CN212178073U - Support frame for pipeline installation - Google Patents

Support frame for pipeline installation Download PDF

Info

Publication number
CN212178073U
CN212178073U CN202020838088.5U CN202020838088U CN212178073U CN 212178073 U CN212178073 U CN 212178073U CN 202020838088 U CN202020838088 U CN 202020838088U CN 212178073 U CN212178073 U CN 212178073U
Authority
CN
China
Prior art keywords
supporting
fixedly connected
shaped
arc
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020838088.5U
Other languages
Chinese (zh)
Inventor
尚延高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Beiteng Chemical Equipment Co ltd
Original Assignee
Changchun Beiteng Chemical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Beiteng Chemical Equipment Co ltd filed Critical Changchun Beiteng Chemical Equipment Co ltd
Priority to CN202020838088.5U priority Critical patent/CN212178073U/en
Application granted granted Critical
Publication of CN212178073U publication Critical patent/CN212178073U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a support frame for pipeline installation, including the supporting shoe, be equipped with the cavity in the supporting shoe, the right side inner wall of cavity is improved level and is rotated and run through and be equipped with adjustment mechanism, be equipped with the bar opening on the top surface of cavity, adjustment mechanism runs through the bar opening setting, the one end that adjustment mechanism is located the cavity outside is equipped with fixture. The utility model discloses a twist and move the gag lever post and make it rotate the carousel and drive two-way threaded rod and rotate with the thread groove after-separating, make two movable block relative movement of two-way threaded rod drive, and adjust the relative distance of two arc grip blocks, be convenient for according to pipeline size adjustment clamping position, make its and draw-in groove separation through two T type pieces of pulling, the pulling connecting rod drives two spinal branch vaulting poles and goes up and down in circular sleeve, make two T type pieces of second spring drive insert respectively and locate corresponding draw-in groove in, effectively fix the bracing piece in circular sleeve, be convenient for adjust bearing height according to actual need.

Description

Support frame for pipeline installation
Technical Field
The utility model relates to a pipeline installation equipment technical field especially relates to a support frame for pipeline installation.
Background
The pipeline is a fluid device which is connected by pipes, pipe connectors, valves and the like and used for conveying gas, liquid or fluid with solid particles, has wide application range, is mainly used for water supply, drainage, heat supply and the like, is installed by pipes, pipe fittings, flanges and other pipelines, and needs to be supported by a support when being connected.
When the existing pipeline mounting support frame is used in practice, the clamping position of the existing pipeline mounting support frame is not convenient to adjust according to the size of a pipeline, the supporting height of the existing pipeline mounting support frame is not convenient to adjust according to actual needs, and the existing pipeline mounting support frame is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a support frame for pipeline installation for solve among the background art current pipeline installation support frame when in-service use, it is not convenient for adjust clamping position according to the pipeline size, and is not convenient for adjust the technical problem of support height according to actual need.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a support frame for pipeline installation, includes the supporting shoe, be equipped with the cavity in the supporting shoe, the right side inner wall of cavity is improved level and is rotated and run through and be equipped with adjustment mechanism, be equipped with the bar opening on the top surface of cavity, adjustment mechanism runs through the bar opening setting, the one end that adjustment mechanism is located the cavity outside is equipped with fixture, the lower extreme that the supporting shoe is close to the left and right sides all is equipped with supporting mechanism.
Preferably, the adjusting mechanism comprises a bidirectional threaded rod which horizontally rotates and penetrates through the inner wall of the right side of the chamber, the left end of the bidirectional threaded rod is rotationally connected with the inner wall of the left side of the cavity, two moving blocks are sleeved on one end of the bidirectional threaded rod in the cavity in a threaded manner, the upper ends of the two moving blocks are arranged through the strip-shaped opening, the clamping mechanism is arranged at the upper ends of the two moving blocks, the end of the bidirectional threaded rod outside the cavity is fixedly connected with a rotary table, a limiting rod is horizontally and rotatably arranged on the rotary table in a penetrating way, two rotary rods are fixedly connected on the annular side wall of the limiting rod close to the right side, the annular side wall of the limiting rod close to the left side is provided with external threads, the side wall of the right end of the supporting block close to the upper end is provided with a thread groove, the external thread is in threaded connection with the thread groove, and the limiting rod is positioned between the supporting block and the rotary table, and one end of the limiting rod is fixedly sleeved with an annular limiting block.
Preferably, the bottom of the cavity is provided with a sliding chute, the sliding chute is internally and slidably connected with two sliding blocks matched with the sliding chute, the upper ends of the two sliding blocks are respectively and fixedly connected with the lower ends of the two moving blocks, and the sliding chute and the strip-shaped opening are arranged in equal length.
Preferably, the clamping mechanism comprises an arc-shaped fixed plate and an arc-shaped limiting block, the arc-shaped fixed plate is fixedly connected to the upper ends of the two moving blocks respectively, the arc-shaped limiting block is fixedly connected to the upper end of the supporting block and is arranged close to the inner wall of the rear side of the strip-shaped opening, the two arc-shaped fixed plates are fixedly connected to the inner wall of the arc-shaped fixed plate, and the first springs are arranged on the same side of the arc-shaped fixed plate and are far away from the.
Preferably, the arc-shaped clamping plate is made of rubber.
Preferably, the supporting mechanism comprises supporting rods which are fixedly connected to the supporting blocks and are close to the lower ends of the left side and the right side respectively, the same connecting rod is fixedly connected between the two supporting rods, circular sleeves are arranged below the two supporting rods, circular plates are fixedly connected to the lower ends of the two circular sleeves, the two supporting rods are respectively inserted into the two circular sleeves, T-shaped blocks penetrate through the annular inner wall of the upper end of the two circular sleeves, a plurality of clamping grooves which are distributed in equal intervals are formed in the annular side wall of the two supporting rods, two second springs are fixedly connected between the T-shaped blocks and the annular side wall of the circular sleeve, and one ends of the two T-shaped blocks, which are located in the circular sleeves, are respectively inserted into the two clamping grooves.
Compared with the prior art, the utility model, its beneficial effect does:
1. the limiting rod is screwed to be separated from the thread groove, then the rotary table is rotated to drive the bidirectional threaded rod to rotate, the bidirectional threaded rod drives the two movable blocks to move relatively, the relative distance between the two arc-shaped clamping plates is adjusted, and the clamping position is convenient to adjust according to the size of the pipeline.
2. Make its and draw-in groove separation through pulling two T type pieces, the pulling connecting rod drives two spinal branch vaulting poles and goes up and down in circular sleeve for the second spring drives two T type pieces and inserts respectively and locates corresponding the draw-in groove, effectively fixes the bracing piece in circular sleeve, is convenient for adjust the bearing height according to actual need.
Drawings
Fig. 1 is a schematic cross-sectional view of a support frame for mounting a pipeline according to the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is an enlarged view of a portion of FIG. 1 at B;
fig. 4 is a schematic structural view of the circular sleeve and the circular plate of the support frame for pipeline installation according to the present invention.
In the figure: the device comprises a supporting block 1, a cavity 2, a strip-shaped opening 3, a bidirectional threaded rod 4, a moving block 5, a rotary table 6, a limiting rod 7, a rotating rod 8, a threaded groove 9, an annular limiting block 10, a sliding groove 11, a sliding block 12, an arc-shaped fixing plate 13, an arc-shaped limiting block 14, a first spring 15, an arc-shaped clamping plate 16, a supporting rod 17, a connecting rod 18, a circular sleeve 19, a circular plate 20, a T-shaped block 21, a clamping groove 22 and a second spring 23.
Detailed Description
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a supporting frame for pipeline installation comprises a supporting block 1, a cavity 2 is arranged in the supporting block 1, an adjusting mechanism is arranged on the right inner wall of the cavity 2 in a horizontally rotating and penetrating manner and comprises a bidirectional threaded rod 4 arranged in a horizontally rotating and penetrating manner and arranged on the right inner wall of the cavity 2, the left end of the bidirectional threaded rod 4 is connected with the left inner wall of the cavity 2 in a rotating manner, two moving blocks 5 are sleeved on one end of the bidirectional threaded rod 4 positioned in the cavity 2 in a threaded manner, the upper ends of the two moving blocks 5 are both arranged in a penetrating manner through a strip-shaped opening 3, a clamping mechanism is arranged at the upper ends of the two moving blocks 5, a turntable 6 is fixedly connected on one end of the bidirectional threaded rod 4 positioned outside the cavity 2, the turntable 6 is used for rotating the bidirectional threaded rod 4, a limiting, two swing arms 8 are convenient for rotate gag lever post 7, gag lever post 7 is equipped with the external screw thread on being close to left annular lateral wall, be equipped with thread groove 9 on the right-hand member lateral wall that supporting shoe 1 is close to the upper end, external screw thread and 9 threaded connection of thread groove on the gag lever post 7 are back effectively spacing carousel 6, and spacing two movable blocks 5, gag lever post 7 is located between supporting shoe 1 and the carousel 6 and serves to fix and cup joint annular stopper 10, annular stopper 10 can prevent that gag lever post 7 and carousel 6 from separating.
Be equipped with spout 11 on the bottom of cavity 2, sliding connection has two assorted sliders 12 with it in spout 11, the upper end of two sliders 12 respectively with the lower extreme fixed connection of two movable blocks 5, slider 12 cooperates the bar opening 3 of isometric setting when the spout 11 removes, prevents that two-way threaded rod 4 from rotating and drives two movable blocks 5 and rotate simultaneously, makes it only can drive two movable blocks 5 relative movement, spout 11 is isometric setting with bar opening 3.
Be equipped with bar opening 3 on cavity 2's the top surface, adjustment mechanism runs through the setting of bar opening 3, the one end that adjustment mechanism lies in cavity 2 outside is equipped with fixture, fixture is including respectively fixed connection in arc fixed plate 13 and the arc stopper 14 of fixed connection in supporting shoe 1 upper end of two movable blocks 5 upper ends, arc stopper 14 is close to bar opening 3's rear side inner wall setting, arc stopper 14 docks after being used for placing the pipeline, equal a plurality of first springs 15 of fixedly connected with on two arc fixed plate 13's the arc inner wall, the same one end fixedly connected with a plurality of first springs 15 keep away from arc fixed plate 13 with one arc grip block 16, arc grip block 16 is rubber products, two arc grip blocks 16 of rubber products cooperate a plurality of first springs 15 to carry out the centre gripping fixedly to the pipeline, and then effectively support the pipeline.
The lower ends of the supporting block 1 close to the left side and the right side are respectively provided with a supporting mechanism, the supporting mechanisms comprise supporting rods 17 which are respectively fixedly connected with the supporting block 1 close to the lower ends of the left side and the right side, the same connecting rod 18 is fixedly connected between the two supporting rods 17, circular sleeves 19 are respectively arranged below the two supporting rods 17, circular plates 20 are respectively fixedly connected with the lower ends of the two circular sleeves 19, the supporting frame can be conveniently placed on the ground by the circular plates 20, the two supporting rods 17 are respectively inserted into the two circular sleeves 19, T-shaped blocks 21 are respectively arranged on the annular inner walls of the two circular sleeves 19 close to the upper ends in a penetrating manner, a plurality of clamping grooves 22 which are distributed at equal intervals are respectively arranged on the annular side walls of the two supporting rods 17 in the circular sleeves 19, two second springs 23 are respectively and fixedly connected between the annular side walls of the two T-shaped blocks 21 and the circular sleeves 19, meanwhile, the connecting rod 18 is conveniently pulled to drive the supporting rod 17 to move, so that the two T-shaped blocks 21 can be inserted into the clamping grooves 22 in the corresponding positions, one ends of the two T-shaped blocks 21, which are located in the circular sleeve 19, are respectively inserted into the two clamping grooves 22, and the T-shaped blocks 21 are inserted into the clamping grooves 22 to effectively limit and fix the supporting rod 17 in the circular sleeve 19.
When the utility model is used, the pipeline to be connected is arranged on the arc-shaped limiting block 14 on the supporting block 1 for butt joint, the two rotary rods 8 are manually screwed to drive the limiting rod 7 to rotate, so that the external thread on the limiting rod 7 is separated from the thread groove 9 on the supporting block 1, then the rotary disc 6 is manually rotated to drive the bidirectional threaded rod 4 to rotate, and the two moving blocks 5 which are in threaded sleeve joint are driven by the rotating bidirectional threaded rod 4 to move relatively under the limiting action of the sliding chute 11 and the sliding block 12, so that the two moving blocks 5 drive the two arc-shaped fixed plates 13 to move relatively until the two arc-shaped clamping plates 16 respectively contact against the annular side wall of the pipeline and compress a plurality of first springs 15, the rotating rod 8 is screwed again to enable the limiting rod 7 to be in threaded connection with the threaded groove 9, the two arc-shaped clamping plates 16 are matched with the first spring 15 to clamp and fix the pipeline, so that the clamping position can be conveniently adjusted according to the size of the pipeline; when the supporting height needs to be adjusted, the second springs 23 are stretched after the two side T-shaped blocks 21 are pulled, until the two side T-shaped blocks 21 are separated from the clamping grooves 22 at the moment respectively, then the lifting connecting rod 18 drives the two supporting rods 17 to lift in the two side circular sleeves 19, when the two supporting rods 17 drive the supporting block 1 to move to the required height, the two side T-shaped blocks 21 are loosened to enable the two side second springs 23 to reset to drive the two T-shaped blocks 21 to be inserted into the two clamping grooves 22 on the corresponding positions respectively, the two supporting rods 17 are effectively fixed in the circular sleeves 19 in a limiting mode, and the supporting height can be adjusted conveniently according to actual needs.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a support frame for pipeline installation, includes supporting shoe (1), its characterized in that, be equipped with cavity (2) in supporting shoe (1), the right side inner wall of cavity (2) is improved level and is rotated and run through and be equipped with adjustment mechanism, be equipped with bar opening (3) on the top surface of cavity (2), adjustment mechanism runs through bar opening (3) and sets up, the one end that adjustment mechanism is located the cavity (2) outside is equipped with fixture, the lower extreme that supporting shoe (1) is close to the left and right sides all is equipped with supporting mechanism.
2. The supporting frame for pipeline installation according to claim 1, wherein the adjusting mechanism comprises a bidirectional threaded rod (4) which horizontally rotates and is arranged through the inner wall of the right side of the chamber (2), the left end of the bidirectional threaded rod (4) is rotatably connected with the inner wall of the left side of the chamber (2), two moving blocks (5) are sleeved on one end of the bidirectional threaded rod (4) which is positioned in the chamber (2) in a threaded manner, the upper ends of the two moving blocks (5) are arranged through the strip-shaped opening (3), the clamping mechanism is arranged at the upper ends of the two moving blocks (5), a turntable (6) is fixedly connected to one end of the bidirectional threaded rod (4) which is positioned outside the chamber (2), a limiting rod (7) is arranged on the turntable (6) in a horizontally rotating and penetrating manner, and two rotary rods (8) are fixedly connected to the annular side wall of the limiting rod (7), the limiting rod (7) is provided with an external thread on the annular side wall close to the left side, the supporting block (1) is provided with a thread groove (9) on the right end side wall close to the upper end, the external thread is in threaded connection with the thread groove (9), and the limiting rod (7) is located between the supporting block (1) and the turntable (6) and is fixedly sleeved with an annular limiting block (10).
3. The supporting frame for pipeline installation according to claim 2, wherein a sliding groove (11) is arranged at the bottom of the chamber (2), two sliding blocks (12) matched with the sliding groove (11) are connected in the sliding groove (11), the upper ends of the two sliding blocks (12) are respectively fixedly connected with the lower ends of the two moving blocks (5), and the sliding groove (11) and the strip-shaped opening (3) are arranged in equal length.
4. The supporting frame for pipeline installation according to claim 2, wherein the clamping mechanism comprises an arc-shaped fixing plate (13) fixedly connected to the upper ends of the two moving blocks (5) and an arc-shaped limiting block (14) fixedly connected to the upper end of the supporting block (1), the arc-shaped limiting block (14) is arranged close to the inner wall of the rear side of the strip-shaped opening (3), the inner walls of the two arc-shaped fixing plates (13) are fixedly connected with a plurality of first springs (15), and one end of each of the first springs (15) on the same side, which is far away from the arc-shaped fixing plate (13), is fixedly connected with the same arc-shaped clamping plate (16).
5. A support bracket for mounting a pipe according to claim 4, wherein said arc-shaped holding plate (16) is made of rubber.
6. The supporting rack for pipeline installation according to claim 1, wherein the supporting mechanism comprises supporting rods (17) fixedly connected to the supporting block (1) near the lower ends of the left and right sides, the same connecting rod (18) is fixedly connected between the two supporting rods (17), a circular sleeve (19) is arranged below the two supporting rods (17), a circular plate (20) is fixedly connected to the lower ends of the two circular sleeves (19), the two supporting rods (17) are respectively inserted into the two circular sleeves (19), T-shaped blocks (21) are arranged on the annular inner wall of the two circular sleeves (19) near the upper end in a penetrating manner, a plurality of clamping grooves (22) distributed at equal intervals are arranged on the annular side wall of the two supporting rods (17) in the circular sleeve (19), and two second springs (23) are fixedly connected between the two T-shaped blocks (21) and the annular side wall of the circular sleeve (19), one ends of the two T-shaped blocks (21) positioned in the circular sleeve (19) are respectively inserted into two of the clamping grooves (22).
CN202020838088.5U 2020-05-19 2020-05-19 Support frame for pipeline installation Active CN212178073U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020838088.5U CN212178073U (en) 2020-05-19 2020-05-19 Support frame for pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020838088.5U CN212178073U (en) 2020-05-19 2020-05-19 Support frame for pipeline installation

Publications (1)

Publication Number Publication Date
CN212178073U true CN212178073U (en) 2020-12-18

Family

ID=73776321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020838088.5U Active CN212178073U (en) 2020-05-19 2020-05-19 Support frame for pipeline installation

Country Status (1)

Country Link
CN (1) CN212178073U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112851244A (en) * 2021-01-26 2021-05-28 江西龙正科技发展有限公司 Novel ultra-high performance concrete UHPC water pipe
CN113124234A (en) * 2021-04-25 2021-07-16 中建五局安装工程有限公司 Adjustable pipeline mounting bracket
CN113179607A (en) * 2021-02-24 2021-07-27 董林妤 Cooling pipe installation device for heat dissipation of electronic equipment
CN113473768A (en) * 2021-05-27 2021-10-01 张焱 Big data computer network safety intelligence protector
CN113606383A (en) * 2021-07-07 2021-11-05 郭仕俊 Lifting means with adjustable electromechanical device installation maintenance
CN114754256A (en) * 2022-04-21 2022-07-15 辽宁工业大学 Man-machine measuring device for intelligent service type furniture design
CN114857364A (en) * 2021-01-20 2022-08-05 昆明嘉和科技股份有限公司 Novel adjustable bracket for pipeline
CN117307565A (en) * 2023-09-27 2023-12-29 临沂临工重托机械有限公司 Double-cooling device of hydraulic system of backhoe loader

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114857364A (en) * 2021-01-20 2022-08-05 昆明嘉和科技股份有限公司 Novel adjustable bracket for pipeline
CN112851244A (en) * 2021-01-26 2021-05-28 江西龙正科技发展有限公司 Novel ultra-high performance concrete UHPC water pipe
CN113179607A (en) * 2021-02-24 2021-07-27 董林妤 Cooling pipe installation device for heat dissipation of electronic equipment
CN113124234A (en) * 2021-04-25 2021-07-16 中建五局安装工程有限公司 Adjustable pipeline mounting bracket
CN113473768A (en) * 2021-05-27 2021-10-01 张焱 Big data computer network safety intelligence protector
CN113606383A (en) * 2021-07-07 2021-11-05 郭仕俊 Lifting means with adjustable electromechanical device installation maintenance
CN114754256A (en) * 2022-04-21 2022-07-15 辽宁工业大学 Man-machine measuring device for intelligent service type furniture design
CN117307565A (en) * 2023-09-27 2023-12-29 临沂临工重托机械有限公司 Double-cooling device of hydraulic system of backhoe loader
CN117307565B (en) * 2023-09-27 2024-04-09 临沂临工重托机械有限公司 Double-cooling device of hydraulic system of backhoe loader

Similar Documents

Publication Publication Date Title
CN212178073U (en) Support frame for pipeline installation
CN108247557A (en) A kind of hardware machinery pipeline clamping workbench
CN213064862U (en) Pipeline mounting bracket
CN212553454U (en) Pipeline detects with strong clamping structure of stability
CN220688212U (en) Pipeline pre-buried construction equipment
CN210010727U (en) Pipe clamping device convenient for adjusting diameter of clamping opening
CN208528917U (en) A kind of casting bus clamping device
CN213748508U (en) Connecting and fixing mechanism for detecting underground pipeline
CN215598922U (en) Pipe fitting hardness detection device
CN219189989U (en) Airtight valve installation auxiliary device of people's air defense system
CN220016336U (en) Support device for urban water supply pipe network
CN210732205U (en) Processing clamp for engineering plastic part
CN217761565U (en) Double-hanging ring pipe clamp
CN219692454U (en) Support frame with stable spacing
CN221097731U (en) Pipeline stabilizing frame
CN219796359U (en) Pipeline fixing device
CN221753382U (en) Experimental support adjusting device
CN220302176U (en) Drilling gas extraction structure for high extraction drilling site of coal mine
CN214789420U (en) Fixing support adaptable to pipelines with different diameters
CN220613687U (en) Auxiliary clamping mechanism for double-wall pipe machining
CN212645858U (en) Clamping device for water meter detection
CN221048287U (en) Fixing clamp for fire-fighting equipment detection
CN220822475U (en) Length-adjustable galvanized wire pipe
CN214146839U (en) Support surface adjustable antidetonation gallows
CN218063688U (en) A supplementary installation device of water supply and drainage pipe for engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A support bracket for pipeline installation

Granted publication date: 20201218

Pledgee: Changchun FAW sub branch of Bank of Jilin Co.,Ltd.

Pledgor: CHANGCHUN BEITENG CHEMICAL EQUIPMENT Co.,Ltd.

Registration number: Y2024220000029

PE01 Entry into force of the registration of the contract for pledge of patent right