coke chute of the conventional design is in a mode of external steel plates and internal ceramic tiles, and coke passes through the bar screen and then impacts the ceramic tiles in the chute to enter the coke bin. Because the coke has high hardness and large impact force, the lining ceramic tiles are broken and fall off frequently, the chute is blocked frequently, the treatment time is 30min for short time and 60min for long time, the production is interrupted frequently, and the production plan is difficult to meet.
Meanwhile, after the chute is blocked, the problem that the water content fluctuation of the dry quenching is large, the stability of the operation of the blast furnace is seriously influenced and the production of molten iron and a subsequent procedure is extremely disadvantageously restricted must be solved by adopting a water flushing mode.
Disclosure of Invention
The utility model aims at providing a novel sieve burnt building chute to above-mentioned condition, this sieve burnt building chute's use makes the operation continuity of sieve burnt building obtain effective assurance, and coke oven and blast furnace production stability are showing and are improving.
The utility model has the following concrete scheme: a novel chute for a coke screening building is provided with a chute body which is obliquely arranged, guardrail coamings are arranged on two sides of the chute body, the chute body is formed by sequentially obliquely splicing a plurality of wear-resistant lining plates, the joint edges of two adjacent wear-resistant lining plates are spliced in an aligning and splicing mode, the interfaces of the two wear-resistant lining plates are kept parallel and level, and the upper edge of the wear-resistant lining plate with a low position is not higher than the lower edge of the wear-resistant lining plate with a high position; the splicing positions of two adjacent wear-resistant lining plates are connected into a whole by fastening screws, and each wear-resistant lining plate is connected with a corresponding bracket for mounting the chute body.
Further, the utility model discloses in correspond each fastening screw and all be equipped with the screw backplate that an oblique downward set up on wear-resisting welt, the screw backplate is close to the installation of guardrail bounding wall to the screw backplate on both sides all is the splayed and arranges.
Further, in the utility model discloses in wear-resisting welt adopts wear-resisting steel sheet preparation to form.
The utility model discloses a method that the wear-resisting welt that adopts novel wear-resisting steel sheet preparation replaces conventional ceramic tile as sieve coke building chute welt is showing the fault rate and the breakage rate that have reduced the chute, has stabilized the moisture and the production continuity of coke, has ensured the steady operation of coke oven and blast furnace effectively.
Drawings
FIG. 1 is a schematic diagram of a chute structure of a conventional coke-screening floor;
fig. 2 is a schematic view of the top view structure of the present invention;
fig. 3 is a schematic side view of the structure of the present invention;
fig. 4 is a schematic view of the present invention.
In the figure: the device comprises a ceramic tile lining plate 1, a guardrail surrounding plate 2, a fastening screw 3, a screw protecting plate 4, a wear-resistant lining plate 5, a coke bin 6, a chute body 7 and a bar screen 8.
Detailed Description
Referring to fig. 2-4, the utility model relates to a novel coke screening floor chute, which is provided with a chute body 7 arranged obliquely, wherein the two sides of the chute body are provided with guardrail coamings 2, the chute body is formed by sequentially obliquely splicing a plurality of wear-resistant lining plates 5, the joint edges of two adjacent wear-resistant lining plates adopt an alignment splicing mode, the interfaces of the two wear-resistant lining plates are kept parallel and level, and the upper edge of the wear-resistant lining plate with a low position is not higher than the lower edge of the wear-resistant lining plate with a high position; the splicing positions of two adjacent wear-resistant lining plates are connected into a whole by fastening screws 3, and each wear-resistant lining plate is connected with a corresponding bracket for mounting the chute body.
Further, correspond each fastening screw in this embodiment and all be equipped with a screw backplate 4 that sets up to one side down on wear-resisting welt, the screw backplate is close to the installation of guardrail bounding wall to the screw backplate on both sides all is the splayed arrangement of falling.
The design of screw backplate under the prerequisite that does not influence the coke and descend, has protected screw or bolt that are used for the fastening and has avoided the coke to strike the condition that appears becoming flexible or damaging for wear-resisting welt is fixed more firmly, uses more lastingly.
Further, in this embodiment both wear-resisting welt and guardrail bounding wall all adopt wear-resisting steel sheet preparation to form, increase its life cycle.
The utility model discloses an installation preparation as follows:
1. measuring the size of the required chute, and manufacturing an outer bin plate outside the chute by using a common steel plate;
2. according to the coke passing area, preparing a fastening screw and a fastening bolt for standby for a wear-resistant lining plate at the bottom of the chute and guardrail enclosing plates at two sides;
3. manufacturing a wear-resistant steel plate into wear-resistant lining plates of 400 multiplied by 15mm, and opening holes at four corners of each wear-resistant lining plate according to the mounting and welding size of the wear-resistant lining plates so as to facilitate mounting;
4. the wear-resistant lining plates are sequentially arranged at the bottom of the chute and the middle of the guardrail enclosure plate, two adjacent wear-resistant lining plates are spliced in an aligned mode, the gap at the junction is ensured to be controllable, the upper edge of the wear-resistant lining plate with the lower position is not higher than the lower edge of the wear-resistant lining plate with the higher position, and each wear-resistant lining plate is fixed on the guardrail at the periphery through screws so as to ensure that the wear-resistant lining plates fall off due to coke impact;
5. during maintenance, the original chute with lining bricks are disassembled and hoisted to the ground;
6. the two ends of the chute body of the utility model are respectively connected with the outlet of the bar screen 8 and the inlet of the coke bin 6 through flanges;
7. according to the operation condition of the bar screen, the inclination angle of the chute body is adjusted in time, and the coke is ensured to descend smoothly.
Through changing the utility model discloses back behind the chute, the continuity of sieve coke building operation has effectively been guaranteed, and coke oven and blast furnace production stability are showing and are improving. The coke screening building operates to the present after the factory is reformed, and the coke blockage situation does not occur in the normal operation of the coke screening building.
In the use, if the damage of individual wear-resistant lining plate needs to be replaced, the damaged lining plate only needs to be detached and replaced independently, and the wear-resistant lining plate is very convenient to use.
The lining plates with large blocks and high wear resistance are adopted for replacement in the embodiment, the damage rate caused by coke impact is guaranteed while the number of the lining plates is reduced, and the lining plates are made of wear-resistant materials, so that the service life is prolonged correspondingly, and the replacement and maintenance time is shortened.
The utility model discloses a method that the wear-resisting welt that adopts novel wear-resisting steel sheet preparation replaces conventional ceramic tile as sieve coke building chute welt is showing the fault rate and the breakage rate that have reduced the chute, has stabilized the moisture and the production continuity of coke, has ensured the steady operation of coke oven and blast furnace effectively.

