CN212193868U - Jig for machining die parts - Google Patents

Jig for machining die parts Download PDF

Info

Publication number
CN212193868U
CN212193868U CN202020733425.4U CN202020733425U CN212193868U CN 212193868 U CN212193868 U CN 212193868U CN 202020733425 U CN202020733425 U CN 202020733425U CN 212193868 U CN212193868 U CN 212193868U
Authority
CN
China
Prior art keywords
die
die holder
well
holder
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020733425.4U
Other languages
Chinese (zh)
Inventor
金辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang Saiwangda Precision Electronics Co ltd
Original Assignee
Wujiang Saiwangda Precision Electronics Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang Saiwangda Precision Electronics Co ltd filed Critical Wujiang Saiwangda Precision Electronics Co ltd
Priority to CN202020733425.4U priority Critical patent/CN212193868U/en
Application granted granted Critical
Publication of CN212193868U publication Critical patent/CN212193868U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a mould is tool for parts machining, including die holder, upper die base and well die holder, well die holder card is established on the die holder, the upper die base card is established on well die holder, well die holder comprises first half-die and second half-die, the shaping groove has been seted up to first half-die and second half-die inside, and the shaping inslot side has seted up middle part bead groove, first constant head tank has all been seted up to both sides about first half-die and the second half-die, die holder upside mid-mounting has the lug, the lower locating piece is installed to the die holder upside, the upper locating piece is installed to the upper die base downside, the utility model discloses a well die holder that is equipped with, well die holder insert by first half-die and second half-die and establish the butt joint and constitute, are convenient for unload the mould and handle to be convenient for take out fashioned mould, can improve the die holder through constant head tank and locating, The accuracy of the positioning of the upper die holder and the middle die holder.

Description

Jig for machining die parts
Technical Field
The utility model relates to a mould processing technology field specifically is a tool is used in mould parts machining.
Background
The jig is a tool for carpenters, ironmen, pincers, machines, electrical controls and other handicrafts, and is mainly used as a tool for assisting in controlling position or action (or both). Molds have been widely used in industrial age, including mechanical jigs, woodworking jigs, welding jigs, jewelry jigs, and other fields. Some types of jigs, also known as "molds" or "aids", are primarily intended to repeat reproduction of a part repeatedly and accurately. An obvious example is that when duplicating keys, the original key is usually fixed to a fixture so that the machine can duplicate a new key by guidance from the appearance of the original key.
The existing jig for processing the die parts wastes time and labor during die unloading, so that the efficiency of die production forming is influenced, and the positioning stability between the jigs is poor, so that the quality of die forming is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mould is tool for parts machining to solve current mould is tool for parts machining, the mould unloading is wasted time and energy, thereby influences the fashioned efficiency of mould production, and positional stability is relatively poor between the tool moreover, thereby influences the fashioned quality problem of mould.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a mould is tool for parts machining, includes die holder, upper die base and well die holder, well die holder card is established on the die holder, the upper die base card is established on well die holder, well die holder comprises first half-die and second half-die, the shaping groove has been seted up to first half-die and second half-die inside, and the shaping inslot side has seted up middle part gib muscle groove, first locating groove has all been seted up to both sides about first half-die and the second half-die, die holder upside mid-mounting has the lug, the lower locating piece is installed to the die holder upside, the locating piece is installed to the upper die base downside.
Furthermore, the lower positioning block and the upper positioning block are arranged in a rectangular frame shape, and the first positioning grooves of the first half module and the second half module are matched and clamped with the lower positioning block and the upper positioning block.
Furthermore, a second positioning groove is installed at one end of the first half die, and an end positioning block is installed at one end of the second half die.
Furthermore, one end of the first half die is provided with a positioning hole, and one end of the second half die is provided with a positioning insertion rod which is matched with and inserted into the positioning hole.
Further, the first mold half and the second mold half are arranged into a square frame.
Furthermore, a pouring gate is formed in the upper side of one end of the upper die base, and the sum of the length and the width of the first half die and the second half die is the same as the length and the width of the lower die base and the upper die base.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a well die holder that is equipped with, well die holder is inserted by first half module and second half module and is established the butt joint and constitute, is convenient for unload the mould and handle to be convenient for take out fashioned mould.
2. The utility model discloses because the location is established through the card between first constant head tank, lower locating piece and the last locating piece between die holder, upper die base and the die holder, can improve the accuracy of die holder, upper die base and die holder location, be favorable to improving the production quality of mould.
3. The utility model discloses and install the second constant head tank through first half mould one end, the tip locating piece is installed to second half mould one end, and the locating hole has been seted up to first half mould one end, and second half mould one end is provided with and inserts the location inserted bar of establishing with the locating hole cooperation, is convenient for peg graft fixedly to first half mould and second half mould one end for easy dismounting is swift.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic diagram of the explosion structure of the present invention;
fig. 3 is a schematic structural view of a first half mold of the present invention;
fig. 4 is a schematic structural diagram of a second mold half according to the present invention.
In the figure: 1. a lower die holder; 2. an upper die holder; 3. a first mold half; 4. a second mold half; 5. a bump; 6. a lower positioning block; 7. an upper positioning block; 8. an end positioning block; 9. positioning the inserted rod; 10. a pouring gate; 11. a first positioning groove; 12. a middle bead groove; 13. a second positioning groove; 14. and (7) positioning the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, in an embodiment of the present invention, a jig for processing a mold part includes a lower die base 1, an upper die base 2 and a middle die base, the middle die base is clamped on the lower die base 1, the upper die base 2 is clamped on the middle die base, the middle die base is composed of a first half die 3 and a second half die 4, the middle die base is conveniently disassembled from the middle portion to both sides, forming grooves are formed in the first half die 3 and the second half die 4, a middle convex rib groove 12 is formed in the inner sides of the forming grooves, first positioning grooves 11 are formed in both the upper and lower sides of the first half die 3 and the second half die 4, a bump 5 is installed in the middle portion of the upper side of the lower die base 1, a lower positioning block 6 is installed on the upper side of the lower die base 2, an upper positioning block 7 is installed between the lower die base 1, the upper die base 2 and the middle die base through the first positioning, the positioning accuracy of the lower die holder 1, the upper die holder 2 and the middle die holder can be improved, and the production quality of the die is improved.
Preferably, the lower positioning block 6 and the upper positioning block 7 are arranged in a rectangular frame shape, and the first positioning grooves 11 of the first half mold 3 and the second half mold 4 are matched and clamped with the lower positioning block 6 and the upper positioning block 7, so that the first half mold 3 and the second half mold 4 can be conveniently disassembled and assembled with the lower mold base 1 and the upper mold base 2 for use.
Preferably, a second positioning groove 13 is installed at one end of the first half die 3, and an end positioning block 8 is installed at one end of the second half die 4, so that the first half die 3 and one end of the second half die 4 can be conveniently inserted and fixed, and the assembly and disassembly are convenient and rapid.
Preferably, one end of the first half die 3 is provided with a positioning hole 14, and one end of the second half die 4 is provided with a positioning insertion rod 9 which is matched with the positioning hole 14 and inserted, so that the first half die 3 and one end of the second half die 4 can be conveniently inserted and fixed, and the disassembly and assembly are convenient and rapid.
Preferably, the first half die 3 and the second half die 4 are arranged into a square frame body, so that the middle die holder can be conveniently disassembled from the middle part to two sides for use.
Preferably, the upper side of one end of the upper die holder 2 is provided with a pouring gate 10, and the sum of the length and the width of the first half die 3 and the second half die 4 is the same as the length and the width of the lower die holder 1 and the upper die holder 2.
The utility model discloses a theory of operation and use flow: the die holder 1, the upper die base 2 and the middle die base are positioned through the first positioning groove 11, the lower positioning block 6 and the upper positioning block 7 in a clamping mode, the accuracy of positioning of the die holder 1, the upper die base 2 and the middle die base can be improved, the production quality of the die is improved, the middle die base is formed by inserting the first half die 3 and the second half die 4 into a butt joint mode, the die unloading processing is facilitated, and therefore the formed die can be taken out conveniently.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a tool is used in mould parts machining, includes die holder (1), upper die base (2) and well die holder, its characterized in that: well die holder card is established on die holder (1), upper die base (2) card is established on well die holder, well die holder comprises first half module (3) and second half module (4), first half module (3) and second half module (4) are inside to have seted up the shaping groove, and the shaping inslot inboard has seted up middle part bead groove (12), first locating slot (11) have all been seted up to both sides about first half module (3) and second half module (4), die holder (1) upside mid-mounting has lug (5), lower locating piece (6) are installed to die holder (1) upside, upper locating piece (7) are installed to upper die base (2) downside.
2. The jig for processing a mold part according to claim 1, characterized in that: the lower positioning block (6) and the upper positioning block (7) are arranged in a rectangular frame shape, and the first positioning grooves (11) of the first half die (3) and the second half die (4) are matched and clamped with the lower positioning block (6) and the upper positioning block (7).
3. The jig for processing a mold part according to claim 1, characterized in that: a second positioning groove (13) is installed at one end of the first half die (3), and an end positioning block (8) is installed at one end of the second half die (4).
4. The jig for processing a mold part according to claim 1, characterized in that: one end of the first half die (3) is provided with a positioning hole (14), and one end of the second half die (4) is provided with a positioning insertion rod (9) which is matched with and inserted into the positioning hole (14).
5. The jig for processing a mold part according to claim 1, characterized in that: the first half mould (3) and the second half mould (4) are arranged into a square frame body.
6. The jig for processing a mold part according to claim 1, characterized in that: a pouring gate (10) is formed in the upper side of one end of the upper die base (2), and the sum of the length and the width of the first half die (3) and the second half die (4) is the same as the length and the width of the lower die base (1) and the length and the width of the upper die base (2).
CN202020733425.4U 2020-05-07 2020-05-07 Jig for machining die parts Expired - Fee Related CN212193868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020733425.4U CN212193868U (en) 2020-05-07 2020-05-07 Jig for machining die parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020733425.4U CN212193868U (en) 2020-05-07 2020-05-07 Jig for machining die parts

Publications (1)

Publication Number Publication Date
CN212193868U true CN212193868U (en) 2020-12-22

Family

ID=73830905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020733425.4U Expired - Fee Related CN212193868U (en) 2020-05-07 2020-05-07 Jig for machining die parts

Country Status (1)

Country Link
CN (1) CN212193868U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112829357A (en) * 2021-01-05 2021-05-25 日照中意华坤金属制造有限公司 Hydraulic forming machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112829357A (en) * 2021-01-05 2021-05-25 日照中意华坤金属制造有限公司 Hydraulic forming machine

Similar Documents

Publication Publication Date Title
CN212193868U (en) Jig for machining die parts
CN210877567U (en) Machine tool for turning outer circle
CN112123285B (en) Welding cutter and manufacturing method thereof
CN2209585Y (en) Perforating locator for jade buttons
CN218452719U (en) Laser welding positioning device
CN206435876U (en) Stamping parts locating support
CN216501944U (en) Power casing surface nondestructive processing mould
CN218311592U (en) Quick jig changing device
CN215787714U (en) Traction rod support assembly welding tool
CN219521349U (en) Movable platen processing jig
CN215200841U (en) Novel brill is attacked quick-witted saddle processing gemini tool
CN218693058U (en) Outer tube symmetry cut-out press
CN215880000U (en) Graphite hole vertical drilling tool
CN213969160U (en) High-precision tool for drilling reaction rod support and connecting shaft assembly
CN211052624U (en) Side hole machining jig
CN217373193U (en) Mold frame accurate in positioning
CN220240106U (en) T pole product perforating device
CN210255270U (en) Quick interchange processing template for processing mobile phone card holder
CN210280781U (en) Drill jig special for split pump bearing block
CN211840570U (en) Resistance welding needle changing jig
CN206702694U (en) Swollen location structure in one kind
CN217412579U (en) Medium support part machining device
CN215034896U (en) High-stability pneumatic welding fixture
CN207771351U (en) A kind of drill jig to drill on special-shaped outline workpiece
CN220387590U (en) Seat reinforcing plate stamping die with continuous stamping function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201222