Claims (3)

1. The utility model provides a novel sieve burnt building chute, has the chute body that the slope set up, and the guardrail bounding wall, its characterized in that are equipped with to the both sides of chute body: the chute body is formed by sequentially obliquely splicing a plurality of wear-resistant lining plates, the joint edges of two adjacent wear-resistant lining plates are spliced in an aligning manner, the interfaces of the two wear-resistant lining plates are kept flush, and the upper edge of the wear-resistant lining plate with the lower position is not higher than the lower edge of the wear-resistant lining plate with the higher position; the splicing positions of two adjacent wear-resistant lining plates are connected into a whole by fastening screws, and each wear-resistant lining plate is connected with a corresponding bracket for mounting the chute body.
2. The novel sieve coke floor chute of claim 1 wherein: correspond each fastening screw and all be equipped with the screw backplate that an oblique downward set up on wear-resisting welt, the screw backplate is close to the installation of guardrail bounding wall to the screw backplate on both sides all is the splayed and arranges.
3. The novel sieve coke floor chute of claim 1 wherein: the wear-resistant lining plate is made of wear-resistant steel plates.
CN202020978711.7U 2020-06-02 2020-06-02 Novel coke screening building chute Active CN212197082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020978711.7U CN212197082U (en) 2020-06-02 2020-06-02 Novel coke screening building chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020978711.7U CN212197082U (en) 2020-06-02 2020-06-02 Novel coke screening building chute

Publications (1)

Publication Number Publication Date
CN212197082U true CN212197082U (en) 2020-12-22

Family

ID=73813521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020978711.7U Active CN212197082U (en) 2020-06-02 2020-06-02 Novel coke screening building chute

Country Status (1)

Country Link
CN (1) CN212197082U (en)

Similar Documents

Publication Publication Date Title
KR101189999B1 (en) a hoper for stone disintegrator
CN212197082U (en) Novel coke screening building chute
CN201749048U (en) Combined sample preparation system
CN210151144U (en) Blast furnace distributing chute
CN206094122U (en) Cutting remove system
CN216678393U (en) Breaker is used in concrete production
CN206974189U (en) A kind of long-life tail gathering sill of sintering machine
CN211801108U (en) Limestone crushing device
CN210943406U (en) Energy-saving and noise-reducing chute of sand and stone processing system
CN209759375U (en) Coke discharging chute wear-resisting device of coking dry quenching furnace
CN107233987A (en) Solid state fermentation device is used in one kind mining
CN219057253U (en) Replaceable blanking hopper blocking adjusting device
CN106833685A (en) A kind of coke dry quenching furnace bracket structure
CN208990961U (en) Sieving approach system switched arrangement device
CN216710521U (en) Step type blanking opening bucket elevator
CN201643866U (en) Blast furnace slag and water separating equipment
CN201140082Y (en) Backstroke frame of backstroke crusher
CN217154819U (en) Material raising reinforcing structure based on coal grinding process
CN218950148U (en) Coke chute under vibrating screen
CN217837179U (en) Dry quenching vibrating feeder
CN219296362U (en) Bucket elevator with adjustable bottom plate
CN111394134A (en) Novel gasifier slag discharging device
CN110791297A (en) Put out stove inclined way bracket structure futilely
CN218763368U (en) Coal feeding anti-abrasion device for return leg of circulating fluidized bed boiler
CN214076961U (en) Sandstone hammer crusher

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant